Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC PALATHINKAL H BHOOTHATHANKETTU P O | PALAKKAD | KERALA | 678001 | ₹1.3 Cr | L1 | Accepted-AOC Agreement executed |
| Sl No | Description | Qty | Unit | Liju Paul L1 |
|---|---|---|---|---|
| 1.00Appendix- A Reactive Maintenance(Initial Rectification work) | ||||
| 1.00 | 3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m) | 79.12 | cum | 69 ₹5,459.63 |
| 1.00 | 55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | 1.6 | cum | 2,700 ₹4,333.50 |
| 1.00 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 8.49 | cum | 2,600 ₹22,074 |
| 1.00 | 55.6.a:Providing pre mix bitumen leveling coarse having thickness between 20mm and 40mm with 12mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen (vg 30) with pressure sprayer at the rate of 48 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores. | 1.6 | cum | 9,500 ₹15,247.50 |
| 1.00 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 8.49 | cum | 5,750 ₹48,817.50 |
| 1.01 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 19,338 | sqm | 12 ₹2.3 L |
| 1.01 | 5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means. | 80 | sqm | 69 ₹5,520 |
| 1.01 | 5.2.b:Providing and applying tack coat with bitumen emulsion (RS) using emulsion pressure distributor at the rate of 0.25 - 0.30 kg per sqm on the prepared Granular Surface cleaned with mechanical broom. | 80 | sqm | 15 ₹1,200 |
| 1.01 | 4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method | 41.25 | cum | 3,900 ₹1.6 L |
Tender Value
₹1.3 Cr
EMD Value
₹50,000
Closing Date
25 Oct 2025, 4:00 pmClosed
Superintending Engineer
O/o,Superintending Engineer, Roads Central Circle Aluva
initial rectification of the road stretches,Pre-monsoon works,pot hole filling with ready mix,maintenance of shoulders, prevention of water logging ,Emergency Works
2025_PWD_801659_2
PWD/RB/TR/11500/2025_5_1_1/1
Open Tender
Civil Works - Roads
365 days
Thodupuzha Muttom
Please refer Tender documents.
10 documents required · 10 mandatory
₹6,508
Yes
₹50,000
Yes
4 Feb 2026
15 Oct 2025
28 Oct 2025
15 Oct 2025
25 Oct 2025
15 Oct 2025
15 Oct 2025 - 25 Oct 2025
Work Name:GENERAL-RM /2025 - 26 - RC 2 Phase I / Zone -IX-One year running contract for various PWD roads under road section Muttom in Idukki District - 3 road stretches for a length of 14.180 Km-General Civil Work
.2 mm to .9mm (Type B) aggregate using penetration grade bitumen to required line ,grade and level to serve as wearing course on previously prepared base.including mixing in asuitable plant laying and rolling with afree wheel 8-10 kN static roller and finishing to required level and grades as per Technical specification 12.8.A:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M15 ( Without formwork) >8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.9OD64658/2025-2026:Vinyl stickering on existing RC board. )Appendix- B Pre-monsoon works"OD64659/2025-2026:Engaging mazdoorachsOD64660/2025-2026:Engaging small Tipper for removing the excavated materials, debris for various premonsoon works hour?OD64662/2025-2026:Engaging Excavator (JCB) for various purposes7OD113009/2025-2026:Filling up potholes with bituminous ready mix compound ( 25 kg bag) and compacting by ramming to get a compact surface after applying bituminous priming coat measured separately including cost of material, laying charges, transportation to site etc.complete rate is arrived for a bag of 25 kgnoi2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the areaHectare8Appendix -C Proactive/Preventive maintenanceÖOD104880/2025-2026:Providing laying and rolling of close graded premix surfacing material of 20mm thickness composed of 11.2mm to .9mm(Type A) or 13.2 mm to .9mm (Type B) aggregate using penetration grade bitumen to required line ,grade and level to serve as wearing course on previously prepared base.including mixing in asuitable plant laying and rolling with afree wheel 8-10 kN static roller and finishing to required level and grades as per Technical specification 7OD113010/2025-2026:Filling up potholes with bituminous ready mix compound ( 25 kg bag) and compacting by ramming to get a compact surface after applying bituminous priming coat measured separately including cost of material, laying charges, transportation to site etc.complete rate is arrived for a bag of 25 kg12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 2OD64649/2025-2026:Supply granular material at siteOOD64647/2025-2026:Engaging mazdoor for clearing drain to prevent water logging ZOD64645/2025-2026:Engaging Excavator (JCB) for various purposes for clearing water logging8OD64651/2025-2026:Engaging Small Tipper for Various workëOD64648/2025-2026:Conducting and Reporting Inspection Inspection for the entire length of the Project Road frequency of 7 days throughout thr agreement project for the Running Contract as directed by the departmental officers at site km'Appendix -D Emergency Works7OD64652/2025-2026:Engaging mazdoor for various purposeseach?OD64653/2025-2026:Engaging Excavator (JCB) for various purposes8OD64654/2025-2026:Engaging Small Tipper for Various workGOD64655/2025-2026:Hire charges of wood cutting equipments ,pullies etc.DaySOD64656/2025-2026:Engaging wood cutter for cutting branches of trees of any girth
Work Name:GENERAL-RM /2025 - 26 - RC 2 Phase I / Zone -IX-One year running contract for various PWD roads under road section Muttom in Idukki District - 3 road stretches for a length of 14.180 Km-General Civil Work
.2 mm to .9mm (Type B) aggregate using penetration grade bitumen to required line ,grade and level to serve as wearing course on previously prepared base.including mixing in asuitable plant laying and rolling with afree wheel 8-10 kN static roller and finishing to required level and grades as per Technical specification 12.8.A:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M15 ( Without formwork) >8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.9OD64658/2025-2026:Vinyl stickering on existing RC board. )Appendix- B Pre-monsoon works"OD64659/2025-2026:Engaging mazdoorachsOD64660/2025-2026:Engaging small Tipper for removing the excavated materials, debris for various premonsoon works hour?OD64662/2025-2026:Engaging Excavator (JCB) for various purposes7OD113009/2025-2026:Filling up potholes with bituminous ready mix compound ( 25 kg bag) and compacting by ramming to get a compact surface after applying bituminous priming coat measured separately including cost of material, laying charges, transportation to site etc.complete rate is arrived for a bag of 25 kgnoi2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the areaHectare8Appendix -C Proactive/Preventive maintenanceÖOD104880/2025-2026:Providing laying and rolling of close graded premix surfacing material of 20mm thickness composed of 11.2mm to .9mm(Type A) or 13.2 mm to .9mm (Type B) aggregate using penetration grade bitumen to required line ,grade and level to serve as wearing course on previously prepared base.including mixing in asuitable plant laying and rolling with afree wheel 8-10 kN static roller and finishing to required level and grades as per Technical specification 7OD113010/2025-2026:Filling up potholes with bituminous ready mix compound ( 25 kg bag) and compacting by ramming to get a compact surface after applying bituminous priming coat measured separately including cost of material, laying charges, transportation to site etc.complete rate is arrived for a bag of 25 kg12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 2OD64649/2025-2026:Supply granular material at siteOOD64647/2025-2026:Engaging mazdoor for clearing drain to prevent water logging ZOD64645/2025-2026:Engaging Excavator (JCB) for various purposes for clearing water logging8OD64651/2025-2026:Engaging Small Tipper for Various workëOD64648/2025-2026:Conducting and Reporting Inspection Inspection for the entire length of the Project Road frequency of 7 days throughout thr agreement project for the Running Contract as directed by the departmental officers at site km'Appendix -D Emergency Works7OD64652/2025-2026:Engaging mazdoor for various purposeseach?OD64653/2025-2026:Engaging Excavator (JCB) for various purposes8OD64654/2025-2026:Engaging Small Tipper for Various workGOD64655/2025-2026:Hire charges of wood cutting equipments ,pullies etc.DaySOD64656/2025-2026:Engaging wood cutter for cutting branches of trees of any girth
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
sbd.pdf
Tender Documents • 1.65 MB
nit.pdf
Tender Documents • 0.08 MB
BOQ_1352576.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid