Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-Finance | ₹2.2 L | L1 | Accepted-Finance Lowest BID accepted |
| 2 | L2₹2.6 L+₹38,546 (17.2%)Rejected-Finance | ₹2.6 L+₹38,546 (17.2%) | L2 | Rejected-Finance Lowest BID Accepted |
| Sl No | Description | Qty | Unit | JAMSHAD NASEERI P.K L2 | MULLETIS AND PUSULURI INFRACON ENGINEERS PRIVATE LIMITED L1 |
|---|---|---|---|---|---|
| 1.00APPENDIX A - SUBSOIL INVESTIGATION | |||||
| 1.00 | 56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring | 1 | set | 30,000 ₹30,000 | 8,000 ₹8,000 Lowest |
| 1.00 | 56.17.1:Providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing. | 96 | sqm | 20 ₹1,920 | 10 ₹960 Lowest |
| 1.00 | 56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring. | 6 | Bore Holes | 3,000 ₹18,000 | 1,500 ₹9,000 Lowest |
| 1.00 | 56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 60 | metre | 950 ₹57,000 | 850 ₹51,000 Lowest |
| 1.00 | 56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 30 | metre | 800 ₹24,000 Lowest | 950 ₹28,500 |
| 1.01 | 56.5.a:Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In land | 60 | metre | 1,500 ₹90,000 | 1,100 ₹66,000 Lowest |
| 1.01 | 56.4:Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river. | 6 | metre | 4,941 ₹29,646 | 2,500 ₹15,000 Lowest |
| 1.01 | 56.7:Conducting standard penetration test in bore hole at any depth. | 72 | each | 10 ₹720 Lowest | 200 ₹14,400 |
| 1.01 | 56.8:Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code. | 72 | each | 10 ₹720 Lowest | 300 ₹21,600 |
Tender Value
₹3.3 L
EMD Value
₹8,191
Closing Date
27 Dec 2025, 11:00 amClosed
Executive Engineer
O/o The Executive engineer, RIQCL, Kozhikode
Investigation Work
2025_PWD_822967_1
PWD/DE/TR/20982/2025_3_1_1/1
Open Tender
Civil Works - Others
Item Rate
60 days
Govt College Malappuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹725
Yes
₹8,191
Yes
28 Jul 2026
20 Dec 2025
29 Dec 2025
20 Dec 2025
27 Dec 2025
20 Dec 2025
Work Name:GENERAL-Investigation work for Science Block, Govt College Malappuram-Soil Investigation-Investigation Work
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1379312.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 0.34 MB
Tendernotice_3.pdf
PDF • 0.48 MB
Tendernotice_4.pdf
PDF • 1.65 MB
BOQ_1379312.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .