E-Tender Enquiry for Industrial Canteen Services at GNFC, Bharuch on Annual Rate Service Contract (ARC) basis.
308070
GNFC/BHARUCH/RFP/ARC/CANTEEN/2026
Open
Miscellaneous Services
Works
Bharuch
25 May 2026
25 May 2026
25 May 2026
10 Jun 2026
25 May 2026
with the Technical Bid)
5. The intending bidder must have successfully executed at least three (3) similar
contracts during the last five (5) years, each having a minimum annual value of
₹2.5 Crore, in factory/industrial establishments operating under continuous
production conditions (24×7), in at least Two (2) different companies in Gujarat.
The bidder shall submit copies of work orders along with corresponding completion
certificates or satisfactory performance certificates issued by the respective clients
as documentary evidence.
6. Bidder should possess valid (a) PF / ESIC Code Number (b) Income Tax
Permanent Account Number (PAN), (c) GST Registration number. (Copies of each
documents to be attached with the Technical Bid)
7. The bidder must also possess a valid GST registration in Gujarat State only.
8. The intending Bidder must have the capacity to cater up to 700 (Lunch /Dinner)
persons per day in an industrial canteen setup, supported by documentary proof of
past or ongoing contracts of similar scale.
9. The bidder must have experience in handling industrial canteen operations with a
minimum manpower deployment of 60 to 70 personnel under a single contract,
supported by documentary evidence. The bidder shall submit documentary evidence
such as Work Order/Agreement, Labour Licence, PF & ESIC records, wage records or
any other supporting documents clearly establishing deployment of minimum 60–70
manpower under a single Industrial Canteen contract.
10. The bidder shall have a valid and functional office/establishment in the State of
Gujarat, and documentary proof of the same shall be submitted.
11. The intending Bidder must not have been blacklisted, banned, Holiday list or
debarred by any Government department, Public Sector Undertaking, or reputed
private organization at the time of submission of the bid. A self-declaration on
company letterhead must be submitted.
12. The intending Bidder must not have declined and / or abandoned and /or
Terminated and/or suspended any awarded work order in the past 5 years with
any Government department, PSU, or reputed private organization, due to any
13. The intending Bidder must have adequate qualified and trained manpower on
payroll to manage large-scale industrial canteen operations, including cooks,
service staff, housekeeping, and supervisory staff.
14. Any Party/ Vendor/ Supplier/ Contractor having raised any dispute/ litigation/
Arbitration against/with the Company or having any past history of legal dispute
with the company or any existing legal dispute going on in any court of law by or
against the Company, shall be liable to be disqualified from bidding/participating in
the present tender OR any fresh/ amended tender inquiry that may be issued by
15. Attendance in the pre-bid meeting is mandatory. Bids submitted by bidders who do
not attend the pre-bid meeting shall be summarily rejected and shall not be
considered for further evaluation.
C. DOCUMENTS TO BE SUBMITTED BY BIDDER IN :
1. Work orders / agreements proving minimum 5 years’ experience in Industrial
Canteen Services.
2. Copies of valid licenses, registrations, and permissions for canteen operations.
3. Audited Balance Sheet and Profit & Loss Account for last 3 financial years or
CA-certified turnover certificate (₹6 Crore minimum annual turnover).
4. Valid FSSAI registration certificate.
5. Copies of PF registration, ESIC registration, PAN card, and GST registration
(Gujarat State).
6. Constitution of the firm, if the bidder is not a sole proprietary concern; for
partnership firm a partnership deed; for a registered company it’s Memorandum
of Association and Articles of Association. Registration under MSME act, if any.
7. Power of attorney or board resolution duly executed in favour of the person
signing the tender authorizing him to sign the tender document in case the bidder
is not a sole proprietary concern.
8. Work orders and completion / performance certificates for at least 3 similar
contracts (₹2.5 Crore annually each) from 2 different companies in Gujrat.
9. Documentary proof of handling minimum 700 meals per day (Lunch/Dinner).
10. Documentary proof of deployment of minimum 60-70 manpower in a single
11. Proof of office/establishment in Gujarat State.
12. Self-certificate stating that the Bidder is not blacklisted by any Central/ State
Govt. / PSUs or Local Govt. Department, as on the date of application and is not
debarred from participation in the Tender process.
13. Self-declaration confirming no abandonment/termination of work in last 5 years.
14. Declaration regarding no past or ongoing litigation with the Company
15. Declaration on Rs. 300/- Non-Judicial Stamp Paper duly notarized confirming that all
documents submitted are genuine, valid, authentic, and true copies of original
documents, and no forged/fabricated document has been submitted. In case any
document is found false or misleading, the Company reserves the right to
reject/terminate the contract, forfeit EMD/Security Deposit, and blacklist the bidder.
Vendors is required to submit above details with supporting documents hard
copy and EMD to
Mr. Uttam Singh Panwar
Administration department,
Gujarat Narmada Valley Fertilizers & Chemicals Ltd,
PO: Narmadanagar, Bharuch, Gujarat PIN :
before the last date of submission of bid. On non-submission of the same, offer
shall not be considered for evaluation.
D. EXPERIENCE INFORMATION OF BIDDER
List of Government / Semi-Government Departments / Public Sector Units / MNCs /
Reputed Industries wherein contract work for providing catering services in industrial
canteens of the value as mentioned in the prequalification criteria has been undertaken
by your firm / company.
Name of Contract
Sr. Address Mobile Email Contract Total Order
No. of No. ID Period To Experience Value (₹
Company in Lakh)
Note: Any bid submitted without all the required supporting documents,
including complete details of work executed, company location, client name, and
client email ID in the prescribed format, shall not be considered and shall be
liable to outright rejection.
E. VENDOR INFORMATION
Sr. No. Description Particulars
A Name and Address of the Bidder
Fax No. (if any)
Website (if any)
B i) Firm / Company Registration No.*
ii) Income Tax PAN*
iii) GST Registration No.*
iv) PF Code No.*
v) Registration No. as per Food Safety and
C Type of Organization including names of
Partners / Directors (with DIN), qualifications,
age, contact numbers, PAN copy, address
proof, Driving License, partnership deed /
MOA / AOA / Registration Certificate*
(Sole Proprietorship Firm, Partnership Firm,
Pvt. Ltd. Company, Cooperative Body, etc.)
D Bank Account Details
Name of the Firm in Bank
Bank Name & Address
Type of Account
Attach first page of Bank Pass Book
authenticated by Branch Manager and
cancelled cheque copy*
* Copies of all relevant documents are to be attached with the Technical Bid.
F. SIGNING OF TENDER:
1. Person or persons signing the tender shall state in what capacity he is or they are
signing the tender. e.g. as sole proprietor of a firm or as Secretary/Manager/Director
etc., of a Limited company or as a partner of a partnership firm. In the case of
partnership firm, the names of all the partners should be disclosed and the tender shall
be signed by all the partners or their duly constituted attorney, having authority to bind
all the partners in all matters pertaining to the contract. In case of a limited company,
the names of the Directors shall be mentioned and it shall be certified that the person
signing the tender is empowered to do so on behalf of the limited company. In case of
Hindu undivided family, the names of the family members should be disclosed and the
Karta, who can bind the HUF, should sign the form and indicate his status below his
2. Persons signing the tender form or any document forming part of the tender on behalf
of another or on behalf of a firm shall be responsible to produce certified copy of Board
Resolution / or proper Power of Attorney on stamp paper duly signed and notarized by
a certified Notary Advocate in his favour stating that he has authority to bind such other
person or the firm as the case may be, in all matters pertaining to the contract. If the
person so signing the tender fails to produce the said power of attorney his tender shall
be liable to rejection, without prejudice to any other rights of Company under the Law.
G. BID VALIDITY PERIOD:
Bids shall remain valid for a period 120 working days after the due date of bid
submission. A bid valid for a shorter period may be rejected by the Company as non-
responsive bid. The Company reserves the right, in exceptional circumstances, to
request bidder(s) for an extension of the period of validity.
H. EARNEST MONEY DEPOSIT:
Each Bid must be accompanied by an EMD of Rs. 2, 50,000/- in the form of Demand
Draft only of any nationalized bank in favour of “Gujarat Narmada Valley Fertilizers &
Chemicals Limited” payable at Bharuch. Bids not accompanied by EMD shall be
summarily rejected. Earnest money shall be forfeited if the bidder withdraws the bid
during the period of bid validity or in the event the bidder fails, after acceptance of the
tender, to furnish the requisite security deposit within 30 days from date of issue of work
order, without prejudice to any other rights and remedies of Company under the
contract and law.
The Earnest Money Deposit of the unsuccessful bidders shall be returned as soon as
practicable after decision on tenders. Successful bidder’s Earnest Money Deposit shall
be returned upon his furnishing the Security Deposit / Bank Guarantee.
I. OPENING OF TENDERS:
The tenders shall be opened on the due date and time specified. The Company may
not extend the due date for submission of bid. If the date for opening of tenders
happens to be a holiday, the tenders will be opened on the next working day following
the holiday. The decision relating to technical qualifications of the parties will rest with
the Company and would not be called into question.
J. EVALUATION OF BIDS:
All the legitimate bids received by the Company prior to the deadline for submission of
bids shall be evaluated after due date of submission of bid, in accordance with the
policy of the Company. Such evaluation shall be broadly based on factors deemed to
be advantageous to the Company.
K. NEGOTIATIONS:
The Company reserves the right to negotiate with the bidders. The bidder(s) should be
prepared to proceed to the Registered Office/Site Office of the Company, at their own
expense and without any obligation, if called upon to do so, by GNFC for negotiations.
L. ACCEPTANCE OF TENDER:
The Company reserves the right to reject any or all tenders without assigning any
reason and do not bind it to accept the lowest or any tender. The successful bidder
shall be informed of the acceptance of his tender by a letter/ fax/ e-mail. Where
acceptance is communicated by letter/ fax/e-mail the same shall have to be acted upon
immediately, without waiting for the post copy in confirmation.
M. EXECUTION OF AGREEMENT:
The successful bidder shall enter into an agreement with the Company in the format
prescribed by the Company. The agreement shall be executed on a Non-Judicial Stamp
Paper of appropriate value within 04 (four) weeks of the acceptance of the tender,
failing which the Contract may be liable to be rescinded. In such case the Earnest
Money Deposit of the bidder shall stand forfeited.
The execution of agreement shall be preceded by furnishing of interest free Security
Deposit Bank Guarantee as per our standard format. The Company may at his
discretion, however, on a specific request by the successful bidder, give additional time
to the Contractor to furnish the Security Deposit Bank Guarantee and execute the
1. GNFC reserves the right to change any bid condition of any item even after inviting the
bids, with prior notification. Notwithstanding anything mentioned hereinabove, the
Company shall have the full and final powers to take decision on the matter.
2. From the time the Proposals are opened and up to the time the Contract is awarded,
the bidders shall not contact GNFC or any of its officers, on any matter related to its
Technical and/or Financial Proposal. Any effort by bidder to influence GNFC and/ or its
officers, in the examination, evaluation, ranking of Proposals, canvassing in any form or
recommendation for award of Contract, may result in the rejection of the bidder’s
SPECIAL CONDITIONS OF THE TENDER/ CONTRACT
These Special Conditions of Tender read with other Annexure to this Tender Document
shall govern the contractual relations between the parties during the period of contract,
and shall have over-riding effect over the General Conditions of Contract attached at
Annexure - V to the extent they are inconsistent with these terms and conditions.
These Special Conditions of Tender shall be integral to the contract to be entered into
between the Company and the Contractor. Non-acceptance of any of these terms and
also those mentioned in General Instructions (Annexure-I), GCC (Annexure – V) and /
or any other annexure may result in rejection of the bid of the bidder. Non-compliance
with any of these terms during the duration of the contract period may expose the
Contractor to termination of the contract.
1. DEFINITIONS:
The following expressions hereunder and elsewhere in the Contract Documents used
shall unless repugnant to the subject or context thereof have the following meanings
hereunder respectively assigned to them, namely:
1.1 "Acceptance of Tender" shall mean Acceptance of the Tender (terms and conditions)
floated by the Company for the subject work/ job.
1.2 “Bidder/ Tenderer” shall mean the Party intending to and selected by the Company for
allowing to submit offer against the subject tender for the performance of the work and
shall include the successors and permitted assigns.
1.3 "Company" shall mean Gujarat Narmada Valley Fertilizers & Chemicals Limited, a
public company incorporated under the Companies Act 1956 (Act-I of 1956) having its
registered office at P.O. Narmadanagar - 392 015, Dist. Bharuch and shall include its
successors and assigns.
1.4 “Contractor” shall mean the successful bidder to whom the Contract is awarded by the
1.5 " Officer-in-Charge” shall mean the person designated as such by the Company and
shall include the person issuing the Letter of Intent and/ or Work Order/ Service Order
or the person who are expressly authorised by him to act for and on his behalf for
Operation of the Contract.
1.6 "Managing Director" shall mean the Managing Director of Gujarat Narmada Valley
Fertilizers & Chemicals Limited or his successor in office as designated by the
Company or a person in-charge of his office.
1.7 "Sub-Contractor" shall mean any persons or firm or company (other than the
Contractor) to whom any part of the work has been entrusted by the Contractor with the
prior written consent of the Engineer-in-Charge / Officer-in-Charge.
1.8 "Scope of Work" shall mean the totality of the work by expression or implication
envisaged in the Contract and shall include all material, equipment and labour required
for or relative or incidental to or in connection with the commencement, performance or
completion of any work and/ or for incorporation in the works.
1.9 "Schedule of Rates" shall mean the Schedule of Rates annexed to Acceptance of
Tender & shall include any remuneration payable to Contractor for any work,
determined in accordance with conditions herein.
1.10 "Total Contract Value" shall mean entire remunerations due to Contractor under the
contract and as specified in the acceptance of Tender.
2. PERIOD OF CONTRACT:
The Contract shall be for a period of 02(Two) year from date of issuance/ Award of
Work. The Contract may be further extended annually for a period of 2 (1+1) (Two)
years on the same terms and conditions, at Sole Discretion of the Company and in case
such extension is offered by GNFC, the same shall have to be compulsorily accepted
by the Contractor.
3. VALIDITY OF LICENCE / PERMIT:
Contractor must possess valid and subsisting licence issued by the Government or any
other authority for effective discharge of his duties under the Contract at all times during
the tenure of the contract.
4. RATES AND REMUNNERATIONS:
4.1 The Contractor shall quote rates for each and all line items, including all services and
obligations stipulated in the tender document and as per the format for Schedule of
4.2 The Sale Price for the Food Items, stipulated in this tender document, is the subsidized
Price fixed by GNFC for its Industrial Canteen with the intent of ensuring affordability
and accessibility of quality meals/ food to its employees and workmen, as a part of its
welfare measures. Accordingly, the rates are pre-fixed and shall remain binding on the
Contractor.”. The Contractor shall sell the Food Items at such subsidized price / rates,
either in cash or through digital payment modes. Despite the subsidized nature of these
rates, the contractor shall remain fully responsible for maintaining high standards of
hygiene, food quality, quantity, and service, strictly in accordance with GNFC norms,
best industry practice and applicable food safety regulations. While quoting their lump
sum rates, the bidders should take into account all associated costs, including but not
limited to expenses towards Statutory compliance costs, qualified manpower (such as
manager, supervisor, cook, etc.), raw materials of approved make, quality and
specification, medical examination of food handlers, staff food and accommodation,
transportation, office expenses, packaging material, FSSAI license and renewal fees,
health and safety certifications, local authority charges, and all applicable taxes and
4.3 The Contractor shall quote rates in the Schedule of Rates (SOR), against each item,
excluding the government taxes & levies. The applicable taxes & levies shall be paid at
actual; it shall be the entire responsibility of the contractor to deposit the same in time to
the appropriate authority.
4.4 Lump sum Rate & Applicability of Escalation Formula:
The lump sum monthly rate shall be revised every year based on an escalation
formula linked to the Labour Wages Index declared by the Government of Gujarat
(75% weightage) and the Wholesale Price Index declared by the Government of
India (25% weightage).
For example, if the contractor has quoted a lump sum rate of ₹10,00,000 per month
for the first year, and during the year the Labour Wages Index increases by 12% and
the Wholesale Price Index increases by 8%, then the escalation shall be calculated
Labour component: 75% of 12% = 9%
WPI component: 25% of 8% = 2%
Total escalation = 11%
Accordingly, the lump sum rate shall increase to ₹11, 10,000 per month for the second
year (i.e., an increase of ₹1, 10,000 per month). The lump sum rate shall be revised
every year on the same basis.
4.5 Rejection of Abnormally Low or Non-Workable Bids:
However, in case it is observed during evaluation that the L-1 bidder has quoted non-
workable or unreasonably low rates, which significantly affect the pricing structure and
raise concerns regarding the feasibility, sustainability, or quality of service delivery,
GNFC reserves the right to reject such a bid in the interest of maintaining viability,
ensuring service standards, and promoting fair competition.
4.6 The Contractor shall ensure GST compliance. For convenience, we are enclosing
herewith the guidelines as Annexure – XIII.
4.7 Contractor shall provide good quality of 3 pairs of stitched uniform & 1 pair of shoes and
1 pair Rain Coat per year to all the staff to be deployed. Contractor shall provide
Uniform & Shoes as per the approved specification of cloth quality, colour & stitching
pattern decided by the Authorized Officer of Company within period of 15 days from the
award of Contract & ensure that the manpower deployed wear neat, clean, and ironed
uniform and polished shoes on a daily basis. No deviation on this account shall be
permitted. The cost of uniforms only shall be reimbursed by the Company upon
submission of original purchase bills, subject to verification and approval by the
Authorized Officer, and limited to the approved rate and specification.
The quantities indicated below for Wet Snacks, Dry Snacks, Tea/Coffee, and
Lunch/Dinner are tentative and may vary depending upon the actual requirement of
the Company during the contract period. The quantities are indicative only, and no
minimum or maximum quantity is guaranteed.
Any increase or decrease in actual consumption shall be accommodated by the
Contractor within the agreed lump-sum contract rates without any additional financial
implication to the Company.
Sr. No. Item Quantity (Nos.)
1 Wet snacks(70Gms) approx. 1200 /days
2 Dry snacks(500gms) approx. 800 / days
3 Tea/Coffee(100ml) approx. 1500 / days
4 Lunch/Dinner(Limited) approx. 700/days
6. PAYMENT TERMS:
6.1 On satisfactory completion of the work, the contractor shall prepare and submit bill in
duplicate along with all relevant and supporting papers for the respective month to the
Officer-in-charge of the work. The payment of the bills shall be made on monthly basis
by NEFT/RTGS after usual deduction of applicable taxes and other dues as per the
6.2 The bill will be paid within 30 days provided the same is complete in all respects. Such
payment shall be made after completion of the calendar month and after submission of
a certificate from the Officer-in-charge duly recommended by him to the effect that the
work carried out by the contractor during the month is as per the contractual obligations
and to the entire satisfaction.
6.3 The payment of running bills/final bill by the Company shall not have any linkage with
the payment of wages and other dues to be made by the contractor to his deployed
manpower. In other words, the contractor shall discharge from time to time his liabilities
for payment of wages and other dues to his deployed manpower irrespective of receipt
of payment of running bills/final bill from the Company.
6.4 The final bill should be submitted along with documents such as "No Objection
Certificate" from our HR and Security Departments and No-claim Certificate from you.
6.5 The payment towards the Final Bill will be released after 90 days of submission of the
6.6 In case the Contractor abandons the site during the currency of the contract, no
payment what-so-ever shall be released even for the partial work that might have been
done by the Contractor during the said month. The company shall have also right to
forfeit the amount of Security Deposit and recover the additional cost incurred by the
Company for engaging another contractor for the remaining period of contract.
7. TAXES AND DUTIES:
Bidder to clearly mention all applicable taxes and duties in Schedule of Rates, on
supply of goods and / or services to be made.
8. SECURITY DEPOSIT
In the event of award of Contract, the successful Bidder will submit Security Deposit at
the time of acceptance of contract in the form of Bank Guarantee / Demand Draft /
RTGS or in the form of one Single Bank Guarantee in prescribed format of GNFC from
Nationalized Bank only and / or Bank approved by GNFC, which shall be valid till
faithful execution of contract plus 3 months claim period for an amount equivalent to
7 % of total contract value (including taxes and duties).
Security Deposit/ Bank Guarantee shall be released after upon satisfactory
performance of the contract and completion of the defect liability period. In case
extension is granted the Contractor shall accordingly furnish SDBG for further period of
9. SUB-CONTRACTING
The Contractor shall not assign or transfer whole or part of the contract awarded, or
whole or part of works, services, obligations, responsibilities, liabilities and rights or give
a sub-contract for carrying out all or any of the work, service, obligation, responsibility,
liability and right, to any other person or party without Company’s prior written consent.
10. ALTERATION IN SCOPE OF WORK:
The Company may at any time(s) before or after the commencement of the work by
notice in writing issued to the Contractor, alter the scope of work by increasing or
reducing the jobs required to be done by the Contractor or by adding thereto or omitting
there from any specific jobs or operations or by substituting any existing jobs or
operations with other jobs and/or operations, or by requiring the Contractor to perform
any extra works in or about the job site. And upon receipt of such notice the Contractor
shall execute the job(s) as required within the altered scope of work.
11. PERFORMANCE OF THE CONTRACT:
12.1 The Contractor shall arrange to deploy adequate manpower with required skill &
experience to execute the job smoothly, safely & as per the schedule &/or frequency.
12.2 The Contractor shall deploy supervisor/s for (i) to coordinate with Engineer-in-
Charge / Officer-in-Charge for job execution (ii) assignment of the job & to pass on
instructions to the manpower deployed by the contractor for execution of job (iii)
effective supervision of the job (iv) to ensure that manpower deployed by the contractor
are carrying out the job safely, using proper safety appliances / wearing proper
Personal Protection Equipment, maintaining peace & discipline & observing safety &
security regulations & instructions. (v) To ensure that manpower deployed by the
contractor are not tampering with or operating any machinery / equipment of the plant.
12.3 The manpower deployed should be engaged for the specific work under the
contract & should not be deployed in other jobs.
12.4 The contractor shall keep & maintain area neat & clean all the time.
12. CANCELLATION OF CONTRACT:
12.1 The Company shall be entitled at any time at its discretion to cancel the Contract if, in
the opinion of the Company, the cessation of the work has become necessary owing to
any cause, what so ever.
12.2 The Contractor shall not be entitled for any compensation, whatsoever, in addition to
the payment for the work actually performed by the Contractor, calculated on the basis
of the Schedule of Rates.
13.1 The Contractor shall at all times indemnify and keep indemnified the Company and its
officers, servants and agents from and against all third party claims whatsoever
(including but not limited to property loss and damage personal accident, injury or death
of/to property or person of any Sub-Contractor and/or the servants or agents of the
Contractor, and Sub-Contractor(s) and/or the Company) and the Contractor shall at his
own cost and initiative at all times hereof take out and maintain insurance policies in
respect of all insurable liabilities under Employee’s Compensations Act 1923 and all
other applicable labour laws, including but not limited to third party insurance and Act.
Personal injuries insurance Act, etc.
13.2 The Contractor shall also at all times indemnify and keep indemnified the Company and
its officers / employee of the company including Officer-in-charge against all actions,
proceedings, claims, demands, cost & expenses whatsoever arising due to failure of the
contractor in the performance of his obligations under the contract.
13.3 The Company shall not be liable for or in respect of any demands or compensation
payable under any law in respect of or in consequence of any accident or injury to any
workman or other person in the employment of the contractor or his sub-contractor and
the Contractor shall indemnify & keep indemnified the Company against all such
damage and compensation and against claims, demands, proceedings, costs, charges
& expenses whatsoever in respect thereof or in relation thereto.
14. PENALTY FOR DELAY/ DEFAULT:
As mentioned in the Annexure-IV
15. SUSPENSION OF CONTRACT:
In appropriate case, the Company may at its discretion, instead of terminating contract
for breach of any terms or conditions by Contractor, suspend the contract for specified
period. In case the contract is so suspended, Contractor will be under obligation to
reimburse the Company for damages or loss suffered by the Company on account of
Company making alternative arrangement during period of suspension of contract and if
the Contractor fails to reimburse such loss or damages, the same will be recovered
from the Security Deposit or any other payment to be made to the Contractor under the
contract with the Company.
16. TERMINATION:
17.1 Company may, without prejudice to any other remedy for breach of contract, by
written notice of 30 days of default sent to the Contractor, terminate the Contract in
whole or in part if the Contractor fails to perform any other obligation(s) under the
17.2 If the Contractor goes bankrupt or goes into liquidation.
17.3 The Company reserves the right to cancel the contract at any time if the
continuation of canteen services is deemed unnecessary due to policy changes,
restructuring, or closure of operations.
17.4 Persistent complaints regarding food quality, hygiene, service delays, or staff
misbehaviour may lead to contract termination with immediate effect.
17.5 Repeated failure to maintain cleanliness and sanitation standards in kitchen,
dining area, and washing zones shall be considered a serious breach and grounds for
17.6 Violation of food safety regulations or use of expired, substandard, or unhygienic
raw materials may lead to immediate cancellation of the contract.
17.7 Any act of gross negligence or misconduct by the contractor or their staff causing
health hazards or safety incidents shall invite immediate termination.
17.8 Breach of any statutory obligation, such as non-payment of PF, ESI, or non-
compliance with labor laws, may lead to cancellation..
17.9 If contractor’s personnel are found tampering with food, misbehaving with
company employees, or engaging in theft or vandalism, the contract will be terminated
17.10 Delay or default in starting operations or recurring disruptions in food supply will
be treated as non-performance and may lead to termination.
17.11 Misuse or damage to Company infrastructure, utilities, or canteen equipment by
contractor staff may result in cancellation of the contract.
17.12 If the contractor fails to comply with the approved menu, quality standards, or
serving schedule repeatedly, the contract shall be liable for termination.
17.13 Repeated complaints from employees, committee members, or site officers
regarding food quantity, quality, or hygiene shall be treated seriously.
17.14 The Company reserves the right to cancel the contract without assigning any
reason, by giving 30 days’ written notice to the contractor.
17.15 In case of any legal or administrative dispute affecting the contractor’s eligibility
or ability to continue services, the contract may be terminated forthwith.
17.16 Upon cancellation of the contract, the contractor shall immediately vacate the
canteen premises, hand over all Company property in good condition, and settle all
dues related to staff, vendors, and statutory bodies.
17.17 The contractor shall maintain compliance with ISO standards implemented by
GNFC. Non-compliance with ISO practices or repeated audit failures by internal or
external ISO auditors shall be treated as a breach and may lead to contract termination
17.18 In the event of termination of contract by the Company on account of breach of
any terms and conditions of the contract by the Contractor the entire Security Deposit
Bank Guarantee given by the Contractor will liable to be forfeited.
17.19 The Company may at its discretion, terminate the contract by giving a notice of
30 days, for convince, at any time, without assigning any reasons, whatsoever.
17.PAYMENT UPON TERMINATION :
If the Contract is terminated because of a breach of Contract by the Contractor, the
Company shall process payments due to Contractor less all required deductions. If the
total amount due to Company exceeds any payment due to the Contractor, the
total amount due to Company exceeds any payment due to the Contractor, the
difference shall be a debt payable by Contractor to the Company and the same may be
recovered from Security Deposit and/ or any other dues payable by the Company to the
18.DEFECT LIABILITY PERIOD AND LATENT DEFECTS:
19.GOVERNMENT REGULATIONS:
The Contractor shall comply with and ensure strict compliance by his / its sub-
contractors, servants and agents of all applicable Central, State, Municipal and Local
Laws and regulation/notifications of any Central, State or Local bodies and authorities
and undertakes to indemnify the Company from and against and levies, damages,
penalties and payments whatsoever as may be imposed by reason of any breach or
violation of any law, rule or regulation whatsoever and all actions, claims and demands
arising there from and / or relative thereto.
GNFC strongly opposes sexual harassment and any such behaviour against women is
prohibited by the law as set down in “The Sexual Harassment of Women at Workplace
(prevention, prohibition and Redressed) Act, 2013” and Rules framed there under The
Sexual Harassment of Women at Workplace Rules.
The Contractor shall ensure compliance of Gujarat Professional Tax Act, 1976 and
required to deduct Professional Tax as applicable from the wages to be paid to your
workers & required to deposit the same to the appropriate authority.
20.COMPLIANCE WITH LABOUR & SAFETY REGULATIONS:
During the continuance of the Contract, the Contractor shall abide at all times by all
existing labour enactments and rules made there under, such as Minimum wages Act,
E.P.F Act.etc., regulations, notifications and bye laws of the State or Central
Government or local authority and any other labour law (including rules), regulations,
bye laws that are in force or may be passed or notification that may be issued under
any labour laws in future either by the State or the Central Government or the local
authority. The Contractor shall keep the Company indemnified against and/or on
account of contravention of any of the provisions of any Act or rules made there under,
regulations or notifications including amendments.
If the Company is caused to pay or reimburse, such amounts as may be necessary to
cause or observe, or for non-observance of the provisions stipulated in the
notifications/bye laws/Acts/ Rules/ regulations including amendments, if any, on the part
of the Contractor, Company shall have the right to deduct all such sums from any
money due to the Contractor including his amount of security. The Company shall also
have right to recover from the Contractor any sum required or estimated to be required
for making the loss or damage suffered by the Company. The employees of the
Contractor in no case shall be treated as the employees of the Company at any point of
21.FORCE MAJEURE:
In the event that performance under the Contract, in the reasonable opinion of either
party (Company & Contractor) is made impossible by force majeure like war, hostilities,
revolution, civil commotion, strike, epidemic, accident, wind, fire, flood, or because of
any law, order, proclamation, regulation or ordinance of any Government, or of any
subdivision thereof or because of any act of God, quarantine restrictions, epidemics, etc.
then either party shall so notify the other in writing. If such force majeure circumstances
continue for more than three months then either party may terminate the Contract, or
complete performance of the Contract with such adjustments as are required by the
existence of the force majeure and are agreed upon by the parties.
22.DISPUTE RESOLUTION:
22.1 All disputes or difference(s) whatsoever which shall at any time arise between the
parties hereto touching or concerning the works or the execution or maintenance
thereof of this Tender Agreement or the rights touching or concerning the works or the
execution or maintenance thereof of this Tender Agreement, of the construction
meaning operation or effect thereof or to the rights, liabilities of the parties or arising out
of or in relation thereto whether during or after completion of this Tender Agreement or
whether before or after determination, foreclosure or breach of this Agreement, shall be
referred by the disputing Party, in writing to the other Party, within 30 days of
occurrence of such event, to resolve any such dispute or difference.
22.2 If such dispute mentioned above is not resolved amicably by direct informal
negotiation, within a period of 30 days, then such dispute/ difference shall be
referred to arbitration by a Sole Arbitrator to be appointed as stated herein below,
under the aegis of the Arbitration and Conciliation Act, 1996 and any amendments
22.3 Upon invocation of Arbitration by either party, the Company shall suggest a panel of
five independent and distinguished persons who shall be qualified to be appointed
as an Arbitrator under the law in force at the relevant time, to the Contractor, for
selecting any one among them to act as the Sole Arbitrator.
22.4 In the event of failure of the Contractor to select the Sole Arbitrator within 30 days
from the receipt of the communication from the Company suggesting the panel of
arbitrators, the right of selection of the sole arbitrator by the Contractor shall stand
forfeited and the Company shall appoint the Sole Arbitrator from the suggested
panel of three Arbitrators for adjudication of dispute(s).
22.5 The decision of the Company on the appointment of the sole arbitrator shall be final
and binding on the Contractor.
22.6 The provisions of the Indian Arbitration Act, 1996 and all statutory enactments and
modifications thereof and rules made there under shall apply to the arbitration
22.7 The Arbitration proceedings shall be conducted in English and the venue and seat
of the Arbitration proceedings shall be at Bharuch and the Courts at Bharuch shall
have exclusive jurisdiction.
22.8 The governing substantive law shall be Indian laws.
23.LABOUR LAWS AND REGULATION:
23.1 The Contractor shall be responsible for strict compliance of and shall ensure strict
compliance by it sub-Contractors, servants or agents of all labour and other laws, rules
or regulation having the force of law affecting the relationship of employer and
employee between the Contractor/Sub-Contractor and their respective employees.
23.2 The Contractor and Sub-Contractor(s) of the Contractor shall obtain authority(ies)
designated in this behalf under any applicable law, rule or regulation including but not
limited to the Factories Act, ESI Act, Employees Compensation Act and Contract labour
(Abolition & Regulation) Act, 1970 (insofar as applicable) any and all such license(s)
consent(s), registration(s) and / or other authorisation (s) as shall from time to time be
or become necessary for relative to the execution of the work or any part or portion
thereof or otherwise in connection with performance of the Contract, and shall at all
times observe and ensure due observance by the Sub-Contractor, servants and agents
of all terms and conditions of the said licence(s), regulation(s) and other authorisation(s)
and laws, rules and regulations applicable thereto.
23.3 Nothing in the Contract document stated shall anywise constitute any workman/
employee of the Contractor or any Sub-Contractor as or to be workman/ employee of
the Company, or place obligation or liability in respect of any such workman/ employee
upon the Company.
23.4 Without prejudice to any other liabilities or obligation of the Contractor relative to Sub-
Contractors in terms hereof or otherwise, the Contractor shall indemnify and keep
indemnified the Company from and against all actions, claims, demands and liabilities
whatsoever under and in respect of the breach of any other provisions and / or against
any claim, action or demand by any workman / employee of the Contractor or any Sub-
Contractor and / or from any liability anywise to any workman / employee of the
Contractor or any Sub-Contractor under any law, rule or regulation having the force of
law, including but not limited to claims against the Company under the Employee’s
Compensations Act, 1923, The Employees Provident Funds Act, 1952, and/ or The
Contract Labour (abolition & Regulation) Act,
23.5 The contractor shall ensure that all workers engaged in the execution of the contract
are paid at least the minimum wages as notified by the Government of Gujarat under
the Minimum Wages Act. Wages must be paid regularly and timely, preferably through
bank transfer or digital payment mode, with proper documentation. The contractor shall
also comply with all applicable labour laws, including statutory provisions related to EPF,
ESIC, and other benefits. Proof of wage payment, statutory deposits, and attendance
records shall be submitted monthly to GNFC. Any violation in this regard may result in
penalties, recovery of dues, or termination of contract.
24.SAFETY REGULATION, ACCIDENT AND DAMAGE:
24.1 The Contractor shall be responsible at his own cost in and relative to performance of
the work and Contractor to observe and to ensure observance by his Sub-Contractors,
agents and servants of the provisions of Safety Code as hereinafter appearing and all
fire, Safety and Security regulations as may be prescribed by the Company from time to
time and such other Precautions, measures as shall be necessary.
24.2 All necessary personal safety / protection equipment as considered adequate by the
Engineer- in-Charge / Officer- in-Charge should be made available for the use to
deployed manpower on the site and maintained in a condition suitable for immediate
use and the Contractor should take adequate steps / monitor continuously for proper
use of such equipment’s by those concerned.
24.3 The contractor shall submit immediately in writing about accidents occurred during the
work execution to Company’s Fire & Safety and HR deptt. under intimation to Engineer-
in-Charge / Officer- in-Charge.
25.SECURITY REGULATIONS:
25.1 The contractor shall ensure for strict compliance with the security regulations /
directives of the Company & shall also ensure that the manpower deployed follows the
rules during Entry / Exit as well as while they are in the Company premises. All the
deployed manpower shall prominently display the Entry Cards while they are in the
premises of the Company.
25.2 If the Company finds any person / persons deployed by the Contractor to be
undesirable the contractor shall immediately withdraw such person / persons and
substitute him / them. The decision of the Company for undesirability of the persons
deployed by the contractor shall be final and binding on the contractor.
26.QMS, EMS, OHSMS & EnMS COMPLIANCE:
The Company is certified for Quality Management Systems, Environment Management
System, Occupational Health & Safety Management System and Energy Management
System. All the persons (including Contractors, Supervisors & their workers) working at
GNFC or on behalf of GNFC are required to comply with the QEHSEn guidelines in
addition to other applicable labour laws, safety laws as well as legal compliances.
27.OTHER TERMS:
GNFC reserves its right to enter into parallel Contract/s with other Bidders.
In case, if contract is awarded and bidder fails to execute the same in line with
Conditions of Contract given in the contract, GNFC reserves its right to source such
services from any other source and extra financial implication, if any, shall be to the
defaulting Contractor’s risk and cost.
28.GENERAL CONDITIONS OF CONTRACT:
All other terms conditions, not covered to the extent as provided above and in Annexure
attached hereto shall be as per General Conditions of Contract (GCC) attached and
marked as Annexure – V, which is an integral part of this tender document.
29.GENERAL OBLIGATIONS OF THE CONTRACTOR:
29.1 The Contractor shall deploy suitably qualified and experienced manpower in adequate
numbers to carry out the job as per the scope of work efficiently, safely & systematically
depending upon the requirement of the Company from time to time.
29.2 The Contractor shall deploy only such persons:
a) Who are above the age of 18 (eighteen) years and below the age of 60 (sixty) years.
b) Who are physically sound, well behaved, trustworthy and competent
c) Who are medically fit, with proper eye sight (with or without glasses).
d) Who can read and write Gujarati / Hindi.
e) Who have clean habits and are teetotallers.
f) Who have no criminal record & have authentic ID & birth date proofs.
29.3 The Contractor shall deploy Supervisors in adequate numbers to organize job related
activities, supervise closely the job to be carried out by his deployed manpower as well
as to ensure their safety & security. The contractor / supervisor shall obtain details of
jobs to be carried out from Engineer-in-Charge / Officer-in-Charge & shall update
progress of jobs to concern.
29.4 The Contractor shall solely and exclusively responsible for engaging and employing the
persons for execution of this contract. The company shall have no liability whatsoever
concerning workers. The Contractor shall indemnify the company against all losses or
damages or liabilities arising out of or in course employing person or out of their
29.5 The Contractor shall be responsible and liable for payment of salaries, wages & other
lawful dues of his personnel as EMPLOYER. The Contractor shall maintain proper
books, accounts, records & documents and comply with all statutory rules & regulations
applicable to the Employer as CONTRACTOR.
29.6 The Contractor shall make payment of wages and other dues to his personnel on
scheduled date but not later than 10th of each calendar month. The Contractor shall
also certify that all personnel employed have been paid the minimum wages as
prescribed by the Government and all other laws are complied with and that there is no
violation of any applicable laws and no case of litigation is instituted or pending before
any authorities.
29.7 The Contractor shall disburse the monthly wages to his personnel deployed at our site
through bank only, disbursement of wages in cash shall be not be allowed in any case.
The Contractor shall submit soft copy of file containing full name of worker, his bank
account no. and name of bank & branch as well as PF account / UAN no., before first
wage disbursement to operating department & HR department.
29.8 The Company shall be entitled to deduct directly from the bills to be paid to the
contractor any sum payable by him and which sum/sums the Company is required to
pay as Principal Employer on account of contractor’s default in respect of all liabilities
referred to in above clauses and loss, damage etc. suffered by the Company due to
contractor’s negligence.
29.9 The successful contractor shall arrange (i) to Submit separate Employee’s
Compensation Policy ( W.C.Policy /ESIC )exclusively for GNFC Bharuch site / Dahej
site (as the case may be) for total duration of contract and Labour License before
commencement of work (ii) to get verified the wage sheet from HR Dept. before
disbursement of wages and ensure wage disbursement through Bank on the schedule
date notified by HR dept, (iii) to submit copy of wage sheet along with bank letter
showing transfer of wages as well as PF challan along with ECR before 20th of every
month (iv) to execute agreement on stamp paper for wage disbursement through bank.
29.10 The Contractor shall provide in writing the list of persons to be deployed by him to
Security department of the Company in prescribed format for allowing them to enter in
to Co.’s premises to carry out subject job. The contractor shall also collect the ID Proof,
Date of Birth proof, Present & Permanent address proof, emergency contact nos. and
shall maintain the proper record.
29.11 On expiry of the validity of the Contract or in the event of the company terminating the
contract prematurely, the contractor shall ensure that all the entry passes issued to his
workers are collected back and deposited with the Security Department. The Contractor
shall be solely responsible for misuse of any of the entry pass issued to his workers and
the final payment if any, applicable shall be made after confirmation of the Security
department to that effect.
29.12 The Contractor shall obtain License for deployment of workers from the appropriate
authorities & also get insured them under W. C. policy/ESIC as per the provisions of
laws and shall submit copies thereof to the Company.
29.13 All tools & tackles, safety items etc. which are required to carry out the work safely shall
be arranged by you as & when required, except where some special tools & tackles are
being provided by the Company.
29.14 The Contractor shall provide free of charge all required safety equipment / Personal
Protection Equipment to the deployed manpower & ensure that they use the same while
carrying out the job. If required for specific job, the contractor shall approach Engineer
in-charge / Officer in-charge for special tools/ tackles and safety appliances if required.
Any loss or damage to the specialized tools and tackles provided by the Company to
the contractor due to deliberate or negligence of the deployed manpower shall
be recovered from the payment due to contractor at the rate as decided by the
29.15 All safety precautions while executing the contract shall be strictly observed by the
contractor. Corrective measures as penalty for non - compliance and eventual
termination of contract followed by de-registration, as approved contractors / vendors
are the consequences of repeated non - compliance and negligence.
29.16 Company is committed to safety of all the persons working inside the factory, including
contractors/agencies/their supervisors /workers / sub-contractors / agents, etc. Health &
Safety Policy of GNFC is enclosed herewith at Annexure–‘VII’ which demonstrates
GNFC's strong commitment to safety. In this regard, the Company shall imparting
necessary job related training. The Contractor shall be required to spare the deployed
manpower to participate in such programme.
29.17 The Company is certified for Environment, Occupational Health & Safety, & Quality
Management System, under which there are good number of legal and other
requirements to be fulfilled. In this regard, the Company shall imparting necessary job
related training. The Contractor shall be required to spare the deployed manpower to
participate in such programme. We enclose herewith a copy of Integrated Management
System Policy of the Company as well as QEHSEn Guidelines to Contractors at
Annexure–‘VIII’ & Annexure–‘IX’.
29.18 The Contractor shall be fully liable for any delay, loss or injury caused directly or
indirectly by any act or omission on the part of his labourers, agents or persons. In case,
if any damage, loss or injury is caused, the Contractor shall be liable to compensate for
the same as per the decision of GNFC, which shall be final and binding.
29.19 Company, however, reserves its right to terminate the contract prematurely without
giving any notice or any compensation whatsoever, in case of failure by the contractor
to discharge the jobs under the scope of the subject contract to the satisfaction of the
Company or in case of misbehaviour/indiscipline on the part of the Contractor himself or
his labourers or agents or persons. The decision of the Engineer-in-charge / Officer-in-
charge of the Company in this regard shall be final and binding upon the contractor.
29.20 In case the contractor fails to discharge his obligations in time, then the Company shall
get the services of other contractor/agency at contractor’s risk and cost. The expense
towards this shall be recovered from the contractor. The decision of the Company shall
be final in this regard.
1. The canteen contractor will be responsible to manage on 24 hours 365 days
basis Industrial canteens (one main canteen + one at Ani-TDI complex + one at
corporate building +one labour canteen & One Neem project canteen) of GNFC
site at Narmadanagar, Bharuch
2. The Canteen Contractor shall provide meals, tea, snacks, cold drinks etc. for
approximately 3000 employees/contract labours/guests of the company etc.
round the clock (24 hours). However, there is no commitment for minimum or
maximum number of meals, tea, snacks etc. required to be served by the
canteen contractor in this canteen.
3. The contractor shall provide catering services to all eligible employees/persons
based on any of the following modes:
On making payment by an individual by cash less mode [like BHIM, PAYTM,
CREDIT / DEBIT CARD or by Meal vouchers/Meal Sodexo Card] issued by the
Canteen Service slips issued by authorized employees of the Company.
Smart Cards if any issued by the Company
4. The services to be provided by the canteen contractor will broadly consist of the
To serve tea and snacks at various service points/locations [About 145 No’s] and
offices situated within the Company premises at the following timings:
(i) 06.30 a.m. To 7.15 a.m. Tea & Dry Snacks
(ii) 08.30 a.m. To 9.15 a.m. Tea & Wet Snacks
(iii) 02.00 p.m. To 3.00 p.m. Tea & Dry Snacks
(iv) 05.00 p.m. To 5.45 p.m. Tea & Wet Snacks
(v) 10.45 p.m. To 11.30 p.m. Tea & Dry Snacks
(vi) 02.30 a.m. To 3.15 a.m. Tea & Dry Snacks
Note: This is a broad indication of schedule of timings, but the contractor will
have to follow the timings as per the practice in vogue in the Company from time
1 1 METHONOL-1 /OFF,SIDE ELE/ FIRE/ SAFETY DIPT/ I M C
2 2 INPECTION /I S D/ COMPUTER /I S O CELL
3 3 ERS ELE / ERS MECH /MRS / S/WORK SHOP
4 4 S , LAB / C , WORKSHOP
HAJADAS PLANT /GAIL / RAILWAY YARD / URIA BAGING PLANT /URIA
6 9 URIA ELE / URIA MECH- /CMG MAINTANENS /CMG OFFICE
7 10 AMONIA ELE / AMONIA C/R , / AMONIA INSTRUMENT
NITRO RIAR / NITRO C/R . /NITRO FRONT /NITRO ENSTRUMENT /W N
A-2 /1 ./ NITRO ELE-
9 13B NITRO MECH-
10 16 URIA C/R / ,AMONIA MENTANENC
11 18 S, HANDALING / BOILER ELE / BOILER MENTANENCE
12 19 CAN-1 CAN-2 / NITRO ETP / NITRO ROCK /AN, MAILT /DISUL PUMP
13 19B NITRO BAGING / CALL HANDALING
14 21 MRTHONOL -2 C/R , /METHONOL -2 PROSES / METHONOL -2 ELE-,
15 22 FORMIC ACID C/R ,/FORMIC ACID ,LEB / METHONOL -2 MECH-
A, ACID C/R ,/ A, ACID -LEB / ETHAIL -1 C/R, A, ACID -MECH/ STEEL
17 29 ASGP ELE / ASGP ENSTRUMENT / ASGP MECH- /ROW WATER
ETP / IP MARKETING C/R / IP PHILING FILD / ETP MECH - /DRAM
DRAM STORE-2 / IP KANTA /IP KANTA -2 / FARTI GATE /IP MARKETING
19 30 TANKAR WASHING /ETHAIL -2 ELE -/ ETHAIL-2C/R -/ DRAMING
20 35 TOWANSHIP GATE / ADMIN / HOSPITAL /LEDIS CLUB
CORPORATE CANTEEN
21 1 D&C /OLD LIBRARY /ADMIN
22 2 HR / SECRETARIAL / MARKETING / PURCHASE
24 4 NEEM PLANT
N C P L CANTEEN PLANT
25 1 TDI ELE / TDI INSTRUMENT / TDI C/R
26 2 EMARGANCY GATE /PFD / FIRE /STORE /TDI LEB
27 3 DRAMING /AN C NETAR / CLORING TANAR / H/K /
28 4 TEN FORM / S-ETP /IP KANTA /TDI M-GATE
29 1 METHONOL -1 OFF SIDE ELE -/ FIRE / IMC /S/GATE
HAJADAS PLANT / BOILER C/R CPP C/R /CPP ELE / CPSU C/R /
31 8 URIA C/R / URIA ELE / RAILWAY YEARD /URIA BAIGING /LOGISTRIC
32 13 NITRO ELE / NITRO LEB / NITRO FRONT / NITRO C/R /
33 19 WNA-1 WNA-2 / NITRO ROCK /AN MAILT / NITRO ETP /
34 21 AMONIA ELE /AMONIA C/R / METHONONL -2 C/R FORMIC C/R
/METHONOL -2 ELE
35 27 ETHAIL -1 A/A , ACID C/R /ASGP C/R /ASGP ELE /ROW WATER
C- ETP /IP PHILING C/R /IP KANTA / FARTI GATE /IP MARKETING
/ETHAIL-2 /ETHAIL-2ELE
37 NCPL TDI C/R //TDI ELE/ FIRE / TDI MAIN GATE / TDI LEB
5. The Company reserves the right to increase service points and timings in
consultation with the Company as and when required. In such an event, the
revised service points & timings shall be binding to the contractor.
6. The tea will be carried in the insulated jars and will be served in mugs. The
snacks will be packed in brown paper bags. The quantity and other details of
food/ snacks to be provided are shown in the attached schedule in Annexure –
7. To serve Lunch/Dinner in the canteen, Lunch/dinner will consist of the fixed
vegetarian thali or half thali (consisting of quantities and other specifications
shown separately in the rate schedules) at Annexure-VII. The timings for lunch
will be between 11.30 hours to 13.30 hours and for dinner between 7.00 p.m. to
The Contractor shall arrange to provide cold and clear drinking water to the
employees of the Company on the dining table itself during lunch/dinner hours.
8. To serve tea/coffee/cold drinks and other snacks as and when required as
mentioned in clause No.1.1 round the clock (24 hour basis).
The contractor shall not be allowed to use plastic cup for serving tea / coffee /
soft drink in plant premises.
9. To collect coupons/meal vouchers for booking of lunch/dinner from employees
working in various departments of the Company.
10. To supply lunch/dinner in Tiffin / Serving plates to various plants, deptts. Of the
Company as required and to collect back the same immediately after
lunch/dinner time for washing & cleaning.
The details regarding the serving points/timings etc. will be approved by the
authorised officer of Company in consultation with the company.
11. The Company reserves its right to modify the arrangement of the services at its
sole discretion depending upon the exigency and requirement from time to time.
12. The Company reserves the right to award, if required, additional contract to any
other party/parties. The canteen Contractor shall not claim any exclusive right in
OTHER TERMS & CONDITIONS APPLICABLE TO CONTRACT
1.0 COMPANYS OBLIGATIONS ARE LIMITED TO THE FOLLOWING:
1.1 The company shall provide the canteen premises including dining halls, Kitchens, pantry,
store room etc. at a token License fee of Re.1/-(Rupee one only) per month per
premises, for providing catering services only.
1.2 The company shall also provide furniture, cooking appliances, equipment’s, utensils for
serving, kitchen equipment’s, water coolers, bottle cooler required in connection with
the running of the canteen.
1.3 The company will make available to the canteen contractor Natural Gas (NG) (only in
Main canteen) and water free of cost from the company in Main Industrial canteen only.
However, in case of non-availability of NG due to any reasons in Main canteen, the
canteen contractor will have to make alternate arrangements / gas cylinders for cooking.
Reimbursement of charges of commercial cylinders on actual basis as declared by Oil
Company shall be made by Company/company to canteen contractor against
submission of documentary evidence. The cost of LPG cylinders for the Labour
Canteen, ANI-TDI Plant Canteen, Neem Plant Canteen, and Corporate Canteen shall
be borne by the canteen contractor. Further, during Plant Shutdown period, payment for
extra Mondays/mandays and additional working hours, if required for canteen
operations, shall be made by the Company as per actual requirement and approved
1.4 The company will make electricity available free of charge in the canteen for lights, fans
and all electrical gadgets installed in the canteen premises. However, the contractor
shall not use electricity for cooking purpose.
1.5 The company will take care of normal maintenance of all electrical appliances, fans, lights,
furniture, fixtures etc. of the canteen buildings. However, if there is any damage to or
loss of any of these items on account of any act or omission attributed to the canteen
contractor or his employees or agent, the canteen contractor will have to bear the
expenses for necessary repairs/replacement as the case may be as decided by the
authorized officer of the company and his decision shall be final and binding to the
1.6 The company will permit movement of materials, manpower and other eatables in
connection with the fulfillment of canteen contractor’s obligations, but it will be subject to
observing and complying fully, security and safety regulation of the company in force
from time to time.
2.0 CANTEEN CONTRACTOR’S RESPONSIBILITIES:
2.1 The contractor shall be responsible for making all necessary
arrangements for operating the canteen efficiently. This includes engaging an
adequate number of competent cooks, supervisors, and helpers/servers, ensuring
timely payment of their salaries and statutory benefits as per applicable laws. The
contractor shall procure good quality A Grade provisions, fresh A Grade
vegetables, and other cooking materials as per specifications provided by GNFC.
All relevant laws and regulations, including labour laws, must be strictly followed,
and necessary licenses should be obtained and kept valid throughout the contract
period. A supervisor must be present in the canteen round the clock to oversee
operations and ensure the quality, quantity, and hygiene of raw materials and
cooked food. Only the quality/brand of major items as specified in the Annexure
2.2 The contractor shall be responsible for serving and operating the canteen
as per the directions of GNFC’s authorized representatives, ensuring the timely
supply of wholesome and hygienic food and refreshments during prescribed hours.
This includes serving tea, coffee, and snacks in various departments at fixed
hours, providing food during shift operations, and adjusting service hours in line
with any changes notified by the company. The contractor shall also arrange
meals and refreshments for guests upon reasonable notice, serve meals and
beverages within the canteen and designated locations inside the factory and
office premises during day and night shifts, provide packed meals at work spots or
offices when required, and prepare additional food items or offer tiffin carrier
services as and when directed. Under no circumstances shall the contractor sell
food or refreshments to any outsiders.
2.3 The food rates specified in this tender are subsidized rates fixed by
GNFC. These rates shall be directly collected by the canteen contractor from
employees and laborers availing the canteen services, either in cash or through
digital payment modes. Despite the subsidized nature of these rates, the
contractor shall remain fully responsible for maintaining high standards of hygiene,
food quality, quantity, and service, strictly in accordance with GNFC norms and
applicable food safety regulations. While quoting their lump sum rates, the bidders
should take into account all associated costs, including expenses towards
qualified manpower (such as manager, supervisor, cook, etc.), additional cost of
raw materials of approved make, make quality food and specification , medical
examination of food handlers, staff food and accommodation, transportation, office
expenses, packaging material, FSSAI license and renewal fees, health and safety
certifications, local authority charges, and all applicable taxes and duties.
2.4 The contractor shall ensure that the kitchen area is thoroughly cleaned
three times daily, once after breakfast, once after lunch, and once after dinner or
snack preparation. Each cleaning must cover all critical surfaces and areas,
including cooking platforms and preparation tables, kitchen floors, sinks and
washbasins, walls up to a height of five feet, exhaust fans, chimneys and hoods,
gas pipelines and visible fixtures, storage shelves and surrounding areas, as well
as refrigerators and walk-in coolers.
In addition to the daily routine, the contractor shall carry out a weekly deep
cleaning activity. This shall include scrubbing and degreasing of floors, thorough
cleaning of exhaust fans, hoods and chimneys, cleaning behind and beneath all
kitchen equipment, washing of walls beyond the daily five-foot height limit (up to
full height where necessary), and cleaning of ceiling fans, lighting fixtures and
other overhead utilities. All cleaning activities, both routine and deep, must be
documented in a Kitchen Sanitation Logbook maintained onsite. The logbook shall
be signed by the Supervisor on duty and made readily available for review and
inspection by GNFC officials at any time.
2.5 Kitchen waste must be segregated into wet and dry categories and
disposed of in clearly labeled bins, which must be cleaned and disinfected daily.
GNFC will carry out inspections to ensure cleanliness standards are met. Any
deviations from these standards will result in disciplinary actions, including
possible termination for repeated non-compliance.
2.6 The external surfaces of refrigerators, freezers, and cold room doors shall
be cleaned daily using approved disinfectants. Internal shelves, trays, and
compartments must be cleaned weekly with temporary relocation of food items.
Monthly deep cleaning of cold rooms—including walls, ceilings, floors, fans,
condenser units, drip trays, and drains—shall be conducted in coordination with
GNFC. Defrosting should be done regularly as per manufacturer guidelines. Only
food-safe cleaning agents and non-abrasive tools shall be used. A cleaning
checklist shall be maintained and periodically verified by authorized GNFC
2.7 Re use of cooking oil is strictly prohibited. Food stored in refrigerators and
cold rooms must be kept in clean, covered, food-grade containers labeled with
preparation or storage dates. The FIFO (First-In-First-Out) method must be
followed to ensure freshness and prevent waste. Storage of uncovered, unlabeled,
or unclean containers is prohibited.
2.8 The dining hall shall be cleaned three times daily—before breakfast, after
lunch, and after dinner or snacks—including sweeping, mopping, wiping tables
and chairs, removing leftover food, and disinfecting contact surfaces. Weekly
cleaning shall include removing cobwebs and cleaning ceiling fans, tube lights,
and walls. The area outside the canteen, including the veranda and entrance, shall
be cleaned twice daily, with special attention to preventing water stagnation,
garbage accumulation, and pest breeding. Waste disposal must comply with
regulations of the Gujarat Pollution Control Board or local municipal authorities.
Repeated failure to maintain cleanliness may result in payment deductions or
contract termination.
2.9 The contractor shall provide all necessary Personal Protective Equipment
(PPE) such as head caps, face masks, aprons, gloves, and non-slip footwear to all
personnel and ensure its proper use at all times within the canteen premises.
2.10 The Contractor shall ensure that all canteen workers engaged by him
undergo periodical mandatory medical examinations at his own cost every
months. These examinations shall include stool test, chest X-ray, blood test, skin
examination, eye examination, typhoid vaccination, Hepatitis A vaccination and
audiometry test. A detailed medical report for each worker, covering the specified
tests, must be submitted along with a fitness certificate issued by a qualified and
registered medical officer. Only those workers who are certified as medically fit
shall be allowed to work in the canteen. The medical examination and test
expenses of all Workmen carried out will be borne by the Contractor.
2.11 The contractor shall arrange food sampling tests for a minimum of (8)
eight items, to be conducted twice a year. These sampling tests must be carried
out by government-approved and FSSAI-authorized laboratories. The test reports
shall be submitted to the Canteen In-charge without delay. All costs related to food
sampling and laboratory testing shall be borne by the contractor.
2.12 On termination of Contract, the premises, utensils, equipment’s, furniture,
fixtures, fittings etc. will be handed over to the Company in good and working
condition. The Company will be free to get them replaced or repaired at the risk
and cost of the Canteen Contractor, if he fails to do so.
2.13 The premises, with fittings and fixtures, furniture, crockery, cutlery,
appliances, equipment’s and utensils etc. as provided to the Canteen Contractor
for running of the Canteen shall be the property of the Company. The Canteen
Contractor shall have no right on any of these and shall place them back at the
disposal of the Company when demanded. The Canteen Contractor shall be
responsible for the safe custody and proper use of all equipment’s and other
properties of the Company whether movable or immovable. Any damage caused
to the equipment’s or properties by the negligent operation, act or omission of the
Canteen Contractor or by his employees or his agents, shall be made good by the
Canteen Contractor immediately to the satisfaction of the Company for the entire
loss, failing which, the cost of equipment’s, properties will be recovered from his
Security Deposit and/or from other dues payable to him by the Company or will be
otherwise recovered.
2.14 The Canteen Contractor shall ensure that the crockery, utensils,
equipment, appliances etc. are washed and cleaned in a hygienic way, as directed
by the authorized officer of the Company.
2.15 The Canteen Contractor shall keep the canteen premises in neat and tidy
condition. He shall also keep all furniture and other articles neat and clean to the
entire satisfaction of the authorized officer of the Company and arrange to have
them detergent washed every day as many times as necessary and also as per
directions given in this behalf by the Company. The Canteen Contractor shall have
to comply with all the provisions of the Factories Act in this matter, and he will be
solely liable for the same.
2.16 Non-vegetarian food items are strictly prohibited inside the GNFC canteen
premises. If any such item is found being prepared, stored, served, or consumed
within the canteen premises, it will be treated as a serious breach of contract,
leading to immediate disciplinary action, which may include contract termination
without notice, forfeiture of security deposit, and blacklisting from future tenders.
2.17 The contractor shall ensure that canteen workers, including cooks,
helpers, servers, supervisors, and others, do not use the canteen premises or
nearby service areas for residential purposes.
2.18 The contractor shall not allow any food to be cooked outside the GNFC-
provided kitchen areas, nor shall any food prepared externally be brought in for
serving. This is strictly prohibited to ensure food safety, hygiene, and compliance
with GNFC's quality standards.
2.19 The contractor shall arrange and provide one Tempo vehicle (non-CNG),
six (06) trolleys, and twelve (12) bicycles for effective management and
transportation related to canteen services across different plants. The entire cost
towards procurement, operation, maintenance, fuel, repairs and all other incidental
expenses shall be borne by the contractor.
The Contractor shall deploy sufficient manpower for the smooth and efficient operation
of all canteens located within the Company’s premises and township at GNFC,
Bharuch, including the Labour Canteen near the Bagging Plant, TDI-I Canteen,
Corporate Building Canteen, and Neem Project Canteen. Deployment of at least one
Gujarati Cook shall be mandatory. The Supervisors and Managers deployed by the
Contractor shall have a minimum of three (03) years’ experience in an industrial
catering background.
The Contractor shall be solely responsible for engaging and deploying sufficient number
of qualified and skilled personnel to ensure preparation and service of fresh,
wholesome, and good-quality food, efficient service, and maintenance of the highest
standards of hygiene and cleanliness in and around the canteen premises.
Wearing the uniform prescribed and provided by the Contractor to the Workmen is
compulsory. The Contractor shall provide three pairs of stitched uniforms to bearers,
cooks and other persons working in the dining hall, kitchen, and pantry, and service
points. He shall ensure that the uniforms are neat, clean, and tidy and also arrange for
washing and ironing of the uniforms regularly. The Contractor shall supply raincoats for
plant service points in monsoon to his Workmen. No workmen wearing
chappals/slippers etc. shall be allowed inside company premises. The Contractor shall
provide to all his Workmen proper shoes to cover their feet fully.
5.0 INGREDIENTS:
5.1 The quality of foodstuff, snacks, tea etc.to be supplied by the canteen contractor shall
be wholesome and of good standard. For this purpose, he will purchase the best quality
material in sufficient quantity available in the market from the standard & well known
suppliers. Seasonal green vegetables and milk shall be procured afresh every day. The
canteen contractor shall also keep in ready stock condensed/powdered milk to meet
urgent and unforeseen requirements. The schedule and specifications of the quality of
ingredients to be used in the preparations to be served by the canteen contractor is
herewith attached as Annexure-A which must be complied with. The Medical Officer of
the company or any other authorized officer or the member of Canteen Managing
Committee formed by the company will inspect at his convenience the quality of food,
snacks and also raw materials like grains, oil, Atta (flours), fruits, vegetables and
provisions for cooking arrangements. If any of these items are not as per specifications
as judged by the company’s authorized officer or the member of the Canteen Managing
Committee, the same shall be destroyed under the instructions and supervision of the
authorized officer. The canteen contractor shall not in any way restrict, restrain or resist
such inspection/rejection and shall not claim any cost therefore.
SCHEDULE AND SPECIFICATIONS OF THE INGREDIENTS TO BE USED FOR
PREPARATION OF FOOD IN THE CANTEEN.
KIND OF INGREDIENTS BRANDS NAME
Filtered Groundnut oil for Cooking Gulab / Tirupati / Fortune / Dhara / Rani
and corn oil for Frying Items /adani/Korndrop/others good brand approve by Committee.
Sugar B Grade type White suger
Rice Old Rice (Jirasar / Gujarat-17 )
Wheat-Atta Aashirvad, Patanjali, Fortune, Amul /other Brand Approved
by Canteen Management.
Tuver Dal Angoor,Rentio,Laxsmi /any other Brand Approved by
Canteen Management.
Spices Ramdev,Ranchhodrai ,Everest,MDH ,/any other Brand
Approved by Canteen Management.
Kathol Any standard Brand with Agmark.
Besan Fortune,Gai Chap,Navjivan,Tata,Angoor/any other Brand
Approved by Canteen Management.
Dry Snacks Das kaka/ Raju Namkeen
Vegetables All fresh Good quality green seasonal Veg. as per menu
Milk Powder (for emergency) Amul/Sagar Milk Powder
Papad Lijjat / Shreeji / Sharda \Gopal (Medium size)
Pickles Any Standard brand with Agmark.
Ice Cream Amul/Hacco/Hammur /Vadilal
Tea CTC Tea (Waghbakri / Tata / Jivraj / Musaji / Girnar)
Coffee Nescafe / Bru / Sunrise
Sauce Kissan / Maggie
Dry Sacks Below Varity Das Kaka/ Raju Namkeen
1. Bombay Mixture All items must be in sealed, branded packets with proper
2. Khatta Mitta Mix labelling and expiry dates. Bulk loose packaging is not
3. Bhakarwadi allowed.
10. Chapta Chana
11. Garlic Chevda
13. Marawadi Sev
15. Marawadi Sev (Thick)
17. Makkai Chevda
18. Mangalori Mix
19. Nariyadi Mix
20. Papad Pauva
21. Surti Special
22. Bhavnagari Gathiya
(a) The packets of the food items wherever applicable should bear the FPO /Fssai
(b) Contractor should strictly ensure the expiry date mentioned on the packs if any..
(c) Any brand other than that mentioned above is allowed with the permission of the
officer in charge.
5.2 It shall be the sole responsibility of the canteen contractor to procure ingredients for
food stuff. The Company may give recommendatory letter in favor of the canteen
contractor addressed to the Govt. Authorities for drawing the controlled items, if any,
but it may not be construed as a pre-condition for prices fixed for the items, their
availability, quality and supply.
5.3 The authorized officer of the Company/Company shall be entitled to give such directions
as he may deemed necessary for any improvement required in the canteen services
and facilities from time to time for the benefit of its employees & guests and the
Contractor shall carryout these fully as directed.
5.4 The canteen contractor shall also comply with the provisions of The Food Adulteration
Act, Child Labour Act and Legal Metrology Act, 2009 and rules made there under and
as may be necessary & required under any other law and rules made there under as
amended from time to time.
6.0 RIGHT TO AUDIT CANTEEN ACCOUNT:
The Company may periodically audit the account, check the stock position of raw
material and articles provided by the Company. The Canteen Contractor shall make
available all such records etc. as may be necessary for this purpose.
Sr.No. Penalty applicable for following Penalty amount (Rs.)
incident/circumstances
1 Serving underweight or insufficient food Rs.5000/- per incident
2 Substandard quality or quantity of food served Rs.10000/- per incident
3 Food sample not tested as per schedule Rs.5000/- per incident
4 Poor hygiene in kitchen and Dining hall Rs.10000/- per incident
5 Non –maintenance of cleaning logbook Rs.5000/- per incident
6 Food handlers without valid medical certificates Rs.5000/- per incident
7 Improper segregation of garbage Rs.5000/- per incident
8 Delay in service food/snacks/tea and Shortage of Food Rs.5000/- per incident
9 Mishandling of kitchen equipment or canteen premises Rs.5000/- per incident
In event of a delay in wage payment to workers beyond the
10 10th day of the month, a penalty of INR 1000 per day shall Rs. 5000/- per day
be imposed, starting from the 8th day to actual date of
11 Not use of approved brand materials or found re use of Rs.5000/- per incident
12 Dirty or greasy utensils and Kitchen equipment’s Rs.5000/- per incident
13 Lack of supervisor presence during operation Rs.5000/- per incident
14 Denial of Service without justification Rs.5000/- per incident
15 Misbehavior by Contractor’s staff Rs.5000/- per incident
16 Non –maintenance of FIFO Method Rs.5000/- per incident
17 Substandard vegetables/raw materials Rs.5000/- per incident
18 Non-compliance in cleaning as per requirements Rs.10000/- per incident
19 Serve outside cook food without approval Rs.5000/- per incident
20 Use of artificial colour/MSG in food Rs.5000/- per incident
21 Kitchen Equipment not clean Properly Rs. 5000/-per Incident
22 Non-availability of prescribed menu items without prior Rs. 5000/- Per Incident
23 Improper storage of raw materials (not as per standards) Rs. 10000/- Per Incident
24 Rs. 5000/- Per Incident
Failure to attend complaints within reasonable time
25 Presence of foreign particles in cooked food Rs. 5000/- Per Incident
26 Food served at inappropriate temperature (not hot/fresh) Rs. 3000/- Per Incident
27 Food found excessively oily, spicy, salty, or not as per Rs. 3000/- Per Incident
Note: In imposing a penalty the decision of the authorized officer shall be final and binding to
the Canteen Contractor.
Penalty Escalation Clause:
For the first instance of any violation, the penalty shall be imposed as per the
prescribed rates specified in the penalty schedule. In the event of a second occurrence
of the same violation within a period of one month, the applicable penalty shall be
doubled. For the third and any subsequent occurrences of the same violation within the
same period, the penalty shall be tripled. In case of continued, repeated, or serious
non-compliance, the Company reserves the right to impose higher penalties at its
discretion, issue warning notices, recover applicable amounts from the contractor’s
running bills, and/or take appropriate action, including termination of the contract.
8.1 The canteen contractor shall obtain necessary license(s) as required by the Civil Supply
Authorities as well as License under FSSAI.
8.2 The Contractor shall employ adequate staff for running all the canteens located in
Company’s premises at GNFC Bharuch Plant.
8.3 The contractor shall use the canteen building only for catering purpose and for no other
purpose whatsoever.
8.4 The company will provide sanitary materials free of cost to the canteen contractor to
keep the entire canteen premises clean all the time. However, toilet block cleaning will
be done by the company. The Company shall have the right to inspect such cleanliness
and if required, the Contractor shall undertake further steps to achieve the desired
8.5 The contractor shall provide at his own cost Plastic hand gloves, Caps, etc to all
persons and ensure that they use them while they are on their job.
8.6 All the rules, regulations and instructions regarding hygiene, health etc. issued by the
State, Municipality or Panchayat authorities and the Company shall be strictly adhered
to, by the Canteen Contractor.
8.7 The Company premises being a protected area, all the articles which are to be taken
out or brought inside shall be liable for strict security check. Gate Pass system or any
other system, in force from time to time shall have to be complied with.
8.8 The Canteen Contractor shall also maintain all registers as required by the Civil
Supplies deptt. And obtain such licenses as required for the storage of different
8.9 In addition to above, the Canteen Contractor shall be responsible for all incidental
activities necessary to organize the catering of good quality, approved quantity,
punctually and with courtesy and discipline.
8.10 Timely and courteous services and good quality of eatables are the essence of this
8.11 The Contractor agrees and undertakes that in case of dispute regarding the services,
quality, hygiene conditions of canteen premises, or the quality of the foodstuff, snacks,
tea, etc. the decision of GNFC will be final and binding on the Contractor without any
8.12. The Canteen Contractor will work under the direction of such of the officer or officers of
the Company as may be authorized from time to time by Company/Company and any
of them will be the authorized person for imposing penalties for the purpose of Clauses
under this Contract. The authorized officer/s shall have unrestricted entry into the
Canteen premises at any time.
8.13 Should, however, for any reason, the Canteen Contractor does not run the Canteen/s
and lock the Canteen premises without permission, the authorized officers of the
Company will be at liberty to break open the lock and make inventory of all the articles.
Such an inventory shall be final and binding on the Canteen Contractor in connection
with any mutual claims. The Company will also be at liberty to make alternative
arrangements for running the Canteen/s at the risk and cost of the Canteen Contractor.
8.14 The Canteen Contractor shall be solely responsible for any accident including the cases
of food poisoning etc. taking place at the Canteen and shall have to face all
consequences as may arise there from.
GENERAL CONDITIONS OF THE CONTRACT
http://mygnfc/mygnfc/images/finance/VR4U/FORM/GENERAL%20CONDITIONS%2
0OF%20CONTRACT%2028122016%20(2).pdf
CONDITIONS OF LABOUR LAWS
CONDITIONS OF LABOUR LAWS TO BE COMPLIED BY THE CONTRACTOR
1.0 LABOUR LAWS:
The contractor shall be solely responsible for strictly following all Labour Laws,
Industrial Laws, Factories Act, and such other laws which are applicable from time to
time including but not limited to the notification amendments or additions which are
made to these laws during the period of contract. The contractor shall also be
responsible for various levies of State Government, Government of India or any
Statutory Body. The contractor shall have to, at his own expenses, comply with labour
laws and keep the company indemnified in respect thereof. Some of the major liabilities
under various labour and industrial laws which the contractor shall comply with as
under, but not limited to:
1.1 The contractor shall submit all relevant and required documents including but not
limited to the following documents to HR Deptt. of GNFC before commencement of the
i.) Copy of the documents showing legal status of the firm.
ii.) Copy of the documents showing allotment of PF Code No. by the RPFC Office.
iii.) Copy of receipt / cover note / insurance policy obtained to comply with the provision of
Workmen Compensation Act,
iv.) Copy of challans showing remittance of security deposit and license fee to obtain the
labour license as per the provisions of The Contract Labour (R&A) Act,
After verification of above stated documents, entry permits for the contract labours will
be issued by Security Deptt. to the contractor.
1.2 The contractor shall submit application to the Licensing officer to obtain the license as
per the provisions of the Contract Labour (R&A) Act, 1970 before commencement of
the job after remittance of license fee and deposit as stated under:
i.) Payment of deposit in respect of each contract labour at the rates prescribed by the
Govt., with the office of Commissioner of Labour, Ahmadabad as per the Contract
Labour (Regulation and Abolition) Act,
ii.) License fee as prescribed under the Contract Labour (Regulation and Abolition) Act and
rules framed there under depending upon the number of workman employed by the
The contractor shall also submit copy of labour license to HR Deptt. of GNFC within
days from the date of commencement of work.
1.3 The contractor shall not employ any contract labour whose age is below 18 years.
However you shall not employ any person who has reached the age of superannuation
(i.e. 60 Years of Age) under “The Bombay Industrial Employment (Standing Order)
Rules, 1959 (As applicable in State of Gujarat)”.
1.4 The contractor shall also maintain valid labour license under Inter State Migrant Labour
Act if required under this law and shall comply with the provisions of interstate migrant
1.5 The contractor shall allow women employees to work in factory between the hours of
06.00 a.m. to 07.00 p.m. only.
1.6 The contractor shall obtain photo identity cards cum entry passes for all his labours and
supervisors as per the security regulation of the company in force from time to time and
no person shall be allowed entry without such valid pass.
1.7 The contractor shall make payment of contribution by way of employees, contribution
towards provident fund, Pension Scheme, Deposit Linked Insurance Scheme,
Administrative Charges, etc. at the rates made applicable from time to time by
Government of Gujarat / Government of India or other Statutory Authorities.
1.8 The contractor shall provide safety appliances / articles / equipment’s at his own cost to
1.9 The contractor shall pay extra wages for overtime to the labours as per provisions of
the Factories Act,
1.10 The contractor shall pay the wages as fixed by him or rates fixed under the Minimum
Wages Act from time to time, whichever is higher. The wages of every contract labour
employed by him under this contract shall be paid by him before the expiry of 7th day of
the month in respect of which the wages are payable. The payment shall be disbursed
through bank only.
1.11 The contractor shall pay bonus to his eligible employees in accordance with provision
of payment of Bonus Act. He shall keep and maintain register as prescribed under
payment of Bonus Act and shall produce before authorized officers of the Company as
and when asked for inspection.
1.12 The contractor shall pay Gratuity to his employees in accordance with provision of
payment of Gratuity Act. He shall keep and maintain required registers as prescribed
under payment of Gratuity Act and shall produce before authorized officers of the
Company as and when asked for inspection.
1.13 The contractor shall keep and maintain registers and forms as prescribed under the
Factories Act, 1948, Payment of Bonus Act, 1965, Payment of Gratuity Act, Contract
Labour Act, PF Act, and other Labour Laws in force from time to time.
1.14 The contractor shall allow his employees to avail paid leave at the rate of one day for
every 20 days of working or shall encash the earned leave as per the provisions of the
1.15 The contractor shall make payment of retrenchment compensation, notice pay and
other liabilities as per Industrial Dispute Act, any payment to the contractor's employee
arising out of any claim or dispute under Industrial Dispute Act, 1947 or any other
1.16 The contractor shall make payment of compensation in case of accidental injury in
accordance with provisions of Workmen Compensation Act, 1923. For this, the
contractor shall take insurance policy for the labours engaged for this job. The
contractor shall also submit copy of insurance policy to HR Deptt. of GNFC before
commencement of work.
1.17 The Company reserves the right to terminate work order if awarded under this tender
enquiry / work order if contractor fails to comply with the labour laws as stated above
and the labour laws which are applicable to his firm from time to time.
1.18 The contractor shall give his office and residential telephone numbers, mobile
number(s) and addresses to the Company so that in case of labour trouble etc. the
contractor can be contacted.
1.19 The company will be entitled to deduct directly from the bills to be paid to the contractor
any sum or sums payable by him and which sum / sums the company is required to
pay as Principal Employer on account of his default in respect of all liabilities referred to
in above clauses.
1.20 The contractor shall display notice on his notice board showing the rate of wages,
hours of work, wage period, date of payment of wages, name and address of Govt.
Labour Officer and Inspector under Minimum Wages Act having jurisdiction. The notice
shall be displayed in language understood by the majority of workers.
1.21 The contractor shall ensure adherence to the provisions of Gujarat Labour Welfare
Fund in respect of his labours from time to time.
1.22 Periodic Medical check-up of the contract labours shall be got done as per the
provisions of The Factories Act. The medical check-up of new incumbents shall be got
done by the contractor and the reports shall submitted to the HR Deptt.
HEALTH & SAFETY POLICY
Annexure – VIII
INTEGRATED MANAGEMENT SYSTEM POLICY
QEHSEn GUIDELINES TO CONTRACTORS
As GNFC Limited, is certified for Quality, Environment, Occupational Health & Safety
and Energy Management Systems, all the persons (including Contractors, Supervisors
& their workers) working at GNFC or on behalf of GNFC are required to comply with the
QEHSEn guidelines in addition to other applicable Environment, Energy, labour laws,
safety laws as well as legal compliances as mentioned below:
The Contractor shall strictly comply with the following Guidelines while working at site.
These guidelines form a part of the terms & conditions as mentioned in our referred
1. The Contractor is liable to follow Company’s Integrated Management System policy (i.e.
Quality, Environment, Occupational Health & Safety and Energy), Health & Safety
policy (as per Factories Act & Rules), Energy policy & policy against Sexual
Harassment of Woman at workplace and will show/submit the records of compliance of
above whenever demanded.
2. The Contractor shall strictly comply with all the applicable legal compliances related to
work allotted and will maintain the records of it and will show/submit whenever
3. To ensure effective enforcement of the applicable legal & other requirements, the
arrangements made by the contractor shall be open to inspection by GNFC
representatives/statutory authorities.
4. The Contractor shall ensure that he does not engage any workman less than 18 years
of age for the work of the company.
5. GNFC strongly opposes sexual harassment and any such behaviour against women is
prohibited by the law as set down in “The Sexual Harassment of Women at Workplace
(Prevention, Prohibition and Redressal) Act, 2013” and Rules framed there under being
The Sexual Harassment of Women at Workplace Rules.
6. GNFC is a Smoking prohibited area.
7. Contractor is required to get labours checked for sound physical health and fitness to
discharge the duties assigned at site effectively including for work at height or in
confined spaces/vessels in case wherever applicable. Contractor shall be asked to
submit fitness certificate of those labour who do not discharge their duties effectively as
found by Site In charge from certified medical Officer. Wherever workers are employed
by contractor for work at height/confined spaces/vessels, he will ensure that workers
are fit to carry out such jobs.
8. Contractor shall deploy suitable competent persons for carrying out the specified jobs.
9. Contractor shall ensure that all deployed employees follow the safety notices /
instruction displayed or being asked at site.
10. Electricity related work shall be done / performed / installed in conformity with Indian
Electricity regulations and shall employ licensed supervisor / electricians at site.
11. On the completion/expiry of the work, contractor shall remove all constructions,
scaffoldings, works, piping, wirings, surplus materials, rubbish and other installations as
per the guidance of Site in Charge.
12. Contractor shall perform their work with the material/items competent to the requisite
standards. Scaffoldings will be sound and suitable for the job compiling with the
National standards. Revision 01 Date: 02.09.2016 Revised on 18.06.2019 Compiled by
13. Contractor shall ensure to comply with relevant provision of Safety codes and shall
employ all equipments to protect all works, materials, properties, structures, equipments,
installations, communication systems from damage, loss or other hazard what so ever.
14. Contractor shall ensure to carry out periodical examination and tests for all lifting
/hoisting equipments and tackles in accordance with the Factories Act/Rules. A register
of such examinations and test shall be maintained.
15. Contractor shall ensure for safe transportation of materials / tools being carried out by
16. Contractor shall work in such a way that it will not create disturbance and
inconvenience to GNFC, other contractors, public, adjoining land & property owners,
crops, tress, vegetation and water system.
17. Contractor shall provide first aid facilities.
18. Contractor shall report all incidents to the Site in charge of GNFC.
19. Contractor shall start their work with valid work permit and shall obey the instructions
mentioned in it.
20. Contractor shall not block or obstruct the approach of emergency related equipment’s
and/or path/walk ways.
21. Contractor shall provide work related suitable safety equipment’s including PPEs and
Safety equipment’s such as safety helmet, safety belt, safety gloves, glasses, safety
shoes/gumboots, earplugs, gas / welding shields / sets, insulated pliers, ELCB, Line
testers and safe electrical equipment’s with proper earthling. For welding work,
separate earthing cable shall be run parallel to main cable and to be earthed near
22. Contractor shall bring 1ph/3ph ELCB & minimum 15 meters suitable rating flexible cable
with their welding machine / grinder / drill machine etc. for working in plants as per
requirement of engineer I/C. ELCB shall be tested if required by engineer I/C.
23. Contractor shall ensure optimal usage of resources, in particular water, steam, oil,
electricity etc.
24. Contractor shall explain to workers about energy saving measures, potential hazards,
accidents emergencies, environmental impact and explained to all and precautions to
25. Contractor shall arrange to send workers / supervisors for any training class conducted
by the Company for QEHSEn requirements.
26. Contractor shall follow the Various Guidelines as indicated in the respective Value
27. Contractor shall ensure,
a) whenever possible use natural sources of energy,
b) to use energy efficient tools/equipment’s,
c) to use of material that does not causes any destruction of natural resources any
air, water pollution and / or land contamination,
d) to eliminate PVC / ODS in Material used,
e) to eliminate use of halogenated flame retardant and f. to maintain Good
Housekeeping at the site, offices and/or infrastructures within the GNFC premises.
GNFC/BHARUCH/RFP/ARC/CANTEEN/2026
SCHEDULE OF RATES
Price bid - Annual Rate Contract (ARC) for providing services in Industrial Canteen of
GNFC, Bharuch Plant.
Sr Particulars Unit A B C= A X B
Rate in Rs. / Nos. of Amount in
Month Months Rs./Year
1 Operation of Lump sum/
Industrial canteen Month
at Bharuch as per
providing food and
factory canteen
under Factory Act
Currently 5% GST is applicable and will be considered on the rate quoted by the
vendor. However, any change in GST during the contract period will be paid by GNFC
Place:…………………………. Signature and Seal of the Contractor
1. SCHEDULE OF SUBSIDIZED RATES FOR GNFC INDUSTRIAL CANTEEN
Sr. Item Contents of Item Rate
No Description in Rs
3 Wet Snacks 70 Grams
4 Dry Snacks 50 Grams
4 Milk Hot Milk with sugar 100 mls.
Lunch / Dinner 3 Parotha / 6 Puri / 4 Chapati -100 gms. Seasonal
5 Limited Thali Vegetable 100 gms. Kathol 85 gms. Rice/Khichadi 120
gms. Dal/Kadhi 130 mls. Curd 50 gms or Papad 01 No.,
Kachumber/Achar/Two green chilli -2 tea spoon full,
Lunch/Dinner 3 Parotha / 6 Puri / 4 Chapati - 100 gms. Seasonal
6 Limited Half Vegetable - 100 gms. Curd 50gms / Paped -1 no.
Thali Kachumber/Achar/Two green chilli - 2 tea spoon full.
7.1 Lunch/Dinner 3 Parotha/ 6 Puri/ 4 Chapatis, 100 gms
7.2 Cooked Vegetable,100 gms
7.3 Kathol, 85 gms
7.4 Rice/Khichadi, 120 gms
7.5 Dal/Kadhi, 130 mls.
7.6 Curd, 50 gms.
7.7 Papad - 1 no
8 Ice-cream (Havmour & Amul/ Vadilal whichever is MRP
9 Cold drinks , Butter milk (Amul),Srikhand, Milk ( Gold, As per
Tea Special 500ml or 200ml) MRP
10 Milk and Butter Amul As per
1. In addition to the above items, the canteen shall cater branded packed dry snacks
such as Balaji, Gopal, Real, and a variety of biscuits as required (subject to approval by
the Canteen In-charge), along with mineral water bottles and seasonal
sweets/beverages like Shrikhand, mango juice, buttermilk, lassi, etc.
2. Farali and Jain dishes shall be prepared only on an advance booking basis.
3. The Canteen contractor shall also keep dry snacks in 200-gram packing.
4. Vegetable puffs and other snack items shall be served at prevailing market rates.
5. The cost of all packing materials, including disposable items such as tea cups and
paper wrappers, shall be borne entirely by the contractor.
2. INDICATIVE REGULAR MENU ITEMS AND QUALITY.
Prepared individually or in combination of suitable vegetables such as Potato,
Brinjal, Cauliflower, Cabbage, Green Peas, Guwar, Suran, Dudhi, Turiya, Galka,
Palak, Methi, Green Tuver, Tomato, Capsicum, Chilly, Val Papadi, Fansi, Choli,
Bhindi, Carrot, Karela, Tindola/Ghiloda, Sweet Potato or any kind of seasonal
vegetables & leafy vegetables etc.
ii) Kathol / Pulses:
Prepared individually or in combination of suitable pulses such as Vatana, Chole,
Rajma, Desi Val, Tuver, Soybean, Masoor, Desi Chana, Math, Mung, Chora,
Blackgram etc. or any kind of available pulses.
Prepared individually or in combination of suitable dal such as Tuver Dal, Chana
Dal, Mung Dal, Udad Dal, Masoor Dal etc
iv) Hot Snacks like:
Batata poha, Khaman, Sev Khamni, Dhokla, Uttapam, Upma, Idli
Sambar/Chutney, Sabudana Vada, Batata & Mirchi Bhajiya, Dal Vada, Bread
Pakoda, Batakawada, Samosa, Mendu vada, Khasta Kachori, Dakor Gota,
Onion Pakoda, Potato Chips bhajiya, Sev Usal,lilva Kachiri,Moong Dal
Kachori,Bataka Poori,Chapti Vdda, etc. or any other hot snacks of good quality
and taste. Selection of hot snacks are subject to change from time to time.
v) Dry Snacks like:
Sev mamra, Solapuri Chevda, Dalmuth, Makai Chevda, Various Mixtures, Sev
Bundi, Sakar Para, Chana Dal, Moong Dal, Sing Dana fry, Sing Bujiya, Ratlami
sev, Mori Sev, Zini Sev, Chana Chor, Farali Chevada, Fulwadi, Tikha, Mora &
Mari Gathiya etc.(Brands Daskaka or Raju Namkeen)
VI) TEA QUALITY STANDARD:-
Quality of tea should be standardized. The preparation of tea/coffee should
Include minimum 60 % of Amul gold Milk and 40% Water.
VII) Roti:-Roti shall be served with Ghee (Amul Cow Ghee).
Note: Change of any snack or meal item is subject to prior approval of the
management and management reserves the right to change the menu.
We have read and understood the terms and conditions as above and we agree and
accept the same in to unconditionally and without any reservations whatsoever.
Place: Seal & Signature of the authorized representative
COVERING LETTER
(To be submitted on the Letterhead of the Applicant)
Ref: RFP Reference No.
Sub: Submission of Bid in response to the RFP for
1. Having examined the RFP document, we, the undersigned, herewith submit our
Bid/ proposal in response to your RFP Notification number………… for
2. We have read the provisions of the RFP document and confirm that we accept
these. We further declare that additional conditions, variations, deviations, if any,
found in our proposal shall not be given effect to
3. We agree to abide by this proposal, consisting of this letter, the detailed response
to the RFP and all attachments thereto.
4. We would like to declare that we are not involved in any litigation that may have an
impact of affecting or compromising the delivery of services as required under this
assignment, and we are not under a declaration of ineligibility for corrupt or
fraudulent practices.
5. We would like to declare that there is no conflict of interest in the services that we
will be providing under the terms and conditions of this RFP.
6. We hereby declare that all the information and statements made in this proposal
are true and accept that any misrepresentation contained in it may lead to our
disqualification.
7. We understand you are not bound to shortlist/accept any or all the proposals you
8. We would like to declare that we are not blacklisted by any Central/ State Govt. /
PSUs or Local Govt. Department, as on the date of application and is not debarred
from participation in the Tender process.
9. We hereby declare that we qualify and fulfil the eligibility criteria mentioned in the
Date: Signature of Authorized Signatory___________
Place: Name of the Signatory ______________
Company Name & Seal
UNDERTAKING FOR WAGE DISBURSEMENT THROUGH BANK
(To be submitted on the Letterhead of the Applicant)
THIS UNDERTAKING is made on this _____ day of _______________ 20__.
M/s. ________________________________ hereinafter referred to as the Bidder in
favour of Gujarat Narmada Valley Fertilizers & Chemicals Limited, a Public Limited
Company, hereinafter referred to as the Company and/ or GNFC.
Whereas, the Bidder has been issued tender enquiry for ARC / Job Contract to be
Whereas, the Bidder has agreed to provide an undertaking to GNFC that the
Salary/Wages and such other payment as may be required to be made to the Contract
Labourer(s)/Workmen to be deployed by the Successful Bidder/ Contractor who is
awarded the aforesaid job at GNFC will be disbursed by him by cheque or by crediting
the salary/wages in the bank account of each of his Contract Labourer /Workman.
Accordingly, the Bidder /Contractor hereby states, affirms, undertakes and certifies that
if awarded work order under the aforesaid tender enquiry by GNFC.
1. The Successful Bidder / Contractor on award of the Job /Work Order / Contract will
arrange to open the bank accounts of each of his Contract Labourer/ Workman to be
deployed at GNFC site, if they are not having Bank Account.
2. The Successful Bidder / Contractor will arrange to disburse the salary/wages
payable to each of the Contract Labourer / Workman to be deployed at GNFC site by
cheque or by crediting the salary/wages in their respective bank accounts.
3. On default, GNFC /the Company shall be entitled to take such actions(including
termination of the Contract ) against the Successful Bidder / Contractor, as may be
Annexure – XIII
This Annexure shall form integral part and parcel of Purchase/Work/Service Order
► TIMELY PROVISIONOF INVOICES/ DEBIT NOTE/ CREDIT NOTE / OTHER
APPLICABLE DOCUMENTS:
Supplier shall immediately submit the Tax Invoice/ Debit Note/ Credit Note and / or any other
applicable / requisite documents as per the prevailing GST Law and within the timeline as
required under the GST Law so as to enable GNFC to claim/avail tax benefit/credit and it
shall ensure that GNFC must be able to claim ITC [Input Tax Credit] as per applicable
provisions & restrictions of GST Law. All necessary adjustment entries (Credit Note,
Purchase Returns, and Debit Notes) shall be made within time limit as prescribed under the
GST Law to ensure that no loss or damageis caused to GNFC due to such adjustment as per
GST Law. Any consequence in terms of tax / loss of input tax credit, interest or penalty
thereon on account of delay in raising tax invoice and/or submission of other applicable
documents or adjustment documents as mentioned above shall be to the account of the
Supplier and the Supplier shall indemnify and hold GNFC good against any such
consequential tax, interest, penalty or any other losses / damages.
HSN / SAC for goods & services respectively shall be specifically included in the tax invoices
as required under the applicable provisions of GST Law. The manner and digits of such
HSN/SAC Code shall be compliant with applicable provisions of GST Law from time to time.
In case of receipt of advance or refund of such advance received where invoice against the
said advance was not prepared, the Supplier shall raise the necessary statutory documents.
Further, the Supplier shall also raise the prescribed documentation governing the movement
of goods like e way bill, delivery challan etcas per applicable GST law provision from time to
Supplier shall ensure correct classification of HSN/SAC and it shall indemnify GNFC against
any additional taxes, interest or penalty, if any, imposed on GNFC due to wrong classification
Any known post supply discount shall form part of terms of the agreement/contract
i.e. it is required to be pre-agreed before any supply takes place and any discount given at
the time of sale shall be recorded on invoice to enable Supplier/ GNFC to claim tax
adjustment. In case there is any pre-agreed post supply discount then the credit note to that
effect shall be issued within time limit prescribed in applicable provisions of GST Law to
enable supplier/GNFC to claim tax adjustments.
► MANNER OF ISSUE OF INVOICES:
a) Wherever applicable, three copies of the valid tax invoices or other applicable document as
per GST Law shall be issued by supplier in case of supply of goods (i.e. ‘Original’ for
recipient (GNFC), ‘Duplicate’ for transporter and ‘Triplicate’ for supplier), 2 copies of invoice
or other applicable document as per GST Law shall be issued by supplier in case of supply of
services (i.e. ‘Original’ for recipient and ‘Duplicate’ for supplier). Further, the invoices for
supplies shall be as per the GST Law & clearly bear the GSTIN / UID number along with
Purchase Order/Work Order/Service Order number and date and wherever the law requires,
an Electronic Invoice Reference Number and QR code from Invoice Registration Portal, for
b) Supplier shall be responsible to issue applicable documents for movement of goods (such as
tax invoice, delivery challan, e-way bill, e-invoice etc) under the GST Law as may be
applicable from time to time and the logistic partner as well as GNFC shall not be liable for
any loss arising due to confiscation of goods by government agencies on account of lack of
proper documents or anymiss-declaration or any non-compliance, whatsoever, on part of the
c) Where the supply of goods/ services are liable to GST under reverse charge mechanism, the
supplier shall clearly mention the category under which it has been registered and also that
“the liability of payment of GST is on the Recipient of Service”. Invoice of such RCM supply
must comply with applicable provisions of GST Law. If payment of GST is received by
Supplier in spite of Goods or Services supplied by said supplier is covered under RCM
[Reverse Charge Mechanism] and GST is payable by GNFC, the supplier shall reimburse the
amount of GST immediately to GNFC so that default on part of GNFC can be avoided. In
case of supplier’s failure to make appropriate declarations and / or Supplier’s failure to
reimburse the GST amount, the same shall be recoverable from the Supplier with interest at
such rate as may be applicable under Section50 of CGST Act 2017 from time to time. Such
supplier will be required to submit invoice for supply of services within 30 days from date of
invoice. In case of failure to submit invoice within 30 days from date of invoice, GNFC will be
required to pay interest @ 18% or other applicable rate from time to time underGST Law for
delay in discharge of GST liability under RCM. Any loss of input tax credit, penalty, interest,
any other loss arising out of supplier’s failure to submit invoice within 30 days from its date,
will be recovered by GNFC from supplier with applicable taxes.
d) In case supplier makes payment to any other person on behalf of GNFC and subsequently
claims reimbursement of such payment from GNFC then such reimbursement claim is
required to be submitted in same month in which suchamount was paid on behalf of GNFC.
Any delay in discharge of GST liability under RCM by GNFC in relation to such
reimbursement claim if results into lossof input tax credit, penalty, interest, any other loss arising
out of supplier’s failure to submit above mentioned reimbursement claim within same month of
payment, will be recovered by GNFC from supplier with applicable taxes.
e) The invoice should clearly specify abatement, if any, claimed or otherwise from the Taxable
Value while calculating the GST.
f) Tax invoice and other tax documents like debit/credit notes etc. shall be issuedby the supplier
as per applicable provisions of GST Law.
g) In case of supplier supplying Goods/Services/Both in relation to creation of immovable
property, Input Tax Credit of which is blocked under applicable GST Law provision(s),
Invoice(s) in relation to such Goods/Services/Both is needed to be provided separately by
keeping planning, designing, execution etc. in thisregard separate in consultation with GNFC.
Also other requirements in relation such work such as providing Chartered Engineer’s
Certificate for Goods/Services/Both used in foundation and structural support of plant an
machineries and any other requirement in this regard as communicated by GNFC will also be
required to be complied with by such supplier. Non-compliance of supplier in relation to above
if results into loss of input tax credit / additional tax liability, penalty, interest, any other loss,
same will be recoveredby GNFC from supplier with applicable taxes.
► OTHER POINTS:
a) Any Liability, whatsoever, arising out of or in connection with dispute on the tax structure, tax
rate(s), HSN classification, correct disclosure in return, timely filing of applicable GST returns,
raising of correct tax invoice, within statutory timelines and presenting to GNFC immediately,
calculation, correct valuation and payment of GST to the Government will be to the Supplier’s
b) In case the value of tax invoice or GST rate on tax invoice as mentioned in tax invoice of
Supplier is assessed differently by the department during assessment proceedings or any
other dispute is raised by department resultingin additional tax liability on the Supplier, GNFC
shall not be liable to reimburseany amount of tax or interest or penalty to such Supplier in
relation to such additional liability or any other incidental expenses or liabilities, whatsoever;
c) The tax invoice or debit note raised by supplier shall be compulsorily furnishedin GST return
in the manner as required under the GST Law. Further, GST in respect of such tax invoice
shall be paid by the Supplier as required under theGST Law. In case e invoicing is applicable,
debit/credit note(s) or other documents as prescribed in applicable GST Law provision must
be issued in compliance of such e invoicing requirement containing all fields as prescribed in
applicable provision(s) of GST Law. In case the same is not complied with then the Supplier
shall make ‘good’ the loss suffered or potential loss that maybe suffered by GNFC due to the
input tax credit or other loss in that transaction (including applicable interest at such rate as
may be applicable under Section 50 of CGST Act 2017 and/or other applicable provisions of
GST Law from timeto time and penalty in this regard).
d) In case the tax invoice is not presented to GNFC immediately on issuance andif GNFC is not
able to claim Input tax credit on account of expiry of statutory timeline then GNFC shall not
make payment of any taxes to Supplier;
e) The PO/SO/WO shall be terminated immediately, if supplier is found to be non- compliant or
any action has been taken against it by authority, in such case nopayment of tax will be made
and any loss or potential loss due to such non- compliance to GNFC will be recovered with
applicable interest and penalty.
f) The Supplier/ Sub contractor shall communicate to GNFC with regard to any change in the
registration details, issue of blacklisting/suspension/cancellation/receipt of notice/demand etc
or any non- compliance by Supplier irrespective of the fact that whether such events are
attributable to the Suppliers or not;
g) Any local levies and or other charges levied by any Central/state/local authorities wherever
applicable shall be extra and the same shall be to the account of the supplier. GNFC shall not
pay or reimburse the same to the Supplier.
h) Declaration/ Self Certificate stating that Taxes which have been collected/ with-held on behalf
of GNFC have been duly paid/ will be paid to the Government account within the prescribed
due dates specified under various Tax Laws (including GST law) in India and Rules made
there under shall be submitted bythe Supplier to GNFC.
i) In case supplier is located outside India and supplying services to GNFC whether on his own
account or through intermediary acting as ultimate supplierof GNFC, GNFC will become liable
to discharge GST under RCM as per India’s GST Law. Such supplier or in case of
intermediary such intermediary e.g. LSTKContractor, commission agent etc. will be required
to submit invoice for supplyof services within 30 days from date of invoice. In case of failure
to submit invoice within 30 days from date of invoice, GNFC will be required to pay interest @
18% or at other applicable rate from time to time under GST Law for delay in discharge of GST
liability under RCM. Any loss of input tax credit, penalty, interest, any other loss arising out of
supplier’s failure to submit invoicewithin 30 days from its date, will be recovered by GNFC from
supplier or in caseof intermediary such intermediary.
j) In case supplier is located outside India and supplying goods to GNFC whether on his own
account or through intermediary acting as ultimate supplier of GNFC, for which GNFC is
required to carry out customs clearance for home consumption by filing BoE [Bill of Entry]
then such supplier or in case of intermediary such intermediary e.g. LSTK Contractor,
commission agent etc. must ensure that quantity of BoE must be equal to quantity invoiced
by such supplier to GNFC. If goods in BoE is not received or short received or due to
misunderstanding regarding UoM [Unit of Measurement] or other point of PO between foreign
supplier and GNFC BoE quantity is considered to be short received against invoice, any
additional liability/loss of input tax credit, penalty, interest, any other loss arising out of
supplier’s failure to ensure that quantity and UoM in his invoice accurately matches with
quantity and UoM of BoE and same is received by GNFC completely at its place of business
under GST Law, will be recovered by GNFC from supplier or in case of intermediary such
intermediary. Also such supplier or in case of intermediary such intermediary must ensure
that only non-creditable portion of GST be passed on to GNFC after taking Input Tax Credit
of creditable portion of GST. Loss/expense if anysuffered due to passing on such creditable
GST paid by supplier will be recovered with interest as decided by GNFC.
k) In case of any dispute in relation to invoice(s) already issued, same is to be resolved
amicably in consultation with GNFC at the earliest, however if it appears that such resolution
will not take place until September of financial year immediately succeeding the financial year
in which such invoice(s)was/were issued, amount of GST will not be paid / if already paid will
be recovered along with applicable interest / interest as decided by GNFC. Such supplier
may choose to issue GST Credit Note under relevant provisions of GST Law within such time
limit to enable both parties to claim tax adjustments and avoid any tax / Input Tax Credit /
Interest / Penalty loss.
l) In case of advance payment i.e. clean/pure advance against which services willbe supplied,
appropriate receipt voucher will be required to be issued and whensuch advance gets adjusted
against supply of any services, necessary adjustment of tax already paid against advance will
be required to be adjustedand net tax if any is to be claimed against such tax invoice. In case
such advance is not adjusted against any supply necessary refund voucher will be issued.
m) For GST compliance purpose DAY means a continuous period of twenty-four hours
commencing from midnight 00:00:00 hours.
n) For GST compliance purpose MONTH means a continuing period, commencing from first
day in a calendar month and ending on last day of suchmonth.
o) In case of recovery of any amount in the nature of liquidated damages, penalty,fine, etc., from
the Contractor (i.e., supplier), on account of non-performance or breach of any of the clauses
and/or conditions stipulated in the agreement, ifit qualifies as consideration for agreeing to the
obligation to tolerate an act or asituation or to refrain from or do an act, such transaction shall
be considered as a supply of services by GNFC in terms of para 5(e) of Schedule II of the
Central Goods and Services Act, 2017 (“CGST Act”) / Gujarat Goods and Services Act,
leviable to GST at applicable rate In case of issuance of GST invoice contractor (i.e., supplier)
will be required to pay the amount of such liquidated damages, penalty, fine etc. along with
GST applicable thereon. In case of commercial recovery such amount as demanded has to
be paid to GNFC separately and shall not be adjusted against payment of any other GST
p) In case any amount payable by the Contractor (i.e., supplier) to the Owner (i.e., GNFC)other than
covered by clause o) above is deducted from the Contract Price or any other amounts owed
by the Owner (i.e., GNFC) to the Contractor(i.e., supplier), such deduction of amount may be
treated as consideration towards independent supply of service/ goods, or in such other
manner, as may be mutually agreed upon between Owner (i.e., GNFC) and Contractor (i.e.,
supplier). The Owner (i.e., GNFC) may raise GST tax invoice and charge appropriate GST
against the supply of goods and/or services for such deduction from the contract price, as the
case may be. In no event, the said deduction shall be considered as discount or reduction in
the Contract price as agreed in this Agreement unless specifically agreed mutually between
Owner (i.e., GNFC) and Contractor (i.e., supplier).
q) Any reference to GST compliances or GST, interest, penalty, levy, etc., in any of the clauses
of this contract shall be referred to and read in consonance with this GST Annexure. In the
event of a conflict or inconsistency between the terms of contract and the terms of this GST
Annexure, the terms of this GST Annexure shall prevail over the terms mentioned in contract
for GST compliances as well as all matters related to GST, interest, penalty etc.
CLAUSE ON ANTI-PROFITEERING:
Any economic or tax benefit arising out of the implementation of GST is mandatorilyrequired to
be passed on to GNFC by the Supplier. Similarly, the benefits enjoyed by Supplier’s
Suppliers and other players in the supply chain are also required to be passed on to the
Supplier, which in turn shall be passed on to GNFC by way of pricereductions. Accordingly,
Suppliers are expected to pass on any direct or indirect benefits arising thereon.
All benefits due to change in rate of tax of outward supply or availability of Input Tax Credit to
supplier even post implementation of GST will be required to be passed onto GNFC.
The responsibility to pass on the above benefits vests with the Suppliers as our ‘Responsible
Suppliers’ and GNFC shall have a right to understand and seek details of the manner/
mechanism in which such benefits shall passed on to it.
► TAX INDEMNITY CLAUSE:
If GNFC is not able to avail Input Tax Credit due to any short coming / failure on partof the
Supplier in compliance of provisions of GST Law applicable from time to time, including but
not limited to mismatch of ITC between Invoice and GST return uploaded by supplier (which
otherwise should have been available to GNFC in the normal course) and issuance of valid
tax invoice compliant with e invoicing and / or any other applicable requirements under the
GST Law, the Supplier shall at his own cost and effort get the short coming rectified. If, for any
reason, said rectification is not possible, the Supplier shall make ‘good’ the loss suffered or
potential loss that may be sufferedby GNFC due to or on account of short coming / failure on
part of the Supplier in compliance of provisions of GST Law and consequent tax credit loss
caused to GNFC in that transaction. When any shortcoming is communicated by GNFC to
Supplier, the Supplier shall take prompt action to rectify the same at the earliest. GNFC
reserves right to recover from outstanding dues of Supplier without prejudice to above
mentioned obligation of Supplier to make ‘good’, the loss suffered or potential loss that GNFC
The Company shall not be liable for or in respect of any liabilities, whatsoever, arisingout of or
in connection with the non-compliance [examples like but not limited to non-payment of tax to
Government, non-filing of GST returns, delay in filing of GST returns,non-reporting of invoices
pertaining to supplies made to GNFC, breach of conditions specified in GST law for payment
of output tax liability as well as availment of input tax credit etc.] of any of the applicable
provisions of GST Law by the Supplier and the Supplier shall indemnify & keep indemnified
the Company against all such liabilities including but not limited to additional tax liability/ loss
of input tax credit, penalty, interest thereon, all direct and incidental expenditures in relation to
litigation cost being borne by company damages, costs, charges & expenses whatsoever in
respect thereofor in relation thereto.
SIGN & SEAL OF SUPPLIER
“MSME ANNEXURE”
1. MSME Checklist: The Bidders / Contractors / Vendors shall fill in the below
checklist and give confirmations as follows.
Sr. Checklist Confirmation
1. Bidders / Contractor / Vendor to confirm whether they are Yes No
registered under the Micro, Small and Medium Enterprises
2. If the Bidders / Contractor / Vendor is registered under the Tick Mark the applicable
MSMED Act, 2006, confirm the category under which the category
Bidder is registered under.
- Micro Enterprise:
- Small Enterprise:
- Medium Enterprise:
3. Bidders / Contractor / Vendor to confirm whether they are Tick Mark the applicable
covered under any of the following categories: category
- National Small Industries Corporation:
- Small Industries Development Corporation of any
State or Union Territory (UT):
4. Bidders / Contractor / Vendor to confirm whether they are Yes No
going to supply the goods produced by a Micro or Small
Enterprise or render services provided by Micro or Small
5. Bidders / Contractor / Vendor shall attach the ‘Udyam Attached No-Attached
Registration Certificate’
If the Bidders / Contractor / Vendor is registered under the MSMED Act, 2006, under
any of the categories mentioned at Point No. 2, 3 and 4 above, the following terms and
conditions shall be applicable to the Contract between the Contractor / Vendor and the
In case of inconsistency with any other terms and conditions of the Tender Documents
and the Contract, these terms and conditions shall prevail.
2. Submission of Despatch / Delivery Documents:
2.1 The Contractor / Vendor shall submit all the Despatch / Delivery documents
to the Company / GNFC, at the earliest and latest within 5 Days of the
delivery of goods and / or completion of the services.
2.2 The Contractor / Vendor shall ensure that the Despatch / Delivery documents
are submitted to the full satisfaction of the Company / GNFC.
3. Submission of Invoice:
3.1 The Contractor / Vendor shall submit the Invoice for the goods delivered /
services rendered, at the earliest and latest within 5 Days of delivery of goods
and / or completion of the services.
3.2 Along with the Invoice the Contractor / Vendor shall submit all the supporting
documents required for processing the payment.
3.3 The Contractor / Vendor shall submit the Invoice and the supporting
documents directly to the Bills Payment Section, Finance Department at the
following address:
Bills Payment Section, Finance Department,
GNFC Corporate Office,
P.O. Narmadanagar –
District: Bharuch, Gujarat
3.4 The Contractor / Vendor shall ensure that the Invoice and the supporting
documents are submitted to the full satisfaction of the Company / GNFC.
4. Payment Terms:
1.1 It is agreed by and between the Contractor / Vendor and the Company /
GNFC that the Company / GNFC shall be liable to make payment for the
goods delivered / services rendered by the Contractor / Vendor, within a
period of 45 days from the day of acceptance or the day of deemed
acceptance of goods / services by the Company / GNFC.
1.2 In case of any defect / deficiencies in the goods delivered / services rendered
by the Contractor / Vendor, the same shall be communicated by the
Company/ GNFC, to the Contractor / Vendor, within 15 days of delivery of
goods and/ or completion of services by the Contractor / Vendor and the
days period for releasing the payment shall commence only after defect/
deficiency is rectified/ resolved by the Contractor / Vendor, to the satisfaction
of the Company / GNFC.
1.3 The obligation of the Company / GNFC at sub-clause 3.2 and 3.3 shall be
subject to timely receipt of Despatch / Delivery Documents and Invoice (along
with supporting documents) from the Contractor / Vendor and in case of delay
on the part of the Vendor / Contractor, in submission of the Despatch /
Delivery Documents and Invoice (along with supporting documents), the
same shall be treated as a defect in the goods delivered / services rendered
and the 45 days period for releasing the payment shall commence only after
submission of such documents by the Contractor / Vendor, to the satisfaction
of the Company / GNFC.
2.1 It is agreed by and between the Bidders / Contractor / Vendor and the
Company/ GNFC that the payment for the goods delivered / services
rendered shall be released subject to contractual deductions like liquidated
damages, retention money etc., of whatsoever nature and the same shall not
be construed as non-payment of contractual dues to the Bidders / Contractor
/ Vendor by the Company/ GNFC.
2.2 It is agreed by and between the Bidders / Contractor / Vendor and the
Company/ GNFC that the provisions under Clauses 1, 2, 3 and 4 above
stipulates corresponding obligations of the Parties and the Parties shall
ensure adherence thereof, in letter and spirit.
Acceptance by the Bidders / Contractor / Vendor:
We hereby irrevocably and unconditionally accept this MSME Annexure along with all
the terms and conditions stipulated herein, without any objection or deviation,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Final_Canteen_Draft_Tender_26-27.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .