Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.8 LAccepted-AOC | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹14.3 L+₹49,290.54 (3.57%)Rejected-Finance | L2 | Rejected-Finance SECOND LOWEST |
Tender Value
₹16.9 L
EMD Value
₹42,356
Closing Date
21 Jul 2023, 5:00 pmClosed
AEE Neyyattinkara municipality
Neyyattinkara municipality
Annual Plan-85/23-24-NEYYATTINKARA MUNICIPALITY-COMPLETION WORK OF KAITHOTTUKONAM POND IN ARALUMMOODU WARD
2023_LSGD_587534_40
2/AEE/LSGD/NTA
Open Tender
Civil Works - Roads
Item Rate
180 days
Neyyattinkara municipality
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹42,356
Yes
3 Oct 2023
14 Jul 2023
25 Jul 2023
14 Jul 2023
21 Jul 2023
14 Jul 2023
14 Jul 2023 - 21 Jul 2023
Amount
Side wall
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
S.ROBINSON
Bidder Name
SAJI C
S.ROBINSON
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_869128.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .