| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71.7 LAdmitted-Finance | ₹71.7 L | L1 | Admitted-Finance |
| 2 | L2₹77.3 L+₹5.6 L (7.87%)Admitted-Finance | ₹77.3 L+₹5.6 L (7.87%) | L2 | Admitted-Finance |
| 3 | L3₹80.0 L+₹8.3 L (11.6%)Admitted-Finance | ₹80.0 L+₹8.3 L (11.6%) | L3 | Admitted-Finance |
| 4 | L4₹83.0 L+₹11.3 L (15.7%)Admitted-Finance | ₹83.0 L+₹11.3 L (15.7%) | L4 | Admitted-Finance |
| 5 | L5₹83.4 L+₹11.7 L (16.3%)Admitted-Finance | ₹83.4 L+₹11.7 L (16.3%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | New Zeal Construction Co L9 | Javaid Ahmad Dev L7 | M/S GULZAR AHMAD BEIGH L4 | LATIEF AHMAD BHAT L3 | M/S BASHIR AHMAD DAR L5 | MA CONSTRUCTIONS L11 | SHAKEELAHMADSHAH L1 | KHURSHEED AHMAD KUCHAY L2 | GH RASOOL WANI L8 | LUCKY TRADERS CONTRACTORS AND ENGINEERS L6 | jhelum construction company L10 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. and for shafts, wells, cesspits and including all areas, including dressing of sides and ramming of bottoms with all leads and lifts, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | 1,850 | Cum | 169 ₹3,12,650 | 200 ₹3,70,000 | 220 ₹4,07,000 | 229 ₹4,23,650 | 140 ₹2,59,000 | 149 ₹2,75,650 | 200 ₹3,70,000 | 100 ₹1,85,000 Lowest | 250 ₹4,62,500 | 150 ₹2,77,500 | 147 ₹2,71,950 |
| 2.00 | Dewatering at Site during and after execution, complete job (LS) | 4 | Job | 29,999 ₹1,19,996 | 2,000 ₹8,000 | 20,000 ₹80,000 | 1,800 ₹7,200 | 10,000 ₹40,000 | 2,00,000 ₹8,00,000 | 5,000 ₹20,000 | 1,000 ₹4,000 Lowest | 1,000 ₹4,000 Lowest | 5,000 ₹20,000 | 5,015 ₹20,060 |
| 3.00 | Nallah Diversion , during and after execution Complete Job (LS) | 4 | Job | 99,999 ₹3,99,996 | 2,000 ₹8,000 | 10,000 ₹40,000 | 1,800 ₹7,200 | 15,000 ₹60,000 | 2,00,000 ₹8,00,000 | 30,000 ₹1,20,000 | 2,000 ₹8,000 | 1,000 ₹4,000 Lowest | 5,000 ₹20,000 | 5,075 ₹20,300 |
| 4.00 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto Top level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) (a) MudMat( Including all carriages e.t.c) | 94 | Cum | 6,999 ₹6,57,906 | 5,900 ₹5,54,600 | 5,500 ₹5,17,000 | 5,500 ₹5,17,000 | 4,900 ₹4,60,600 | 3,900 ₹3,66,600 | 3,900 ₹3,66,600 | 5,500 ₹5,17,000 | 2,800 ₹2,63,200 Lowest | 4,500 ₹4,23,000 | 5,250 ₹4,93,500 |
| 5.00 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto top level: (M20)1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)complete job.(Including all carriages) | 279 | Cum | 8,349 ₹23,29,371 | 8,000 ₹22,32,000 | 6,700 ₹18,69,300 | 7,050 ₹19,66,950 | 7,600 ₹21,20,400 | 9,000 ₹25,11,000 | 5,500 ₹15,34,500 Lowest | 6,800 ₹18,97,200 | 8,500 ₹23,71,500 | 7,500 ₹20,92,500 | 7,590 ₹21,17,610 |
| 6.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto top level. Thermo-Mechanically Treated bars of grade Fe-500D or more, including carriage of materials and placing under water conditions complete job.(Including all carriages ) | 16,740 | Kg | 95 ₹15,90,300 | 100 ₹16,74,000 | 73 ₹12,22,020 | 80 ₹13,39,200 | 80 ₹13,39,200 | 123 ₹20,59,020 | 80 ₹13,39,200 | 85 ₹14,22,900 | 70 ₹11,71,800 Lowest | 85 ₹14,22,900 | 70 ₹11,71,800 Lowest |
| 7.00 | Centering and shuttering including strutting, propping etc. and removal of form for: Columns, pillars, piers, abutments, posts and struts. | 905.4 | Sm | 479 ₹4,33,686.6 | 200 ₹1,81,080 | 210 ₹1,90,134 | 280 ₹2,53,512 | 240 ₹2,17,296 | 499 ₹4,51,794.6 | 200 ₹1,81,080 | 400 ₹3,62,160 | 350 ₹3,16,890 | 10 ₹9,054 | 5 ₹4,527 Lowest |
| 8.00 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter 2.7mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, including cost of boulders ( Split Stones/quary stone including carriage), as per drawing, all complete as per direction of Engineer-in-charge,including carriage of materials complete job.. | 1,740 | Cum | 2,249 ₹39,13,260 | 2,000 ₹34,80,000 | 2,200 ₹38,28,000 | 1,900 ₹33,06,000 | 2,100 ₹36,54,000 | 2,600 ₹45,24,000 | 1,750 ₹30,45,000 Lowest | 1,900 ₹33,06,000 | 2,800 ₹48,72,000 | 2,600 ₹45,24,000 | 3,417 ₹59,45,580 |
| 9.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, with all leads and lifts | 1,620 | Cum | 89 ₹1,44,180 | 200 ₹3,24,000 | 80 ₹1,29,600 | 100 ₹1,62,000 | 70 ₹1,13,400 | 199 ₹3,22,380 | 100 ₹1,62,000 | 10 ₹16,200 Lowest | 50 ₹81,000 | 50 ₹81,000 | 81 ₹1,31,220 |
| 10.00 | Providing and fixing 100mm dia PVC Pipe Wheep holes at staggered positions as per drawing | 310 | No. | 349 ₹1,08,190 | 300 ₹93,000 | 40 ₹12,400 | 50 ₹15,500 | 250 ₹77,500 | 211 ₹65,410 | 100 ₹31,000 | 50 ₹15,500 | 10 ₹3,100 Lowest | 100 ₹31,000 | 80 ₹24,800 |
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
1 Jul 2025, 4:00 pmClosed
executive engineer tlmd8
tlmd8, pdd complex bemina sgr
Design Prep. of Drawings and calculations and construction of protection walling for Tower Location LP2 LP4 LP5 LP6 of 220 KV DC MirBazar Lassipora TL at Turkwangan Shopian
2025_PDD_278453_1
enit TLMD/VIII/TS/03 Dated 04-06-2025
Open Tender
Consultancy
Lump-sum
90 days
kashmir
Please refer Tender documents.
5 documents required · 5 mandatory
₹3,000
CD 0367010200000174
₹2.6 L
Yes
16 Jul 2025
7 Jun 2025
2 Jul 2025
7 Jun 2025
1 Jul 2025
9 Jun 2025
7 Jun 2025 - 25 Jun 2025
Amount
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. and for shafts, wells, cesspits and including all areas, including dressing of sides and ramming of bottoms with all leads and lifts, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:
Dewatering at Site during and after execution, complete job (LS)
Nallah Diversion , during and after execution Complete Job (LS)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto Top level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) (a) MudMat( Including all carriages e.t.c)
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto top level: (M20)1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)complete job.(Including all carriages)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto top level. Thermo-Mechanically Treated bars of grade Fe-500D or more, including carriage of materials and placing under water conditions complete job.(Including all carriages )
Centering and shuttering including strutting, propping etc. and removal of form for: Columns, pillars, piers, abutments, posts and struts.
Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter 2.7mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, including cost of boulders ( Split Stones/quary stone including carriage), as per drawing, all complete as per direction of Engineer-in-charge,including carriage of materials complete job..
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, with all leads and lifts
Providing and fixing 100mm dia PVC Pipe Wheep holes at staggered positions as per drawing
KHURSHEED AHMAD KUCHAY (BID ID -2390612)
LATIEF AHMAD BHAT (BID ID -2390608)
M/S GULZAR AHMAD BEIGH (BID ID -2390773)
M/S BASHIR AHMAD DAR (BID ID -2390693)
LUCKY TRADERS CONTRACTORS AND ENGINEERS (BID ID -2394296)
Javaid Ahmad Dev (BID ID -2389482)
GH RASOOL WANI (BID ID -2394058)
New Zeal Construction Co (BID ID -2389015)
jhelum construction company (BID ID -2390578)
MA CONSTRUCTIONS (BID ID -2390573)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_854607.xls
BOQ • 0.33 MB
sbd1.pdf
Tender Documents • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .