Making new compound wall,gate and Paver block foothpath at different palces from MP/MLA,Councillor budget and other budget in Paldi ward West Zone.(ARC)
281870
8/25-26 (T.N.99)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹1,500
Yes
Municipal Commissioner, Ahmedabad
₹25,101
Yes
3 Mar 2026
3 Mar 2026
3 Mar 2026
6 Mar 2026
3 Mar 2026
Name of Work:- "Making new compound wall,gate and Paver block foothpath at
different palces from MP/MLA,Councillor budget and other budget in Paldi
ward West Zone."
Sr.No Qty Items Rate Rs. Per Amount Rs.
1 200.00 Excavation for foundation up to1.5 m depth
including sorting out and stacking of useful
materials and disposing of theexcavated
stuff upto 50 Meter lead.(A) Loose or soft
soil 115.92 Cmt
50.00 (B)1.5 to 3.0 mt.depth
2 50.00 Filling available excavated earth
(excluding rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding
20 cm. in depth consolidation each
deposited layer by ramming and watering. 129.10 Cmt
3 20.00 Filling in plinth with sand under
floors including watering ramming,
consolidating and dressing etc. complete.
4 20.00 Filling in foundation and plinth with murrum
or selected soil in layers of 20 cm.
thickness including watering,ramming and
consolidating etc. 286.20 Cmt
5 Conveyance charge of earth, lime, murrum,
building rubbish, manure, garbage, sludge,
excavated rock, fly ash, aggregates of any
kind executed outside the road site. Rate
also includes spreading & levelling etc
380.00 c)Lead up to 5 Km.
6 Extra rate over item of excavation of earth
for excavation of asphalt pavement / RCC
of thickness up to 0.20 meter including
demolishing the asphalt carpet, metal,s
oiling/cutting Reinforcement etc.comp. with
stacking the material as directed. (Based
on Previously approved rate by C E sir )
a 40.00 up to 0.20 meter thickness (By Manual) 71.42 cmt
b 30.00 0.20 to 0.30 meter (By any type of Breaker
Machine or R.C.C.Cutter machine including
cost of operator, fuel, & transportation etc
complete. 178.57 cmt
c 30.00 0.30 meter & above (By any type of
Breaker Machine or R.C.C.Cutter machine
including cost of operator, fuel, &
transportation etc complete. 312.50 cmt
7 85.00 Providing and laying cement
concrete1:5:10 (1-Cement: 5- coarses
sand and:10-hand broken stone
aggregates 40mm nominal size) and
curing complete excluding cost of
formworkin (A) Foundation and Plinth
(upto 10 ton). 2,492.51 Cmt
8 65.00 Providing and laying cement
concrete1:4:8 (1-Cement: 4- coarses
and:8-hand broken stone aggregates
40mm nominal size) and curing
complete excluding cost of formworkin
(A) Foundation and Plinth (upto 10 ton). 2,653.67 Cmt
9 Providing and laying cement concrete
work 1:2:4 ((1-Cement:2- coarse sand:4-
graded aggregates 20mm nominal size)
curing complete excluding cost of
formwork and reinforcement.
a 55.00 Foundations, footings, base or columns
and mass concrete 3,923.53 Cmt
b 40.00 Slabs, landing, shelves, balconies, lintels,
beams, girders and cantilivers upto
floor two level 4,012.47 Cmt
c 25.00 Independent piers, columns, and pillars,
upto floor two level 4,012.47 Cmt
10 Brick work using common burnt clay
building bricks having crushing
not less than 35kg./Sq.Cm.in foundation
and plinth in Cement Mortar1:6 (1-Cement
:6 - fine sand)
100.00 (A) Conventional (upto 10 ton)
10.00 B) Modular 4,241.70 Cmt
11 Extra Rate for brickwork in Above Item
for super structure above plinth level upto
floor two level (B) Conventional
a 50.00 (A) Conventional (upto 10 ton) 272.25 Cmt
b 5.00 B) Modular
12 Providing form work in ordinary timber
planking so as to give a rough finish
including centering, shuttering, strutting
and propping etc. height of propping
and centering below supporting floor to
celling not exceeding 4 M
& removal of the same for in situ reinforced
or plain concrete work upto floor four level.
a 200.00 Foundation, footings, bases of columns
etc. and mass concrete. 171.68 Smt
d 150.00 Vertical surface such as walls (any
thickness) partitions and the like including
attached buttresses
& string course & the like. 229.95 Smt
e 150.00 (ii) Sides And Soffits Of Beam,
Haunchings Cantilevers, Girders,
Bressumers And Lintels Not Exceeding
1 M In Depth. 192.15 Smt
f 50.00 (G) Columns PillarsPosts and struts. (1)
Square Rectangular Polygonal in plan. 297.68 Smt
g 10.00 (2) Circular or curved in plan. 422.10 Smt
13 1100.0 P/F structural steel frame as per design
0 using angles,chanel secction the rate
incl.cleaning cutting ,bending ,welding and
fabrication as per design the rate
incl.carting the frame to thae site applying
red oxide and two coat of oil paint colour as
directed.name board indicating pole/street
name of approach should be of plain MS
sheet (C.R.C. sheet) to be fixed on 80 mm
dia.M.S.pipe or any appropriate dia.of pipe
& 40 mm x 40 mm x 5 mm size angle and
30 mmx6 mm flates framing work having
M.S.decorative basket design artical which
given as per drawing or engg.in charge. 60.71 kg
14 300.00 Providing 10mm thick cement plaster in
single coat on rick/concrete walls for interior
plastering upto floor two level and finished
even and smooth in (i)Cement mortar 1:3 (1-
cement:3-sand) 127.58 Smt
15 300.00 Providing 20mm thick sand faced cement
plaster on walls upto height 10 metres above
ground level consisting of 12mm thick
backing coat of C.M. 1:3 (1-cement : 3-sand)
and 8mm thick finishing coat of C.M. 1:1 (1-
cement : 1-sand) etc. complete. 215.78 Smt
16 500.00 Colour washing with lime on wall surface
(two coats) over and including a primary 12.29 Smt
coat of white washing to give an even
shade after through brooming the surface
to remove all dirt, dust, mortar drops and
other foreigh matter.
17 100.00 Removing dry or oil bound
distemper by a washing and scraping
and sand papering the wall surface
smooth including necessary repairs to
scratches complete. 11.19 Smt
18 500.00 Distempering with dry distemper of
approved brand and manufacture (two
coats) and of required shade on wall
surfaces of given an even shade, over
and including a priming coat of
whiting after thoroughly brooming the
surface free from mortar dropping and
other foreign matter. 46.94 Smt
20 150.00 Distempeing (Two coats) with oil bound
distemper of approved brand and
manufacture and of required shade on
wall surfaces to give an even shade,
over and including a priming coat with
primer of approved brand and
manufacture after thoroughly brushing the
surface free from mortar dropping and
other foreign matter
and also including preparing the surface
even and sand papered smooth. 76.08 Smt
21 350.00 Wall painting (two coats) with plastic
emulsion paint of approved brand and
on undecorated wall surface to give an
even shade including throughly brushing
the surface free from mortar droppings
and other foreign matter and sand papered
smooth. 78.44 Smt
22 150.00 Painting one coats (excluding priming
coat) on previously printed steel and other
metal surface with synthetic enamel paint,
brushing to give an even shade including
cleaning the surface of all dirt, dust and
other foreign matter. 54.35 Smt
23 150.00 Painting two coats (excluding priming
coat) on external surface of new rain water,
soil, waste and vent pipes and fittings with
ready mixed bituminous brushing, black,
anti corrosive to give an even shade
including cleaning of all dirt, dustand other
foreign matter.(75 mm dia) 20.16 Smt
24 100.00 Painting two coats (excluding priming
coat) on external surface of new rain water,
soil, waste and vent pipes and fittings with
ready mixed bituminous brushing, black,
anti corrosive to give an even shade
including cleaning of all dirt, dust and other
foreign matter.(100 mm dia) 16.70 Smt
25 100.00 Applying two coats of Birla
(whitecementbased) or Asian
(acryliclapy- putty) or equivalent & two
coats of primer of approved brand and
manufacture on new wall surface to give
an even shade including thoroughly
brushing the surface free from mortar
dropping 40.19 Smt
26 300.00 Finishing wall with weather proof exterior
emulsion paint on wall surface (two
coats) to give an required shape even
shade after thoroughly brushing the surface
dirt, and remains of loose powdered
materials.etc complete 113.40 Smt
27 50.00 Demolition including stacking of
serviceable materilas and disposal of
unserviceable materials with all lead and
lift. (i) R.C.C. work 1047.38 Cu.M.
28 60.00 Demolition of Brick work and stone
masonry including stacking of
serviceable materil as and disposalof
unserviceable materials with all lead and
lift.(ii) In Cement Mortar. 362.25 Cu.M.
29 80.00 Dismentling barbed wire in fencing
including making rolls and also including
dismentling fencing posts including all earth
work concrete in base and making
good the disturbed ground stacking
useful materials as directed and
disposing as directed and disposing
of the unserviceable materials with all
lead and lift. 66.15 Rmt
30 150.00 Removing and scraping of old
deteriorated plaster of any thickness
R.C.C member including stacking of
serviceable material and disposal of
unserviceable from site of work with all lead
and lift 19.38 Smt
31 50.00 Providing and fixing 1.20 Metre high
fencing with 2.0 Metre long M.S. Angle
posts 40 mm x 40 mm x 6 mm and oil
painting 3 coats fixed at2.5 Mt, C/c. with
five Horizontan lines and two diagonals of
galvanised steel barbed wire weighting
9.38 Kg. per 100 Metre, strained and fixed
to posts with G.I, staples including fixing
the posts in ground with 0.5 M x 0.5.M x
0.5 M. block in C.C 1:5:10 etc complete. 385.40 Rmt
32 2000.0 .Providing TMT Bar FE 415 reinforcement
0 forR.C.C. work including bending, binding
and placing in position complete up to floor
two level (up to 10 ton) 66.59 Kg.
33 250.00 Supplying and fixing of 300 mm-L x
150mm-B x 380 mm-H Kerb block for
Footpath in M-20 grade using 20 mm
nominal size black trap aggregate of
Sevaliya/Timbaor equivalent quality
for pre-cast blocks,
reasonablyexposed finish/
formwork , mould with well
equippedwith vibratory system for kerb
stones of approved design including
curing, etc. complete, including thecost of
formwork etc. complete. The rate shall
also include necessary cutting of
asphalt, fixing the Kerbstones in line and
level on 5 cm thick sand bedding
withnecessary equipments and materials.
The rate shall also include the flush
pointing in CM (1:3) for all joints of
thekerbstones. Filling of zari alone the
sides of the kerbstone fixed with
concrete Bituminousconcrete / C.C. mixed
in proper position to flush withthe road
surface as directed by Engineer in
change to form a portable mixture.a)
Laying on 5 cm thick Sand Bedding 350.89 Rmt
34 700.00 Providing and Laying of Rubber Moulded
Paver Block Grey/Coloured 60 mm thick,
M-35 Grade of any size ; shape (Usually
Uni-Paver Blocks) using black trap good
quality aggragate of 20 mm nominal size
for footpath, parking areas, service lanes
and other areas as mentioned in the
drawing / instruction of engineer in charge.
Cost includes formworks using rubber
mould, Rate providing and laying paver
blocks as per required grading and
specification. The paver block shall be
mechanically compacted. The work of
paving blocks shall be executed in line and
level by skill mason of flooring work only. It
should be laid in such a way that the no
cutting of the paver block to be necessary.
if cutting of paver block necessary then it
should be cut by machine only and carting.
The finished surface of the paver block
shall have resonably good, plain finished.
Paver blocks shall be compacted and shall
be relaid if necessary. Gravel or such type
of materials shall not be allowed for
production. Laying on 5cms thick sand
beddding.I) Laying on Sand bedding as per
requirement to fix the C.C.Block / Nibhada
Stone in Line & Level 501.60 Smt
Tender Fee Rs.1500.00
Earnest Money Rs.25,101.00
Contractor’s Name & Address :
MEMORANDUM OF WORK IN BRIEF
"Making new compound wall,gate and Paver block
foothpath at different palces from MP/MLA,
1. Name of Work
Councillor budget and other budget in Paldi ward
Rs.25,10,071.35 (exclusive of GST). GST will be paid extra by
2. Tender Estimated Cost AMC/Authority at prevailing rate to the contractor.
1% of the Tender Cost in the form (Rs.25,101.00)
3. Earnest Money (D.D./Pay Order / Local Micr Check/B.G.)
4 Tender Fee Rs Demand Draft of Rs.1500.00
6. Time-Limit 12 months
7. Validity Period 120 Days
8 Eligibility Criteria Register “E-2” class in PWD in Govt. R&B/CPWD/AMC or
equivalent registration with any other state Govt. or institutions.
(i) Last Date of Submission of
9 the Dt-24.07.2024 upto 18:00 PM
(ii) Mode of Sending a) In Sealed cover in duplicate copies by Registered Post A.D, or
by Courier.or hand delivery
b) Tender sent by ordinary post will be rejected out right.
(iii) Description essential to be a) Name of work, Tender Notice No. & Tender No.
made on sealed cover b) Date of receiving tender by Corporations.
(iv) Mode of quoting rates in The Price bid shall be submitted online only.t
Schedule of Quantities and shall not be submitted Physically.
10 Date of Opening Dt-25.07.2024, 15:00 PM
Place of Submission & Submission of EMD. Tender fee and other Documents during office
11. Opening of hours: On Dt.25.07.2024 &12:00 pm West Zone, 2nd Floor, A.M. Office,
Tender Dr. Ramanbhai Patel Bhavan, Usmanpura.Ahmedabad
Municipal Corporation, W.Z. Office, Ahmedabad-380013.
(1) Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and upto
12 Penalty Due to Delay of 30 Lakhs), (3) Rs.5000 per day (for all tenders amounting
work above 30 Lakhs) but not more then 10% of bill
13 Defect Liability As per ‘B-1 Form Close
Whenever a work is allotted by Engineering staff, whether minor or
Time permitted to start major of part thereof of any amount, the contractor shall be bound to
14 parts ofwork start the works within 48 hours of intimation of work. Communication
done telephonically via SMS, Via Whatsapp and
through letter / E-mail shall be considered legal and binding for the
same. Failure of comply to start the works in 48 hours of intimation
as above by contractor the contractor shall be levied penalty of (1)
Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and upto
30 Lakhs), (3) Rs.5000 per day (for all tenders amounting above
30 Lakhs). Three times failures by contractor shall make
contractor responsible to be black listed unless and otherwise
justified properly in writing / binding within 15 days of last notice of
The staff of the contractor shall wear safety jackets,
hoes, helmets etc. while on duty and any violation will attract
fine of Rs. 5,000/- for each incident.
15 Safety Failure to erect safety signage or trying to carry out
he works without proper precautions/safety measures as
equired will attract a fine of Rs. 5,000/- for each incident.
16 Defect &Liability Period The contractor shall be responsible to make good and remedy at
his own expense any defect which may develop or may be noticed
before the period mentioned hereunder from the certified date of
completion, The within 15 days of receipt of the notice. In the case
of failure on the part of the contractor, the Engineer-in-charge may
rectify or remove or re-execute the work at the risk & cost of the
contractor. The Engineer-in-charge shall be entitled to appropriate
the whole or any part of the amount of security deposit towards
the expenses, if any, Incurred by him in rectification, removal or re-
execution. The Defects Liability period shall be as under(a) for all
works costing upto Rs. 50,000 ( amount put to tender), the period
shall be 3 months from the certified date of completion.
(b) for all works costing more than Rs. 50,000 and upto Rs. 1 crore
(amount put tender), the period shall be 6 months from the
certified date of completion or one monsoon, whichever is later.
(c) for major projects costing more than Rs. 1 crore, the period
shall be 12 months from the certified date of completion which
should include one monsoon.
(d) For building works, the period specified in (a), (b) or (c) above
OR elapse of monsoon period following the certified date of
completion, whichever is later. For the purpose of deciding the
monsoon period, the 30th September may be treated as the last
17 Time permitted to start parts of Whenever a work is allotted by Engineering staff, whether minor
work or major of part thereof of any amount, the contractor shall be
bound to start the works within 48 hours of intimation of work.
Communication done telephonically via SMS, Via Whatsapp and
through letter / E-mail shall be considered legal and binding for
the same. Failure of comply to start the works in 48 hours of
intimation as above by contractor the contractor shall be levied
penalty of (1) Rs.1000/- per day (for tenders amounting upto
Lakhs), (2) Rs.2500 per day (for tenders amounting above
Lakhs and upto 30 Lakhs), (3) Rs.5000 per day (for all tenders
amounting above 30 Lakhs). Three times failures by contractor
shall make contractor responsible to be black listed unless and
otherwise justified properly in writing / binding within 15 days of
last notice of penalty.
18 Compensation for Delay 10% of Remaining work (As per Circular)
19 Addendum/Corrigendum Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To
the Final Submission Time And Date. The Same Shall From a part
Of Tender And The Same As to be Attached Along With The Tender
20 EPF Act As per Acoount Department circular no-37 Date:09/08/2018
21 GST GST will be paid extra by AMC/Authority at prevailing rate to the
Contractor's Sign Add.C.E.(west zone)
AMC Finance dept. circular No – 41, Dt.08/02/2022
(A) Guarantees issued by following banks will be accepted as SD/EMD on permanent basis.
(1) All Nationalized Banks
(B) Guarantees issued by following banks will be accepted as SD/EMD for the period up to March- 31,
The validity cut-off date in the GR is with respect to the date of issue of Bank Guarantee irrespective of the
date of termination of Bank Guarantee. Guarantees issued or Authorized by Ahmedabad Branch Only.
(1) Commercial Banks:
(3) ICICI Bank.
(5) Kotak Mahindra Bank
(6) IndudInd bank
(8) Tamilnadu Mercantile Bank
(9) Ujjivan Small Finance bank
(10) A U Small Finance Bank
(11) Fedaral Bank Bank
(12) Equitas Small Finance bank
(13) Bandhan Bank
(14) Standard Chartered Bank
(2) Co-Operative & Rural Banks of Gujarat
1. The Mehsana Urban Co-operative Bank Ltd
2. The Ahmedabad Mercantile Co-Operative Bank Ltd
3. Nutan nagrik Sahakari Bank Ltd
4. The Kalupur Commerical Co-operative Bank Ltd
5. Rajkot Nagarik Sahakari Bank Limited
6. The Gujarat State Co-Operative Bank
7. Sarswat Bank
8. Saurashtra Gramin Bank
Seal and Signature of the Bidder Addl City Engineer
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION, (hereinafter called “the Employer”) invites sealed
Tender document from reputed and qualified bidders for the construction of Works detailed in the
Sr. Name of Works Approximate Earnest Completion
No. value of works (Rs.) Money Period
1 "Making new compound Rs. 25,10,071.35/- Rs.25,101/- 12 Months
wall,gate and Paver block
foothpath at different palces
from MP/MLA,Councillor
budget and other budget in
Paldi ward West Zone."
2. Interested bidders shall download the tender documents from AMC’s website
www. amcnprocure.com/ www.nprocure.com.
3. Tender (a complete set of bidding document) fee shall be Rs.900.00 in the form of Demand Draft / Pay
Order from any Nationalised Bank in favour of MUNICIPAL COMMISSIONER, Ahmedabad, payable at
Ahmedabad, which shall be non refundable.
4. All bids must be accompanied by Earnest Money Deposit of the amount specified for the Works in the
above Table payable at Ahmedabad and drawn in favour of MUNICIPAL COMMISSIONER, Ahmedabad,
payable at Ahmedabad,. Earnest Money Deposit will have to be specified in Clause 2 of Financial
5. Physical submission must be delivered to Asst. Manager (Admin) West Zone, 2nd Floor,Dr. Ramanbhai
Patel Bhavan, Usmanpura, Ahmedabad Municipal Corporation, W.Z. Office, Ahmedabad-380013.
6. The Bids will be opened at the office of Addl.City Engineer (W/Z) , Ahmedabad Municipal Corporation,
2nd Floor, Dr. Ramanbhai Patel Bhavan, Usmanpura, Ahmedabad Municipal Corporation, W.Z. Office,
Ahmedabad-380013. in the presence of bidders or their representatives who choose to attend. In the
event of the specified date of bid submission/opening being declared a holiday for the Employer, the
bids shall be received /opened on the next working day at the same place and the same time.
TERMS & CONDITIONS
( A ) INSTRUCTIONS TO BIDDERS (ITB)
( B ) GENERAL TERMS & CONDITIONS
( C ) FINACIAL TERMS & CONDITIONS
( D ) TECHNICAL SPECIFICATION /MAIN CONDITION
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( A ) INSTRUCTIONS TO BIDDERS (ITB)
1. Procedure for Submission of Tender
a). The Bidder should quote the price bid in tender form before schedule time Tender Document, tender fee &
EMD (Draft /DD) and all other enclosures as asked in tender.
b).The bidder shall submit the following Tender documents physically in hard copy in two separate envelope
(marked as “original” and other marked as “Duplicate”) in schedule time by RPAD/ Speed Post/ Hand
Delivery in duplicate. The Bid envelopes shall be marked as follows:-
Tender Document
Registration certificate of class
c).The envelope shall be addressed to the Employer at the following address:
Asst. Manager (Admin) West Zone,
2nd Floor,Dr. Ramanbhai Patel Bhavan,
Usmanpura, Ahmedabad Municipal Corporation,
W.Z. Office, Ahmedabad-380013
d).Bear the following identification:
“TO BE OPENED ONLY IN PRESENCE OF THE EVALUATION COMMITTEE”
e). Indicate the name and address of the bidder.
If the outer envelope is not sealed and marked as above, the Employer will assume no responsibility for the
misplacement or premature opening of the bid.
f).All information has to be typed or hand written legibly. All pages of the Bid have to be initialed by the bidder.
g) All The Bid Document Essentially Needs to be Properly binded/steppled
2. Assessment of Submission
2.1 The Employer will open the technical bid of physically submitted document of all the bids received for the
package (except those received late) containing the sealed Tender volume and other enclosures then
announce the names of bidders in the presence of bidders or their representatives who choose to attend
on the date and time mentioned in the NIT In the event of specified date of bid opening being declared as
a holiday for the Employer, the Tender will be opened at the appointed time and location on the next
2.2 In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first. The Employer at the
opening will announce bidder’s names, , the presence/or absence of EMD, the amount and validity of EMD
furnished with each bid, is valid registration and such other details, as the Employer may consider
2.3 The Employer will determine whether the bid is accompanied by the required EMD.
2.4 If the EMD furnished does not conform to the amount and validity period as specified in the Invitation for
Bid and has not been furnished in the form, the bid shall be rejected by the Employer as non-responsive
and the Tender volume will be returned to the bidder.
2.5 Subject to confirmation of the EMD by the issuing bank, the Tender volume accompanied with valid EMD
will be taken up for further evaluation. In case, the Bank does not confirm the EMD, the bid shall be
rejected as non-responsive and no further evaluation carried out.
2.6 The tender volume will further be examined to determine whether the bid has been properly signed,
meets the eligibility and qualification criteria, has the required available bid capacity, is accompanied by
the requisite certificates, undertaking and other relevant information specified in the bid documents and is
substantially responsive to the requirement of the bidding documents and provides any clarification for
ascertaining the correctness of the information/details.
2.7 If the Tender volume is not substantially responsive, it will be rejected by the Employer and will not
subsequently be made responsive by correction or modification or withdrawal of the nonconforming
deviation or reservation.
3. Evaluation and Comparison of Tender volume
The Employer will evaluate and compare only those Tender volumes which are determined to be
substantially responsive in accordance with Clause 2 and qualified for award of Contract in accordance
with Clause 5 (General Terms and Condition).
4. Procedure for Tender Opening
Received copies of tender in physical form with in schedule time, will be open on schedule date and time.
In the event of specified date of bid opening being declared bidders who qualify the criteria then bidder bid
will be considered for opening of price bid.
5.1 The Employer will award the Contract to the bidder whose bid has been determined to be substantially
responsive to the bidding documents and who has offered the lowest Evaluated Bid Price, provided that
such bidder has been determined to be (i) eligible in accordance with the provisions of Clause 3(General
Terms and Condition); and (ii) qualified in accordance with the provisions of Clause 5(General Terms and
6. Notification of Award
6.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer will notify the
successful bidder by cable/fax and confirmed by registered letter that his bid has been accepted. This letter
shall name the sum which the Employer will pay the Contractor in consideration of the execution,
completion and maintenance of the Works by the Contractor as prescribed by the Contract.
6.2 The notification of award will constitute the formation of the Contract.
7. A successful Bidder has to deposit security deposit / Bank Guarantee as per Circular after receiving letter of
Indent. Time limit of work will commence from the date of issue of work order.
8. Clarification of Bids
8.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his discretion,
ask any bidder for authentication the correctness of the information/details furnished by him in his bid.
Such request by the Employer and the response by bidder shall be in writing or by cable/fax.
8.2 Subject to above clause, no bidders shall contact the Employer on any matter relating to his bid from
the time of bid opening to the time contract is awarded.
8.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid comparison or
contract award decisions may result in the rejection of his bid.
9.1 Information relating to the examination, clarification, evaluation and comparison of bids and
recommendations for the award of a contract shall not be disclosed to bidders or any other persons not
officially concerned with such process until the award to the successful bidder has been announced. Any
effort by a bidder to influence the Employer's processing of bids or award decisions may result in the
rejection of his bid.
10.1 The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for itself on
its own responsibility all information that may be necessary for preparing the bid and entering into a
contract for construction of the Works. The costs of visiting the Site shall be at the bidder’s own expense.
10.2 The bidder and any of its personnel or agents will be granted permission by the Employer to enter its
premises and lands for the purpose of such inspection, but only upon the express condition that the
bidder, its personnel and agents, will release and indemnify the Employer and its personnel and agents
from and against all liability in respect thereof and will be responsible for death or personal injury, loss of
or damage to property and any other loss, damage, costs and expenses incurred as a result of the
11.0 Cheklist for submition of Technical Bid.
11.2 valid Registration Copy.
11.3 Valid E.M.D
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( B ) GENERAL TERMS & CONDITIONS
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites Tender document for the
construction of works (as defined in these documents, hereinafter referred to as "the Works") detailed in the
table given in the IFB.
1.2 The Works consist of: “as Above "
Source of Funds
1.1 The expenditure on these Works will be met by AHMEDABAD MUNICIPAL CORPORATION.
3. Eligible Bidders
3.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet the following
A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent practice.
The bidders shall have a registration with State PWD, and/or CPWD for "E1" class and or equivalent. If
contractor is not registered with AMC in the relevant class, on award of contract he shall be required
to register himself with AMC within 3 month's time.
Bidders shall provide such evidence of their continued eligibility satisfactory to the Employer, as the Employer
shall reasonably request.Subject to Submition of Succsesful Submition as per Clause –II of R.&B.
4. Eligible Material, Equipment and Services
4.1 At the Employer's request, the bidder having offered the lowest evaluated financial bid may be required to
provide evidence of the origin of materials, equipment, and services to the satisfaction of the Employer.
4.2 For purposes of Sub Clause 4.1, "origin" means the place where the materials are mined, grown, produced
or manufactured; similarly for equipments and from where the services are provided.
5. Qualification of the Bidder
To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the bidder; and
AHMEDABAD MUNICIPAL CORPORATION
EN G I N E E R I N G D E PA RTM E N T
Name of Work :-"Making new compound wall,gate and Paver block foothpath
at different palces from MP/MLA,Councillor budget and other
budget in Paldi ward West Zone." (ARC)
Th e wo rk sh a ll b e co m p l et e d w i th 12 Mo n t h s a ft er th e o r de r to sta r t th e wo r k s.
E n gin e er /Ad d l . C i ty E n g i n e er a nd h is o r d e r wi l l b e co n si de r ed fi n a l.
Th e con t ra c to r sh a l l h a v e t o m a in t a in ac cou n t o f st e e l , c e m en t a n d o t he r ma t er i al s t ha t m a y b e
b ro u g h t b y h i m o n s it e. Th is a cc ou n t sh a ll be r e gu l a r ly ma i nt a i ne d a n d kep t o p en fo r i n sp e ct io n b y
Mu n i cip a l S ta ff . W a t e ri n g o f a l l th e it e m s sh a l l b e a s p er i n st ru ct i o n s. Mi x i n g o f c o n c r et e sh a l l b e
o cc u r s. Th e co nt r a cto r sh a l l a r r a n g e fo rm ed a mp er sa nd i n n i g h t a n d h e sh a ll b e r e sp o n si b l e for
o ver t h e bu i l d in g w i th f in a l fi n i sh in g o f th e w o rk a s d i r e ct e d. A ll t h e r e j ec te d m a t er i a l s sha ll b e
F or m ixi n g mo r ta r e it h e r fo r m a so n ry o r fo r p la st er or fo r a ny o th er p u r po s e co n tr a cto r sh a l l h a v e
co nt r a c to r a n d h e sh a ll b e p a i d a t t h e r at e f i xed by C.E . / Ad d l . C i t y E ng i n e er a s p e r t h e ra t e
If in th e i n te r e st o f th e Co r po r a t io n i t i s n e ce ssa ry t o c ha n g e e i th e r a n y s it e o r t he d e si gn o f t h e
ext r a a n d th e co n tr a cto r w i l l h a ve t o c a r r y o u t t he wo r k s a n d h e wi ll b e p a id a t t h e r a t e q uo t e d b y
h im a n d n o c l a i m for e xt r a fo r su b seq u en t c h a n g e s ma y b e e n te r ta in ed .
Th e cu b ic a l co n t e nt s o f t h e c e me n t b a g sh a l l be ta k en a s 1 -2 0 c ft. P er ba g a n d th e con t ra c t o r s
wh en t ech n ic a l r eq u ir e m en t s a r e s uch th a t co n ti n u it y o f wo r k sh o u ld b e ma i nt a i n ed a n d t h a t to
wi ll be w i t h p r i o r p e r mi ssi o n o f th e co mp et en t au t ho r i ty .
wh i ch w i l l b e p a i d a t t h e t i me o f fin a l b i l l.
Co nt r ac tor wi l l b e ful l y re sp o n s ib le fo r co mp l i a nc e o f t h e va r i o u s pr e v i si o n und er co ntr a c t Ac t.
Mu n i cip a l Co r p o r at i on s h al l w it h ou t pr ej u d ic e t o a ny ri gh t o r r e m ed y b e a t li b er ty to fo r f ei t in fu l l
A s p e r Ci r cu l a r N o . M C R 2 1 7 6 ( 96 ) 24 18 ( i i ) G H H d a t e d 31 - 03 - 77 i ssu e d b y Go ver n m e nt o f Gu j a r a t
co nt r a c to r s a r e r eq u e st ed t o pr o d u c e t h e i r q u a rr y m a te r i a l s fo r co n st r u ct i o n w o r k th r o u gh l e gal
so u r c e s. i. e. o n l y f o r m t he q u a r ry l e a se h o l d er s, p er m i t h o l de r o r mi d d le m a n wh o sa t i sfi e s t h e
If t h e wo r k i s n o t ca r ri e d o ut w i th i n t h e sp ec if i ed ti m e l i mi t pen a l t y w i l l b e cha r g ed a pp l ica bl e a s
Co nt r a cto r h a s t o m a k e h i s o wn a r ra ng e m en t fo r p r o cu r e m en t o f st ee l a n d c e m e n t.
i ii ) In ca se o f t e nd e r d o wn l o a d e d f ro m w eb si t e, te nd er f e e & E MD sho u l d be su b mi tt ed i n fo r m
l iab i l it y C la u s e i s n o t a p p l ica b l e Fo r t h is Wo r k .
V) i n t h e C a s e m i s s i n g / D o u t , C o r r e c t i o n o r D e t a i l S p e c i f i c a t i o n A s P er G ov t. Sp e ecif ica tio n A ppli ca bl e For
W o r k s b o o k a v a i l a b l e f r o m G u j a r a t Book Stores (Pvt.) Ltd. Sector-21,Gandhinagar,DE TAIL E D GE NER AL
T E C H N I C A L S P E C I F I C A T I O N S c a n b e a va i la bl e fr o m A h m ed a b a d Mu n i c ip a l Cor p o ra ti o n w e b si te
C o n tr a c to r ’s Si gn a tu r e Ad d . C i ty E n g in eer
( Wes t Z o n e)
General information
All individual firms must complete the information in this form. Nationality information shall be provided for all
owner(s) or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address With Contact no.:
3 Local office address (if any) With Contact no.:
4 Telephone/ Contact With name :
5 E-mail address:
6 Place of incorporation/registration:
7 Year of incorporation/registration:
Additional information regarding litigation, debarment, arbitration, etc.
Authorised Signeture Bidder
5.3 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for any of the
following reasons:
a) Misleading or false representation in the forms, statements and attachments submitted and included in
b) Record of poor performance such as abandoning the work, rescinding of contract for which the reasons are
attributable to the non-performance of the contractor, consistent history of litigation awarded against the
applicant or financial failure due to bankruptcy.
c) Has been identified by the Employer as poor performer in implementation of ongoing AMC works.
d) The bidder fill (tender) in percentage rate above or below and total amount (both in figures and words) only
d) The bidder fill (tender) in percentage rate above or below and total amount (both in figures and words) only
in E-Tender (Online) Not to fill in hard copy of Tender documents
5.4 Debarment/Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for their misleading or
false representations in the forms statements etc. for the period to be decided by the Employer.
6. One Bid per Bidder
6.1 Each bidder shall submit only one bid per contract package either by himself or as a partner in a joint
venture. A bidder who submits or participates in more than one bid for a contract package will be disqualified.
7. Bidding Documents
The bidder is expected to examine carefully the contents of all the above bid documents. Failures to comply
with the requirements of bid documents will be at the bidder's own risk. Pursuant to Clause 16, bids which are
not substantially responsive to the requirements of the bidding documents will be rejected.
8. Language of Bid
The bid, and all correspondence and documents related to the bid exchanged between the bidder and the
Employer shall be written in the English language. Supporting documents and printed literature furnished by
the bidder may be in another language provided they are accompanied by an accurate translation of the
relevant passages in the English language, in which case, for purposes of interpretation of the bid, the English
translation shall prevail.
9.1. Unless stated otherwise in the bidding documents, the Contract shall be for the whole works as described
in bidding documents, based on the percentage rate amount in the Bill of Quantities submitted online by
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in figures and
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in figures and
words) for overall items of the Works provided in the Bill of Quantities
10. Bid Validity
10.1 Bids shall remain valid as per Instruction to Bidders (ITB) after that deadline date for bid submission
specified in Clause. The Employer as non-responsive shall reject a bid valid for a shorter period.
10.2 In exceptional circumstances, prior to expiry of the original bid validity period, the Employer may request
the bidders to extend the period of validity for a specified additional period. The request and the
responses thereto shall be made in writing or by fax. A bidder may refuse the request without forfeiting
his bidder agreeing to the request will not be required or permitted to modify his bid but will be required
to extend the validity of his Bid Security for the period of the extension, and in compliance with Clause
( Financial Terms & Conditions) in all respects.
11. Format and Signing of Bid
11.1 The bidder shall prepare two copies of the documents comprising the bid as described in Instructions to
11.2 The bid shall be typed or written in indelible ink and shall be signed by a person or persons duly
authorized to sign on behalf of the bidder.
11.3 The bid shall contain no alterations, omissions or additions, except those to comply with instructions
issued by the Employer, or as necessary to correct errors made by the bidder, in which case the person
or persons signing the bid shall initial all such corrections.
11.4 All witnesses and sureties shall be persons of status and probity and their full names,
Occupations and addresses shall be printed below their signatures.
12. Deadline for Submission of Bids
Bids must be received by the Employer at the address specified above not later than the time and date
specified in the NIT.
Any bid received by the Employer after the deadline for submission of bids will be returned unopened to the
14. Signing of Agreement
At the same time that the Employer notifies the successful bidder that his bid has been accepted, the Employer
will direct him to submit the Performance Security and attend the Employer's office on a date determined by
the Employer for signing the Form of Agreement.
15. The selection process will lay high emphasis on the ability and competency of contractors to do high quality
work within the given time schedule.
16. The onus of providing, all necessary company / project related information, in appropriate manner and
medium, so as to demonstrate the competency of the bidder and to allow proper evaluation, will rest entirely
17. All clause shall be operative from the date of issue of work order and up to the expiry of original and
extended time limit.
18. Legal Condition:-
Corrupt or Fraudulent Practices
The Employer will reject a proposal for award if he determines that the Bidder recommended for award
has engaged in corrupt or fraudulent practices in competing for the contract in question. The Employer will
declare the firm ineligible, either indefinitely or for a stated period of time, to be awarded a contract by
AHMEDABAD MUNICIPAL CORPORATION if it at any time determines that the firm has engaged in corrupt
or fraudulent practices in competing for the contract, or during execution.
“corrupt practice” means behavior on the part of officials in the public or private sectors by which they
improperly and unlawfully enrich themselves and/or those close to them, or induce others to do so, by
misusing the position in which they are placed, and it includes the offering, giving, receiving, or
soliciting of anything of value to influence the action of any such official in the procurement process or
in contract execution; and
“fraudulent practice” means a misrepresentation of facts in order to influence a Procurement process
or the execution of a contract to the detriment of the Borrower, and includes collusive practice among
bidders (prior to or after bid submission) designed to establish bid prices at artificial non-competitive
levels and to deprive the Borrower of the benefits of free and open competition.
Municipal Commissioner reserves the rights to reduce/increase the scope of work and contract without
assigning any reason thereof.
If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be liable for
disqualification / rejection at any stage.
Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If the Tender
volume is submitted without valid documents and without proof of eligibility criteria it will be rejected.
Those who do not meet with the eligibility criteria need not submit the Tender document.
Tenders, which do not fulfill all or any of condition or are submitted incomplete in any respect or are
conditional tenders, will be rejected.
Contractor shall be responsible to obey all Labour Laws, Environmental and Safety Laws.(the existing laws
as well as framed from time to time). Any penalties laid due to violation of such laws shall be directly
deducted from the contractor's outstanding.
19. Administrative Conditions:-
Safety and Signage
Contractor has to arrange for the complete safety of the persons working for project, users of the road i.e.
public and vehicles also. All the arrangements of traffic drums, metal / fiber cones, traffic blinkers, traffic
signs as per design, safety tapes etc. to be arranged at site. Necessary florescent marking on traffic signs to
be provided so that it should be visible at night. During night working hours safety in charge personnel shall
be provided with florescent jackets. This shall be Provided at no extra cost by the bidder under attaché
with specified in the tender documents under payable iteme.
Liaison with local authority for electrical connections for the AMC
The contractor is responsible for liaison with local authority for change in supply connection or new
connection on behalf of AMC. It includes filling the necessary application to power Supply Company, follow
up and getting the supply, filling the necessary test reports to the power supply company. All official fees
including security deposits and other expenses shall be of initially paid by the contractor. AMC may
support to get the temporary connection and may at its diseretien get the same converted to permanent
connection at the same of AMC if desired do,and contractor shall as no extra cost support the same. In
this case AMC my be as the remaining cost subject to approval.
20 :- CONTINGENT FEE:
The Contractor warrants that he has not employed any person to solicit or secure the contract upon any
agreement for a commission, percentage, brokerage or contingent fee. Breach of this warranty shall
give the Municipal Commissioner the right to cancel the contract or to take any other measure as the
Municipal Commissioner may deem fit. The warranty does not apply to commissions payable by the
contractor to establish commercial or selling agent for the purpose of securing business.
No officer, employer of the Municipal Corporation be admitted to any share or part of this contract or
to any benefit that may rise there from.
21:- OVERPAYMENT AND UNDERPAYMENT:
Whenever any claim fourths payment of a sum to the Municipal Corporation arises out of or under this
Contract against the contractor the same may be deducted by the Municipal Corporation from any sum
then due or which at any time thereafter may become due to the contractor under this contract and
failing that under any other contract with the Municipal Corporation or from any sum due to the
contractor with the Municipal Corporation (which may be available with Municipal Corporation), or from
his retention money, or he shall pay the claim on demand. The Municipal Corporation reserves the right
to carry out post payment audit and technical examination of the final bill including all supporting
vouchers, abstracts, etc.
The Municipal Corporation further reserves the right to enforce recovery of any over payment when
detected not withstanding the fact that the amount of the final bill may be included by the Contractor.
If as a result of such audit and technical examination any over payment is discovered in respect of any
work done by the Contractor or alleged to have been done by him under the contract, it shall be
recovered by the Municipal Corporation from the contractor by way of all the means prescribed above or
if any under payment is discovered by the Municipal Corporation, any amount due to the contractor
under this contract or under payment may be adjusted against any amount then due or which may at any
time thereafter become due before payment is made to the contractor from him to the Municipal
Corporation on any other contract account whatsoever.
If, at any time, there should be evidence of any lien or claim for which owner might have become liable
and which is chargeable to the contractor, the owner shall have the right to retain out of any payment
then due or thereafter to become due an amount sufficient to completely indemnify the owner against
such lien or claim or if such lien or claim be valid the owner may be or become due and payable to the
contractor. If any lien or claims remaining, unsettled after all payments are made, the contractor shall
refund or pay to the owner all money that the latter may be compelled to pay in discharging such lien or
claim including all cost and reasonable expenses.
Contractor shall not sub-let the work without permission of the authority.
Joint venture and subcontracting shall not be allowed under this tender
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of
the contract documents. The full consideration shall be given to such addendum or corrigendum before
submission of tender duly filled in by the contractor. Therefore, the contractors shall have to kindly refer the
tender for such addendum or corrigendum published by AMC through its website www.amc.nprocure.com &
www.nprocure.com 48 hours prior to the deadline of submission of the tender. Tenderers shall verify the
number of addendum issued and enclose the same with the tender documents , failing which the tenders shall
be liable for rejection and no any complaint in respect to this shall be entertained under any circumstances.
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( C ) FINACIAL CONDITION
1. Cost and Currencies of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid and the Employer
will in no case be responsible or liable for those costs.
Currencies of Bid and Payment
The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
All payments including advances, if any, shall be made in Indian Rupees.
2. Earnest Money Deposit :-
2.1 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid shall be valid for
28 days beyond the validity of the bid.
2.2 The EMD of the unsuccessful bidders, except for L1,L2 and L3 bidders, will be returned as promptly as Early
as possible as but not later than 28 days after the expiration of the period of bid validity.
2.3 The EMD of the successful bidder, along with second and third lowest tenders, will be returned when the
bidder has furnished the required performance security and signed the agreement.
2.4 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) Furnish the required Performance Security or
ii) Sign the Agreement.
3. (A) Security Deposit :-
Within 15 (fifteen) Working days of the date of receipt of the Letter of Intent (LOI) the successful bidder
shall deliver to the Employer, a Initial Security Deposit Shall be submitted as per C.E. Circular.in the form
of a Bank Guarantee/ DD/Locle MICR cheque for an amount equivalent to 5% (five percent) of the Contract
Failure of the same shall make the contractor liable for any penalty as decided by AMC. At present a
policy is framed by Audit department of AMC to charge 4% interest for the balance period and
discontinuity period.
The Security Deposit to be provided by the successful bidder in the form of a bank guarantee as per
format shall be issued as per Memorendum of work.
(E) Retention :-
a). Retention @ 2% of the value of work done will be deducted from each RA bill. It will be released along
with release of payment of Final Bill.
4. Approved Bank: - As per Annexer -I
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to any extent and contractor shall not claim any extra rate for the same.
8. Penalty: - 10 percent of the balance work on Date of Completion Date or extended time limit. & As per
9. Tax, Duties on Materials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax, VAT (exculding GST) etc.
on material procurement or any other component for the works from any source shall be borne by the
Special Clause:
As per construction works welfare cess Act – 1996 non-refundable one percent of tender amount shall be
deducted against works welfare cess.
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
General terms & conditions
1. Tenderer should be registered in PWD/ in Govt. R&B /CPWD / AMC or equivalent registration with any other
state Govt. or institutions. Copy of registration should be attached with tender document. Tenderer who was
not registred in AMC must be get registred in panel of approved AMC contractor.
2. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water Resources Department with the
correction slips made up to 15-08-1999 may be referred. (only English version) Clause No. -2 liquidated
damages for delay shall be overrule by A.M.C.’s M.C.circular no.- 9 dt. 18/05/2012.
3. In the specification “as directed" / "approved" shall be taken to mean "as directed / "approved" by the
Engineering in charge.
4. Wherever a reference to any Indian standard appears in the specifications, it shall be taken to mean as
reference to the latest edition of the same of force on the date of agreement.
5. In "Mode of measurement" in the specifications wherever a dispute arises in the absence of specific mention
for a particulars point / aspect, the same in the relevant Indian Standards shall be referred to.
6. All measurement and computations, unless otherwise specified shall be carried out nearest to the
following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or thickness shall be
7. Definite particulars covered in the items of work, though not mentioned or elucidate in its specifications shall
be deemed to be included therein.
8. Approval of the samples of various materials given by the Engineer in charge or AMC's Consultant shall not
absolve the contractor from the responsibility of replacing defective materials brought on site or materials
used in the work found defective at a later date. The contractor shall have no claim to any payment or
compensation whatsoever on account of any such materials being rejected by the Engineer in charge.
9. The contractor’s rate for the item of work shall be for the work completed in all respect.
10. All materials including those of electrical shall be got approved by the Engineer in charge/ Architect before
using them in the work.
11. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be removed from the site
of work within 24 hours.
12. All work shall be carried out in a manner as per standard engineering practice.
13. All tools, templates, machinery and equipment for correct execution of the work as well as for checking lines,
levels, alignment of the works & all precautionary measures during execution shall have to be kept in sufficient
numbers and in good working condition at the site of the work. All excavated trench shall be kept covered with
barricade and caution tap.
14. Special modes of the construction not adopted in general Engineering practice, if proposed to be adopted by
the contractor shall be considered only if the contractor provided satisfactory evidence that such special mode
of construction and completion of work to the required strength and quality. Acceptance of the same by the
Engineer in charge shall not however, absolve the contractor from the responsibility of any adverse effect and
concordance of adopting the same in the course of exaction or completion of the work.
15. The contractor shall be responsible for observing the rules and regulation imposed under the "Minor Mineral
Act", and such other laws and rules prescribed by the Government from time to time.
16. All necessary safety measures and precautions (incl. those laid down in the various relevant Indian Standard)
shall be taken to engrave the safety of men, materials and machinery on the work and also of the work itself.
17. Quantity measured in the tender is approximate. It may increase or decrease looking to the quantum of actual
work for which no any claim shall be entertained by A.M.C.
18. Contractor shall have to execute extra item if required or as per need of AMC.
19. The work in general shall be carried out as per standard specifications of the relevant items to be executed &
as per the instruction of Engineer in charge & as per the guidance of AMC's Consultant for this project.
20. The general terms & conditions of the contract shall be applicable & shall be binding on the contractor. The
contract agreement shall have to be executed between AMC & the agency to which work is awarded for
21. For Tender amounting below 10 lakh LOI shall be issues within 3 days after received of sanctioned tender and
resolution.Within 10 days contractor has to submit SD and after reciveing SD Work order shall be issue to
contractor and the time limit shall be start from the date of issue of the written work order to the contractor.
For Tender amounting above 10 lakh LOI shall be issues within 3 days after received of sanctioned tender
and resolution .Within 15 days contractor has to submit SD and after reciveing SD work order shall be issue to
contractor and the time limit shall be start from the date of issue of the written work order to the contractor.
Security Deposit of 5% of sanctioned tender amount shall be deposited by pay order / demand draft /
cheque or Bank Guarntee of nationalized bank/scheduled bank only. Contractor shall have to sign contract
paper with AMC. The contractor shall be fined 4% of interest per year for delay in submission of S.D and shall
be deducted from contractor’s bill.
22. In case of any ambiguity in specifications mentioned in this tender, the interpretation given by M.C. Or His
Designeted Officer will be final and binding to the Contractor.
23. The contractor shall take no advantage of any apparent error or omission in drawing or specification and the
Engineer -in-charge shall make such corrections and interpretations as necessary to fulfill the intent of the
plants and specifications.
24. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
25. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal Corporation. will be
payable by the contractor.
26. No any kind of price rise / price escalation / price variation for cement, steel or labour shall be paid.
27. Contractor is requested to see the site physically before tendering. He is also requested to quote the rates
keeping in view of all the points mentioned in relevant pages of tender documents.
28. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped water for the
construction of the works and provide a satisfactory supply of potable water for drinking, washing, sanitation
and cleaning down. The contractor will be responsible for all the costs where applicable of connection, meter
installation, water consumed, water required for testing purposes, disconnection and the laying, maintenances
and ultimate removal of any distribution system around the site.
29. Electricity: Electric supply will be made available at the site by the Contractor and the contractor must make
his own arrangements with the Corporation and Electricity Supply Authorities and with other contractors to
connect and to take a supply from such services, paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site for purpose of the work
and shall pay such charges as is fixed by the appropriate supply Authorities.
In case there is any delay in supply of power site of any interruption or fault in the power during the work. No
compensation shall be paid for idle labor staff, machineries and for use of diesel operating sets etc. as the case
30. Tenders shall submit all the valid/certified documents in support of their initial/eligibility criteria mentioned
above along with the bid. They shall have also to submit the income tax clearance certificate and solvency
31. No advance such as secured advance machinery advance, mobilization advance or materials advance will be
32. The contractor shall get the electrical works executed through the authorized Government approved licensed
electrical person or firm in appropriate category in accordance to contractual provisions.
33. The electrical works shall be carried out strictly in accordance with the directives issued by Engineer in charge.
34. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes & thereby total amount of
(i) If the quantity stipulated in the tender items varies or the scope of work changes & thereby total amount of
work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision what so ever.
35. In case of any dispute, decision of Municipal Commissioner shall be final and binding on the contractors.
36. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any respect will be rejected.
Municipal Commissioner reserves the right to increase/decrease the scope of work. No any claim to that effect
shall be entertained. The Municipal Commissioner also reserves the right to reject any or all the tenders
without assigning any reason thereof.
37. The contractors are requested to quote their rates considering above tender conditions.
38. The contractor shall have to execute the contract agreement after received work order.
Even though in special case, If work is not started because of monsoon or any other special reason (like
site is not available and due to unavoidable circumstances arise), after evaluation of situation the actual date
of starting of work will be consider after approval of Dy.M.C. (West zone)
39. The Contractor shall not claim for increase or decrease in the quantity of the BOQ item or the scope of work.
40. The R.A bill / final bill payment shall be made as per the latest A.M.C policy / circular for the work done by the
41. Conditional tenders will not be accepted.
Signature of contractor with seal Additional City Engineer (W.Z)
Date Ahmadabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 months after the order to start the works. Progress of work should be in
proportion to time limit. The details of reinforcement of R.C.C. work shall be as per design and instructions of
Add. City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may be
brought by him on site. This account shall be regularly maintained and kept open for inspection by Municipal
Staff. Watering of all the items shall be as per instructions otherwise no payment shall be made to contractors.
Mixing of concrete shall be done by concrete mixer machine. Arrangements of binding vibrator for R.C.C.
works if required shall have to be made by the contractor.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The contractor
shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic. He shall be
responsible for any damage to public. If any incident happen, during the execution of work. In case of dispute
for unseen or overlooked items the decision of the Dy. City Engineer shall be final. The contractor shall have to
give site clean of all rubbish during the work and at the time of completion of work and hand over the site with
final finishing of the work as directed. All the rejected materials shall be removed from site within 24 hours by
contractor at this risk and cost. Debris shall have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall have
to prepare through of bigger size and mix the mortar in the required proportion. In on case he shall
be allowed to mix the mortar either on floor or any finished surfaces. The contractor shall have to
make his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the contractor and he
shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if item is not available
in SOR than based on current market rates. In case of extra item decision of Add. City Engg. shall remain final
regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the propose work
the contractor shall carry out the same at his quoted rates without charges any extra and the contractor will
have to carry out the works and he will be paid at the rate quoted by him. No claim for extra rate for
subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall have to
prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be fully
responsible for compliance of the various provisions under contract Act. 1970 and the Rules framed the to
The tender for the work shall remain open for a period (180) days from the date of opening of the tenders for
this work and that the tenderer shall not be allowed to withdraw on modify the offer on his own during the
period. If any tenderer withdraw or makes any modifications or addition in the terms and conditions of his
tender not acceptable to the Municipal Corporation the Municipal Corporation shall without prejudice to any
right or remedy be at liberty to forfeit in full the said earnest money and black list the contractor.
If work is not started within specified time limit the penalty as per rule & tender condition delay of start shall
be recovered separately from the immediate bills payable to the contractor. Contractor has to make his own
arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of
iv) Condition of Form - B1 Standard Specification of material & code of practice will be applicable. Form
B1 can be is available in website. Specification shall be as per ' R& B Dept. - Govt. of Gujarat booklets
of Building Works & and Road Works Specifications published by Gujarat Book Depot, Sector-21.
v) All the works Should be done as per specifications specified in Table. Item shall be executed AS PER
SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS GIVEN BY ENGG-IN CHARGE. All
the Specifications should be considered as R & B S.O.R & All Electrical Item works should be done as
specified in table. The works should be done as per Instruction of Engineer In Charge. All the
Specifications related to electrical works should be considered as Per R & B Electrical S.O.R. The
Make and Work Metholody of All of the above items specified in above tender Will be the Final
Decision of Engineer In Charge Or Additonal City Engineer.
vi) Important Note:-
As well as Considered Item Specifications as Per Item Given, not by serial number, the specifications
of items which are not mentioned in BOQ Item, Specifications should be considered as per AMC Sor
Current Approved Rates for Civil and Electrical Works, as per Available on Site of
Ahmedabadcity.gov.in All the Specifications should be Considered as per Schedules Rates of R & B
Division of both civil and Electrical Works. Hence it an ARC Tender All the Quantity Would Vary as per
Instruction of Engineer in Charge. No Rate would be given Extra for Increase or Decrease in the
Quantity of The BOQ Scheduled Items.
CONTRACTOR'SSIGNATURE ADD.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
STANDARD DETAILED TECHNICAL SPECIFICATION OF ITEMS
Name of Work:- Making new compound wall,gate and Paver block foothpath at
different palces from MP/MLA,Councillor budget and other budget in Paldi ward
West Zone.(A.R.C)
Excavation for foundation upto 1.5 M depth including sorting out and stacking useful materials
disposing of the excavated stuff upto 50 meter lead in loose or soft soil.
Any soil which generally yields to the application of ackaxes and shoves, phawaras rakes or any such ordinary
excavating implement or organic soil, gravel silt, sand turfloam, clay, peat etc., fall under this category.
Clearing the site :
The site on which the structure is to be built shall be cleared and all obstructions, loose stone, materials and
rubbish of all kind, bush, wood and trees shall be removed as directed. The materials so obtained shall be
property of the Government and be conveyed and stacked as directed. within 50 M. lead. The roots of the trees
coming in the sides shall be cut and coated with a hot asphalt.
The rate of site clearance is deemed to be included in the rate of earth work for which no extra will be paid.
After clearing the site, the center lines will be given by the Engineer-in-charge. The contractor shall assume full
responsibility for alignment, elevation and dimension of each and all parts of the work. Contractor shall supply
laborers, materials, etc. required for setting out the reference marks and bench marks and shall maintain them
as long as required and directed.
The excavation in foundation shall be carried out in true line and level and shall have the width and depth as
shown in the drawings or as directed. The contractor shall do the necessary shoring and shutting or providing
necessary slopes to a safe angle, at his own-cost. The payment for such precautionary measures shall be paid
separately if not specified. The bottom of the excavated area shall be 1 evened both longitudinally and
transversely. as directed by removing and watering as required. No earth filling will be allowed for bringing it to
level, if mistake or any other reason excavation is made. deeper or wider that shown on the plan or directed. The
extra depth or width shall be made up with concrete of same proportion as specified for the foundation concrete
at the cost of the contractor. The excavation up to 1.5 m. depth shall be measured under this item.
Disposal of the excavated stud :
The excavated stuff of the selected type shall be used in filling the trenches and plinth or leveling the ground in
layer including ramming and watering etc.
The balance of the excavated quantity shall be removed by the contractor from the site of work to a place as
directed with lead upped 50 M. and all lift.
Mode of measurement and payment :
The measurement of excavation in trenches for foundation shall be made according to the sections of trenches
shown on the drawing or as per sections given by the Engineer-in-charge. No payment shall be made for surplus
excavation made in excess of above requirements or due to slopping and sloping back as found necessary on
account of conditions of soil , and requirements of safety.
The rate shall be for a unit of one cubic meter.
Filling available excavated earth in trenches, plinth, sides of foundation etc. incl. watering and ramming
:The earth obtained from excavation shall be filled in layers not exceeding 20 cms. in depth and water
thoroughly after each layer and shall be properly consolidated with rammers so that no hollow voids
remain there. In general the work shall be carried out in the best manner so that no hollow voids
remain after work. Workmanship in general confirm to C –2.
Mode of Measurement shall be on cubic meter basis.
filling in plinth with sand under floors including watering, ramming consolidated and dressing
Sand shall conform to M.
The sand to be used for filling shall be free from salts, organic or other foreign matter, All clods of earth shall be
As soon as the work in foundation has been completed and measured, the site of foundation shall be cleared of
all debris, brick bats, mortar dropping etc; and filled with sand in layers not exceeding 20 Cms. Each layer shall
be adequately watered rammed and consolidated before the succeeding layer is laid. The sand shall be
rammed with iron rammers where feasible and with the butt ends of crow-bars, where rammer cannot be used.
The plinth shall be similarly filled with sand in layers not exceeding 20 Cms adequately watered and
consolidated by ramming with iron or wooden rammers. When nfilling reaches finished level, the surface shall be
flooded with water for at least 24 hours and allowed to dry and then rammed and consolidated.
The finished level of filling shall be kept to shape intended to be given to floor.
In case of large heavy duty flooring like factory flooring, the consolidation may be done by power rollers, where
so specified. The extent of consolidation required shall also be as specified.
Mode of measurement and payment :
The payment shall be made for filling in plinth and trenches, No deduction shall be made for shrinkage
or voids if consolidated as instructed above
The rate includes cost of collecting carting sand with all lead and labour for filling the same in plinth under floors.
The rate shall be for a unit of one cubic meter.
Filling in foundation and plinth with murrum or selected soil in layers of 20 cm. thickness
including watering, ramming and consolidating etc. Complete
Filling in foundation and plinth with murrum or selected soil shall be filled in layers not exceeding 20 cms. in depth
and water thoroughly after each layer and shall be properly consolidated with rammers so that no hollow voids
remain there. In general the work shall be carried out in the best manner so that no hollow voids remain after
work. Workmanship in general confirm to C –2.
Mode of Measurement shall be on cubic meter basis.
Item No : 5:- Conveyance charge of Earth,Lime, Murrum, building rubbish earch manure or sludge and
excavated rock and fly ash,aggregate of any kind etc.comp.upto 5 km lead.
All the surplus earth etc. shall be carried away immediately from the site of work to a place within 5km. distance
or as directed and ordered by the Engineer, so as not to cause any inconvenience to the public traffic finding
which in view of public safety and traffic convenience. The corporation shall carry out the work by any other
agency at the contractor’s risk and cost. If the instructions are not completed within 7 days from the date of order
to cart the surplus materials and clear the site, the said work shall be carried out by the Municipal Corporation at
the risk and cost of the contractor and no claim or dispute shall be entertained in this respect.
If the filling in trenches after settlement of the earth filling in trenches is to be done and the same shall be carried
out by the contractor without asking any extra rate. The contractor shall have to cart the surplus earth after the
trenches we will watered and refilled with the sand. The rate of carting including carting of brickbats, metal,
rubble vegetable and garbage, if necessary to clear the road surface.
The rate shall be for a unit of one cubic meter.
Item No.06 :- Extra rate over item of excavation of earth for excavation of asphalt pavement of thickness up
to 0.20 meter including demolishing the asphalt carpet,metal,soiling etc.comp. with stacking
the material as directed.
(b) 0.20 to 0.30 metre
(c) 0.30 m & above
extra rate for excavation of asphalt pavement of any thickness including demolishing the
asphalt carpet, metal, soiling etc. complete with stacking the materials as directed. The road
surface of asphalt shall carefully be opened to full width as directed by the Engineer in
charge Asphalt, popada's souls, metals etc shall be separately deposited in such places as
may be determined by the Engineering-charge. In case above materials not being so
deposited or being mixed up with the excavated materials will not be allowed for refilling.
The cost of materials shall be charged from the contractor. The decision of the C.E. shall be
final and binding to the contractor. The rate per sq. mt. in this item shall be paid extra
addition to the rate for excavation.
For detailed specification refer 5th revision of MORTH (2013) & also ammendment shall be
applicable to the latest versions.
Mode of measurement
Measurement shall be given in Smt Basis.
Providing and laying cement concrete1:5:10 (1-Cement: 5-coarses sand and:10-hand broken stone aggregates 40mm
nominal size) and curing complete excluding cost of formworkin (A) Foundation and Plinth (upto 10 ton)
Providing and laying cement concrete1:4:8 (1-Cement: 4-coarses and:8-hand broken stone aggregates 40mm
nominal size) and curing complete excluding cost of formworkin (A) Foundation and Plinth (upto 10 ton)
Providing and laying cement concrete work 1:2:4 ((1-Cement:2-coarse sand:4-graded aggregates 20mm
nominal size) curing complete excluding cost of formwork and reinforcement ( up to {(a) to (c)}
2.0 Materials: Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6, Grit
shall conform to M-8 Graded stone aggregate 20 mm nominal size shall conform to M-12.
3.1 The concrete mix is not required to be designed by preliminary tests. The proportion of the concrete mix
shall be 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 10 mm nominal size) by volume.
Concrete work shall have exposed concrete surface or as specified in the item.
3.2 The designation ordinary M-100, M-150, M-200, M-250 specified as per I.S Correspond approximately
to 1:3:6, 1:2:4, 1 1/2 :3 and 1:1:2 nominal mix of ordinary concrete by volume respectively.
3.3 The ingredients required for ordinary concrete containing one beg of cement of 50 Kg. by weight (0.0342
Cu. M) for different proportions of mix shall be as under:
Grade of Total quantity of dry Proportion of fine Quantity of
concrete aggregate by volume aggregate to coarse water per
per 50 Kgs, of cement aggregate 50 Kgs. of
to be taken as the cement
sum of individual maximum.
volume of fine and
coarse aggregates,
M-100 (1:3:6) 300 Liters Generally 1:2 for fine 34 Liters
M-150 (1:2:4) 220 ” aggregate by volume but 32 “
M-200 (1:1 1/2 :3) 160 “ subject to and upper 30 “
M-250 (1:1:2) 100 “ limit of 1:1/2 and lower 27 “
3.4 The water cement ratios shall not more than those specified in the above table. The cement content of
the mix specified in the Table shall be increased if the quantity of water in a mix has to be increased to
overcome the difficulties of placement and compaction so that the water cement ratio specified in the
Table is not exceeded.
3.5 Work ability of the concrete shall be controlled by maintaining a water cement ratio that is bound to give
a concrete mix which is just sufficiently wet to be placed and compacted without difficulty with the means
3.6 the maximum size of coarse aggregate shall be as large as possible within the limits specified but in no
case greater than surround all reinforcement thoroughly and to fill the corners of the form.
3.7 For reinforced concrete work, coarse aggregates having a nominal size of 20mm are generally
considered satisfactory.
3.8 For heavily reinforced concrete members as in the case of ribs of main beams the nominal maximum
size of coarse aggregate should usually be restricted to 5 mm less than the minimum clear distance
between the main bars, or 5 mm less than the minimum cover to the reinforcement whichever is smaller.
3.9 Where the reinforcement is widely spaced as in solid slabs, limitations of size of the aggregate may not
be important and the nominal maximum size may sometimes be as greater than the minimum cover.
3.10 Admixture may used in concrete only with approval of Engineer-in-charge based upon the evidence that
with the passage of time, neither the compressive strength of concrete is reduced nor are other requisite
qualities of concrete and steel impaired by the use of such admixtures.
4.0 Workmanship:
4.1 Proportioning: Proportioning shall be done by volume, except cement which shall be measured in
terms of bags of 50 Kg. weight. The volume of one such bag being taken as 0.0342 Cu. Meter. Boxes of
suitable sizes shall be used for measuring sand aggregate. The size of the boxes (internal) shall be
cms x 25 cms. and 40 cms deep. White measuring the aggregate and sand, the box shall be filled
without shaking ramming or hammering. The proportioning of sand shall be on the basis of its dry
volume and in case of damp sand, allowances for bulkage shall be made.
4.2.1 For all work, concrete shall be mixed in a mechanical mixer which along with other accessories shall be
kept in first class working condition and so maintained throughout the construction. Measured quantity of
aggregate, sand, cement required for each batch shall be poured into the drum of the mechanical mixer
while it is continuously running. After about half a minute of dry mixing, measured quantity of water
required for each batch of concrete mix shall be added gradually and mixing continued for another one
and half a minute. Mixing shall be continued till materials are uniformly distributed and uniform color of
the entire mass is obtained and each individual particle of the coarse aggregate shows complete coating
of mortar containing its proportionate amount of cement. In no case shall the mixing be done for less
than 2 minutes after all ingredients have been put into the mixer.
4.2.2 When hand mixing is permitted by the Engineer-in-charge for small jobs or for certain other reasons, it
shall be done on the smooth watertight platform large enough to allow efficient turning over the
ingredients of concrete before and after adding water. Mixing platform shall be so arranged that no
foreign material gets mixed with concrete nor does the mixing water flow out. Cement in required
number of bags shall be placed in a uniform layer on top of the measured quantity of fine and coarse
aggregate, which shall also be spread in a layer of uniform thickness on the mixing platform. Dry coarse
and fine aggregate and cement shall then be mixed thoroughly by turning over to get a mixture to
uniform color. Specified quantity of water shall then be added gradually through a rose-can and the
mass turned over till a mix of required consistency is obtained. In hand mixing quantity of cement shall
be increased by 10 percent above that specified.
4.2.3 Mixers which have been out of use for more than 30 minutes shall be thoroughly cleaned before putting
in a new batch. Unless otherwise agreed to by the Engineer-in-charge the first batch of concrete from
the mixture shall contain only two thirds of normal quantity of coarse aggregate. Mixing plant shall be
thoroughly cleaned before changing from one type of cement to another.
4.3 Consistency :
3.3.1 The degree of consistency which shall depend upon the nature of the work and methods of vibration of
concrete, shall be determined by regular slump tests in accordance with I.S. 1199-1959. The slump of
10mm to 25mm. shall be adopted when vibrators are used and 80mm when vibrators are not used.
4.4 Inspection:
4.4.1 Contractor shall give the Engineer-in-charge due notice before placing any concrete in the forms to
permit him to inspect and accept the false work and forms as to their strength, alignment, and general
fitness but such inspection shall not relieve the contractor of his responsibility for the safety of men,
machinery, materials and for results obtained. Immediately before concreting, all forms shall be
thoroughly cleaned.
4.4.2 Centering design and its erection shall be got approved from the Engineer-in-charge. One carpenter
with helper shall invariably be kept present throughout the period of concreting. Movement of labour and
other persons shall be totally prohibited for reinforcement laid in position. for access to different parts,
suitable mobile platforms shall be provided so that steel reinforcement in position is not disturbed. For
ensuring proper cover, mortar blocks of suitable size shall be provided so that steel reinforcement in
position is not disturbed. For ensuring proper cover, mortar blocks of suitable size shall be cast and tied
to the reinforcement. Timber kapachi or metal pieces shall not be used for this purpose.
4.5 Transporting and laying:
4.5.1 The method of transporting and placing concrete shall be as approved. Concrete shall be so transported
and placed that no contemination, segregation or loss of its constituent material takes place.
All form wok shall be cleaned and made free from standing water, dust, show or ice immediately before
placing of concrete.
No concrete shall be placed in any part of the structure until the approval of the Engineer-in-charge has
4.5.2 Concreting shall proceed continuously over the area between construction joints. Fresh concrete shall
not be placed against concrete which has been in position for more than 30 minutes unless a proper
construction joint is formed. Concrete shall compacted in its final position within 30 minutes of its
discharge from the mixer. Except where otherwise agreed to by the Engineer-in-charge concrete shall
be deposited n horizontal layers to a compacted depth of not more than 0.45 meter when internal
vibrators are used and not exceeding 0.30 meter in all other cases.
4.5.3 Unless otherwise agreed to by the Engineer-in-charge, concrete shall not be dropped into place from a
height exceeding 2 meters. When trunking or chutes are used they shall be kept close and used in such
a way as to avoid segregation. When concreting has to be resumed on a surface which has hardened, it
shall be roughened, swept clean, thoroughly wetted and covered with a 13 mm thick layer of mortar
composed of cement and sand in the same ratio as in the concrete mix itself. This 13 mm layer of
mortar shall be freshly mixed and placed immediately before placing of new concrete. Where concrete
has not fully hardened, all laitance shall be removed by scrubbing the wet surface with wire or bristle
brushes, care being taken to avoid dislodgment of any particles of coarse aggregate. The surface shall
then be thoroughly wetted, all free water removed and then coated with neat cement grout. The first
layer of concrete to be placed on this surface shall not exceed 150 mm in thickness and shall be well
rammed against old work particular attention being given to corners and close spots.
4.5.4 All concrete shall be compacted to produce a dense homogeneous mass with the assistance of
vibrators, unless, otherwise permitted by the Engineer-in-charge for exceptional cases, such as
concreting under water, where vibrators cannot be used. Sufficient vibrators in serviceable condition
shall be kept at site so that spare equipment is always available in the event of breakdowns.
Concrete shall be judged to be compacted when the mortar fills the spaces between the coarse
aggregate and begins to cream up to form an even surface. Compaction shall be completed before the
initial setting starts i.e. within 30 minutes of addition of water to dry mixture. During compaction, it shall
be observed that needle vibrators are not applied on reinforcement which is likely to destroy the bond
between concrete and reinforcement.
4.6 Curing: Immediately after compaction, concrete shall be protected from weather including rain, running
water, shocks, vibration, traffic, rapid temperature changes, frost and drying out process. It shall be
covered with wet sacking, hassain or other similar absorbant material approved, soon after the initial set
and shall be kept continuously wet for a period of not less than 14 days from the date of placement.
Masonary work over foundation concrete may be started after 48 hours of its laying but curing of
concrete shall be continued for a minimum period of 14 days.
4.7 Sampling and Testing of concrete:
4.7.1 Samples from fresh concrete shall be taken as per I.S. 1199-1959 and cubes shall be made, cured and
tested at 7 days or 28 days as per requirements in accordance with I.S. 516-1959. A random sampling
procedure shall be adopted to ensure that each concrete batch shall have a reasonable chance of being
tested i.e. the sampling should be spread over the entire period of concreting and cover all mixing units.
The minimum frequency of sampling of concrete of each grade shall be in accordance with following:
Quantity of concrete No. of Quantity of concrete in No. of samples
in the work samples the works
51 and above 4+ one additional for each additional 50 M. or part thereof.
NOTE : At least one sample shall be taken from each shift. Ten test specimens shall be made from each
sample, five for testing at 7 days and the remaining five at 28 days. The samples of concrete shall be
taken on each day of the concreting as per above frequency. The number of specimens may be suitably
increased as deemed necessary by the Engineer-in-charge when procedure of tests given above
reveals a poor quality of concrete and in other special cases.
4.7.2 The average strength of the group of cubes cast for each day shall not be less than the specified cube
strength of 150 Kg/Cm at 28 days. 20% of the cubes cast for each day may have value less than the
specified strength provided the lowest value is not less than 85% of the specified strength. If the
concrete made in accordance with the proportions given for a particular grade, does not yield the
specified strength; such concrete shall be classified as belonging to the appropriate lower grade.
Concrete made in accordance with the proportions given for a particular grade shall not, however, be
placed in a higher grade on the ground that the test strength are higher than the minimum specified.
4.8.1 The Engineer-in-charge shall be informed in advance by the contractor of his intention to strike the form
work. While fixing the time for removal of form work, due consideration shall be given to local conditions,
character for the structure, the weather and other condition that influence the setting of concrete and of
the materials used in the mix. In normal circumstances (generally where temperatures are above 20 C)
and where ordinary concrete is used, forms may be struck after expiry of periods specified in item No
9.1(A) for respective item of form work.
4.8.2 All form work shall be removed without causing any shock or vibration as would damage the concrete.
Before the soffit and struts are removed, the concrete surface shall be exposed, where necessary in
order to ascertain that the concrete has sufficiently hardened. Centering shall be gradually and uniformly
lowered in such manner as to permit the concrete to take stresses due to its own weight uniformly and
gradually. Where internal metal ties are permitted, the or their removable parts shall be extracted
without causing any damage to the concrete and remaining holes filled with mortar. No permanently
embedded metal part shall have less than 25 mm cover to the finished concrete surface. Where it is
intended to re-use the form work, it shall be cleaned and made good to the satisfaction of the Engineer-
in-charge. After removal of form work and shuttering, the Executive Engineer shall inspect the work and
satisfy by random checks that concrete produced is of good quality.
4.8.3 Immediately after the removal of forms, all exposed bolts etc., passing through the cement concrete
member and used for shuttering or any other purpose shall be cut inside the cement concrete member
to a depth of at least 25 mm below the surface of the concrete and the resulting holes be filled by
cement mortar. All fine caused by form joints, all cavities produced by the removal of form ties and all
other holes and depressions honeycomb spots, broken edges or corners and other defects shall be
thoroughly cleaned, saturated with water and carefully pointed and rendered true with mortar of cement
and fine aggregate mixed in the proportions used in the grade of concrete that is being finished and of
as dry consistency as is possible to use. Considerable pressure shall be applied in filling and pointing to
ensure thorough filling in all voids. Surfaces which are pointed shall be kept most for a period of
If rock pockets/honeycombs in the opinion of the Engineer-in-charge are of such an extent or character
as to effect the strength of the structure materially or to endanger the life of the steel reinforcement, he
may declare the concrete defective and require the removal and replacement of the portion of the
structure affected.
5.0 Mode of measurement and payment:
5.1 The consolidated cubical contents of concrete work as specified in item shall be measured. The
concrete laid in excess of section shown on drawings or as directed shall not be measured. No
deduction shall be made for –
(a) Ends of dis-similar materials such as joints, beams, posts, girders, rafters, purline trusses, corbels and
steps etc. up to 500 Sq. Cm. in section.
(b) Opening up to 0.1 Sq. M.
5.2 The rate includes cost of all materials, labour, tools and plant required for mixing, placing in position,
vibrating and compacting, finishing, as directed, curing and all other incidental expenses for producing
concrete of specified strength. The rate excludes the cost of form work.
5.3 The rate shall be for a unit of one cubic meter.
5.4.1 Providing and laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate
mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced
concrete work in :
(A) Foundation footing, base of columns and mass (B) Slabs, landings, shelves, balconies, internals beams
girders and cantilever up to floor two level (C) Columns, pillars, posts and struts up to floor two level (D)
Staircase up to floor two level (E) Vertical and horizontal fins up to floor two level.
1.0 Materials & Workmanship
1.1 The relevant specification of item No. 5.3.13 shall be followed except that the work shall be carried out
for reinforced concrete work for work as specified in item 1.2. In addition, the following stipulations shall
be followed for :
(a) The bars shall be kept in position by the following methods:
(i) In case of beam and slab construction, sufficient number of precast cover blocks in cement mortar 1:2
(1 cement : 2 coarse sand) about 4 cms x 4 cms section and of thickness equal to the specified cover
shall be placed between the bars and shuttering as to secure and maintain the requisite cover of
concrete over the reinforcement.
In case of cantilevered or doubly reinforce beams of slabs, the main reinforcing bars shall be held in
position by introducing chain spacers or supports bars at 1.0 to 1.2 meters centers.
(ii) In case of columns walls, the vertical bars shall be kept in position by means of timber temphtes with
slotes accurately out in them. The temphtes shall be removed after concreting has been done below it.
The bars may also be suitably tied by means of annealed steel wires to the shuttering to maintain their
position during concreting.
1.2 All bars projecting from pillars, columns beams, slabs etc., to which other bars and concrete are to be
attached or bounced to later on, shall be protected with a coat of thin neat cement grout, if the bars are
not likely to be incorporated with succeeding mass of concrete within the following 10 days. This coat of
thin neat cement shall be removed before concreting.
2.0 Mode of measurement and payment:
2.1 Relevant specifications of item No. 5.3.13 shall be followed.
2.2 The volume occupied by reinforcement shall not be deducted from R.C.C. work.
2.3 The rate shall be for a unit of one cubic meter.
Brick work using common burnt clay building bricks having crushing strength not less than
35kg./Sq.Cm.in foundation and plinth in Cement Mortar1:6 (1- Cement :6 - fine sand) (B) Conventional
Materials: Water shall conform to M-1 Cement shall conform to M-3 Sand shall conform to M-6. Brick shall
conform to M-15 Cement mortar shall conform to M-11.
The proportion of the cement mortar shall be 1:6 (1 cement : 5 fine sand) by volume.
Wetting of bricks:
The bricks required for masonry shall be thoroughly wetted with clean water for about two hours before use or
as directed. The cessation of bubbles, when the bricks are wetted with water is an indication of through wetting
Bricks shall be laid in English bond unless directed otherwise. Half or cut bricks shall not be used except when
necessary to complete to bond; closer in such case shall be cut to required size and used near the ends of walls.
A layer of mortar shall be spread on full width for suitable length of the lower course. Each brick shall first be
properly bedded and set home by gently tapping with handle of trowel or wooden mallet. It side face shall be
flushed with mortar before the next brick is laid and pressed against it. On copletion of course, the vertical joints
shall be fully filled form the top with mortar.
The walls shall be taken up truly in plumb. All courses shall be laid truly horizontal and all vertical joint shall be
truly vertical. Vertical joints in alternate course shall generally be directly one over the other. The thickness of
brick course shall be kept uniform.
The brick shall be laid with frog upwards. A set of tools comprising of wooden straight edges, mason’s sprit
level, square half meter rub, and pins, string and plumb shall be kept on the site of work for frequent checking
during the progress of work.
Both the faces of walls of thickness greater than 23 cms shall be kept in proper place. All the connected brick
work shall be kept not more than one meter over the rest of the work. Where this is not possible, the work shall
be raked back according to bond (and not left toothed) at an angle not steeper than 45 degrees.
All fixtures, pipes, outlets of water, hold fasts of doors and windows etc. which are required to be built in wall
shall be embedded in cement mortar.
Bricks shall be so laid that all joints are quite flush with mortar. Thickness of joins shall not exceed 12 mm. The
face joints shall be raked out as directed by taking tools daily during the progress of work, when the mortar is
still green so as to provide key for plaster or pointing to done.
The face of brick shall be cleaned the very day on which the brick work is laid and all mortar dropping removed.
Green work shall be protected from rain suitably. Masonry work shall be kept moist on all the faces for a period
seven days. The top of masonry work shall be kept well wetted at the close of the day
Preparation of foundation bed:
If the foundation is to be laid directly on the excavated bed, the bed shall be leveled, cleared of all loose
materials, cleaned and wetted before starting masonry. If masonry is to be laid on concrete footing, the top of
concrete shall be cleaned and moistened. The contractor shall obtain the engineer'’ approval for the foundation
bed, before foundation masonry is started. When puccas flooring is to be provided flush with the top to plinth,
the inside plinth offset shall be kept lower than the outside plinth top by the thickness of the flooring.
Mode of measurements and payment:
The measurements of this item shall be taken for the brick masonry fully completed in foundation up to plinth.
The limiting dimensions not exceeding those shown on the plans or as directed shall be final. Battered, tapered
and curved portions shall be measured net.
No deduction shall be made from the quantity of brick work nor any extra payment made for embedding in
masonry or making holes in respect of following items:
Ends of joints, beams, posts, girders, rafters, purlins, trusses, corbel steps etc. where cross sectional area does not
exceed 500 Sq. cm.
Opening not exceeding 1000 Sq. cm.
Wall plates and bed plates, bearing of slabs, chhajas an the like whose thickness does not exceed 10 Cms. and
the bearing does not extend to the full thickness of wall.
Drainage holes, and recesses for cement concrete blocks to embed hold fasts for doors, windows etc.
Iron fixtures, pipes up to 300 mm dia hold fasts and doors and windows built into masonry and pipes etc. for
concealed wiring.
Forming chases of section not exceeding 350 Sq. Cm. in masonry.
Apertures for fire places shall not be deducted nor shall extra labour required to make splaying of jambs,
throating and making Arches over the aperture be paid for separately.
The rate shall be for a unit of one cubic meter.
Item No.11;- Extra Rate for brickwork in Above Item for super structure above plinth level upto
floor two level (B) Conventional
Mode of Measurement Shall be on Cmt. Basis.
Providing form work of ordinary timber planking so as to give a rough finish including centering
shuttering, strutting and propping etc. height of propping and centering below supporting floor to
celling not exceeding 4 m. and removal of the same for in site reinforced concrete and plain concrete
work in foundations, footing, bases of columns, and mass concrete. ( up a to h)
The shuttering to be provided shall be of ordinary timber planks and shall conform to M-26.
The dimensions of scantlings and battens shall conform to the design. The strength of the wood shall not be less
than that assumed in the design.
The form work shall conform to the shape lines and dimension as shown on the plans and be so constructed as
to remain sufficiently rigid during the placing and compacting of the concrete. Adequate arrangements shall be
made by the contractor to safe guard against any settlement of the form work during the course of concreting
and after concreting. The form work of shuttering, centering, scaffolding bracing etc shall be as per design.
Cleaning & Treatment of forms:
All rubbish, particularly chippings shaving and saw dust shall be removed from the interior of the form before the
concrete is placed and the form work in contact with concrete shall be cleaned and thoroughly wetted or treated.
The surface shall be then coated with soap solution applied before concreting is done. Soap solution for the
purpose shall be prepared by dissolving yellow soap in water to get consistency of paint. Alternatively a coat of
raw linseed oil or form oil of approved manufacture may be applied in case steel shuttering is used. Soap
solution or raw linseed oil shall be applied after thoroughly cleaning the surface. Care shall be taken that the
coating does not get on construction joint surface and reinforcement bars.
Stripping time:
In normal circumstances and where ordinary cement is used forms may be struck after expiry of following
Sides of walls columns and vertical faces of beam 24 to 48 hours.
Beams soffits (Props left under) 7 days.
Removal of props slabs
(i) Slabs spanning up to 4.5 m – 7 days (ii) Spanning over 4.5 mm 14 days
Removal of props to beams and arches
(i) Spanning up to 6 m – 14 days (ii) Spanning over 6 m 21 days
Procedure when removing the form work:
All form work shall be removed without such shock or vibration as would damage the reinforced concrete
surface. Before the soffits form work and struts are removed, the soffits and the concrete surface shall be
exposed where necessary in order to ascertain that the concrete has sufficiently hardened.
The centering to be provided shall be got approved. It shall be sufficiently strong to ensure absolute safely of the
form work and concrete work before, during and after pouring concrete. Watch should be kept to see that
behavior of centering and form work is satisfactory during concreting. Erection should also be such that it would
allow removal of forms in proper sequence without damaging either the concrete or the forms to be removed.
The props of centering shall be provided on firm foundation or base of sufficient strength to carry the loads
without any settlement.
The centering and form work shall be inspected and approved by the Engineer-in-charge before concreting. But
this will not relieve the contractor of his responsibility for strength, adequacy and safety of form work and
centering. If there is a failure of form work or centering, contractor shall be responsible for the damages to the
work, injury to life and damage to property.
All scaffolding, hoisting arrangements and ladders etc required for the facilitating of concreting shall be provided
and removed on completion work by contractor at his own expense. The scaffolding, hoisting arrangements and
ladders etc. shall be strong enough to with stand all live, dead and impact loads expected to act and shall be
subject to the approval of the Engineer-in-charge. However, contractor shall be solely responsible for the safety
of the scaffolding, hoisting arrangement, ladders, work and workman etc.
The scaffolding hoisting arrangements and ladders shall allow easy approach to the work spot and afford easy
The rate is applicable to all conditions of working and height up to 4 mts. The rate shall include the cost of
materials and labour for various operations involved such as:
Splayed edges, notching, allowance for overlaps and passing at angles, battens centering, shuttering propping,
bolting, nailing, wedging, easing, striking and removal.
Filleting to form stop chamfered edges or splayed external angles not exceeding 20 mm width to beams,
columns and the like.
Temporary openings in the forms for pouring concrete, if required, removing rubbish etc.
Dressing with oil to prevent adhesion of concrete with shuttering, and
Raking or circular cutting.
Rate shall be paid in Sq.m
P/F structural steel frame as per design using angles,chanel secction the rate incl.cleaning cutting
,bending ,welding and fabrication as per design the rate incl.carting the frame to thae site applying red
oxide and two coat of oil paint colour as directed.name board indicating pole/street name of approach
should be of plain MS sheet (C.R.C. sheet) to be fixed on 80 mm dia.M.S.pipe or any appropriate dia.of
pipe & 40 mm x 40 mm x 5 mm size angle and 30 mmx6 mm flates framing work having M.S.decorative
basket design artical which given as per drawing or engg.in charge.
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Kg.
Providing 10mm thick cement plaster in single coat on rick/concrete walls for interior plastering upto floor
two level and finished even and smooth in (i)Cement mortar 1:3 (1-cement:3-sand)
Mode of payment shall be in Sqm
Providing 20mm thick sand faced cement plaster on walls upto height 10 metres above ground level
consisting of 12mm thick backing coat of C.M. 1:3 (1-cement : 3-sand) and 8mm thick finishing coat of
C.M. 1:1 (1-cement : 1-sand) etc. complete.
The specification is as per above Item except thickness of the plaster is 20 mm sand faced and 12 mm th. Backing
coat in C.M. (1:3) and 8 mm thick finishing coat no machine paster will be allowed for spray od sand for plastering etc
comp as directed by Engg i charge.
Mode of measurements & payment : The rate shall be for a unit of one Square Meter.
Water M-1. The Cement mortar of proportion 1:3 shall conform to M-13.
Scaffolding : Wooden ballies, bamboos, planks, treatles and other scaffolding shall be sound. These shall be
properly examined before erection and use Stage scaffolding shall be provided for ceiling plaster, which shall be
independent of the walls.
Preparation of back-ground :
The surface shall be cleaned of all dust, loose mortar droppings, traces of algae, afflorescence and other foreign
matter by water or by brushing. Smooth surface shall be roughened by wire brushing if it is not hard and by
racking if it is hard. In case of concrete surface, if a chemical retarder has been applied to the form work, the
surface shall be roughened by wire brushing and all the resulting dust and loose particles cleaned off and care
shall be taken that none of the retarder is left on the surface. Trimming of projections on brick/concrete surface
where necessary shall be carried out to get an even surface.
Raking of joints in case of masonry where necessary shall be allowed to dry out for sufficient period before
carrying out the plaster work.
The work shall not be soaked but only damped evenly before applying the plaster. If the surface becomes dry
such area shall be moistened again.
For external plaster, the plastering operation shall be started from top floor and carried downwards. For internal
plaster, the plastering operations may be started wherever the building frame and cladding work are ready and the
temporary supporting ceiling resting on the wall of the floor have been removed, Ceiling plaster shall be completed
before starting plaster to walls.
Applications of Plaster :
The plaster about 15 x 15 cms. Shall be first applied horizontally and vertically at not more than 2 metre intervals
over the entire surface to serve as gauge. The surfaces of these gauges shall be truly inplane of the finished
plastered surface. The mortar shall then be applied in uniform surface slightly more than the specified thickness,
then brought to a true surface by working a wooden straight edge reaching across the gauges with small upward
and sideways movement at a time. Finally, the surface shall be finished off true with a trowel or wooden float
according as a smooth or a sandy granular texture is required. Excessive trowelling or overworking the float shall
be avoided. All corners, arrises, angles and junctions be truly vertical or horizontal as the case may be and shall
be carefully finished. Rounding or chamfering corners, arrises junctions etc. shall be carried out with proper
templates to the size required.
Cement plaster shall be used within half an hour after addition of water. Any mortar or plaster which is partially set
shall be rejected and removed forthwith from the site :
In suspending the work at the end of the day, the plaster shall be left out clean to the line both horizontally and vertically.
When recommending the plaster, the edges of the old work shall be scraped clean and wetted with cement putty before
plaster is applied to the adjacent area to enable the two to properly joint together. Plastering work shall be closed at the
end of the day on the body of the wall and nearer than 15 cm. To any corners or arrises. Horizontal joints in plasterwork
shall not also occur on parapet tops and copings as these invariably lead to leakage. No portion of the surface shall be
left out initially to be packed up later on.
Each coat shall be kept dam continuously till the next coat is applied or for a minimum period of 7 days.
Moistening shall commence as soon as plaster is hardened sufficiently. Soaking of walls shall be avoided and only
as much water as can be readily absorbed shall be used excessive evaporation on the sunny or windward side of
building in hot air or dry weather shall be prevented by handling mattings or gunny bags on the outside of the
plaster and keeping them wet.
Mode of measurement & payment :
The rate shall include the cost of all materials, labour and scaffolding etc, involved in the operations described
under workmanship.
All plastering shall be measured in square metres unless, otherwise specified length, breadth or height shall be
measured correct to a centimeter.
Thickness of the plaster shall be exclusive of the thickness of the key i.e. grooves or open joints in brick work,
stone work etc. or space between laths. Thickness of plaster shall be average thickness with minimum 10 mm. at
any point on this surface.
This item includes plastering upto floor two level.
The measurement of wall plastering shall be taken between the walls or partition (dimensions before plastering
being taken) for length and from the top of floor or skirting to ceiling for height. Depth of cover of cornices if any
shall be deducted.
Soffits of stairs shall be measured as plastering on ceilings, Flowing soffits shall be measured separately.
For jambs, soffits, sills etc. for openings not exceeding 0.5 sq. mt. each in area for ends of joints, beams, posts,
girders, steps etc. not exceeding 0.5 sq. mt. each in area and for openings exceeding 0.5 sq.mt. and not
exceeding 3.0 sq. mt. in each area deductions and additions shall be made in the following manner :
No deductions shall be made for ends joints, beams posts etc. and openings not exceeding 0.5 sq. mt. each and
no addition shall be made for reveals, jambs, soffits, sills etc. of these opening for finish to plaster around ends of
joints, beams, posts etc.
Deduction for openings exceeding 0.5 sq. mt. but not exceeding 3 sq. mt. each shall be made as follows
and no addition shall be made for reveals, jambs, soffits etc. sills etc. of these openings.
When both faces of all wall are plastered with same plaster, deduction shall be made for one face only
When two faces of wall are plastered with different types of plasters or if one faces is plastered and the other
pointed, deductions shall be made from the plaster or pointing on the side of frame for door, window etc. on
which width or reveals is less than that on the other side but no deductions shall be made on the other side.
Where width of reveals on both faces of all are equal, deductions of 50% of area of opening on each face
shall be made from area of plaster and/or pointing as the case may be.
For openings having door frames equal to projecting beyond the thickness of wall, full deduction for opening shall
be made from each plastered face of the wall.
In case of openings of area above 3 sq. mt. each, deduction shall be made for opening but jambs, soffits and sills
shall be measured.
The rate shall be for a unit of one sq. metre.
colour washing with lime on undecorated wall surfaces (TWO coats) to give an even shade including
thoroughly brooming the surface to remove all dirt, dust mortar drops and other foreign matter.
The calearcole shall be made from glue and boiling water by mixing 1 kg. Mixture shall be suitably tinted
where required for use under coloured distemper if required. Glue shall conform to I.S. 852-1969
(Specifications for animal glue).
Lime used shall be freshly burnt class ‘C’ Lime (fat lime) and white in colour conforming to I.S. 712-1973.
Water shall conform to M-1 Best quality of gum shall be sued in the preparation of white wash. Ultramarine
blue or Indigo: This shall conform to I.S. 55-1970 for points and shall be used for preparation of white wash.
Pigments: mineral colours, not affected by lime shall be sued in preparing colour wash.
Preparation of white wash solution :
Surface already white or colour. The fat lime shall be slaked at site and shall be mixed and stirred with about
five litres of water for 1 kg. of unslaked lime to make a thin cream. This shall be allowed to stand for a period
of 24 hours and then shall be screened through a clean coarse cloth, 4 kg. of gum dissolved in hot water
shall be added to each cubic metre of lime cream. Small quantity of ultramarine blut (Upto 3 gms. Per kg. of
lime) shall also be added to the last two coats of white wash solution and the whole solution shall be stirred
thoroughly before use.
Preparation of surface :
The surface shall be thoroughly cleaned of all dust, dirt, mortar cropping and other foreign matters before
white wash is to be applied.
The surface spoiled by smoke soot shall be scraped with steel wire brushes or steel scrappers or shall be
rubbed with over burnt surkhi or brick bats. The surface shall be then broomed to remove all dust, dirt and
shall be washed with clean water.
Oil or grease spots shall be removed by suitable chemical and smooth surface shall be rubbed wire brushes.
All unsound portion of the surface plaster shall be removed to full depth of plaster in rectangular patches and
plastered again after raking the masonry joints properly. Such portion shall be wetted and allowed to dry.
They shall then be given one coat of white wash.
All unnecessary nails shall be removed, the holes cracks patches etc. shall be made good with materials
similar in composition to the surface to be prepared.
Scaffolding : Wherever scaffolding is necessary it shall be erected in such a way that as far as possible on
part of scaffolding shall rest against the surface to be white or coloured washed. A properly secured strong
and well tied suspended platform (Zoola) may be used for white washing. Where ladders are sued, pieces of
old gunny bags shall be tied at top and bottom to prevent scratches to the floors and walls. For white
washing of ceilings proper stage scaffolding shall be erected where necessary.
Application of white wash :
On the surface so prepared the white wash shall be applied with ‘Moon’ brush. The first stroke of the brush
shall be from top downwards, another from bottom upwards over the first stroke and similarly one stroke
from the right another from the left, over the first stroke brush before the it dries. This will from one coat.
Each coat shall be allowed to dry before next coat is applied. Number coats as specified in item shall be
applied. It shall present smooth and uniform finish free from brush marks and it should not come off easily
when rubbed finger.
Splashing and dropping if any on the doors and windows, ventilators etc. shall be removed and the surface
Priming and Alkali resistant treatments, scrapping of surface washing etc. surface spoiled by smoke soot
removed of oil and grease spots treatment for infection with effloresces moulds moss, funji and kitchen and
patch repairs to plaster wherever done shall not be paid extra.
Mode of measurements & payment :
All the work shall be measured in the decimal system as under :
Dimensions shall be measured to the nearest 0.01 M.
Area in individual items shall be worked out to the nearest 0.01 Sq. M.
All the work shall be measured in sq. mt. Deductions for jambs, soffits, stills etc. for opening not exceeding
0.5 sq. mt. each in area for ends of joints, posts, beams, girders, steps etc. not exceeding 0.5 sq. mt. each in
area and for opening exceeding 0.3 sq. mt. and not exceeding 3.0 sq. mt. each in area deductions and
additions shall be made as under :
No deductions shall be made for ends of joints beams, posts etc. and openings not exceeding 0.5 sq. mt. each.
No addition shall be made for reveals, jambs, soffits, sills etc. of these openings nor for finish around ends of
joints, beams, posts etc.
Deductions for openings exceeding 0.5 sq. mt. but not exceeding 3 sq. mt. each shall be made as follows and
no addition shall be made for reveals, jambs, soffits etc. of these openings :
When both the faces or walls are provided with finish, deduction shall be made for one face only.
When each face of wall is provided with different finish deduction shall be made for that side of frame for door,
windows etc. on which width of reveals is less than that of the other side, where width of reveals on both faces of
wall are equal, deduction of 50% of area of opening on each face shall be made from total area of finish.
When only one face of wall is treated and the other face is not treated, full deduction shall be made if the width
of reveal on the treated side is less than that on the untreated side, but if the width of the reveal is equal or more
than on the untreated side neither deductions nor additions be made for reveals, jambs, soffits, sills etc.
In case of area of opening exceeding 3 sq. mt. each, deduction shall be made for openings but jambs, soffits,
shall be measured.
No deduction shall be made for attachment such as casing, conducts, pipe, electric wiring and the like.
corrugated surfaces shall be measured flat as fixed and not girth. The quantities so measured shall be increased
by the following percentage and the resultant shall be included with the general areas.
Corrugated steel sheets 4%
Corrugated A. C. Sheets 20%
Semi corrugated A. C. Sheets 10%
Nainital pattern roof (Plain sheeting with rolls) 10%
Nainital pattern roof (with corrugated sheets) 25%
Cornices and other wall features, when they are not picked out in a different finish/colour shall be girthed and
included in the general area.
The rate shall include the cost of all materials, labour, scaffolding, protective measures etc. involved in all the
operations described above.
The rate shall be for a unit of one sq. metre.
Removing dry or oil bound distemper by a washing and scraping and sand papering the wall surface
smooth including necessary repairs to scratches complete.
The rate shall be for a unit of one sq. metre.
Distempering with dry distemper of approved brand and manufacture (two coats) and of required shade
on wall surfaces of given an even shade, over and including a priming coat of whiting after thoroughly
brooming the surface free from mortar dropping and other foreign matter.
The rate shall be for a unit of one sq. metre.
Distempeing (Two coats) with oil bound distemper of approved brand and manufacture and
of required shade on wall surfaces to give an even shade, over and including a priming coat
with distemper primer of approved brand and manufacture after thoroughly brushing the
surface free from mortar dropping and other foreign matter and also including preparing
the surface even and sand papered smooth.
The rate shall be for a unit of one sq. metre.
Distempeing (Two coats) with oil bound distemper of approved brand and manufacture and
of required shade on wall surfaces to give an even shade, over and including a priming coat
with distemper primer of approved brand and manufacture after thoroughly brushing the
surface free from mortar dropping and other foreign matter and also including preparing
the surface even and sand papered smooth.
The rate shall be for a unit of one sq. metre.
Wall Painting (two coats) with plastic emulsion paint of approved brand and manufacture and of
shade required on undecorated wall surfaces to give an even shade,.over and including a priming
of approved brand and manufacture & Two Coat of "Birla" or equivalent Wall Putty after
thoroughly brushing the surface free from mortar droppings and other foreign matter and also
including preparing the surface even and sand-papered smooth.
Smoothness of the Surface after two coats of approved putty after sandpapering etc. complete should
be up to the satisfaction of engg. In charge with required watering etc. complete asper
company Guidelines. Plastic paint application after Priming should be as per Building specifications
given in the above said website.
Mode of measurements & payment: The rate shall be for a unit of one sq. metre.
Painting two coats (excluding priming coat) on external surface of new rain water, soil, waste
and vent pipes and fittings with ready mixed bituminous brushing, black, anti corrosive to give
an even shade including cleaning of all dirt, dustand other foreign matter.(75 mm dia)
The rate shall be for a unit of one sq. metre
Painting two coats (excluding priming coat) on external surface of new rain water, soil, waste
and vent pipes and fittings with ready mixed bituminous brushing, black, anti corrosive to give
an even shade including cleaning of all dirt, dust and other foreign matter.(100 mm dia)
The rate shall be for a unit of one sq. metre
Applying two coats of Birla (white cement based) or Asian (acryliclapy-putty) or equivalent & two coats
of primer of approved brand and manufacture on new wall surface to give an even shade including
thoroughly brushing the surface free from mortar dropping and other foreign matter and sand papered
The rate shall be for a unit of one sq. metre
Finishing wall with weather proof exterior emulsion paint on wall surface (two coats) to give an required
shape even shade after thoroughly brushing the surface to remove all dirt, and remains of loose
powdered materials.etc complete
The rate shall be for a unit of one sq. metre
Demolition including stacking of serviceable materilas and disposal of unserviceable materials with all
lead and lift. (i) R.C.C. work
The rate shall be for a unit of one Cum. The work should be done as specified in above item.
Demolition of Brick work and stone masonry including stacking of serviceable materil as and disposal
of unserviceable materials with all lead and lift.(ii) In Cement Mortar.
Demolition of Brick work and stone masonry including stacking of serviceable materil as and disposal of
unserviceable materials with all lead and lift.(ii) In Cement Mortar.
The rate shall be for a unit of one Cum
Dismentling barbed wire in fencing including making rolls and also including dismentling fencing posts
including all earth work concrete in base and making good the disturbed ground stacking useful
materials as directed and disposing as directed and disposing of the unserviceable materials with all
Dismentling barbed wire in fencing including making rolls and also including dismentling fencing posts
including all earth work concrete in base and making good the disturbed ground stacking useful materials as
directed and disposing as directed and disposing of the unserviceable materials with all lead and lift.
The rate shall be for a unit of Rmt. The work should be done as specified in above item.
Removing and scraping of old deteriorated plaster of any thickness from wall /
R.C.C member including stacking of serviceable material and disposal of unserviceable from
site of work with all lead and lift
Removing and scraping of old deteriorated plaster of any thickness from wall / R.C.C member including stacking
of serviceable material and disposal of unserviceable from site of work with all lead and lift
The rate shall be for a unit of Smt. The work should be done as specified in above item.
Providing and fixing 1.20 Metre high fencing with 2.0 Metre long M.S. Angle posts 40 mm x
mm x 6 mm and oil painting 3 coats fixed at 2.5 Mt, C/c. with five Horizontan lines and two
diagonals of galvanised steel barbed wire weighting 9.38 Kg. per 100 Metre, strained and fixed to
posts with G.I, staples including fixing the posts in ground with 0.5 M x 0.5.M x 0.5 M. block in
C.C 1:5:10 etc complete.
Providing and fixing 1.20 Metre high fencing with 2.0 Metre long M.S. Angle posts 40 mm x 40 mm x 6 mm and
oil painting 3 coats fixed at 2.5 Mt, C/c. with five Horizontan lines and two diagonals of galvanised steel barbed
wire weighting 9.38 Kg. per 100 Metre, strained and fixed to posts with G.I, staples including fixing the posts in
ground with 0.5 M x 0.5.M x 0.5 M. block in C.C 1:5:10 etc complete.
The rate shall be for a unit of Rmt
Providing TMT Bar FE 415 reinforcement for R.C.C. work including bending, binding and
placing in position complete up to floor two level (up to 10 ton)
The rate shall be for a unit of kg
Supplying and fixing of 300 mm-L x 150mm-B x 380 mm-H Kerb block for Footpath in M-20 grade
using 20 mm nominal size black trap aggregate of Sevaliya/Timbaor equivalent quality
for pre-cast blocks, reasonablyexposed finish/ formwork , mould with well
equippedwith vibratory system for kerb stones of approved design including curing, etc.
complete, including thecost of formwork etc. complete. The rate shall also include necessary
cutting of asphalt, fixing the Kerbstones in line and level on 5 cm thick sand bedding
withnecessary equipments and materials. The rate shall also include the flush pointing in CM (1:3)
for all joints of thekerbstones. Filling of zari alone the sides of the kerbstone fixed with
Bituminous concrete Bituminousconcrete / C.C. mixed in proper position to flush withthe road
surface as directed by Engineer in change to form a portable mixture.a) Laying on 5 cm thick
Material should be approved make as instructed by Add.City Engineer. The Surface should be thoroughly
cleaned with brush Before Applying, The Rate is Measured in Rmt.
Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm thick, M-35 Grade of any
size ; shape (Usually Uni-Paver Blocks) using black trap good quality aggragate of 20 mm nominal size
for footpath, parking areas, service lanes and other areas as mentioned in the drawing /
instruction of engineer in charge. Cost includes formworks using rubber mould, Rate providing and
laying paver blocks as per required grading and specification. The paver block shall be mechanically
compacted. The work of paving blocks shall be executed in line and level by skill mason of flooring
work only. It should be laid in such a way that the no cutting of the paver block to be necessary. if
cutting of paver block necessary then it should be cut by machine only and carting. The finished surface
of the paver block shall have resonably good, plain finished. Paver blocks shall be compacted and shall
be relaid if necessary. Gravel or such type of materials shall not be allowed for production. Laying on
5cms thick sand beddding.
Scope of work :
Excavation and compaction up to 30 cm in height . for footpath paving in all sorts of soil murrum including
sorting outs and stacking of useful materials stuff up to 50 mt. lead from excavated place
and same well be carting. Up to 5 km.
The scope of work includes manufacturing, supplying and laying of precast paver blocks at various
Retail outlets. The work includes :
1.1 Verification of the existing site condition and advising our project in charge to lay suitable base
course if required. Contractors are required to satisfy themselves with quality of sub grade, sub-base
course before the paver blocks are laid and suggest strengthening if required.
1.2 Clearing the site by removing all obstacles such as stones, debris etc. for laying of paver blocks.
1.3 Manufacturing of paver blocks in your plant as per requirements in technical specification enclosed.
1.4 Supplying of paver blocks at site, including handling at both ends.
1.5 Laying of paver blocks at site as per requirement in technical specification, within shortest possible
time. The site being existing operating Retail Outlets, care should be taken to ensure that the operation
is not closed. The job of laying may required to be carried out during night also.
1.6 Testing of paver blocks through reputed Govt./Non Govt. Test house and submission of test results as
per requirements in Technical Specifications. HPCL reserves the right to carryout test at random. Cost
for such tests to be borne by party.
1.7 The contractor shall guarantee that all material and components designed, fabricated, supplied and
laid by him shall be free from any type of defect due to faulty material and/or workmanship/erection
for a period of One year from the date of completion of work at individual sites. However, the
contractor fro two years shall render free maintenance.
TECHNICAL SPECIFICATIONS :
I) Paver Block Manufacturing Facilities :
The Paver Block shall be made in factory with following minimum facilities :
1.1 Concrete Block making Machines :
The machine should be capable of producing high quality Paver Blocks by obtaining high
level of compaction by application of hydraulic compaction and also by high intensity vibration to the
moulds. The machine should have automatic control panel for uniformity in strength.
1.2 Concrete Batching & Mixing Plant : (Not essential)
The concrete Mix Design should be followed for each batch of materials. The concrete
ingredient should be mixed in concrete Batching & Mixing plant with minimum capacity of
cum/hour. The plant should equipped with automatic control panel for maintaining water cement ratio
from batch to batch to obtain concrete of uniform quality and strength. The plant should be equipped
with adequate mechanism for mechanized loading of raw materials into mixer and conveyor belt for
transportation of concrete from mixer to concrete block making machine to maintain quality of wet
The factory should have well designed curing area to ensure adequate curing of paver blocks.
For the Rubber mould paver block specification has to followed as per specification of Gray and coloured
paver block specification. But at the production level the mould for producting rubber moulded paver block the
mould is of rubber materials and the prodection of rubber moulded paver block is even shaded, finishing and
even colour shaded and using Rubber mould should be producing on vibratory mechine by obtaing high level of
compaction by application of vibration to the moulds. The machine should have automatic control pannel for
uniformity in strength. Or as per direction of engineering incharge.
1.5 Laboratory (Desirable but not essential) :
The factory should have the following:
(i) Compression testing machine of adequate capacity.
(ii) Other tools and equipment for testing raw materials and paver blocks.
(iii) (1).Systematic record of test results of various paver blocks manufactured in the factory.
(2).Concrete Mix Design for various grade of concrete used for making of paver blocks.
II) SPECIFICATIONS FOR COLOURED PAVER BLOCKS :
Coloured concrete paver blocks shall be manufactured as per attached specifications using approved
colour Pigment of “BAYER” Make “BAYFERROX IRONOXIDE PIGMENTS” with minimum
colour pigment of 3% by weight of cement. The colour shade shall be “RED” as selected by HPCL
before commencement of the work. White cement shall be used for colored pavers to obtain the desired
colour shade. The job also includes providing 50 mm thick sand bedding to match the shade of the
The colour of the paver block shall be guaranteed against fading of colour for period of 12 months from the date
of laying of the same at site.
All other technical specifications & Procedure for testing, laying & sampling of coloured pavers will be as per
III) PAVERS BLOCK CHARACTERISTICS :
The concrete pavers should have perpendicularities after release from the mould and the same should be
retained until the laying.
The surface should be reasonably smoothe and of anti skid and anti glare type.
The paver should have uniform chamfers to facilitate easy drainage surface run off.
The pavers should have uniform interlocking space of 2mm to 3mm to ensure compacted sand filling after
vibration on the paver Surface.
The concrete mix design should be followed for each batch of materials separately and automatic
batching plant is to be used to achieve uniformity in strength and quality.
The pavers shall be manufactured in single layer only.
Skilled labour should be employed for laying blocks to ensure line and level of laying, desired shape of
the surface and adequate compaction of the sand in the joints.
The pavers shall be of cement gray colour without any pigment & for coloured pavers refer
“specifications for coloured pavers.”
The pavers are to be skirted all round with kerbing using solid concrete blocks of size 150mm X
250mm X 380mm. The kerbing should be embedded for 100mm depth. The concrete used for kerbing
shall be cured properly for 7 days minimum.
IV) Paver Block Dimensions :
Thickness 60mm or 80mm
Shape Uniregular (Uniform Shape with no Hollow
Chamfer 4mm to 6mm along top edges
Colour a. Natural cement grey colour without
use of any pigment.
b. For coloured pavers refer
“specifications for coloured pavers”
Dimensional Tolerance (+/-) 2mm for length & width,
(+/-) 3mm for Height (Thickness)
V) Testing of Paver Blocks :
SR. Average Values
NO. (Average of Minimum
Five Samples/Site)
1. Compressive Strength Min. 45 N/Sqmm for 80mm
thick OR Min. 30 N/Sqmm for
2. Flexural Strength Minimum 4.5 N/Sqmm
3. Abrasion Resistance Maximum
4. Water Absorption Maximum 5.80%
5. Minimum Cement Contact 380 Kg/Cum (Not Essential)
* Sampling and Testing procedure as per enclosed specifications
SAMPLING AND TESTING PROCEDURES FOR PAVER BLOCKS.
INTERNAL – Average of minimum 3 samples per 5000 Blocks.
Essential – Minimum 2 Blocks per 10000 bocks. Average of minimum 8 blocks per site.
1. Sampling For Testing
Sampling for testing of paver blocks shall be done in accordance with Appendix-A.
2. Compressive Strength
Testing for compressive strength shall be undertaken in accordance with Appendix-B.
The average compressive strength of the bocks tested shall be 40 N/Sqmm.
3. Abrasion Resistance
Testing for abrasion shall be in accordance with IS 1237 (Specifications for Cement Concrete Floor
Tiles) – Appendix C.
4. Flexural Strength
Testing for flexural shall be n accordance with IS 1237 (Specifications for Cement Concrete Floor
Tiles) – Appendix D.
5. Water Absorption
Testing for water absorption shall be in accordance with IS 2185:1979 : Part I (Specifications for
Concrete Masonry Units) – Appendix E.
Sampling of Paver blocks.
1. Method of sampling :
Before laying paver blocks, each designated section comprising not more than 50000 blocks, shall be
divided into ten approximately equal groups. Three blocks shall be drawn from each group.
2. Marking and identification :
All samples shall be clearly marked at the time of sampling in such a way that the designated section of
part thereof, and the consignment represented by the sample, are clearly defined.
The sample shall be dispatched to the approved test laboratory taking precaution to avoid
damage to the paving in transit. Protect the paving from damage and contamination until they have
been tested. The testing shall be carried as soon as possible, after the sample has been taken. As soon
as practicable after sampling. The samples shall be stored in water at 20 degree C 5 degree C for
hours prior to testing.
Important Note:-
As well as Considered Item Specifications as Per Item Given, not by serial number, the specifications of items
which are not mentioned in BOQ Item, Specifications should be considered as per AMC Sor Current Approved
Rates for Civil and Electrical Works, as per Available on Site of Ahmedabadcity.gov.in All the Specifications
should be Considered as per Schedules Rates of R & B Division of both civil and Electrical Works. Hence it an
ARC Tender All the Quantity Would Vary as per Instruction of Engineer in Charge. No Rate would be given
Extra for Increase or Decrease in the Quantity of The BOQ Scheduled Items.
Contractor signature Additional City Engineer
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl –vrùbÍtul
vrùb Ítul Ítulj ytuVem,
1. Wvhtuf< xuLzhtu su <u Jdobtk btLg hSMx[uNl ^htJ<t ftuLx[tfxh©eytuyu ChJt.
2. xuLzhle rlg< xuLzh Ve <&t R.yub.ze. ck^ fJhbtkk Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg< mbgbtk
btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, (xuLzh ftuve <&t yLg vwhtJt mt&u) yawf
mtbuj fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.ck^ fhJh Wvh xuLzh ltuxem lkch,
xuLzh lkch, ftblwk ltb <&t, ftuLx[[tfxhle mkM&tlwk ltb <&t ftuLxufx lkch yJ~g œNtoJJtlt hnuNu. ftuLx[tfxhtuyu xuuLzhbt cukfl wltb,
Ft<t lkch, btRfh lkch ylu mhltb wMvÐ yûthtubtk jFJw.
4. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
5. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
6. xuLzh mt&u BþfJtbtk ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhLxe / zebtLz z[tVx / vu ytuzoh / jtufj btRfh auf&e s
MJefthJtbtk ytJNu. œhuf xuLzh œeX yjd R.yub.ze. ChJtle hnuNu. R.yub.ze. hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb
btxu jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu
R.yub.ze.le hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckuf duhkxelt MJYvbtk ytvJtle hnuNu.
7. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
8. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlwk ltb <&t btuctRj lkch yJ~g jFJtltu
hnuNu. ftuLx[t¾xhu vtu<tle mkkM&tlt auf <&t ze.ze. xuLzh R~gw > <theF ctœlt s ytvJt.
9. Nh<e xuLzhtu hœ ct<j dKtNu.
10. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u mbglu ftble
BþÆ<btk bshu ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^ >huf xuLzhh ujuJe.
11. xuuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrlrmvj frbNlh©ele hnuNu.
12. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykd xuLzh Ch<t vnujt AuÕju œJmu rlg< JucmtRx y&Jt fauheyu sYhe <vtm fhelu s
13. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf, rzbtLz z[tVx, vu
ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe zevtuÍex/ vhVtuboLm duhkxele hfb
btºt rzbtLz z[tVx, vu ytuzoh fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
14. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ Cgto Jdhle mne
mefft fhe mcbex fhJtle hnuNu. stu <ubtk CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
15. mœh xuLzhbtk ” GST rl<e rlgb bwsc jtdw vzNu ” <u bwsc dK<he fhe xuLzhtu
16. mœh xuLzhbtk ” dwsht< mhfth ©e lt ©b,ftiNÕg rJftm ylu htusdth
rJCtd,mraJtjg,dtk^eldh lt XhtJ ¢btkf: LED/WRT/e-
file/11/2024/0293/M2 Dt.15.02.2024” bwsc awM<vKu ybj fhJtltu hnuNu.
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
yu.yth.me. xuLzh- Nh<tu
1. yu.yth.me. xuLzhbtk Jfoytuzh ytÃgt ctœ ftb NY fhJtle mbgbgtoœtbtk ftuLx[tfxh îtht ftb NY fhJtle òK
fgto ctœ 24 fjtflt ftb NY lrn fhJtbtk ytJu <tu yLg ftuLx[tfxh vtmu btfuox hux&e ftuLx[tfxhlt Faou ylu
stuFbu ftbdehe fhtJJtbtk ytJNu.
2. ftuLx[tfxhlu Jfoytuzoh ytÃgt ctœ yu.yth.me. «fthlkw xuLzh ntuR ftble sYhegt< bwsc xujeVtulef òK fhe su
<u ftb NY fhJt fnuJtbtk ytJNu ylu su ftble òK fgtolt 24 fjtfbtk NY fhJtbtk lrn ytJu ylu rlg<
mbgbgtoœtbtk vwKo fhJtbtk lrn ytJu <tu su <u ytRxblt SOR CtJ&e 1.5 dKe vulÕxe Jmwj juJtbtk ytJNu.
3. ºtK fu J^w Jth Wvh bwscle yLg ftuLx[tfxh vtmu&e ftbdehe fhtJJtle Vhs vzNu ylu/y&Jt ºtK fu J^w Jth
vulÕxe fhJtle Vhs vzNu <tu <u mkstudtubtk ftuLx[tfxhlu çjufjeMx fhJtbtk ytJNu sule ykr<b m•tt
Bgw.frb¹lh©elu hnuNu.
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour Prohibition and
Regulation Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the guide lines. If child labour is
employed on the site work, the contractor shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the child
labour welfare fund. If the employer refuses to deposit then action will be taken for contempt of Supreme Court
Judgement and also will be prosecuted by concerned authority. Because of the breach of any provision of child labour
prohibition and regulation Act 1986 by the Contractor & Municipal Corporation becomes liable to pay any amount then
the Municipal Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its Reso. No.
Date 06--02-97, but the Municipal Corporation Board has recently decided that the actual testing charge is taken and the
remaining amount is refundable at the time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and has to follow
other govt.rules.
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be entertain
regarding QUANTITIES.
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by A.M.C. The
same shall be placed on A.M.C website which may be downloaded by the tendrers enclosed along with the tender duly
signed. These shall form a part of tender. The tenderer shall not add or amend the text of any of the documents except in
so far as may be necessary to comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the contract
documents. The full consideration shall be given to such addendum or corrigendum or correction before submission
tender duly filled in by the contractor. Therefore, the contractor shall have to watch such addendum or corrigendum or
correction published by A.M.C through its website www.egovamc.com. Tenderes shall verify the number of addendum
issued and enclose the same with the tender documents,failing which the tender shall be liable for rejection and no any
complaint in respect to this shall be entertained under any circumstances.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP ( West Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 99.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .