| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 CrAccepted-Finance | ₹8.4 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹8.6 Cr+₹18.0 L (2.15%)Rejected-Finance | ₹8.6 Cr+₹18.0 L (2.15%) | L2 | Rejected-Finance L2 |
| 3 | L3₹8.7 Cr+₹28.7 L (3.42%)Rejected-Finance | ₹8.7 Cr+₹28.7 L (3.42%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical VILL P O BARUA P S BELDANGA DIST MURSHIDABAD PIN 742189 | BARUA | MURSHIDABAD | WEST BENGAL | 742189 | - | - | Rejected-Technical REJECTED |
Tender Value
Refer Docs
EMD Value
₹16 L
Closing Date
11 Jan 2024, 12:00 pmClosed
SUPERINTENDING ENGINEER EASTERN CIRCLE
NIJALAY, PLOT NO. CN-8, SEC-V, SALT LAKE CITY, KOLKATA - 700091
Laying of HDPE pipe of different diameter by HDD method for crossing canal, river along busy road etc.at diff. places along the stretches for (South-West Part)...surface water based WS scheme of Bongaon-Bagdah....under Barasat Division, P.H.E. Dte
2023_PHED_617376_2
WBPHED/SE/EC/NIEQ-50/2023-24
Open Tender
CIVIL WORKS
Lump-sum
30 days
Bongaon Sub-Division
Please refer Tender documents.
6 documents required · 6 mandatory
₹16 L
2 Feb 2025
7 Dec 2023
15 Jan 2024
7 Dec 2023
11 Jan 2024
7 Dec 2023
Amount
Supplying, Coneyance & delivery, handling, loading, unloading, storing, setting, jointing, laying etc. and testing of HDPE pipe PN-10/ PN-8, PE-100 of IS: 4984-2016 of diameter 200 mm to 1000 mm at required depth, slope as per design, drawing provided by the agency for Pumping Main / Distribution Main by HDD method with Mechanical Devices and Mechineries (HDD Meachine capacity 60-160 Tons) required for Trenchless Pipe laying for crossing River / Canals Water bodies / NH in all kinds of soils except rocks including cleaning and restoration the sites in all respect with plant, labour and materials all complete as per specification, Drawing and as per direction of EIC. The rate are also inclusive of the cost for shifting of Electric poles, Telephone poles, under ground pipes and cables of electric and telephones etc. dismantling, shifting and re-installation of any permanent or temporary structures which will come across and alignment of HDD operations. N.B. i) Manufacturer’s test certificate for HDPE pipes to be produced before supply. ii) 3rd party inspection for HDPE pipes & specials to be done by CEPET / SGS / NTH Kolkata or as per direction of EIC. HDPE pipes to be supplied from approved vendor list of W.B.P.H.E.D. iii) The custodian of the pipe meterial will be the Agency concern, on event of any theft, lose or Damage of the pipe meterial supplied, the cost of such material should be recovered forthwith from the bill of the concerned Agency.
PART-A
PART-B
PART-C
PART-D
PART-E
PART-F
PART-G
PART-H
PART-I
PART-J
PART-K
GST @18% on all the above items.
Labour Welfare Cess @1% on all the above items.
TELETONE INDIA PRIVATE LIMITED
BENGAL ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .