| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.0 CrAccepted-AOC 294241 NAIBEDYA AGARTALA BISHALGARH ROAD BARDOWALI A D NAGAR WEST TRIPURA TRIPURA 799003 | 294241 | L1 | Accepted-AOC 1st Lowest Bidder | |
| 2 | L2₹21.8 Cr+₹73.9 L (3.51%)Rejected-Finance CHANDRAPUR AGARTALA WEST TRIPURA | WEST TRIPURA | TRIPURA | 799002 | L2 | Rejected-Finance 2nd Lowest Bidder. |
| Sl No | Description | Qty | Unit | OVAL PROJECTS ENGINEERING PRIVATE LIMITED L1 | MRIDUL JANAPTI L2 |
|---|---|---|---|---|---|
| 1.00 | A-SITE PREPARATION
1) Dismantling GS sheet roofing including ridges, hips, valleys, gutters wind ties etc, including dismembering and stacking of serviceable materials and unserviceable materials separately with all lifts and up to a lead of 50 m etc, complete as per direction of the Engineer-in-charge | 1,847.3 | m² | 110 ₹2,03,203 | 97 ₹1,79,188.1 Lowest |
| 2.00 | 2) Dismantling steel work in built up section in channels, angles, tees, flats including all gusset plates, bolts, nuts, cutting rivets, welding including dismembering and stacking of serviceable materials and unserviceable materials separately with all lifts and up to a lead of 50 m etc, complete as per direction of the Engineer-in-charge | 4,500 | kg | 7 ₹31,500 | 3.25 ₹14,625 Lowest |
| 3.00 | 3( Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead
3.1) Of sectional area beyond 40 cm² | 35 | m³ | 2,000 ₹70,000 Lowest | 2,691 ₹94,185 |
| 4.00 | 4) Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc, complete and stacking within 50 metres lead
4.1) Of area beyond 3 m² | 25 | no | 120 ₹3,000 Lowest | 308 ₹7,700 |
| 5.00 | 5) Demolishing brick work including stacking of serviceable materials and disposal of unserviceable materials with all lifts and up to a lead of 50 m etc, complete as per direction of the Engineer-in-charge 5.1) In cement mortar | 32 | m³ | 1,500 ₹48,000 | 1,200 ₹38,400 Lowest |
| 6.00 | 6) Demolishing cement concrete manually / by mechanical means including disposal of material with all lifts and up to 50 m lead etc, complete as per direction of the Engineer-in-charge
6.1) Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | 10 | m³ | 1,050 ₹10,500 Lowest | 1,500 ₹15,000 |
| 7.00 | Demolishing reinforced cement concrete manually / by mechanical means including stacking of steel bars properly and disposal of unserviceable material with all lifts and up to 50 m lead etc, complete as per direction of the Engineer-in-charge | 15 | m³ | 2,500 ₹37,500 | 2,190 ₹32,850 Lowest |
| 8.00 | Dismantling of cement concrete pavements by mechanical means using pneumatic tools, breaking to pieces, not exceeding 0.02 m³ in volume and stock piling at designated locations and disposal of dismantled materials with all lifts and up to a lead of 1000 m, staking serviceable and unserviceable materials separately as per MoRD Technical Specifications, Clause No: 202 | 2.8 | m³ | 1,500 ₹4,200 | 1,416 ₹3,964.8 Lowest |
| 9.00 | 9) Dismantling of flexible pavements and disposal of dismantled materials with all lifts and up to a lead of 100 m, staking serviceable and unserviceable materials separately as per MoRD Technical Specifications, Clause No: 202
9.1) By manual means
9.1.1)Bituminous courses | 0.4 | m³ | 1,020 ₹408 | 1,006 ₹402.4 Lowest |
| 10.00 | 9.1.2) Granular courses | 0.35 | m³ | 750 ₹262.5 | 730 ₹255.5 Lowest |
Tender Value
₹20.5 Cr
EMD Value
₹41.0 L
Closing Date
24 Mar 2025, 3:00 pmClosed
THE EE TUDA 4th Floor UD Bhawan
O/O THE EE TUDA 4th Floor UD Bhawan
Construction of Vegetable and Fish Market in Vidhyasagar Market Belonia South Tripura District Tripura under Special Assistance for Capital Investment during the financial Year 2023 24 Urban Reform Part III
2025_TUDA_58824_1
43_EE_TUDA_2024_25
Open Tender
Civil Works
Percentage
730 days
BELONIA
Please refer Tender documents.
9 documents required · 9 mandatory
₹10,000
TUDA Settlement Account
₹41.0 L
O/O THE EE TUDA 4th Floor UD Bhawan
3 Dec 2025
25 Feb 2025
24 Mar 2025
27 Feb 2025
24 Mar 2025
17 Mar 2025
27 Feb 2025 - 7 Mar 2025
7 Mar 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | A-SITE PREPARATION
1) Dismantling GS sheet roofing including ridges, hips, valleys, gutters wind ties etc, including dismembering and stacking of serviceable materials and unserviceable materials separately with all lifts and up to a lead of 50 m etc, complete as per direction of the Engineer-in-charge | 1,847.3 | m² | - | - |
| 2 | 2) Dismantling steel work in built up section in channels, angles, tees, flats including all gusset plates, bolts, nuts, cutting rivets, welding including dismembering and stacking of serviceable materials and unserviceable materials separately with all lifts and up to a lead of 50 m etc, complete as per direction of the Engineer-in-charge | 4,500 | kg | - | - |
| 3 | 3( Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead
3.1) Of sectional area beyond 40 cm² | 35 | m³ | - | - |
| 4 | 4) Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc, complete and stacking within 50 metres lead
4.1) Of area beyond 3 m² | 25 | no | - | - |
| 5 | 5) Demolishing brick work including stacking of serviceable materials and disposal of unserviceable materials with all lifts and up to a lead of 50 m etc, complete as per direction of the Engineer-in-charge 5.1) In cement mortar | 32 | m³ | - | - |
| 6 | 6) Demolishing cement concrete manually / by mechanical means including disposal of material with all lifts and up to 50 m lead etc, complete as per direction of the Engineer-in-charge
6.1) Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | 10 | m³ | - | - |
| 7 | Demolishing reinforced cement concrete manually / by mechanical means including stacking of steel bars properly and disposal of unserviceable material with all lifts and up to 50 m lead etc, complete as per direction of the Engineer-in-charge | 15 | m³ | - | - |
| 8 | Dismantling of cement concrete pavements by mechanical means using pneumatic tools, breaking to pieces, not exceeding 0.02 m³ in volume and stock piling at designated locations and disposal of dismantled materials with all lifts and up to a lead of 1000 m, staking serviceable and unserviceable materials separately as per MoRD Technical Specifications, Clause No: 202 | 2.8 | m³ | - | - |
| 9 | 9) Dismantling of flexible pavements and disposal of dismantled materials with all lifts and up to a lead of 100 m, staking serviceable and unserviceable materials separately as per MoRD Technical Specifications, Clause No: 202
9.1) By manual means
9.1.1)Bituminous courses | 0.4 | m³ | - | - |
| 10 | 9.1.2) Granular courses | 0.35 | m³ | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
164614794.xls
BOQ Document • 0.56 MB
164282778.html
Tender Document • 0.08 MB
164614795.pdf
Tender Document • 0.58 MB
DRAWING.pdf
Tender Document • 1.23 MB
DNIeT.pdf
Tender Document • 3.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .