Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.5 L+₹1.8 L (21.0%)Rejected-AOC VALLIKATTIL HOUSE MANGATTOOR KOLENCHERY | ERNAKULAM | KERALA | 680667 | L2 | Rejected-AOC L2 |
Tender Value
₹12.7 L
EMD Value
₹31,641
Closing Date
29 Oct 2022, 5:00 pmClosed
Seena B
Assistant Executive Engineer, Minor Irrigation Sub division, Muvattupuzha
GENERAL-Annual Maintenance of Kayanadu LI scheme for the year 2022-23.
2022_Irrig_519538_1
IRR/IA/TR/3002/2022_5_1_1/1
Open Tender
Civil Works - Lift Irrigation Schemes
Item Rate
180 days
Kayanad
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹31,641
Yes
28 Nov 2022
22 Oct 2022
2 Nov 2022
22 Oct 2022
29 Oct 2022
22 Oct 2022
Amount
DETAILED ESTIMATE
OD10319/2022-2023:Engaging Beldar for cleaning and clearing pump house premises and delivery pit
2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
WILSON V VARKEY
Bidder Name
WILSON V VARKEY
Saji O M
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_746110.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .