| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 CrAccepted-AOC | ₹4.6 Cr | L1 | Accepted-AOC Agreement executed by L1 |
| 2 | L2₹4.6 Cr+₹3.1 L (0.68%)Rejected-AOC ANICAD GRAMA PANCHAYAT NURUMAVU P O PATHANAMTHITTA 689589 | PATHANAMTHITTA | KERALA | 689589 | ₹4.6 Cr+₹3.1 L (0.68%) | L2 | Rejected-AOC Agreement executed by L1 |
Tender Value
₹4.4 Cr
EMD Value
₹1 L
Closing Date
19 Feb 2024, 4:00 pmClosed
Superintending Engineer, PWD Bridges North Circle
Office of the Superintending Engineer, PWD Bridges , North Circle, Thondayad, Kozhikode 673017
NABARD-NABARD RIDF Tranche XXIX 2023-24-Flood DamageWorks-Reconstruction of Kolangattukara Bridge in Ch.6/200 in Kottekkad-Mundur Road in Wadakkanchery Constituency in Thrissur Dist-NABARD Tranche XXIX- Kolangattukara Bridge -GeneralCivilWork
2024_PWD_655668_1
PWD/BR/TR/9754/2023_5_1_1/2
Open Tender
Civil Works - Bridges
Item Rate
365 days
Kolangattukkara, Kottekkad Mundur road MDR
Please refer Tender documents.
7 documents required · 7 mandatory
₹8,270
Yes
₹1 L
Yes
6 Mar 2024
7 Feb 2024
21 Feb 2024
7 Feb 2024
19 Feb 2024
7 Feb 2024
Amount
APPENDIX A - BRIDGE PROPER
OD188278/2023-2024:Forming temporary island of the size12.00x10.00x3.50 meter with 0.5 m above water level and driving down full size coconut piles 2.00m below bed level at 75c/c on both side and braced with 4 nos of 1/2 th split coconut wailing pieces and 4 nos of arecanut around and tied with wire nails and coir yarn with ettamat fixed to bamboo frame using with bamboo reapers with 30cm c/c on both ways and filling the island portion with gravelly earth including all cost conveyance labour etc. And periodical maintanence till the completion of work and removing island after completion of the work etc. as per the direction of departmental officers at site
OD39969/2023-2024:Bailing out water using 5 H.P. engine and pump set including hire and labour charges cost of fuel,and oil and errection charges to as per specification.
12.22:Providing Steel Liner 10mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as per Detailed Drawing.
OD39974/2023-2024:Bored cast-in-situ M35 grade R.C.C. Pile Using Batching Plant, Transit Mixer and Concrete Pump excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Pile diameter-800 mm including pile load test, hard rock socketing, flushing, chipping etc.
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
12.1.5.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Marshyn Soil - Depth upto 3 m - Mechanical Means -
12.39:Providing and laying of PCC M15 leveling course 100 mm thick below the pile cap
12.38.D.2:Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification R C C Grade M35 - Using Batching plant, Transit Mixer and Concrete pump
13.5.H.p.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M35 - With Batching Plant, Transit Mixer and Concrete Pump - Height upto 5m
13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
14.1D.2.1.A:"Furnishing and Placing RCC/PSC Grade M35 Using Batching Plant, Transit Mixer, and Concrete Pump as per drawing and Technical Specification For solid slab super-structure - Height upto 5m
14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
14.9:Drainage Spouts complete as per drawing and Technical specification
14.16:Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm.
8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
OD86048/2023-2024:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer. G.I. pipes(150mm dia for vertical post and 40mm dia horizontal) (DSR 10.26.3)
OD87687/2023-2024:Supplying and fixing M S Plates,including all material, labour and conveyance charges etc complete.
APPENDIX B - ROAD FORMATION
12.9.C:Providing and constructing one span service road to reach island location from one pier location to another pier location
3.16:Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
OD177592/2023-2024: Forming temporary bridge for service road size 40mx6.00mx3.60m and driving down full size coconut piles 2.0m below bed level at 75cm c/c on both side and braced with 4nos of 1/2 split coconut walling pieces and 6nos of arecanut around and tied with wire nails and coir yarn with double layer of ettamat fixed to bamboo frame using with bamboo reapers with 30cmc/c on both ways and filling the island portion with gravelly earth and 30cm thick GSB on top portion of service road providing RCC NP2 class pipes (1200 mm dia.) including conveyance, labour etc and periodical maintenance till the completion of work and removing the service road after completion of work etc , also dismantling the unserviceable materials at site and stacking serviceable materials with a lead of 1000m as per direction of departmental officers.
OD188702/2023-2024:Forming temporary road barrier for diversion road using GI sheet 0.4mm thick including all cost,conveyance,labour etc and periodical maintenance till the completion of work and removing the barrier after completion of work, considering material will be unserviceable after use of 8 times, sorting the dismantled material, disposal of unserviceable material as per direction of departmental officers at site.(details of section ISMC 100, MS flat and GI sheet of 0.4mm thick )
13.9.A:Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material
12.39:Providing and laying of PCC M15 leveling course 100 mm thick below the pile cap
14.11:Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification.
OD204086/2023-2024:Supplying and spreading granular materials of 60mm to down varying sizes in the portions of temporary service road where water logging occurs and low level berms as per the direction of the departmental officers at the site.
4.1.A.1:Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with a motor grader on the prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Grading-I - Plant Mix Method
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
55.22:Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete.
OD166625/2023-2024:Providing and laying Cement concrete wearing coat M-30 grade using recron fibres @ 125gm/bag of cement etc complete as per drawing and Technical Specifications.
14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
OD166630/2023-2024:Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand). Dark shade pigment using ordinary cement.
APPENDIX C - SIDE PROTECTION WORKS
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
OD87649/2023-2024:Dry rubble masonry including all cost of materials and labour charges etc complete.
OD87650/2023-2024:Dry rubble masonry using departmental stone excluding all cost of materials and overhead charges etc complete.
OD181095/2023-2024:Supplying and stacking well matured straight 6m long coconut post having avg diameter on 25cm for driving down through various strata below bed level including cost coveyance labour charges etc complete. (OD of CTE approved OD 3.1)
OD181118/2023-2024:Driving down coconut pile to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long 15 numbers per day 6X15=90m Details for 90m length (OD of CTE approved data 3.2)
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
OD204071/2023-2024:Cutting and removing the excess length of Wooden/ Coconut piles to lines and levels and removing the cut end of piles and stacking within 150m.(CTE approved OD 3.13)
12.8.G.2.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 - Using Batching Plant, Transit Mixer and Concrete Pump
3.16:Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
13.5.G.p.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M30 - Height upto 5m - using Batching Plant, Transit Mixer and Concrete Pump
13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
13.10:Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
14.1A.2.1.A:Furnishing and Placing Reinforced Cement Concrete Grade M20 Using Batching Plant, Transit Mixer, and Concrete Pump as per drawing and Technical Specification. For solid slab super-structure - Height up to 5m
14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
OD188284/2023-2024:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. (CTE approved OD 2.2)
12.8.B.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20
TRAFFIC SAFETY WORKS
55.14:Providing and fixing retro-reflectorised ceramic tilesProviding and fixing retro-reflectorised ceramic tiles of size 10cmX20cm using High Intensity Micro Prismatic (Type IV) grade sheeting with 7 years warranty fixed over Ist quality ceramic glazed tiles including cost of glue, cutting charges, fixing with suitable adhisive on concrete or other surface etc complete.
55.16:Providing and fixing guard post Providing and fixing guard post of size 200mmx200mm, 1400mm long, 800mm above ground level and 600mm below GL. casted in M20 Grade concrete reinforced with 4 nos of 8mm dia longitudinal bars and 6mm dia stirrups @ 100mm c/c, firmly fixed in position by means of foundation of size 0.5mx0.5mx0.7m in M15 grade concrete below ground level including painting 2 coats on exposed surface with synthetic enamel paint in alternate white & black band 20cm wide
55.10.2:Providing and erecting retro-reflectorised Object Hazard Marker 450mm x 900mm Providing and erecting retro-reflectorised Object Hazard Marker sign with 07 years warranty, manufactured as per IRC 67 USING Type IV ASTM D 4956-09 micro prismatic retro reflective sheeting fixed over aluminium sheetig, 2 mm thick / aluminium composit material sheeting 4 mm thick with suitable back support frame and supported on a mild steel angle iron post 75mmx75mmx6mm, firmly fixed 30cm above ground level by means of properly designed foundation with M 15 grade cement concrete 30cmx30x45cm, 45cm below ground level including painting all non-reflective faces with epoxy paint 2 coats over epoxy primer as per approved drawing and clause 801. 450mm x 900 mm
8.4.4:Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 7years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting vide clause 801.3.3 fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. 80 mm x 60 mm rectangular
8.6:Providing and fixing of direction and place identification retro-reflectorised sign with 7 years warranty manufactured as per IRC :67 High Intensity Micro Prismatic (Type IV) grade sheeting fixed over aluminum sheeting, 2 mm thick/aluminum composite material sheeting 4 mm thick with an area exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on suitably designed GI pipe pole not less than 50mm NB , 2 Nos. confirming to IS 1239, firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.
OD166597/2023-2024:Providing and fixing of DLP Boards of non-reflectorised sign with 7 years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with area not exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.
OD166688/2023-2024:Engraving letters in hard stone (DAR-16.21)
OD166689/2023-2024:Providing and fixing Inaugration Granite Stone of 18mm thick gang saw cut, mirror, polished, premoulded and prepolished, machine cut of required size, approved shade , colour and texture laid over 12 mm thick base cement mortar 1:3 (1 cement:3 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high glass finish etc. complete at all levels. Area of slab upto 0.50 Sqm.
APPENDIX E - DISMANTLING ITEMS
2.4.2.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Prestressed / reinforced cement concrete grade M-20 & above - By Mechanical Means
2.5.2.A:Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately Bituminous course - By Mechanical Means
2.1.4:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit Girth above 1800 mm
2.3.2.B:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of thorny jungle - By Mechanical Means
2.4.4.D:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Dry rubble masonry
BIJU JOSEPH
Bidder Name
BIJU JOSEPH
T A Davis
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .