Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.6 LAccepted-AOC GALA NO B 128 129 130 SATYAM INDUSTRIAL ESTATE OFF KARVE ROAD OPP SNDT COLLEGE ERANNDWANE PUNE 411038 PUNE MAHARASHTRA 411038 | PUNE | MAHARASHTRA | 411038 | L1 | Accepted-AOC L1 | |
| 2 | L2₹28.1 L+₹2.5 L (9.74%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹29.7 L+₹4.1 L (16.2%)Rejected-AOC 00 00 BAIRIYA NEAR KALI MAA MANDIR BALLIA UTTAR PRADESH 277502 | BALLIA | UTTAR PRADESH | 277502 | L3 | Rejected-AOC L3 | |
| 4 | L4₹31.2 L+₹5.7 L (22.1%)Rejected-AOC FLAT NO B 205 S NO 296 2 DIVINE HOMES PORWAL ROAD LOHEGAON PUNE 411047 | PUNE | MAHARASHTRA | 411047 | L4 | Rejected-AOC L4 | |
| 5 | L5₹31.5 L+₹6.0 L (23.3%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
₹37.0 L
EMD Value
₹74,000
Closing Date
13 May 2020, 6:00 pmClosed
GE (AF) LOHEGAON
GE (AF) LOHEGAON, PUNE -411032
OUTSOURCING OF RESOURCES FOR MANNING AND OPERATION OF DG SETS IN 509 AREA 9 TETTRA SIMULATOR WSA AKASH TECH AND 9 BRD AT AF STATION PUNE UNDER GE AF LOHEGAON
2020_MES_340891_1
8359/E8
Open Tender
Miscellaneous Services
Item Rate
300 days
GE (AF) LOHEGAON
As Per NIT
8 documents required · 8 mandatory
₹500
Yes
GE (AF) LOHEGAON
₹74,000
Yes
8 Aug 2020
25 Apr 2020
15 May 2020
25 Apr 2020
13 May 2020
1 May 2020
Amount
Outsourcing of services for operation of DG sets upto 500 KVA capacity along with control panel, AMF Panel, Electric panel round the clock, seven days a week incl Sunday/holiday (8 Hrs each shift) by deploying skilled operator to operate installed machinery in 509 Power House - 1 No DG sets complete all as specified and directed. (a)First Shift - 0600 Hrs to 1400 Hrs -One DG Operator (b)Second shift-1400Hrs to 2200Hrs- One DG Operator (C)Third Shift -2200Hrs to 0600Hrs - One DG Operator
Outsourcing of services for operation of DG sets upto 500 KVA capacity along with control panel, AMF Panel,electric panel round the clock, seven days a week incl Sunday/holiday (8 Hrs each shift) by deploying skilled operator to operate installed machinery in 9 Tetra-01 No DG set,simulator-01 No DG set complete all as specified and directed. (a)First Shift - 0600 Hrs to 1400 Hrs -One DG Operator (b)Second shift-1400Hrs to 2200Hrs- One DG Operator (C)Third Shift -2200Hrs to 0600Hrs -One DG Operator
Outsourcing of services for operation of DG sets upto 500 KVA capacity along with control panel, AMF Panel,electric panel round the clock, seven days a week incl Sunday/holiday (8 Hrs each shift) by deploying skilled operator to operate installed machinery in WSA, Akash Tech flight 5 nos DG set complete all as specified and directed. (a)First Shift - 0600 Hrs to 1400 Hrs -One DG Operator (b)Second shift-1400Hrs to 2200Hrs- One DG Operator (C)Third Shift -2200Hrs to 0600Hrs - One DG Operator
Outsourcing of services for operation of DG sets up 500 KVA capacity along with control panel,AMF Panel,electric panel for two shifts, seven days a week incl Sunday/holiday (8 Hrs each shift) by deploying skilled operator to operate installed machinery in 9 BRD DG Sets complete all as specified and directed. (a)First Shift - 0600 Hrs to 1400 Hrs -One DG Operator (b)Second shift-1400Hrs to 2200Hrs- One DG Operator
Note :- For Srl item No 1.00 to 4.00 (i) Contractor will submit the nominal roll and qualification certificate of operator with in 15 days of acceptance. (ii) The Operator shall be ITI qualified in concerned trade or shall have minimum 05 years experience in operation of DG set. (iii) Contractor will ensure attendance of all operators shift wise if any operator found absent from duty a recovery of double the rate quoted by the contractor against each shift/item shall be made. (iv) All necessary T&P including uniform shall be provided by the contractor to the operators at no extra cost. The rates for the same is deemed to be included in the unit rates of the items. (v) The contractor will provide of all the necessary stationery such as log book ,attendance register etc to the operator for maintenance the plant running record. (vi) All operator shall wear proper uniform. (vii) Contractor shall submit the payment Statement with operators Passbook in every month of 1st week. (viii) Contractor shall provide Notice Board of each installation with in 15 days from the date of commencement of contract. (ix) Area cleaning including cutting of grasses etc up to 3 meters from the plinth protection all around plant room/DG set (x) Contractor shall submit the monthly duty roster of each installation before 03 days of respective month. (xi) If the quoted amount is less than the estimated cost of the work, then the lowest bidder will have to deposit FDR/BGB in favour of Accepting Officer within 07 days of opening of Financial Bid for the difference in estimated cost & quoted amount. In case the said FDR/BGB is not submitted within the stipulated period as mentioned above, the contractor shall be banned for 06 months & his bid will be rejected. FDR/BGB shall be released only after satisfactory completion of work including defect liability period of contract whenever applicable. (xii) The minimum wages are revised every six months, therefore the rates quoted shall be applicable as on bid submission end date and the bidder shall undertake to pay only as per minimum wages revised from time to time in future during the contract period and the contractor shall have no claim whatsoever on this account.
Maruti Abhiyantriki
Neha Enterprises
BSK Construction
Smruti Construction
KSP ENTERPRISES
Apurva constructions
HVAC Engineering Co
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .