| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical ok |
| 2 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-नगर पालिका कारà¥à¤¯à¤¾à¤²à¤¯ में off line दसà¥à¤¤à¤¾à¤µà¥‡à¤œ जमा नही करवानें के अà¤à¤¾à¤µ में निरसà¥à¤¤ किया जाता है |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-नगर पालिका कारà¥à¤¯à¤¾à¤²à¤¯ में off line दसà¥à¤¤à¤¾à¤µà¥‡à¤œ जमा नही करवानें के अà¤à¤¾à¤µ में निरसà¥à¤¤ किया जाता है |
Tender Value
₹96.0 L
EMD Value
₹1.9 L
Closing Date
27 Jan 2026, 6:00 pmClosed
EO
Nagarpalika hindoli
as per Rules
2026_DLB_527478_1
3042
Open Tender
Civil Works
Percentage
hindoli
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
MD RISL
₹1.9 L
Yes
16 Feb 2026
14 Jan 2026
28 Jan 2026
14 Jan 2026
27 Jan 2026
14 Jan 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: Municipal Board Hindoli Dist. Bundi (Raj)
Name of Work: अख्तर शकूर पार्लर से दिनेश उपाध्याय के मकान की और आर.सीसी नाला निर्माण कार्य।
Name of the Bidder/ Bidding Firm / Company :
Item Description Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
2 Silt clearance of drains, channels and canals with lift 1.5 Mtr and lead up to 50 Mtr Clearance Nala bed and side 0.00;[Re10]0.00 p.cum 0.00;[Re18]0.00 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
3 Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m Excavation in Nala bed 0.00;[Re8]0.00 p.cum 0.00;[Re16]0.00 Excess(+) Full Conversion INR INR Two Lakh Thirty Two Thousand Three Hundred & Sixty Eight and Paise Seventy Five Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
4 Random rubble dry stone Kharanja (soling) under floor. 0.00;[Re10]0.00 p.cum 0.00;[Re19]0.00 Excess(+) Full Conversion INR INR Two Lakh Twenty Nine Thousand Eight Hundred & Thirty Seven and Paise Fifty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
5 Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40mm nominal size). PCC PCC IN BED FOR BASE 0.00;[Re7]0.00 P.Cum. 0.00;[Re10]0.00 Excess(+) Full Conversion INR INR Three Lakh Eight Thousand Eight Hundred & Twelve and Paise Fifty Only 2 Construction of chamber for 100mm sluices valve item3 10 Nos
6 Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. Both side wall (inside outer side 2+2=4) 0.00;[Re5]0.00 SQM 0.00;[Re1]0.00 Excess(+) Full Conversion INR INR Six Lakh Thirty Eight Thousand Five Hundred & Eighty Only 2 Construction of chamber for 100mm sluices valve item3 10 Nos
7 Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level :1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) Nala bottom (Bed) Both side wall 0.00;[Re9]0.00 p.cum 0.00;[Re10]0.00 Excess(+) Full Conversion INR INR Forty One Lakh Eight Thousand Three Hundred & Twenty Only 2 Construction of chamber for 100mm sluices valve item3 10 Nos
8 Reinforcement for R.C.C. work at all levels including straightening,cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars. 0.00;[Re21]0.00 kg 0.99;[Re23]0.99 Excess(+) Full Conversion INR INR Forty Lakh Forty Eight Thousand Three Hundred & Eighty Only 2 Construction of chamber for 100mm sluices valve item3 10 Nos
Total in Figures INR Ninety Six Lakh Five Thousand Two Hundred & Twenty Nine and Paise Thirty Eight Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Please Enable Macros to View BoQ information
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.35 MB
BOQ_941446.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .