Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-AOC | ₹9.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹9.1 L+₹5,943.83 (0.66%)Rejected-Finance S 10 2 1 L RAM SINGH KATRA HUKULGANJ VARANASI | VARANASI | UTTAR PRADESH | ₹9.1 L+₹5,943.83 (0.66%) | L2 | Rejected-Finance L2 |
| 3 | L3₹10.2 L+₹1.1 L (12.4%)Rejected-Finance 2244 3 JHANSI BRAMHAPURI COLLONEY KHATIBABA ROAD VILLAGE TOWN ISAITOLA CITY JHANSI JHANSI UTTAR PRADESH 284003 INDIA | JHANSI | UTTAR PRADESH | 284003 | ₹10.2 L+₹1.1 L (12.4%) | L3 | Rejected-Finance L3 |
| 4 | L4₹10.8 L+₹1.7 L (18.7%)Rejected-Finance 9 207 | BALLIA | UTTAR PRADESH | 221701 | ₹10.8 L+₹1.7 L (18.7%) | L4 | Rejected-Finance L4 |
| 5 | L5₹11.1 L+₹2.1 L (22.8%)Rejected-Finance 00 BHADAR TIKARMAFI BAZAR SULTANPUR UTTAR PRADESH 227413 | AMETHI | UTTAR PRADESH | 227413 | ₹11.1 L+₹2.1 L (22.8%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | ARUN KUMAR PANDEY L4 | DEV ENTERPRISES L5 | Shree Construction L3 | VARLAKSHMI ENTERPRISES L1 | VINOD KUMAR SINGH L2 | Nirmala L6 |
|---|---|---|---|---|---|---|---|---|---|
| .10Laying and Jointing PVC Pipe. Heading | |||||||||
| 1.00 | E/W in strengthening anti erosion bandhi section as per direction of Engineer -in- charge including all lead and lift ,manual compaction ,cost of labour , T&P etc.required for proper complition of work complete in all respect. | 3,415 | M3 | 182 ₹6,21,530 | 190 ₹6,48,850 | 160 ₹5,46,400 | 159.55 ₹5,44,846.18 | 154 ₹5,25,910 Lowest | 225 ₹7,68,375 |
| 2.00 | Earth work in excavation in foundation in all type of soil including lift upto 1.50 m and lead up to 30 m including all cost of labour ,T&P etc.required for proper complition of work in all respect . | 96 | M3 | 75 ₹7,200 | 99 ₹9,504 | 110 ₹10,560 | 73.72 ₹7,076.64 Lowest | 115 ₹11,040 | 110 ₹10,560 |
| 3.00 | P.C.C.1:3:6 in foundation with stone ballast of size 20 to40mm Including all cost of material, lead ,lift ,labour and T&P etc . required for proper complition of work in all respect as per direction of Engineer -in- charge. | 10.8 | M3 | 4,800 ₹51,840 | 5,100 ₹55,080 | 5,200 ₹56,160 | 3,837.61 ₹41,446.18 Lowest | 5,986 ₹64,648.8 | 5,500 ₹59,400 |
| 4.00 | Providing and laying 1000 mm dia NP-3 hume pipe Including all lead ,lift ,labour and T&P etc , as per direction of Engineer -in- charge. | 25 | M3 | 2,500 ₹62,500 Lowest | 2,900 ₹72,500 | 4,200 ₹1,05,000 | 3,104.29 ₹77,607.15 | 3,206.37 ₹80,159.25 | 5,000 ₹1,25,000 |
| 5.00 | Brick work with Brick class 150 in cement mortar 1:4 in foundation and superstructure as per drawing Including all cost of material, lead ,lift ,labour and T&P etc . required for proper complition of work in all respect as per direction of Engineer -in- charge . | 13.25 | M3 | 6,200 ₹82,150 | 5,800 ₹76,850 | 6,000 ₹79,500 | 4,778.67 ₹63,317.43 Lowest | 7,455 ₹98,778.75 | 7,000 ₹92,750 |
| 6.00 | Stone boulder pitching 23 cm thick up to 25 kg weight including all lead ,lift ,labour and T&P etc.complete. Including all cost of material, lead ,lift ,labour and T&P etc . Required for proper complition of work in all respect as per direction of Engineer -in- charge . | 148.12 | M3 | 1,700 ₹2,51,804 | 1,700 ₹2,51,804 | 1,500 ₹2,22,180 | 1,168.7 ₹1,73,107.4 | 900 ₹1,33,308 Lowest | 1,650 ₹2,44,398 |
Tender Value
₹13.8 L
EMD Value
₹27,000
Closing Date
18 May 2026, 2:00 pmClosed
Executive Engineer
Executive Engineer, Bandhi Division, Varunapuram Sinchai Colony, Sigra, Varanasi
Repair work on the damaged anti-erosion embankment in Atayastganj village, Shahabganj Development Block, Chandauli District.
2026_UPIDC_1147578_32
04/EE/BDV/2026-27
Open Tender
Civil Works
Turn-key
20 days
Chandauli
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹27,000
Yes
26 Jun 2026
12 May 2026
18 May 2026
12 May 2026
18 May 2026
12 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.1 | Laying and Jointing PVC Pipe. Heading | - | - | - | - |
| 1 | E/W in strengthening anti erosion bandhi section as per direction of Engineer -in- charge including all lead and lift ,manual compaction ,cost of labour , T&P etc.required for proper complition of work complete in all respect. | 3,415 | M3 | - | - |
| 2 | Earth work in excavation in foundation in all type of soil including lift upto 1.50 m and lead up to 30 m including all cost of labour ,T&P etc.required for proper complition of work in all respect . | 96 | M3 | - | - |
| 3 | P.C.C.1:3:6 in foundation with stone ballast of size 20 to40mm Including all cost of material, lead ,lift ,labour and T&P etc . required for proper complition of work in all respect as per direction of Engineer -in- charge. | 10.8 | M3 | - | - |
| 4 | Providing and laying 1000 mm dia NP-3 hume pipe Including all lead ,lift ,labour and T&P etc , as per direction of Engineer -in- charge. | 25 | M3 | - | - |
| 5 | Brick work with Brick class 150 in cement mortar 1:4 in foundation and superstructure as per drawing Including all cost of material, lead ,lift ,labour and T&P etc . required for proper complition of work in all respect as per direction of Engineer -in- charge . | 13.25 | M3 | - | - |
| 6 | Stone boulder pitching 23 cm thick up to 25 kg weight including all lead ,lift ,labour and T&P etc.complete. Including all cost of material, lead ,lift ,labour and T&P etc . Required for proper complition of work in all respect as per direction of Engineer -in- charge . | 148.12 | M3 | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
TenderDocuements012026-27.pdf
Tender Documents • 3.33 MB
BOQ_2147129.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .