| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC VILL THADOH P O BHATWARA TEHSIL GHUMARWIN DISTT BILASPUR H P | ₹3.0 L Quoted ₹3.1 L | L1 | Accepted-AOC being L1 |
| 2 | L2₹3.2 L+₹10,987 (3.56%)Rejected-Finance HIMACHAL PRADESH HP | LAHUL AND SPITI | HIMACHAL PRADESH | 175133 | ₹3.2 L+₹10,987 (3.56%) | L2 | Rejected-Finance Being L2 |
| 3 | L3₹3.3 L+₹23,808 (7.72%)Rejected-Finance NOT SPECIFIED | ₹3.3 L+₹23,808 (7.72%) | L3 | Rejected-Finance Being L3 |
| 4 | L4₹3.4 L+₹29,187 (9.46%)Rejected-Finance JOGINDER NAGAR | ₹3.4 L+₹29,187 (9.46%) | L4 | Rejected-Finance Being L4 |
| 5 | L5₹3.4 L+₹31,006 (10.1%)Rejected-Finance VILLAGE BEHRAN POST OFFICE JHANDUTTA TEHSIL JHANDUTTA DISTRICT BILASPUR H P | ₹3.4 L+₹31,006 (10.1%) | L5 | Rejected-Finance Being L5 |
| Sl No | Description | Qty | Unit | Amit Kumar L4 | Daljeet Singh L2 | RANVEER SINGH L5 | Lalit Singh L1 | Jitender Kumar L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Excavation infoundation and trenches etc. in all kinds of soil such as pick work, jumper work, blasting and chiselling soft or hard rock where blasting is prohibited in all leads and lifts including trimming and dressing of sides, levelling of bed to correct grade stacking the excavated soil clear from the edge of excavation and returning the excavated soil after laying, jointing and testing of GI pipes in trenches in 15cm layers including consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated soil as directed with in a lead of 20 mtrs . | ||||||||
| 1.01 | Pick Jumper Work. | 24.71 | Cum | 410 ₹10,131.1 | 390 ₹9,636.9 | 430 ₹10,625.3 | 260 ₹6,424.6 Lowest | 400 ₹9,884 |
| 2.00 | Providing and laying cement concrete 1:3:6 ( 1 cement:3 sand: 6 stone aggregate 40 mm nominal size )and curing complete excluding cost of form work in foundation and plinth. | 1.45 | Cum | 6,050 ₹8,772.5 | 7,400 ₹10,730 | 6,100 ₹8,845 | 8,600 ₹12,470 | 6,000 ₹8,700 Lowest |
| 3.00Providing and laying cement concrete 1:1.5 :3 (1Cement : 1.5 sand: 3 graded crushed stone aggregate 20mm nominal size and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in all leads and lifts in :- | ||||||||
| 3.01 | Foundation, footing, bases of columns and the like & mass concrete. | 2.18 | Cum | 9,100 ₹19,838 | 8,800 ₹19,184 Lowest | 9,100 ₹19,838 | 11,000 ₹23,980 | 9,000 ₹19,620 |
| 3.02 | Walls (any thickness but not less than 0.10 mts. Thickness) attached pillasters, buttresses plinth, & string courses etc. from top of found action level upto floor two level. | 7.6 | Cum | 9,550 ₹72,580 | 8,800 ₹66,880 Lowest | 9,600 ₹72,960 | 11,000 ₹83,600 | 9,500 ₹72,200 |
| 3.03 | In suspended floors, roofs ,landings, shelves and their support balconies, beams, bressumers and cantilevers up to floor two level. | 1.45 | Cum | 11,200 ₹16,240 | 8,900 ₹12,905 Lowest | 11,500 ₹16,675 | 11,000 ₹15,950 | 11,000 ₹15,950 |
| 4.00Providing form work with steel plates 3.15mm thick welded with angles iron in frame 30x30x5mm so as to give a fair finish including certring shuttering strutting and propping etc. with wooden battens and ballies height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs and removal of the same for in-situ reinforced concrete & plain concrete work in all leads and lifts in:- | ||||||||
| 4.01 | Vertical surfaces such as soffits and suspended floors roofs landing and like floors etc. up to 200 mm in thickness | 75.96 | Sqm | 430 ₹32,662.8 | 350 ₹26,586 Lowest | 450 ₹34,182 | 360 ₹27,345.6 | 420 ₹31,903.2 |
| 4.02 | Flat surfaces such as soffits and suspended floors roofs landing and like floors etc. | 12.02 | Sqm | 470 ₹5,649.4 | 480 ₹5,769.6 | 460 ₹5,529.2 | 296 ₹3,557.92 Lowest | 450 ₹5,409 |
Tender Value
Refer Docs
EMD Value
₹6,700
Closing Date
10 Apr 2026, 11:00 amClosed
Exuective Engineer
JSV Division
Construction of RCC storage tank of 30000 ltrs capacity
2026_HPIPH_132996_1
JSDJ-13660-13759 dt. 31.3.2026
Open Tender
Civil Works
Item Rate
90 days
kheri tindi
Please refer Tender documents.
7 documents required · 7 mandatory
₹350
₹6,700
18 May 2026
31 Mar 2026
10 Apr 2026
31 Mar 2026
10 Apr 2026
31 Mar 2026
31 Mar 2026 - 10 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Excavation infoundation and trenches etc. in all kinds of soil such as pick work, jumper work, blasting and chiselling soft or hard rock where blasting is prohibited in all leads and lifts including trimming and dressing of sides, levelling of bed to correct grade stacking the excavated soil clear from the edge of excavation and returning the excavated soil after laying, jointing and testing of GI pipes in trenches in 15cm layers including consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated soil as directed with in a lead of 20 mtrs . | - | - | - | - |
| 1.01 | Pick Jumper Work. | - | Cum | - | - |
| - | Providing and laying cement concrete 1:3:6 ( 1 cement:3 sand: 6 stone aggregate 40 mm nominal size )and curing complete excluding cost of form work in foundation and plinth. | - | Cum | - | - |
| - | Providing and laying cement concrete 1:1.5 :3 (1Cement : 1.5 sand: 3 graded crushed stone aggregate 20mm nominal size and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in all leads and lifts in :- | - | - | - | - |
| 3.01 | Foundation, footing, bases of columns and the like & mass concrete. | - | Cum | - | - |
| - | Walls (any thickness but not less than 0.10 mts. Thickness) attached pillasters, buttresses plinth, & string courses etc. from top of found action level upto floor two level. | - | Cum | - | - |
| 3.03 | In suspended floors, roofs ,landings, shelves and their support balconies, beams, bressumers and cantilevers up to floor two level. | - | Cum | - | - |
| 4Providing form work with steel plates 3.15mm thick welded with angles iron in frame 30x30x5mm so as to give a fair finish including certring shuttering strutting and propping etc. with wooden battens and ballies height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs and removal of the same for in-situ reinforced concrete & plain concrete work in all leads and lifts in:- | |||||
| - | Vertical surfaces such as soffits and suspended floors roofs landing and like floors etc. up to 200 mm in thickness | - | Sqm | - | - |
| - | Flat surfaces such as soffits and suspended floors roofs landing and like floors etc. | - | Sqm | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
form6.pdf
Tender Documents • 0.73 MB
form8.pdf
Tender Documents • 1.20 MB
conditions.pdf
Tender Documents • 0.22 MB
BOQ_196684.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .