Tender Value
₹14.4 L
EMD Value
₹15,000
Closing Date
15 Jun 2026, 6:00 pm
Executive Engineer, Rajkot Irrigation Project Division, Rajkot
Third Try Resurfacing of Bitumen Road On Earthen Dam At Veri Irrigation Scheme Ta. Gondal Dist: Rajkot
309671
RIPD 05 of 2026-27
Open
Civil - All
Rajkot
6 documents required · 6 mandatory
₹900
Executive Engineer Rajkot Irrigation Project Division Rajkot.
₹15,000
29 May 2026
29 May 2026
29 May 2026
15 Jun 2026
29 May 2026
Name Of Work :- Resurfacing of Bitumen Road On Earthen Dam At Veri Irrigation Scheme Ta. Gondal Dist: Rajkot
BILL OF QUANTITIES (SCHEDULE - B)
Item Description of Item Quantity Unit Estimated Rate Rs. In Figures. Amount
No. (with brief specification and reference to book of specifications)
Rs. In Rs. In Words
1 Preparing surface by brushing with wire brushes for removing caked mud etc. 3290.00 Sqmt 18.74 (Rupees
sweeping with brooms and finally fanning the cleaned surface with gunny bags Eighteen And
to remove all loose dirt etc.(II) BLACK TOP SURFACE Seventy Four
2 Providing and laying 37.50 mm Buitt up spray grout in one layer black crushed 247.00 M.T. 2011.73 (Rupees Two
stone aggregate as per gradation and specification including using bitumen Thousand Eleven
VG 30 for tack coat at the rate of 4.00 Kg./10 sq.m, on BT surface by And Seventy
mechanical sprayer sprayer and bitumen VG- 30 grade mixing at the rate of
19.90 kg.Mt.by weight of totat mix (i.e.1.99%) including heating and mixing the
aggregate and bitumen by continuousl batching drum mix plant, transporting
the mix and spreading the same by paver finisher and consolidation with
vibratory roller including cost of all materials, fuel, labours, tools and plants
using contractor's own drum mix plant and machineries etc. compete.
3 Providing, laying and rolling of 25 mm thick open graded premix bitumenous 173.00 M.T. 2275.47 (Rupees Two
carpet with B.T. aggregate as specified and using bitumen VG-30 for mixing Thousand Two
with aggregate at the rate of 3.4% i.e. 34.00 Kg./ M.T. of total mix including Hundred Seventy
heating and mixing in drum mix plant, spreading the same with paver finisher
Five And Fourty
and consolidation with vibratory roller including necessary fire wood,
oil,lubricants, labour charges etc. using contractor's own drum mix plant and
equipment tools etc. completed in accordance with the requirement of Only)
Item Description of Item Quantity Unit Estimated Rate Rs. In Figures. Amount
No. (with brief specification and reference to book of specifications)
Rs. In Rs. In Words
4 Providing and laying 20 mm thick Mix Seal Surface (M.S.S.) using stone chips 146.00 M.T. 2881.49 (Rupees Two
as per MORTH specification using 60/70 grade and using bitumen at rate of Thousand Eight
50.00 Kg/ M.T. ie 5.00% by weight of total mix using Drum mix plant and laid Hundred Eighty
by paver finisher including consolidation with vibrator roller including heating
the asphalt including all necessary equipment tools, plants, oil, fire, wood and
kerosene and all labour charges etc complete (Including using contractor's
Nine Paisa Only)
own drum mix plant and machineries)
5 Providing and laying Asphalt painting on B.T Surface with bitumen grade VG- 3285.00 Sqmt 21.61 (Rupees Twenty
10 at the rate of 5.00 Kg/10 Sq.mt by mechanical cap sprayer and spreading One And Sixty
the stone dust on prepared surface at the rate of 0.03 Cum/10 Sq.mt and One Paisa Only)
rolling with PTR roller & brushing etc. comp.
(Rupees Fourteen Lakh Fourty Three Thousand Eight Hundred Ninety Four And Sixty One Paisa Only)
I/We/ am/are willing to carry out the work at ---------------------- % Below / Above ………….. % ( should be written in figures and words) of the
estimated rates mentioned above amount of my / our tender works out as under
Estimated Amount Estimated Amount
Put to tender Rs………………..
Put to tender Rs………………..
Deduct …….. % Below Rs………….
Add …….. % Above Rs………….
( Please strike out whichever is not applicable)
The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment shall be
2 The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-10/2017 Cement Consumption/16/C
Date:11/05/2017 as stated in S.O.R.thereforeinR.C.C.items where there is a change as per actual mix design the cost of difference of cement consumption
have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of contractor. Executive Engineer
Rajkot Irrigation Project Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. ONLINE_NOTICE.pdf
1. E-SBD Veri Re-Surface Road road part 1.pdf
2. SBD survo road part 2.pdf
3. Paripatra Part-3 (R and B).pdf
4. SCHEDULE B Veri Re-fursacing approach road.pdf
Download all tender documents and submit your bid