| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.0 CrAdmitted-Finance | -19.63% | ₹1.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹11.3 L (10.7%)Admitted-Finance HIMALAYA HOUSE D 248 SECTOR 10 NOIDA DIST G B NAGAR U P 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | -11.00% | ₹1.2 Cr+₹11.3 L (10.7%) | L2 | Admitted-Finance |
| 3 | L3₹1.2 Cr+₹16.5 L (15.8%)Admitted-Finance | -6.96% | ₹1.2 Cr+₹16.5 L (15.8%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical 00 PRAKASH CO SHIV BLOCK COLONY BABUGARH VIKAS NAGAR DEHRADUN UTTARAKHAND 248198 | DEHRADUN | UTTARAKHAND | 248198 | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.3 Cr
EMD Value
₹3.1 L
Closing Date
21 Jul 2026, 5:00 pmClosed
GENERAL MANAGER (JAL)
Water Works Compound Sector-5 Noida
Mo Gangajal (Construction of Utility Rooms, Guard Rooms, Toilet Rooms and Shed for DG in different Gangajal UGRs) Noida
2026_NOIDA_1169280_1
08/SM(GANGAJAL)/ET/2026-27
Open Tender
Civil Works - Others
Fixed-rate
730 days
NOIDA
Please Refer to Tender Document
3 documents required · 3 mandatory
₹5,310
NOIDA
₹3.1 L
19 Aug 2026
15 Jul 2026
22 Jul 2026
15 Jul 2026
21 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 Sqm. on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. All kinds of soil -The contractor has to dectect different utilities like sewer line,water supply line,electric cable,telephone cable gas pipe line etc using utility dectecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in- Charge | 456.56 | Cum. | 136 | ₹62,092.16 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundaions etc. in layers not exceeding 20 cm in depth: consolidating earth deposited layer by ramming and watering, lead up to 50m and lift upto 1.50 m. | 456.56 | Cum. | 93 | ₹42,460.08 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work upto plinth level - All work up to plinth level : 1:4:8 (1 cement : 4 coarse sand :8 graded stone aggregate 20 mm nominal size) | 138.35 | Cum. | 5,746.88 | ₹7,95,080.85 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:2:4 (1 Cement :2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 159.68 | Cum. | 6,753.45 | ₹10,78,390.9 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) aggregate 20 mm nominal size) | 185.76 | Cum. | 8,444.41 | ₹15,68,633.6 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundation, footings, bases of columns etc. for mass concrete. | 444.48 | Sqm. | 181.64 | ₹80,735.35 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform | 930.34 | Sqm. | 385.68 | ₹3,58,813.53 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Cold twisted bars | 168.22 | Qtl | 6,501.84 | ₹10,93,739.52 |
| 9 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 10 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand) | 199.68 | Cum. | 6,276.98 | ₹12,53,387.37 |
| 10 | 12 mm cement plaster of mix :1:4 (1 cement: 4 coarse sand) | 1,722.62 | Sqm. | 176.77 | ₹3,04,507.54 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
TD08.pdf
Tender Documents • 2.43 MB
BOQ_2194250.xls
BOQ • 0.30 MB
Capability_08.xls
Additional Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .