Loading…
Loading…
Tender Value
₹1.0 Cr
EMD Value
₹1.0 L
Closing Date
24 Sept 2026, 6:00 pmClosed
the Executive Engineer, R & B Division, Mehsana
Providing Compector Storage in District Court Building At Mehsana Dist. Mehsana
341650
5 FOR 2026-2027 SN- 6
Open
Civil Works - Buildings
Works
Mehsana
6 documents required · 6 mandatory
₹3,600
Executive Engineer, R&B Division, Mehsana
₹1.0 L
24 Sept 2026
3 Sept 2026
25 Sept 2026
3 Sept 2026
16 Sept 2026
3 Sept 2026
It. No. Quantity Unit In Words Amount
reference to book of specifications) Figures
Compactor storage from any of
Approved Make: Godrej, Kompress, Neelkamal & other equivalent brand
Compactor system strictly to be manufacured, supplied and installed as per
the detailed technical specifications in the tender considering BASE
Rupees Thirty Eight
FRAME of 100mm ht, SHELF in 35mm front profile and with minimum
Thousand Four
12 Bend technology and all corners locked by welding from inside with a tie
1 265.14 Cmt 38456.76 Hundred Fifty Six And
technology, with DRIVE SYSTEM in STAR HAND WHEEL with every
Paise Seventy Six
compactor unit lock essentially integrated within the CENTRAL HUB of
the hand wheel. The Rail Assembly of the system have to essentially made
of MS BRIGHT BAR of 30 mm dia (not square rail) Every Bay of the
Compactor system have to be Size: mm Width X 450/900 Depth X
2535mm ht each
Total Bid Price (in Figure)
Rupees One Crore One Lakh(s) Ninety Six Thousand Four Hundred
(in words)
Twenty Five And Paise Thirty Five Only
I/We am/are willing to carry out the work at…% above/below percent(Should be written in figures and words) of the estimated rate mentioned
above. Amount of my /our tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below % Above
In words In words
The Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-
10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where
there is a change as per actual mix design the cost of difference of cement consumption have been deducted
from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of contractor
Deputy Executive Engineer Executive Engineer
R & B Sub Division R & B Division
Mehsana Mehsana
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2.GR to be attached with DTP_SBD Amendment.pdf
BUILDINGSPECIFICATIONSBOOK(NEW) Amendment.pdf
Index Spe Amendment.pdf
SBD BOOK Amendment Type.pdf
Schedule B Amendment.pdf
TECHNICAL SPECIFICATIONS OF COMPACTORS Amendment Type.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .