Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.7 LQualified | L1 | Qualified MSE, Category: General | |
| 2 | L2₹24.0 L+₹3.2 L (15.7%)Qualified 8 A I R LANE NEAR COMMUNITY HALL DELANIPUR PORT BLAIR SOUTH ANDAMAN ANDAMAN NICOBAR 744102 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744102 | L2 | Qualified MSE, Category: OBC | |
| 3 | L3₹28.4 L+₹7.7 L (37.3%)Qualified | L3 | Qualified MSE, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
8 Feb 2025, 1:00 pmClosed
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - WK507; HA1010 Clean the bilges and thoroughly inspect the structure to Main engine foundation Supports for distortion cracks and delamination; Service Provider
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - WK507; HA1011 Check the tightness of foundation bolts of all auxiliary machineries; Service Provider
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - WK507; HA1012 Marine Toilet Remove and clean all flexible pipes and refit with new clipsHand pumpsuction and discharge valve to be overhauledMake JABSCOModelCMPCT 24vDia..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - WK507; HB1013 Dfender Crack and deterioration observed at Dfenders at various places to be renewed as per sampleLegth approx10 MtrEBD type rubber fender 75x75x40 mm; Se..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - WB507; HB1014 Cleaning and painting of bilges of following compartment to be carried out as per paint schemePaint yard supply i Engine Room 148 Sqm Approx ii Pum..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - WB507; HB 1015 Wheel House sofa Rexine is deteriorated and tear off at various places to be renewed as per samplelength 03 mtr height and breadth 05 mtr each; Service Pr..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - WB507; HB 1016 Wheel House Sofa and sitting area seat cover to be changed as per sample Length03 mtrheight and breadth 05 mtr eachQty02; Service Provider
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - WB507; HB 1017 Wheel House Sofa and sitting area Floor Mat is damaged To be renewed as per sample Area 12 SQm Mat PVC VINYL; Service Provider
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - WB507; HB1018 Wheel House Wash Basin Tap leaking drain pipe choked pipe to be chemically clean and tap to be reneweddia of pipe40mmMaterial MS Tap materialSS; Service Pr..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - WB507; HB1019 Wheel House rear window sun light protection film shading screen tear off at amny places to be replaced as per sample Area20 Sqm; Service Provider
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - WB507; HB1020 A wooden locker at crew cabin broken Hinges securing holes inlarge Locker to be repaired and sunmica sheet to be renewed Size1mtrx1mtrx05 mtr; Service Prov..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - WB507; HB1021 Ingress of rain water observed in bridge Crew cabin Engine room and pump room through window beeding Wire gland and securing bolt of stanchion Beeding to b..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - WB507; HB1022 Anchor and chain cable to be chip and clean and paint with two coats of anti corosive paint Make SEA Links Weight50 Kg Cable Length10 Mtr Dia10mm Paint and..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - WB507; EA3001 Gear oil cooler to be chemically claeneed and pressure tested In way job include renewal of gasketO rings and 02 nos sacrificial anode TP 15 barQty02; Serv..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - WB507; EA3002 AC sea water pump to be overhauled and proved for Bid Details 2/46 satisfactory operation Jobs include renewal of bearings Mechanicalseal and impeller MakeCrompton Greaves ..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - WB507; EA3003 Checks all cooling coils for cleaniness and corrosion If the coils are dirty Clean with water sparay Soap solution and nylon brush and carryout pressure te..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - WB507; EA3004 Fire Fighting system ModelNOVEC 1230 Following jobs to be undertaken in yearly routine a Check Manual operation b Calibrate all pressure device ..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - WB507; EA3005 Following sewa water syatem valve to be removed overhaulked and pressure tested All material and spares Yard supply a Bilge syatem valve 40 NB TypeSDN..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - WB507; EA3006 Fresh water tank to be cleaned with liquid detergent Renew Man hole cover gasket; Service Provider
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - WB507; EA3007 Fuel Oil tank to be cleaned inspect and paint the as per paint scheme Paint Yard Supply Renew Manhole Cover gasket; Service Provider
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - WB507; EA3008 Fire Pump ot be overhauled and proved for satisfactory operation All spares and material yard supply Make CEM Model AM 512A; Service Provider
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - WB507; EA3009 Bilge pump to be overhauled and proved for satisfactory operation All spares and material yard supply Make CEM Model AM 512A; Service Provider
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - WB507; EB3010 Fresh water pump is not developing sufficient pressure Suspect excessive clearence between pump and impeller Pump to be overhauled and proved for satsifac..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - WB507; EB3011 Quick Shutt off valve cover of firemain syatem broken to be fabricated as per sample Material FRP Sheet Saize04x08x12 inches; Service Provider
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - WB507; EB3012 Securing Clamps of Sw Fw and fuel syatem coroded and deteriorated to be renewed as per sample a Dia12 inches Qty06 MaterialSS b Dia10 inches Qty06..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - WB507; EB3013 04 nos gland bush stud of port and stbd shafting thread wornout Stud to be fabricated and fitted as per sample Dia14 mm Length72 mm MaterailSS; Service Pro..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - WB507; LA5001 Engine Room supply fans with motors 02 Nos to be overhaul and bearings to be replace Make CEM Model VE35230M; Service Provider
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - WB507; LA5002 05 in no Battery Charger to be overhauled and proved for satisfactory operation all spares and material yard supply MakeVICTRON ENERGY ModelBLUE SMART IP67..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - WB507; LA5003 Window Wiper Overhaul the window wiper motor and gear assembly Replace bearings if required Wiper blade to be changed as per sample All spares and materia..
Repair
Maintenance
and Installation of Plant/Systems/Equipments Bid Details 3/46 (Version 2) - WB507; LA5004 General Lighting Replace the damage fittings with a new one Qty08; Service Provider
7445824
GEM/2025/B/5881823
Two Packet Bid
Maintenance
South Andamans, Andaman And Nicobar Islands
Total value wise evaluation
SERVICE
7 documents required · 7 mandatory
3 yrs
₹3
Exempted
30 Jan 2025
30 Jan 2025
8 Feb 2025
and Installation of Plant/Systems/Equipments (Version 2) - WK507; HA1010 Clean the bilges and thoroughly inspect the structure to Main engine foundation Supports for distortion cracks and delamination; Service Provider
and Installation of Plant Systems/Equipments (Version 2) - WK507; HA1011 Check the tightness of foundation bolts of all auxiliary machineries; Service Provider
and Installation of Plant/Systems/Equipments (Version 2) - WK507; HA1012 Marine Toilet Remove and clean all flexible pipes and refit with new clipsHand pumpsuction and discharge valve to be overhauledMake JABSCOModelCMPCT 24vDia..
and Installation of Plant/Systems/Equipments (Version 2) - WK507; HB1013 Dfender Crack and deterioration observed at Dfenders at various places to be renewed as per sampleLegth approx10 MtrEBD type rubber fender 75x75x40 mm; Se..
and Installation of Plant/Systems/Equipments (Version 2) - WB507; HB1014 Cleaning and painting of bilges of following compartment to be carried out as per paint schemePaint yard supply i Engine Room 148 Sqm Approx ii Pum..
and Installation of Plant Systems/Equipments (Version 2) - WB507; HB 1015 Wheel House sofa Rexine is deteriorated and tear off at various places to be renewed as per samplelength 03 mtr height and breadth 05 mtr each; Service Pr..
and Installation of Plant/Systems/Equipments (Version 2) - WB507; HB 1016 Wheel House Sofa and sitting area seat cover to be changed as per sample Length03 mtrheight and breadth 05 mtr eachQty02; Service Provider
and Installation of Plant Systems/Equipments (Version 2) - WB507; HB 1017 Wheel House Sofa and sitting area Floor Mat is damaged To be renewed as per sample Area 12 SQm Mat PVC VINYL; Service Provider
and Installation of Plant/Systems/Equipments (Version 2) - WB507; HB1018 Wheel House Wash Basin Tap leaking drain pipe choked pipe to be chemically clean and tap to be reneweddia of pipe40mmMaterial MS Tap materialSS; Service Pr..
and Installation of Plant/Systems/Equipments (Version 2) - WB507; HB1019 Wheel House rear window sun light protection film shading screen tear off at amny places to be replaced as per sample Area20 Sqm; Service Provider
and Installation of Plant Systems/Equipments (Version 2) - WB507; HB1020 A wooden locker at crew cabin broken Hinges securing holes inlarge Locker to be repaired and sunmica sheet to be renewed Size1mtrx1mtrx05 mtr; Service Prov..
and Installation of Plant/Systems/Equipments (Version 2) - WB507; HB1021 Ingress of rain water observed in bridge Crew cabin Engine room and pump room through window beeding Wire gland and securing bolt of stanchion Beeding to b..
and Installation of Plant/Systems/Equipments (Version 2) - WB507; HB1022 Anchor and chain cable to be chip and clean and paint with two coats of anti corosive paint Make SEA Links Weight50 Kg Cable Length10 Mtr Dia10mm Paint and..
and Installation of Plant/Systems/Equipments (Version 2) - WB507; EA3001 Gear oil cooler to be chemically claeneed and pressure tested In way job include renewal of gasketO rings and 02 nos sacrificial anode TP 15 barQty02; Serv..
and Installation of Plant/Systems/Equipments (Version 2) - WB507; EA3002 AC sea water pump to be overhauled and proved for Bid Details 2/46 satisfactory operation Jobs include renewal of bearings Mechanicalseal and impeller MakeCrompton Greaves ..
and Installation of Plant Systems/Equipments (Version 2) - WB507; EA3003 Checks all cooling coils for cleaniness and corrosion If the coils are dirty Clean with water sparay Soap solution and nylon brush and carryout pressure te..
and Installation of Plant/Systems/Equipments (Version 2) - WB507; EA3004 Fire Fighting system ModelNOVEC 1230 Following jobs to be undertaken in yearly routine a Check Manual operation b Calibrate all pressure device ..
and Installation of Plant/Systems/Equipments (Version 2) - WB507; EA3005 Following sewa water syatem valve to be removed overhaulked and pressure tested All material and spares Yard supply a Bilge syatem valve 40 NB TypeSDN..
and Installation of Plant Systems/Equipments (Version 2) - WB507; EA3006 Fresh water tank to be cleaned with liquid detergent Renew Man hole cover gasket; Service Provider
and Installation of Plant/Systems/Equipments (Version 2) - WB507; EA3007 Fuel Oil tank to be cleaned inspect and paint the as per paint scheme Paint Yard Supply Renew Manhole Cover gasket; Service Provider
and Installation of Plant/Systems/Equipments (Version 2) - WB507; EA3008 Fire Pump ot be overhauled and proved for satisfactory operation All spares and material yard supply Make CEM Model AM 512A; Service Provider
and Installation of Plant Systems/Equipments (Version 2) - WB507; EA3009 Bilge pump to be overhauled and proved for satisfactory operation All spares and material yard supply Make CEM Model AM 512A; Service Provider
and Installation of Plant/Systems/Equipments (Version 2) - WB507; EB3010 Fresh water pump is not developing sufficient pressure Suspect excessive clearence between pump and impeller Pump to be overhauled and proved for satsifac..
and Installation of Plant Systems/Equipments (Version 2) - WB507; EB3011 Quick Shutt off valve cover of firemain syatem broken to be fabricated as per sample Material FRP Sheet Saize04x08x12 inches; Service Provider
and Installation of Plant/Systems/Equipments (Version 2) - WB507; EB3012 Securing Clamps of Sw Fw and fuel syatem coroded and deteriorated to be renewed as per sample a Dia12 inches Qty06 MaterialSS b Dia10 inches Qty06..
and Installation of Plant Systems/Equipments (Version 2) - WB507; EB3013 04 nos gland bush stud of port and stbd shafting thread wornout Stud to be fabricated and fitted as per sample Dia14 mm Length72 mm MaterailSS; Service Pro..
and Installation of Plant/Systems/Equipments (Version 2) - WB507; LA5001 Engine Room supply fans with motors 02 Nos to be overhaul and bearings to be replace Make CEM Model VE35230M; Service Provider
and Installation of Plant/Systems/Equipments (Version 2) - WB507; LA5002 05 in no Battery Charger to be overhauled and proved for satisfactory operation all spares and material yard supply MakeVICTRON ENERGY ModelBLUE SMART IP67..
and Installation of Plant/Systems/Equipments (Version 2) - WB507; LA5003 Window Wiper Overhaul the window wiper motor and gear assembly Replace bearings if required Wiper blade to be changed as per sample All spares and materia..
and Installation of Plant/Systems/Equipments Bid Details 3/46 (Version 2) - WB507; LA5004 General Lighting Replace the damage fittings with a new one Qty08; Service Provider
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_7445824.pdf
GEM_BID
1738132777.pdf
OTHER
1738132781.pdf
OTHER
ATC_9984f2a5-bf39-4974-b3501738133045260_DTO14.docx
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .