| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.1 LAccepted-AOC WARD NO 2 MALVIIYANAAGAR P O WEST CHIRIMIRI COLLIERY DISTT MCB CHHATTISGARH PIN 497773 | KOREA | CHHATTISGARH | 497773 | L1 | Accepted-AOC As being L1 Bidder | |
| 2 | Rejected-Technical | - | Rejected-Technical As Recommended by Tender Committee. | |
| 3 | Rejected-Technical | - | Rejected-Technical As Recommended by Tender Committee |
Tender Value
₹37.1 L
EMD Value
₹46,500
Closing Date
2 Nov 2023, 5:00 pmClosed
Staff Officer Civil Chirimiri Area
OFFICE OF THE STAFF OFFICER CIVIL CHIRIMIRI AREA PO WEST CHIRIMIRI DIST KOREA CG PIN CODE 497773 MOB NO. 9425533308
Providing garland drain, fencing of area on surface over T10, T11, T12 and subsidence crack filling on surface over T11 and T12 panels of Vijay West UG Mine of RASA.
2023_SECL_291637_1
SECL/CHRM/DYGMC/23-24/ E TENDER/18 dt. 18.10.2023
Open Tender
Civil Works - Others
Item Rate
90 days
Chirimiri
As per NIT
3 documents required · 3 mandatory
₹46,500
1 Jan 2024
20 Oct 2023
4 Nov 2023
20 Oct 2023
2 Nov 2023
21 Oct 2023
21 Oct 2023 - 28 Oct 2023
Amount
Item Description
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but, excluding cost of reinforcement, with 1:1.5:3 (1 cement 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Cold twisted bars
Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil.
Carriage of Materials by mechanical transport including loading, unloading and stacking Earth upto 5.00 km Lead
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. As per instruction of Engineer Incharge
Total impact of GST for the purpose of CTC
M/s SKYHIGH ENTERPRISES
MAA SHITALA
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .