| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.6 LAccepted-Finance | ₹13.6 L | L1 | Accepted-Finance verified |
| 2 | L2₹13.8 LAccepted-Finance | ₹13.8 L | L2 | Accepted-Finance verified |
Tender Value
₹13.0 L
EMD Value
₹25,951
Closing Date
7 May 2026, 3:00 pmClosed
EE-II (WKS) SVPMC
EE-II (WKS) SVPMC
Repair and Maintenance of side road and widening of footpath drain with covering slab and Retaining wall MS Grill with hand railing starting from Lord Krishna Temple to Shiv Temple at Dairy Farm ward No 15
2026_PMBC_22771_2
55/EE-II/WKS/R/MC/2025-26
Open Tender
Civil Works - Roads
90 days
Shiv Temple at Dairy Farm ward No 15
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹25,951
8 May 2026
30 Apr 2026
7 May 2026
30 Apr 2026
7 May 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.
a) Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | 28.68 | Cum | 3,434.36 | ₹98,497.44 |
| 2 | Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars. | 12.16 | Cum | 3,977.05 | ₹48,360.93 |
| 3 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge:
a) All kinds of soil | 232.5 | Sqm | 183.2 | ₹42,594 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for
a) Foundations, footings, bases of columns, etc. for mass concrete | 27.53 | Sqm | 553.26 | ₹15,231.25 |
| 5 | Centering and shuttering including strutting, propping etc. and removalof form for
a) Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 61.07 | Sqm | 1,188.64 | ₹72,590.24 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
a) (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 34.88 | Cum | 11,115.38 | ₹3,87,704.45 |
| 7 | Providing and laying cement concrete in retaining walls, return walls,walls (any thickness) including attached pilasters, columns, piers,abutments, pillars, posts, struts, buttresses, string or lacing courses,parapets, coping, bed blocks, anchor blocks, plain window sills, fillets,sunken floor etc., up to floor five level, excluding the cost of centering,shuttering and finishing:
a)1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 10.5 | Cum | 13,960.64 | ₹1,46,586.72 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level.
a)Thermo-Mechanically Treated bars of grade Fe-500D or more. | 712.75 | Kgs | 152.16 | ₹1,08,452.04 |
| 9 | Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands,copings, bed plates, anchor blocks, plain window sills and the like,including the cost of required centering, shuttering but excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 8.4 | Cum | 14,935.12 | ₹1,25,455.01 |
| 10 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
a) 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.34 | Cum | 12,762.2 | ₹29,863.55 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Tendernotice_2.pdf
PDF • 1.01 MB
BOQ_24240.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid