Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC AT PO LAIYO DIST RAMGARH JHARKHAND PIN 825325 | LAIYO | RAMGARH | JHARKHAND | 825325 | ₹3.6 L | L1 | Accepted-AOC LOWEST QUOTED RATE |
| 2 | L2₹3.7 L+₹16,374.96 (4.60%)Rejected-Finance NEAR RELIANCE PETROL PUMP RAMGARH CANTT 829122 DIST RAMGARH JHARKHAND | RAMGARH CANTT | RAMGARH | JHARKHAND | 829122 | ₹3.7 L+₹16,374.96 (4.60%) | L2 | Rejected-Finance HIGHER RATE QUOTED |
| 3 | L3₹3.8 L+₹28,561.39 (8.02%)Rejected-Finance BHANDANI NAGAR BHURKUNDA RAMGARH JHARKHAND 829105 | BHURKUNDA | RAMGARH | JHARKHAND | 829105 | ₹3.8 L+₹28,561.39 (8.02%) | L3 | Rejected-Finance HIGHER RATE QUOTED |
| Sl No | Description | Qty | Unit | Rajneesh Electricals L2 | RAHIM CONTRACTOR L3 | M/S S. Z. Brothers & Company L1 |
|---|---|---|---|---|---|---|
| 1.00 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (A+B) | 2,056.56 | kg | 120 ₹2,46,787.2 | 124 ₹2,55,013.44 | 114.9 ₹2,36,298.74 Lowest |
| 2.00 | Painting with black anti corrosive bitumastic paint of approved brand and manufacture to give an even shade two or more coats on new work.(=185.72/2+38.88)sqm | 131.75 | Sqm | 107 ₹14,097.25 | 110 ₹14,492.5 | 101.5 ₹13,372.62 Lowest |
| 3.00 | Providing and fixing bolts including nuts and washers complete. | 40 | Kg | 115 ₹4,600 | 120 ₹4,800 | 109 ₹4,360 Lowest |
| 4.00 | Fitting and erection of drum including cleaning,pressure,testing,tightening and finally pulling inside the tee.(36(for making new 36 drum pontoon)+30(of 72 drums) | 66 | Nos. | 71 ₹4,686 | 72 ₹4,752 | 67 ₹4,422 Lowest |
| 5.00 | Supply of PVC Drum, 200 ltr | 36 | Nos. | 1,260 ₹45,360 | 1,300 ₹46,800 | 1,200 ₹43,200 Lowest |
| 6.00 | Total impact of GST for the purpose of CTC | 1 | No | - | - | - |
Tender Value
₹3.6 L
EMD Value
₹4,500
Closing Date
11 Apr 2026, 2:00 pmClosed
PE EnM JOCP
JOCP
A) fabrication and commissioning of one (01) PVC drum pontoon for a 1000 GPM pump, along with B) repair of one (01) existing 72-drum pontoon used for a 2000 GPM pump, for deployment in the quarry sump to ensure efficient dewatering during the upcomin
2026_CCL_357873_1
PO/JOCP/EnM/Tender/26-27/01
Open Tender
Electrical and Maintenance Works
Item Rate
10 days
JOCP
AS PER NIT
2 documents required · 2 mandatory
₹4,500
12 May 2026
1 Apr 2026
13 Apr 2026
1 Apr 2026
11 Apr 2026
1 Apr 2026
1 Apr 2026 - 6 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (A+B) | 2,056.56 | kg | - | - |
| 2 | Painting with black anti corrosive bitumastic paint of approved brand and manufacture to give an even shade two or more coats on new work.(=185.72/2+38.88)sqm | 131.75 | Sqm | - | - |
| 3 | Providing and fixing bolts including nuts and washers complete. | 40 | Kg | - | - |
| 4 | Fitting and erection of drum including cleaning,pressure,testing,tightening and finally pulling inside the tee.(36(for making new 36 drum pontoon)+30(of 72 drums) | 66 | Nos. | - | - |
| 5 | Supply of PVC Drum, 200 ltr | 36 | Nos. | - | - |
| 6 | Total impact of GST for the purpose of CTC | - | No | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.14 MB
BOQ_370743.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .