Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.0 LAccepted-AOC DUCKBANGLO JAGADISHPUR RAJARHAT NORTH 24 PGS KOLKATA 700135 | KOLKATA | NORTH 24 PARGANAS | WEST BENGAL | 700135 | ₹54.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹55.3 L+₹1.4 L (2.57%)Rejected-Finance 1087 LASKARHAT KOLKATA 700039 | KOLKATA | WEST BENGAL | 700039 | ₹55.3 L+₹1.4 L (2.57%) | L2 | Rejected-Finance L2 |
| 3 | L3₹55.4 L+₹1.5 L (2.75%)Rejected-Finance 1 1E KHODAGONGE ROAD KOLKATA 700 010 | KOLKATA | KOLKATA | WEST BENGAL | 700010 | ₹55.4 L+₹1.5 L (2.75%) | L3 | Rejected-Finance L3 |
Tender Value
₹54.4 L
EMD Value
₹1.1 L
Closing Date
17 Aug 2026, 2:00 pmClosed
Executive Engineer, ED-IV, EM, KMDA
Office Of The Executive Engineer, ED-IV, EM, Block-L, 3rd Floor, Unnayan Bhavan, KMDA, Salt Lake-700091
Operation, Guarding, Cleaning including Daily/Periodic Maintenance etc, of the clear Water pumping equipment and articles for 36 (Thirty-Six) Months at Lake town clear water Booster Pumping Station Under South Dum Dum Municipality.
2026_KMDA_1035002_1
KMDA/EM/EE/ED-IV /e-NIT-09 (3rd call) of 2026-27, dated-27.07.2026
Open Tender
ELECTRICAL WORKS M/R
Percentage
1095 days
South Dum Dum Municipality.
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.1 L
Office of the EE, ED-IV, EM, KMDA
31 Aug 2026
3 Aug 2026
19 Aug 2026
3 Aug 2026
17 Aug 2026
3 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Round the clock operation and minor maintenance of the Pumping Station with adequate number of working personnel for each month as per direction of EIC. | |||||
| 1.01 | For the period of First year | - | Months | 1,16,454 | - |
| 1.02 | For the period of Second year | - | Months | 1,20,858 | - |
| 1.03 | For the period of Third year | - | Months | 1,25,424 | - |
| 2Checking of all the Mechanical parts and preventive maintenance of all pump machinery as per technical specification and scope of work and direction of the EIC. (Once a month) | |||||
| 2.01 | For the period of First year | - | - | - | - |
| 2.02 | For the period of Second year | - | Days | 1,002 | - |
| 2.03 | For the period of Third year | - | Days | - | - |
| 3Checking of all the Electrical equipments like LT Panel, MCC Cum PDB panel, Control Desk, Battery Bank, EOT Crane etc. and preventive maintenance of all electrical machinery as per technical specification and scope of work and direction of the EIC . (Once a month) | |||||
| 3.01 | For the period of First year | - | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Docs9R_ED4.pdf
Tender Documents • 0.86 MB
BOQ_2542257.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .