Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.4 LAdmitted-Finance LOCATION UTTARAKHAND UT | ₹11.4 L | L1 | Admitted-Finance |
| 2 | L2₹11.9 LAdmitted-Finance ABC OF VIJAYPUR SECTION UNDER EDD BAGESHWAR | ₹11.9 L | L2 | Admitted-Finance |
| 3 | L3₹15.2 LAdmitted-Finance | ₹15.2 L | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Offline/physically tender not submitted |
| Sl No | Description | Qty | Unit | GURUKRIPA ENGINEERS AND CONTRACTORS L2 | AJAY KUMAR CHAUHAN L1 | Hari Om Sai Electricals L3 |
|---|---|---|---|---|---|---|
| 1.00SUPPLY | ||||||
| 2.00 | Stay clamp for SP-23 double ended | 150 | Nos | 200 ₹30,000 | 275 ₹41,250 | 280 ₹42,000 |
| 3.00 | LT clamp with N&B ST pole SP-21 | 345 | Nos | 156 ₹53,820 | 195 ₹67,275 | 200 ₹69,000 |
| 4.00 | Stay clamp for SP-21 with N&B | 252 | Nos | 180 ₹45,360 | 205 ₹51,660 | 205 ₹51,660 |
| 5.00 | Earth wire clamp for SP-23 with N&B | 100 | Nos | 203 ₹20,300 | 275 ₹27,500 | 280 ₹28,000 |
| 6.00 | PP and clamp with N&B ST pole SP-23 | 300 | Nos | 150 ₹45,000 | 133 ₹39,900 | 135 ₹40,500 |
| 7.00 | Shackle insualator 75x90 mm with N&B | 345 | Nos | 40 ₹13,800 | 60 ₹20,700 | 65 ₹22,425 |
| 8.00 | Stay Insulator | 100 | Nos | 24 ₹2,400 | 20 ₹2,000 | 20 ₹2,000 |
| 9.00 | Bracing clamp top for SP-23 with N&B | 100 | Nos | 250 ₹25,000 | 250 ₹25,000 | 255 ₹25,500 |
| 10.00 | Bracing clamp bottom for SP-23 with N&B | 100 | Nos | 250 ₹25,000 | 245 ₹24,500 | 250 ₹25,000 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹45,000
Closing Date
16 Jan 2026, 4:00 pmClosed
EE,EDD,Ranikhet
EDD,Ranikhet
Construction of line for giving connection to consumers under Dwarahat and Bagwalipokhar secction under EDSD, Dwarahat
2025_UPCL9_89531_1
09/2025-26EDD(R)
Open Tender
Electrical Works
30 days
Ranikhet
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Yes
EE
₹45,000
3 Feb 2026
8 Dec 2025
17 Jan 2026
8 Dec 2025
16 Jan 2026
8 Dec 2025
Stay clamp for SP-23 double ended
LT clamp with N&B ST pole SP-21
Stay clamp for SP-21 with N&B
Earth wire clamp for SP-23 with N&B
PP and clamp with N&B ST pole SP-23
Shackle insualator 75x90 mm with N&B
Stay Insulator
Bracing clamp top for SP-23 with N&B
Bracing clamp bottom for SP-23 with N&B
Errection fo earthing rod
Fabrication of steel
Excavation of pit for stay set
Errection of LT stay set
Excavation of pit for pole
Errection of single SP-21 pole
Errection of single SP_23 pole
Errection of SP-23 double pole
Grouting of pole
Muffing of pole
Installation of 100 KVA DTR on pole structure
Installation of 63 KVA DTR on pole structure
Installation of 25 KVA DTR on pole structure
Fixing of TPMO
Laying of Rabbit conductor in HT line
Laying of 3P4WLT line (Rabbit)
Laying of 1P2W LT line (Rabbit)
T-off connection 11 KV line
Cartage of SP-21/23 pole, 100-150 km
Cartage of petty material ,100-150 km
Cartage of 16/25 KVA DTR 100-150 km
Cartage of 63 KVA DTR, 100-150 Km
Cartage of 100 KVA DTR, 100-150 km
Head load cartage of of SP-21/23 pole(1-3 km)
Head load cartage of material (1-3 km)
Head load cartage of 25 KVA DTR(1-3 km)
Head load cartage of 63 KVA DTR(0-1 km)
Head load cartage of 100 KVA DTR(0-1 km)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.62 MB
BOQ_106152.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid