Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹12.1 Cr
EMD Value
₹12.1 L
Closing Date
12 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, R & B Division, Patan
Resurfacing of Madhutra - Datrana – Barara – Dhokawada Road Road Km.0/0 to 11/980 (ODR) (Pro.Resurfacing & Reconstruction Work, C.C. Road, Road Furnishing, C.D.Work & Protection Wall)
357918
28 of 2026-27
Open
Civil Works - Roads
Works
Patan
16 documents required · 16 mandatory
₹18,000
Executive Engineer, R&B Division, Patan
₹12.1 L
12 Nov 2026
22 Oct 2026
13 Nov 2026
22 Oct 2026
5 Nov 2026
22 Oct 2026
90 days
Name Of Work : Resurfacing And Strengthening of Madhutra- Datrana- Barara- Dhokawada Road Road
Km.0/0 to 11/980 (ODR) (Pro.Resurfacing & Reconstruction Work,C.C.Road,Road Furnishing,C.D.Work
& Protection Wall)
BILL OF QUANTITY
Quantities Rate
It Rs. In In Words according to
but may Item of Work Unit
No. be more Figures. estimated
1 7.19 Clearing and grabbing of road length including 28455.10 Rupees Twenty Hect
up rooting vegetable grass, bush, shrubs, Eight Thousand
saplings and threes of any size and any depth Four Hundred
including removal of stumps, disposal of Fifty Five And
unserviceable material and stacking of Paise Ten Only
serviceable material to 100 Mt. From road
boundary as per most specification clause
in (C) Avert. light jungle.
2 51535.00 Scarifying gravelled macadam or bitumen 4.04 Rupees Four Smt
macadam or C.C. surface 6 mm to 10 And Paise Four
mm.depth including stacking useful materials Only
on road side and disposing off remaining stuff.
3 5728.00 Box cutting the road surface to proper slope 114.44 Rupees One Cum
and camber for marking a base for road work Hundred
including removing excavated stuff and Fourteen And
disposing on the road side slope as directed Paise Forty Four
within 50 mt lead. Only
4 4000.00 Providing and Laying 200mm thick 1247.35 Rupees One Cum
(100mm+100mm) Natural GSB Granular Sub Thousand Two
base course in single layers as per gradation Hundred Forty
made of natural unscreened gravel & sand in Seven And
proper propertion as directed including Paise Thirty Five
spreading, watering & rolling with vibrator roller Only
5 3456.00 Providing and laying Spreading and 3033.03 Rupees Three Cum
compacting graded stone aggregate to Wet mix Thousand Thirty
macadam (W.M.M.) as per MORT&H Three And Paise
specification incl. premixing the material with Three Only
water to O.M.C. in mechanical mix plant.
Carriage of mixed material by tipper to site,
laying in uniform layers with mechanical grader
in sub base, base course on well prepared
surface and compacting with vibratory roller to
achieves the desired density.
6 5421.00 Providing and laying evenly priming coat using 114.13 Rupees One Smt
low viscocity liquid bituminious emulsion SS1 Hundred
of IS 8887 materials at the rate of 7.5 Kg / 10 Fourteen And
Sq.M. on road surface using emulsion pressure Paise Thirteen
sprayer etc complete including the cost of all Only
labour and materials
Quantities Rate
It Rs. In In Words according to
but may Item of Work Unit
No. Figures. estimated
7 6266.00 Providing and laying 50.00 mm. thick 5167.16 Rupees Five M.T.
bitumenous macadam with using asphalt VG- Thousand One
30 for tack coat at the rate of 2.50kg./10 Hundred Sixty
sqm. using crushed stone aggregate as per Seven And
MORT & H gradation and Viscocity grade of Paise Sixteen
VG - 30 grade for mixing bitumen at the rate Only
of 3.40% by weight of total mix ( ie 34 kg. /
MTon of mix ) including heating &mixing the
asphalt and aggregates by in drum mix
plant and transporting the mix and
spreading the same by sensor paver finisher
and consolidation with vibratory road roller
including providing and laying uniformly tack
coat and using using contractor's own
machinaries drum mix plant & sensor paver
finisher etc complete.
8 3275.00 Providing & laying 25 mm. thick compacted 6360.98 Rupees Six M.T.
SDBC with B.T. Stone chips as per MORT&H Thousand Three
gradation & specification with bulk asphalt VG- Hundred Sixty
30 for mixing at the rate of 50.00 Kg./MT by wt. And Paise
of total mix i.e.(5.00% by weight of total mix) Ninety Eight
incl. heating the asphalt & aggregates by drum Only
mix plant & spreading the same by paver
finisher incl. rolling & Consolidation with 10-12
tonnes vibratory & paver roller & pro. all
materials, equipments, tools and plants, fire
wood, oil, kerosene, labour charges etc and
using contractor's own machinaries drum mix
plant & sensor paver paver finisher etc
9 1797.00 Providing and laying Compacted 75 mm thick 2206.85 Rupees Two Cum
of Specified quarry Spall in side shoulder Thousand Two
including carraige of material and spreading on Hundred Six
prepared base including compacting as per And Paise
MOST Specification etc... complete. Eighty Five Only
10 5045.00 Earthwork for embankment including breaking 186.39 Rupees One Cum
clods, dressing with all lead and lift and Hundred Eighty
including watering rolling and consolidation of Six And Paise
subgrade in layers at O.M.C. to required dry Thirty Nine Only
density including filling the depression which
occur during the process using power roller 8T
to 10T.(E) From Borrow area within All lead
11 3013.00 Earthwork in cutting in all sorts of soil and soft 114.44 Rupees One Cum
murrum including conveying and putting the Hundred
stuff in spoil bank maintaining minimum Fourteen And
distance of five meter between top edge and Paise Forty Four
cutting and toe of spoil bank. Only
12 2055.00 Providing and laying cement concrete 1:3:6 (1- 2985.86 Rupees Two Cum
Cement : 3- coarse sand : 6- hand broken Thousand Nine
stone aggregates 40 mmnominal size) and Hundred Eighty
curing complete excluding cost of formwork in Five And Paise
(A) Foundation and Plinth Eighty Six Only
Quantities Rate
It Rs. In In Words according to
but may Item of Work Unit
No. Figures. estimated
13 3157.00 Providing and laying controlled cement 4997.48 Rupees Four Cum
concrete M.300 and curing complete including Thousand Nine
the cost of formwork and reinforcement for Hundred Ninety
reinforced concrete work in C.C.Road with Seven And
concrete floor Hardener material 5 Kg. / Sqm Paise Forty
for reinforced cement concrete work including Eight Only
finishing with a floating coat of neat cement
and by trimix method including Bitument filling
with Grove Cutting etc completed.
14 108465.00 Providing TMT bar FE 500D reinforcement for 77.29 Rupees Seventy Kg
RCC work including bedding binding and Seven And
placing in position complete upto floor two Paise Twenty
level. Nine Only
15 4.00 Direction (Junction) Sign :-Providing and fixing 21287.51 Rupees Twenty No.
sign boards made out of 2mm aluminium sheet One Thousand
size 244x122 cms. rectangular as per design of Two Hundred
IRC-67-2012. Pre treated with phospheting Eighty Seven
process & acid etching; coated with one coat of And Paise Fifty
epoxy primer and two coats of best quality One Only
epoxy paint ; reflectorised with High Intensity
Prismatic Grade retro refiectivesheeting of
Type-4 as per ASTM D-4956 and latest
M.O.S.T.Specifications; 4.0mtr (2 Nos.) long
stand post of Iron Angle 75 x 75 x 6mm / 65NB
Circular MS Pipe as required and frame
fabricated from suitable size iron angle of
50x50x5mm; painted with bestquality epoxy
coatings in black and white bends. The details
of symbol for each board shall be as per the
instruction of engineer in charge. The fixing at
site shall be in 1:2:4 CC blockof size 45 x 45 x
60 Cms. for each leg including excavation,
curing etc.complete under the supervision of
engineer in charge. A warranty for 7 years for
the Retro reflective sheeting from original
manufacturer & a certified copy of 3 year
outdoor exposure test report from third party
test lab for the product offered shall be
Quantities Rate
It Rs. In In Words according to
but may Item of Work Unit
No. Figures. estimated
16 79.00 Regulatory / Mandatory Sign :-Providing and 3540.12 Rupees Three No
fixing sign boards made out of 2mm aluminium Thousand Five
sheet size 60 cms. Dia Circle as per design of Hundred Forty
IRC-67-2012. Pre treated with phospheting And Paise
process & acid etching; coated with one coat of Twelve Only
epoxy primer and two coats of best quality
epoxy paint ; reflectorised with High Intensity
Prismatic Grade retro refiectivesheeting of
Type-4 as per ASTM D-4956 and latest
M.O.S.T.Specifications; 3.6mtr long stand post
of Iron Angle 75 x 75 x 6mm / 65NB Circular
MS Pipe as required and frame fabricated from
suitable size iron angle of 35 x 35 x 3mm;
painted with bestquality epoxy coatings in black
and white bends. The details of symbol for
each board shall be as per the instruction of
engineer in charge. The fixing at site shall be in
1:2:4 CC blockof size 45 x 45 x 60 Cms. for
each leg including excavation, curing
etc.complete under the supervision of engineer
in charge. A warranty for 7 years for the Retro
reflective sheeting from original manufacturer &
a certified copy of 3 year outdoor exposure test
report from third party test lab for the product
offered shall be submitted by contractor. (B)
17 91.00 Cautionary Warning Sign :-Providing and fixing 3906.19 Rupees Three No
sign boards made out of 2mm aluminium sheet Thousand Nine
size 90 x 90 x 90 cms. equilateral triangle as Hundred Six
per design of IRC-67-2012. Pre treated with And Paise
phospheting process & acid etching; coated Nineteen Only
with one coat of epoxy primer and two coats of
best quality epoxy paint ; reflectorised with
High Intensity Prismatic Grade retro
refiectivesheeting of Type-4 as per ASTM D-
4956 and latest M.O.S.T.Specifications; 3.6mtr
long stand post of Iron Angle 75 x 75 x 6mm /
65NB Circular MS Pipe as required and frame
fabricated from suitable size iron angle of 35 x
35 x 3mm; painted with bestquality epoxy
coatings in black and white bends. The details
of symbol for each board shall be as per the
instruction of engineer in charge. The fixing at
site shall be in 1:2:4 CC blockof size 45 x 45 x
60 Cms. for each leg including excavation,
curing etc.complete under the supervision of
engineer in charge. A warranty for 7 years for
the Retro reflective sheeting from original
manufacturer & a certified copy of 3 year
outdoor exposure test report from third party
test lab for the product offered shall be
Quantities Rate
It Rs. In In Words according to
but may Item of Work Unit
No. Figures. estimated
18 6.00 Village name Sign :-Providing and fixing sign 6397.43 Rupees Six No
boards made out of 2mm aluminium sheet size Thousand Three
90x60 cms. rectangular as per design of IRC- Hundred Ninety
67-2012. Pre treated with phospheting process Seven And
& acid etching; coated with one coat of epoxy Paise Forty
primer and two coats of best quality epoxy Three Only
paint ; reflectorised with High Intensity
Prismatic Grade retro refiectivesheeting of
Type-4 as per ASTM D-4956 and latest
M.O.S.T.Specifications; 3.3mtr long stand post
of Iron Angle 75 x 75 x 6mm / 65NB Circular
MS Pipe as required and frame fabricated from
suitable size iron angle of 35 x 35 x 3mm;
painted with bestquality epoxy coatings in black
and white bends. the details of symbol or
inscription / numerals for each board shall be
as per the instruction of engineer in charge.
The fixing at site shall be in 1:2:4 CC blockof
size 45 x 45 x 60 Cms. for each leg including
excavation, curing etc.complete under the
supervision of engineer in charge. A warranty
for 7 years for the Retro reflective sheeting
from original manufacturer & a certified copy of
3 year outdoor exposure test report from third
party test lab for the product offered shall be
19 20.00 Hazard Marker Sign :-Providing and fixing sign 3518.69 Rupees Three No.
boards made out of 2.0 mm aluminium sheet Thousand Five
size 90x30 cms. rectangular as per design of Hundred
IRC-67-2012. Pre treated with phospheting Eighteen And
process & acid etching; coated with one coat of Paise Sixty Nine
epoxy primer and two coats of best quality Only
epoxy paint ; reflectorised with High Intensity
Prismatic Grade retro refiectivesheeting of
Type-4 as per ASTM D-4956 and latest
M.O.S.T.Specifications; 1.8mtr long stand post
of Iron Angle 75 x 75 x 6mm / 65NB Circular
MS Pipe as required and frame fabricated from
suitable size iron angle of 35 x 35 x 3mm;
painted with bestquality epoxy coatings in black
and white bends. The details of symbol for
each board shall be as per the instruction of
engineer in charge. The fixing at site shall be in
1:2:4 CC blockof size 45 x 45 x 60 Cms. for
each leg including excavation, curing
etc.complete under the supervision of engineer
in charge. A warranty for 7 years for the Retro
reflective sheeting from original manufacturer &
a certified copy of 3 year outdoor exposure test
report from third party test lab for the product
offered shall be submitted by contractor. (B)
Quantities Rate
It Rs. In In Words according to
but may Item of Work Unit
No. Figures. estimated
20 130.00 Chevron Sign (Double):Providing and fixing 5255.03 Rupees Five No
sign boards made out of 1.5mm aluminium Thousand Two
sheet size 60x50cm rectangular as per design Hundred Fifty
of IRC-67-2012. Pre treated with phospheting Five And Paise
process & acid etching; coated with one coat of Three Only
epoxy primer and two coats of best quality
epoxy paint ; reflectorised with High Intensity
Prismatic Grade retro refiectivesheeting of
Type-4 as per ASTM D-4956 and latest
M.O.S.T.Specifications; 3.3 mtr long stand post
of Iron Angle 75 x 75 x 6mm / 65NB Circular
MS Pipe as required and frame fabricated from
suitable size iron angle of35x35x3mm; painted
with bestquality epoxy coatings in black and
white bends. the details of symbol or
inscription / numerals for each board shall be
as per the instruction of engineer in charge.
The fixing at site shall be in 1:2:4 CC blockof
size 45 x 45 x 60 Cms. for each leg including
excavation, curing etc.complete under the
supervision of engineer in charge. A warranty
for 7 years for the Retro reflective sheeting
from original manufacturer & a certified copy of
3 year outdoor exposure test report from third
party test lab for the product offered shall be
21 11.00 Providing and fixing ordinary kilometer stone of 891.53 Rupees Eight No.
approved hard stone as per I. R. C. type design Hundred Ninety
in C. C. 1 : 4 : 8 including painting and lettering One And Paise
etc. complete (For N. H., S. H. and M. D. R.) Fifty Three Only
22 200.00 Providing and Fixing reinforced concrete 371.68 Rupees Three No
cylinder (1:2:4 mix) with a 200 mm diameter Hundred
and 0.60 m height. Incorporate internal steel Seventy One
reinforcement. Apply two layers of oil paint. The And Paise Sixty
final coat will be in three colors to monitor Eight Only
floodwater levels and providing Red colour 3M
reflective redium 50 mm wide around cylinder
23 49.00 Providing and fixing hectometer as per I. R. C. 356.50 Rupees Three No.
type design including painting lettering etc. Hundred Fifty
complete Six And Paise
(ii) Fixing in C.C 1:5:10 Fifty Only
Quantities Rate
It Rs. In In Words according to
but may Item of Work Unit
No. Figures. estimated
24 2181.00 Cat Eye / Road stud / RPM supplying of 326.23 Rupees Three No
molded Twin shanks raised pavement markers Hundred Twenty
made of polycarbonate and ABS moulded body Six And Paise
and reflective panels with micro prismatic lens Twenty Three
(No Glass bead lens) capable of providing total Only
internal reflection of the light entering the lens
face and shall support a load 13635 kgs. tested
in accordance to ASTM D 4280 type H and
complying to specifications of category A of
MORTH Circular No RW/NH/33023/10-97-00
Dt-11-06-1997. The height width and length
shall not exceed 20 mm, 130 mm and 130 mm
and with minimum reflective area of 13 sqcm
on each side and the slope to the base shall be
35+/ -5 degree.The strength of detachment of
the intergated cylirdrical shanks. (Of diameter
not less than 19+/ -2 mm and height not less
than 30+/-2 mm ) from the body is to be a
minimum value of 500 kgf. Fixing will be by
drilling holes on the road for the shanks to go
inside, without nails and using epoxy resin
based adhesive as per manufacture's
recommendation and the color of the marker
should be as per the IRC 35-2015 and as
directed by Engineer incharge.
25 3451.00 Road Marking with Hot Applied Thermoplastic 367.72 Rupees Three Smt
paints with Reflectorising Glass Bends on Hundred Sixty
Bituminious surface.Providing and laying a hot Seven And
applied thermoplastic compound 2.5 mm. thick Paise Seventy
including reflectorising glass beads @ 250 gms Two Only
per sqm. area. Thickness of 2.5 mm is
excluding of surface applied glass beads as
per IRC:35. The Finished surface to be level.
Uniform and free from streaks and holes.Zebra
patta / bump patta lane/ Center line / edge line
/ cut patta.The white color marking should
provide liminance coefficinet on cemend road
shall be min 130 mcd /m2/lux and asphalt road
shall be min 100 mcd / m2 / lux during the
service life during the day line.The marking
should meet the performance criteria for night
time reflectivity, wet reflectivity and skid
resistance as mentioned in the section -15 of
IRC 35-2015.Warranty for the Retro reflective
should be two years.
Quantities Rate
It Rs. In In Words according to
but may Item of Work Unit
No. Figures. estimated
26 1.00 Facility Informatory Sign :-Providing and fixing 3990.64 Rupees Three No
sign boards made out of 2mm aluminium sheet Thousand Nine
/ 4mm ACP (Aluminum composite Panel); size Hundred Ninety
80 x 60 cms. rectangular as per design of IRC- And Paise Sixty
67-2012. Pre treated with phospheting process Four Only
& acid etching; coated with one coat of epoxy
primer and two coats of best quality epoxy
paint ; reflectorised with High Intensity
Prismatic Grade retro refiectivesheeting of
Type-4 as per ASTM D-4956 and latest
M.O.S.T.Specifications; 3.6mtr long stand post
of Iron Angle 75 x 75 x 6mm / 65NB Circular
MS Pipe as required and frame fabricated from
suitable size iron angle of 35 x 35 x 3mm;
painted with bestquality epoxy coatings in black
and white bends. The details of symbol for
each board shall be as per the instruction of
engineer in charge. The fixing at site shall be in
1:2:4 CC blockof size 45 x 45 x 60 Cms. for
each leg including excavation, curing
etc.complete under the supervision of engineer
in charge. A warranty for 7 years for the Retro
reflective sheeting from original manufacturer &
a certified copy of 3 year outdoor exposure test
report from third party test lab for the product
27 280.00 Providing and erecting a "Thrie" W - metal 3809.72 Rupees Three Rmt
beam crash barrier comprising of 3 mm thick Thousand Eight
corrugated sheet metal beam rail, 85 cm above Hundred Nine
road/ground level, fixed on ISMC series And Paise
channel vertical post, 150 x 75 x 5 mm spaced Seventy Two
2 m centre to centre, 2 m high with 1.15 m Only
below ground level. All steel parts and fitments
to be galvanised by hot dip process, all fittings
to confirm to IS:1367 and IS:1364, metal beam
rail to be fixed on the vertical Post with a
spacer of channel section 150 x 75 x 5 mm,
550 mm long , Base plate of Size (240 x 320 x
16) complete as per Morth Specification clause
810 including butt welding to all nuts & bolts &
including 100 mm wide & 4.5 m long, type -4
class B High intensity Grade Sheeting Radium
Stripas per IRC 67:2012 etc. complete as per
instruction of Engineer In Charge. Also radium
red/yellow colour strip of size 100 x 300 mm
shall be fixed on vertical front side of post for
better night visibility. The spacer,post, thrie
beam raill shall be Cold roll formed &
galvanized with 550 gm/ square meter.
28 231.00 EXCAVATION for foundation upto 3.00 535.45 Rupees Five Cmt
Mt. depth including sorting out and Hundred Thirty
stacking of useful materials and disposing Five And Paise
of the excavated stuff upto 100 Meter Forty Five Only
lead.dense and hard soil.
Quantities Rate
It Rs. In In Words according to
but may Item of Work Unit
No. Figures. estimated
29 132.00 Providing and filling in foundation with cement 3147.48 Rupees Three Cmt
concrete M 100 mix and providing necessary Thousand One
vertical pin headers including Hundred Forty
formwork,vibrating,ramming and curing Seven And
complete. Paise Forty
30 453.00 Providing and filling in foundation with cement 3887.57 Rupees Three Cmt
concrete M 200 mix and providing necessary Thousand Eight
vertical pin headers including Hundred Eighty
formwork,vibrating,ramming, Trimix and curing Seven And
complet. Paise Fifty
31 90.00 Supplying and fixing reinforced concrete 3469.26 Rupees Three Rmt
heavy duty non pressure pipes with collars Thousand Four
for culverts including setting and jointing the Hundred Sixty
pipes in cm 1:2 watering and laying (To Nine And Paise
level of slope ) of I.S class NP-3 casted by Twenty Six Only
vertically vibrated technology of following
internal diameters. in 900 mm dia.
32 1293.00 Providing and laying weep hole in abutment 90.83 Rupees Ninety Nos.
and returning by using A.C. pipes of 100mm And Paise
diameter including laying in proper grade Eighty Three
and jointing etc. complete as per detailed Only
specifications.
33 309.00 Providing Yellow and Black Patta ( three coat) 97.48 Rupees Ninety Smt
including distempeing (Three coats) with oil Seven And
bound distemper of approved brand and Paise Forty
manufacture and of required shade on wall Eight Only
surfaces to give an even shade, over and
including a priming coat with distemper primer
of approved brand and manufacture after
thoroughly brushing the surface free from
mortar dropping and other foreign matter and
also including preparing the surface even and
sand papered smooth as per instruction of
Engineer Inchare.
34 120.00 Providing Diversion of Road 5.50 mt width 1402.89 Rupees One Rmt
(having 6.50 mt Formation width) for Structure Thousand Four
by Providing & spreding Earth Work, 200 mm Hundred Two
GSB, 200 mm GSB, The length of Road is And Paise
Depend on site condition etc as directed by Eighty Nine
Engineer in charge . Only
35 24.30 Demolition of Brick work and stone masonry 589.70 Rupees Five Cum
including stacking of serviceable materilas and Hundred Eighty
disposal of unserviceable materials with all Nine And Paise
lead and lift.(ii) In Cement Mortar. Seventy Only
36 30.00 Dismentling NP2 900 mm dia pipes including 101.00 Rupees One Rmt
stacking the materials with all lead and lift for Hundred One
any dia of pipe Only
Quantities Rate
It Rs. In In Words according to
but may Item of Work Unit
No. Figures. estimated
37 2158.00 Excavation for foundation upto 1.5 m depth 128.79 Rupees One Cum
including sorting out and stacking of useful Hundred Twenty
materials and disposing off the excavated stuff Eight And Paise
pto 50 Meter lead.(A) Loose or soft soil Seventy Nine
Quantities Rate
It Rs. In In Words according to
but may Item of Work Unit
No. Figures. estimated
38 363.00 Excavation for foundation for depth from 1.5 142.78 Rupees One Cum
m to 3.0 m including sorting out and Hundred Forty
stacking of useful materials and disposing Two And Paise
off the excavated stuff upto 50 Meter Seventy Eight
lead. (A) Loose & soft soil Only
39 985.00 Providing and filling in foundation with cement 3517.53 Rupees Three Cum
concrete M 150 mix and providing necessary Thousand Five
vertical pin headers including Hundred
formwork,vibrating,ramming and curing Seventeen And
complet. Paise Fifty
40 567.00 Filling available excavated earth (excluding 137.47 Rupees One Cum
rock) in trenches. plinth, sides of Hundred Thirty
foundations etc. in layers not exceeding 20 cm. Seven And
in depth consolidating each disposited Paise Forty
layer by ramming and watering. Seven Only
41 300.00 Supplying and fixing reinforced concrete heavy 659.99 Rupees Six Rmt
duty non-pressure pipes with collars for Hundred Fifty
culverts carrying heavy traffic as per IS 458- Nine And Paise
1991 specifications including setting the pipes Ninety Nine
in C.M. 1:2 watering and laying (to level or Only
slopes) of class NP3 of following internal
daimeters.(i) 300mm dia.
42 109.00 Providing and laying controlled cement 4029.90 Rupees Four Cu.M
concrete M150 for curing complete including Thousand
cost of formwork but excluding the cost of Twenty Nine
reinforcement for reinforced concrete work in And Paise
(A) Foundations, footings,Base of columns Ninety Only
and Mass concrete.
43 132.00 Providing and laying controlled cement 4380.37 Rupees Four Cu.M
concrete M250 for curing complete including Thousand Three
cost of formwork but excluding the cost of Hundred Eighty
reinforcement for reinforced concrete work in And Paise Thirty
(A) Foundations, footings, Base of columns Seven Only
and Mass concrete.
44 221.00 Provinding and laying controlled cement 7082.12 Rupees Seven Cu.M
concrete M -250 with curing etc complete, Thousand
including the cost of formwork but excluding Eighty Two And
the cost of reinforcement for R.C.C. work in(F) Paise Twelve
Vertical wall Only
Quantities Rate
It Rs. In In Words according to
but may Item of Work Unit
No. Figures. estimated
45 132.00 Providing and laying controlled cement 6149.89 Rupees Six Cu.M
concrete M250 and curing complete including Thousand One
the cost of form work but excluding the cost of Hundred Forty
reinforcement for reinforced concrete work for Nine And Paise
Slab All floors Eighty Nine
Credit for Dismental material Rs.7938.60 will be deduct from R.A.Bill (Fix Deduction)
I / We am / are willing to carry out the work at …………….% below / above ( Should be written in figure and words ) of the
tender rates mentined above Amount of my / our tender works out as under.
Tender amount Rs…………………. Tender amount Rs………………….
Add…….% above Rs…………………. Less…….% below Rs………………….
Net in words Rs……………….... Net in words Rs………………....
Signature of Contractor
Deputy Executive Engineer Executive Engineer
R & B Sub Division R & B Division
Radhanpur Patan
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BRIDGE WORKS SPECIFICATIONS1.pdf
ROAD WORKS SPECIFICATIONS.pdf
Tender GR Road - Bridges (1).pdf
2.SPECIFICATIONS- VARIOUS.pdf
3.SPECIFICATIONS OF QC.pdf
4.Clause - 1600 steel.pdf
Appendix - A.pdf
BOQ.pdf
Index Specifications.pdf
Notes.pdf
SBD Book_Various Road- MAdhutra - Datrana.pdf
Testing of Materials.pdf
Appendix - B.pdf
RMC (1).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .