Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-AOC | L1 | Accepted-AOC SELECTED CONTRACTOR | |
| 2 | Rejected-Technical | - | Rejected-Technical L3 | |
| 3 | Rejected-Technical | - | Rejected-Technical L2 | |
| 4 | Rejected-Technical | - | Rejected-Technical L4 |
Tender Value
₹1.6 L
EMD Value
₹3,889
Closing Date
6 Jan 2023, 6:00 pmClosed
AE
OFFICE OF AE,LSGD,CHINNAKANAL
PIPE LINE
2022_LSGD_544467_8
08/AE/LIDEW/CKNL/22-23
Open Tender
Civil Works - Water Works
Item Rate
90 days
PANCHAYATH
Please refer Tender documents.
9 documents required · 9 mandatory
₹555
Yes
₹3,889
Yes
1 Feb 2023
30 Dec 2022
9 Jan 2023
30 Dec 2022
6 Jan 2023
30 Dec 2022
Amount
Road Concreting
3.5.2:Excavation in Soil with Dozer with lead upto 100 m <br> Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections.
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
Balachandran
RAJAN S
IKKAS CONSTRUCTIONS
Bidder Name
Balachandran
IKKAS CONSTRUCTIONS
RAJAN S
ANSHAD P K
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_796054.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .