Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.3 LAdmitted-Finance NO 6 127 POONJOLAI STREET PERIYAR NAGAR VALAVANTHANKOTTAI TRICHY 15 | 15 | ₹24.3 L | L1 | Admitted-Finance |
| 2 | L2₹24.4 LAdmitted-Finance | ₹24.4 L | L2 | Admitted-Finance |
| 3 | L3₹27.1 LAdmitted-Finance | ₹27.1 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical 0 GAYTRI NAGAR NAINITAL RAOD NEAR AIRFORCE BAREILLY UTTAR PRADESH 243122 | BAREILLY | UTTAR PRADESH | 243122 | - | - | Rejected-Technical BQR NOT SATISFIED |
| 5 | Rejected-Technical 48 A BOLDENPURAM 3RD STREET TUTICORIN 628003 TAMIL NADU | TUTICORIN | TAMIL NADU | 628003 | - | - | Rejected-Technical BQR NOT SATISFIED |
| Sl No | Description | Qty | Unit | bharaniengineeringworks L2 | MOHIDEEN ENTERPRISES L3 | SMS ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.00 | Sweeping and mopping of the office floors (Flooring with ceramic / marble / granite tiles) steps, staircases, handrails with scented cleaning agents including clearing and disposal of waste papers daily, Dusting and cleaning of files records in racks, furnitures for twice in a week, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed], Staircase, hand rails, doors, windows, blinds, Name boards, Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost etc., complete. | 5,27,613 | sqm | 1 ₹5.3 L | 1.2 ₹6.3 L | 0.79 ₹4.2 L |
| 2.00 | Sweeping and mopping of the office clear space, lobby such as Cash collection center, low roofed repair bay (Flooring with cement mortar) steps,staircases, handrails with scented cleaning agents including clearing and disposal of waste papers and debris daily, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed],Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets and cost of all consumables etc. complete. | 7,03,018 | sqm | 0.6 ₹4.2 L | 0.7 ₹4.9 L | 0.5 ₹3.5 L |
| 3.00 | Sweeping of open areas around Office buildings collection and removal of garbage and wastes from campus to outside office complex daily, all general outdoor cleaning with sprinkling of water, including removal of weeds and unwanted materials as directed by the Engineer at site including the cost of all labour, labour uniforms lead, lift, T&P, cost of all materials such as coconut brooms, Bamboo baskets,cost of all consumables etc. (To be carried out all working days). | 10,76,520 | sqm | 0.28 ₹3.0 L | 0.28 ₹3.0 L | 0.58 ₹6.2 L |
| 4.00Maintenance charges for cleaning the wash basins, water closets, urinals and floor and wall tiles by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping and cleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt/refuge and cobwebs and sweeping away the stagnated water at periodic intervals, including carrying out of other miscellaneous works during lean hours as directed by the Engineer incharge including materials for cleaning except phenyl. The toilet should always be clean, neat and tidy without any odur or foul smell. (2 times in a day - CE & SE offices). | ||||||
| 4.01 | Toilet floors (includes cleaning of wall tiles & doors /
ventilators, removal of cobweb) | 24,163 | sqm | 4 ₹96,652 | 4.22 ₹1.0 L | 1.35 ₹32,620.05 |
| 4.02 | Water closets (IWC / EWC) | 4,320 | each | 10 ₹43,200 | 12.23 ₹52,833.60 | 8.15 ₹35,208 |
| 4.03 | Urinals cleaning & providing scented urinal screen, coloured naphthalene balls) | 1,920 | each | 8 ₹15,360 | 10 ₹19,200 | 7.25 ₹13,920 |
| 4.04 | Washbasins | 7,200 | each | 7.5 ₹54,000 | 8.22 ₹59,184 | 7.05 ₹50,760 |
| 5.00Maintenance charges for cleaning the wash basins, water closets, urinals and floor and wall tiles by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping and cleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt/refuge and cobwebs and sweeping away the stagnated water at periodic intervals, including carrying out of other miscellaneous works during lean hours as directed by the Engineer incharge including materials for cleaning except phenyl. The toilet should always be clean, neat and tidy without any odur or foul smell. (1 time in a day - EE & section offices). | ||||||
| 5.01 | Toilet floors (includes cleaning of wall tiles & doors /
ventilators, removal of cobweb) | 26,162 | sqm | 2.25 ₹58,864.50 | 2.25 ₹58,864.50 | 1.35 ₹35,318.70 |
Tender Value
₹28.5 L
EMD Value
₹28,500
Closing Date
5 Jan 2026, 2:00 pmClosed
AEE-GL GCC TRICHY
O/o.SE, GCC, Near Collectorate, TRICHY
House Keeping (Cleaning, Sweeping, Conservancy, General Maintenance Works) through Works Contract for the period of 10 months at the newly Constructed Chief Engineer/TP-II/Trichy, SE-GCC-Trichy office building and other working office buildings
2025_EB_635188_1
GCC 056 GL 013 2025-26
Open Tender
Civil Works
300 days
TRICHY
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹28,500
Yes
30 Jan 2026
22 Dec 2025
6 Jan 2026
22 Dec 2025
5 Jan 2026
22 Dec 2025
Sweeping and mopping of the office floors (Flooring with ceramic / marble / granite tiles) steps, staircases, handrails with scented cleaning agents including clearing and disposal of waste papers daily, Dusting and cleaning of files records in racks, furnitures for twice in a week, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed], Staircase, hand rails, doors, windows, blinds, Name boards, Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost etc., complete.
Sweeping and mopping of the office clear space, lobby such as Cash collection center, low roofed repair bay (Flooring with cement mortar) steps,staircases, handrails with scented cleaning agents including clearing and disposal of waste papers and debris daily, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed],Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets and cost of all consumables etc. complete.
Sweeping of open areas around Office buildings collection and removal of garbage and wastes from campus to outside office complex daily, all general outdoor cleaning with sprinkling of water, including removal of weeds and unwanted materials as directed by the Engineer at site including the cost of all labour, labour uniforms lead, lift, T&P, cost of all materials such as coconut brooms, Bamboo baskets,cost of all consumables etc. (To be carried out all working days).
Maintenance charges for cleaning the wash basins, water closets, urinals and floor and wall tiles by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping and cleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt/refuge and cobwebs and sweeping away the stagnated water at periodic intervals, including carrying out of other miscellaneous works during lean hours as directed by the Engineer incharge including materials for cleaning except phenyl. The toilet should always be clean, neat and tidy without any odur or foul smell. (2 times in a day - CE & SE offices).
Toilet floors (includes cleaning of wall tiles & doors / ventilators, removal of cobweb)
Water closets (IWC / EWC)
Urinals cleaning & providing scented urinal screen, coloured naphthalene balls)
Washbasins
Maintenance charges for cleaning the wash basins, water closets, urinals and floor and wall tiles by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping and cleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt/refuge and cobwebs and sweeping away the stagnated water at periodic intervals, including carrying out of other miscellaneous works during lean hours as directed by the Engineer incharge including materials for cleaning except phenyl. The toilet should always be clean, neat and tidy without any odur or foul smell. (1 time in a day - EE & section offices).
Toilet floors (includes cleaning of wall tiles & doors / ventilators, removal of cobweb)
Water closets (IWC / EWC)
Urinals cleaning & providing scented urinal screen, coloured naphthalene balls)
Washbasins
Trimming of Korean grass provided in lawns and road center median using Electric lawn mover, cutting the edges evenly, disposing of debris away from the site as directed by the Engineer at site including cost of Hire charges for lawn mover, labour charges, all T&P, lead & lift, etc,complete. (Power Supply to ELM will be given by departmentally at free of cost).
Trimming the Border plants using Scissors to the required shape, size and as directed by the engineer at site including cost of hire charges for all T & P materials, all labour charges for trimming, all lead, lift, transporting charges, disposing of debris away from the site etc, Complete.
Applying fertilizer and manure over the Korean lawn and border plants and around the flowering plants as directed by the engineer at site including cost of manure,fertilizers, all labourcharges, hire charges, safety appliances, all T&P, lead etc. complete.
Cleaning of elevator car (of any size) inner surfaces using appropriate cleaning agents periodically to maintain cleaniness throughout the office working hours, using good fragnence spray or liquid, cleaning of mattress and wall surface. The rate includes the cost of labour, materials etc., complete.
Replacement of damaged or worn out plumbing fixtures with necessary adaptors. The rate includes the cost of all materials, labour, lead, lift etc., complete using the ISI Brand.
15mm dia CP TAP
15/12MM CP PRESSING COCK
CP COATED PILLER TAP
CP COATED ANGLE COCK TAP
20MM DIA GM VALVE
25MM DIA GM VALVE
32MM DIA GM VALVE
URINAL SPREADER
SPINDLE
WATER WASTE LINE HOSE
FLEXIBLE WATER CONNECTION HOSE
CP COATED HEALTH FAUCET
Replacement of damaged or worn out Electrical fittings and accessories with internal wiring if any. The rate includes the cost of all materials, labour, lead, lift etc., complete using the approved quality with guarantee.
20W 4 FEET LED FITTING WITH LED
AC EXHAUST FAN 300mm (12") sweep (Heavy duty)
AC EXHAUST FAN 450 mm (18") sweep (Heavy duty)
5 AMPS FLUSH TYPE SWITCH
16 AMPS FLUSH TYPE SWITCH
Ceiling Fan 48 inches diameter
Ceiling light 1 ft square (20 watts)
Labour charges for repairing the items including dismantling and attending all repairs including cost of minor materials, T&P, all lead, lift etc complete as directed by engineers at site.
Ceiling Fan of all sizes
Ceiling light
Tube light
All water taps
Air conditioner unit (All repairs)
All pipeline
Motor of all capacity (All repairs)
Flush tank
RO water system
Cleaning of water tank upto 2000 litre capacity including cost of minor materials, T&P, all lead, lift etc complete as directed by engineers at site.
Cleaning of septic tank of all capacity including cost of minor materials, T&P, all lead, lift etc complete as directed by engineers at site.
Watering for all trees and plants around CE office building of all working days including cost of minor materials, T&P, all lead, lift etc complete as directed by engineers at site.
Applicable GST 18%
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_760128.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid