Loading…
Loading…
Tender Value
₹99.7 L
EMD Value
₹99,750
Closing Date
16 Oct 2026, 6:00 pm
Dy.City Engineer
Work related to drainage lines and other wards, areas under Deputy City Engineer-2, including cleaning, maintenance work using the required machinery.
345000
Central Zone E-Tender Notice No.07/2026-2027 Tender No.52
Open
Civil Works - Others
Works
Ahmedabad
₹2,400
Municipal Commissioner, Ahmedabad
₹99,750
16 Oct 2026
22 Sept 2026
17 Oct 2026
22 Sept 2026
28 Sept 2026
22 Sept 2026
Name of work :- bægÍtullt zu.mexe.Rsluh -2 btk ytJ<t Ftzegt <&t yLg Jtuzobtk atjeytu,vtu¤tu,<&t djeytubtk lJe meMxubuxef
z[ulus jtRl ltFJtlt,auBch/bNelntuj hevuhekd fhJtlt,<&t lJt bNelntuj cltJJtlt ftb.(yu.yth.me.)
Tender Invited on Behalf of AMC, Central Zone.
Assistant Manager, Central Zone,
Central Zone Zonal Office”, B – Wing,
Third Floor,Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
Signature of Bidder Page 2 of
AHMEDABAD MUNICIPAL CORPORATION
Notice inviting Tender
Competent authority on behalf of Municipal Commissioner of A.M.C. invites percentage rate sealed tenders from interested
contractors for the following work at different locations within the limit of A.M.C.
1 Name of work bægÍtullt zu.mexe.Rsluh -2 btk ytJ<t Ftzegt <&t yLg Jtuzobtk atjeytu,vtu¤tu,<&t
djeytubtk lJe meMxubuxef z[ulus jtRl ltFJtlt,auBch/bNelntuj hevuhekd fhJtlt,<&t
lJt bNelntuj cltJJtlt ftb.(yu.yth.me.)
2 Estimated Tender Amount Rs.99,74,953.00 (exclusive of GST). GST will be paid extra by
AMC/Authority at prevailing rate to the contractor.
3 Tender fee Rs.2400.00
(Non refundable) (Demand Draft in favour of Municipal Commissioner, Ahmedabad)
4 Time Limit 12 Months
5 Download of Tender Tenders from the website www.nprocure.com or shall be down loaded
Documents mentioned AS PER TENDER NOTICE INVITED
6 Required registration Register “D” class having in Road Works in PWD in Govt. R&B / CPWD / AMC
or equivalent register with any other state Govt. or institutions.
7 Earnest Money Deposit (Bid Rs. 99,750.00 (Demand Draft / pay order / Bank Guarantee in favour of
security) Municipal Commissioner, Ahmedabad is to be submitted as prescribed as
(1 % of Estimate put to below. Demand Draft/Bank Guarantee shall be from approved list of AMC of
banks and the issuing branch of bank guarantee shall be of Ahmedabad city
only and it should be valid for for 180 days. ( As Per AMC finance Dept .
Circular No. 5 Dt. 5/5/2007 & F.D. Circular No. 29 Dt. 7/8/2010 &
attched ANNEXURE - 1 finance dept.circular No-40 Dt.05/11/2020.
E.M.D. shall be submitted physically along with the Physical Submission
when applicable.
8 Submission of EMD and Tender Fee & EMD should Submitted physically along with tender
Tender Fees documents as described in the invitation of tender should be submitted to
Assistant Manager- Central Zone, 3rd Floor, B – Wing, Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
Bid submitted without bid security & tender fee shall be treated as non
responsive and shall be summarily rejected.
9 Mode of sending the Tender The whole tender shall be submitted by two modes.
Documents • Whole tender shall be submitted only on www.nprocure.com website as
per Schedule mentioned in Notice inviting Tender.
• Tender Fee, EMD, technical bid and other relevant PQ Documents as per
check list given in tender shall be submitted physically in two copies
(Original & duplicate) in sealed envelope as per Schedule mentioned in
Notice inviting Tender.
10 Last date of receiving As per Notice inviting Tender / Addendum / Corrigendum. The
Tenders. tenders received after latest schedule date and time will not be
entertained under any circumstances.
11 Submission of Price Bid The Price bid shall be submitted online only. The bidder shall fill
percentage rate on amount of BOQ online only until specified.
Price Bid shall be submitted physically duly signed & seal without
mentioning quoted rated, else it shall be considered as rejected.
12 Opening of Technical bid As per Notice inviting Tender / Addendum / Corrigendum.
13 Tender validity period 120 days from the last date of submission of Tender.
14 Security Deposit 5 % of Contract Value to be submitted in the form of (Demand Draft / pay
Signature of Bidder Page 3 of
order / Bank Guarantee in favour of Municipal Commissioner, Ahmedabad.
Bank Guarantee shall be from approved list of AMC of banks as per attched
ANNEXURE - 1 finance dept. latest circular. and the issuing branch of
bank guarantee shall be of Ahmedabad City only. The validity of the Security
Deposit shall be up to valid till 90 days beyond Date of completion of work.
The Security Deposit shall be payable in 10 days (for tenders upto Rs.10.0
Lacs) or 15 days (for tenders of Rs.10.0 Lacs and above) from date of receipt
of LOI failing which interest @ 4% per annum will be charged by AMC.
15 Deductions from Running Bills
a. Retention Money 2 % amount of each Running Bill shall be deducted as a Retention Money.
Such retention money shall be released in the final bill of the said work.
b. Labour welfare cess Labour welfare cess as per the Act, 1996 (non refundable) shall be deducted
from each running bill.
16 Defect & Liability Period All general condition of contract of Form B1 condition of contract shall
17 Compansation for Delay 10 % of the actual balance work after Time limit expired.
18 Penalty Clauses As Per SLA Clause,attached in Tender Documents
20 Time permitted to start parts Whenever a work is allotted by Engineering staff, whether minor or major
of work part of any amount, the contractor shall be bound to start the work within
hours so intimation of work. Communication done telephonically via SMS, via
whatsapp and through letter/ E-mail shall be considered legal and binding for
the same. Failure of company to start the works in 48 hours of intimation as
above by contractor. the contractor shall be levied penalty of (1) Rs.1000/-
per day (for tender amounting upto 10 lakh). (2) Rs. 2500/- per day (for
tender amounting above 10 lakh to 30 lakh). (3) Rs. 5000/- per day (for all
tender amounting above 30 lakh). Three time failure by contractor shall
make contractor responsible to be debar unless and otherwise justified
properly in writing/binding within 15 days so flast notice of penalty. and Also
As Per SLA Clause attached in Tender Documents.
• All the circulars which were published by Authorities of AMC time by time will be applicable on said Tender and bound
to bidder with out any condition.
• Conditional tenders will not be accepted in any case. Municipal Commissioner reserves the rights to reject any or all
the tenders without assigning any reasons thereof.
• The authorized signatory holding Power of Attorney shall only be the Digital Signatory. In case authorized signatory
holding Power of Attorney and Digital Signatory are not the same, the bid shall be considered non-responsive.
• Obey Circular No-03 Date-13-04-2026 of City Engineer Office
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 4 of
(On contractor’s Letter Head / certified with Stamp and Sign with Contact Detail)
TENDER DECLARATION FORM
Additional City Engineer
Ahmedabad Municipal Corporation,
Name of Work :- bægÍtullt zu.mexe.Rsluh -2 btk ytJ<t Ftzegt <&t yLg Jtuzobtk atjeytu,vtu¤tu,<&t djeytubtk lJe meMxubuxef z[ulus jtRl
ltFJtlt,auBch/bNelntuj hevuhekd fhJtlt,<&t lJt bNelntuj cltJJtlt ftb.(yu.yth.me.)
I/We the undersigned have carefully gone through and clearly understood the Tender documents of above mentioned
project comprising of Notice Inviting tenders, Articles of Agreement, Scope of work, Definition of terms, notes
Instructions/Information to Bidder, Condition of Contract, special condition of contract, Appendices, Specifications, Bill of
Quantities, furnished by AHMEDABAD MUNICIPAL CORPORATION.
I/We do hereby offer to execute and complete the whole of the work within the time specified all in accordance with
the specification, designs, drawing and instruction in writing referred to in the said document and with such materials as
mentioned for, at the respective rates which I/we have quoted in the Price Bid or at such other rates as may be fixed under the
provisions of these conditions.
In the event of this tender being accepted I/We agree to enter into an agreement and when required, execute the
contract, according to your form 1 of agreement as or in default where of I/we bound myself/ourselves to forfeit the "Earnest
Money Deposit."
I/We understand that if I/We shall not enter in agreement within fifteen days or as decided by AMC from the date of
receipt of letter of acceptance, you will forfeit the earnest money paid by me/us and take necessary action as deemed fit.
I/We have enclosed a Demand Draft / Bank Guarantee as an “Earnest Money Deposit", for the sum as mentioned in
NIT, the full value of which is to be absolutely forfeited to the Employer If I/We fail to commence the work specified.
Otherwise the Employer shall retain the said sum, as on account of such Security Deposit as provided for in the aforesaid
I/We agree not to employ sub-contractors other than those that may be approved in accordance with conditions in the
aforesaid documents.
I/We understand that Municipal Commissioner is not bound to accept the lowest or any tender, which are received. I /
We also understand & agree that Municipal Commissioner Reserves the right to allot number of tenders to successful bidders
at his sole discretion in case if I / We am/are lowest in more than one tender.
I/We am/are bound to execute the job if the work order is issued within 120 days from the date of opening of the
I am bound to execute the work by maintaining all Quality aspects/parameters mentioned in the tender terms and
conditions. I am also bound to submit all supporting Genuine Original documents as and when asked and if any discrepancy
found in such documents as well as in the executed Work with respect to Quality/Quantity at any stage of work or even after
completion of work, it will be solely my Responsibility. I am bound to prove originality of all documents submitted by me and if
any Documents found false/fake then Municipal Commissioner/AMC has right to take any action/penalty/punishment against
I am also bound that if I/we, indulged into any malpractice and/or used any inferior quality and/or the construction of
road is found to be of an inferior quality under this contract than in such case Municipal Commissioner/AMC has right to
debar/ blacklist permanently.
Signature of Bidder Page 5 of
I/We agree to pay the Government income-Tax, GST/Sales-Tax (Central and State), Octroi duties, Royalty on material
(i.e. Aggregate, Sand etc.) And any other taxes prevailing and from time to time on such items on which the same are leviable
and the rates quoted by me/us are inclusive of the same.
Yours faithfully
Seal and Sign of Contractor
Signature of Bidder Page 6 of
INSTRUCTIONS TO BIDDERS
1. Scope of Bid
1.1 Competent authority on behalf of The Municipal Commissioner, Ahmedabad Municipal Corporation (referred to as
Employer in these documents) invites sealed bids for the construction of works (as defined in these documents and
referred to as “the work”) detailed in the table given in the Invitation for Bid (hereinafter called as IFB.) from
competent bidder. The bidders may submit bids for the works detailed in the table given in IFB.
2.0 Source of Funds
Ahmedabad Municipal Corporation has arranged the fund for this project.
3.0 Eligible Bidders
3.1 The Invitation for Bids is open to all eligible bidders meeting the eligibility criteria as defined in this tender.
3.2 All bidders shall provide Qualification Information and Forms of Bid mentioned in the Clause-14. An agency that has
been engaged by the Employer to provide consulting services for the preparation or supervision of the works, and any
of its affiliates, shall not be eligible to bid.
3.3 Any entity which has been declared as non-performing by NHAI / GoG / AMC or the firms those are blacklisted/
debarred for specified period by AMC, Governement of Gujarat, Government of India or any other entity controlled by
it, would not be eligible to submit the Bid.
4.0 Qualification of the Bidder
4.1 Requires registration:- Register as per Notice Inviting Tender having in Road Works in PWD in Govt. R&B / CPWD /
AMC or equivalent register with any other state Govt. or institutions.
5.0 DISQUALIFICATION
Even though the bidders meet the above mentioned qualifying criteria, they are subject to be disqualified if they have,
• Made misleading or false representations in the forms, statements, affidavits and attachments submitted in proof
of the qualification requirements; and/or
• Record of poor performance such as abandoning the works, not properly completing the contract, inordinate delays
in completion, litigation history, or financial failures etc. or debarring from AMC work etc.
• Tampered the bid document in any manner.
• Colluded with other prospective bidders for this work to arrive at quoted prices for the purpose of restricting
• Indulged in inducement of any official of AMC and/or their consulting engineer and other advisors in any manner
• Proposal not submitted in accordance with this tender.
• During validity of the proposal, or its extended period, if any, the bidder changes his commercial terms.
• The bidder qualifies the proposal with his own conditions.
• Proposal is received after due date and time.
• Commercial proposal is enclosed with the same envelope as technical proposal
• The envelope does not show on the outside the reference of bid and thus gets opened before the due date of
• The E.M.D. is not deposited in full and in the manner as specified in the clause of Earnest Money Deposit.
• The tender is in a language other than English or dose not contains its English Translation in case of other
language adopted for tender preparation.
• The tender documents received are not duly signed by authorized person.
• The validity of tender is less than what is stated in the tender.
Signature of Bidder Page 7 of
• Any of the page or pages of tender is/are removed or replaced.
• Any condition which affect the cost.
• If it is joint venture.
5.1 Debarment / Black listing
Not with standing the above, the Employer may debar or blacklist any of the bidder(s) for their misleading or false
representations in the forms statements etc. for the period to be decided by the Employer.
6.0 Cost of Bidding
The bidder shall bear all costs associated with the preparation and submission of his Bid. Employer will in no case be
responsible and liable for those costs.
The Bidder, at his own cost, responsibility and risk, is encouraged to visit, examine and familiarize himself with the site
of Works and its surroundings including source of earth, water, road aggregates etc. and obtain all information that
may be necessary for preparing the Bid and entering into a contract for construction of the Works. The costs of visiting
the Site shall be at the Bidder's own expense.
8.0 Bidders shall not have any dispute or claim for any kind of compensation in case of,
• If the quantity stipulated in the tender items varies or the scope of work changes and thereby total amount of work
• If the quantity stipulated in the tender items varies or the scope of work changes and thereby total amount of work
increases / decreases up to any extent.
• If the works gets delayed / postponed for some administrative / technical decision whatsoever.
• If the items stipulated in the tender shall not be executed as per site condition/ requirements. No claim shall be
entertained for the same.
• No idle charges shall be paid to contractor for machinery and man power if remain idle and no claim shall be
entertained for the same.
B. BIDDING DOCUMENTS
9.0 Content of Bidding Documents
9.1 The set of bidding documents comprises the documents listed below and addendum (if any) issued.
1. Notice inviting e-Tender
2. Special conditions of Contract
3. Instructions to Bidders
4. Qualification Information
5. Conditions of Contract
6. Technical Specifications
7. Forms of Bid
8. Bill of Quantities
• The bidder is expected to examine carefully all instructions, conditions of contract, contract data, forms, terms,
technical specifications, forms, Annexes in the bid document. Failure to comply with the requirements of bid
documents shall be at the bidder’s own risk. Bids which are not substantially responsive to the requirements of the bid
documents shall be rejected.
10.0 Amendment of Bidding Documents
10.1 Before the deadline for submission of bids, the Employer may modify the bidding documents by issuing addendum.
10.2 Any addendum thus issued shall be part of the bidding documents and shall be placed on website www.nprocure.com
The prospective bidder shall refer to website to check any addendum before 24 hours of opening of bids. AMC will not
give any advertisement for the same.
Signature of Bidder Page 8 of
10.3 To give prospective bidders reasonable time in which to take an addendum into account in preparing their bids, the
Employer may, at his desecration, extend as necessary the deadline for submission of bids.
10.4 Prospective bidders should attach the addendum made for the work & if fails to do so than also the changes made
through such addendum shall be applicable & bound to the bidder.
C PREPARATION OF BIDS
11.0 Language of the Bid
All documents relating to the bid shall be in the English language only.
12.0 Documents comprising bid
The e bid submitted by the bidder shall be in two separate parts.
• Technical Bid
• Financial Bid
To qualify for award of the contract, each bidder must submit the following documents along with bid:
• Required Registration Certificate
• Other requested documents
• Any other material / information required to be submitted in accordance with these Instructions to Bidders
Failure to submit these certificates/documents shall make the bid non-responsive.
Above original documents in physical form in two copies, one marked as “original” and other marked as “Duplicate”,
shall be submitted in a sealed envelope by 18:00 Hrs on the date of physical submission of bid and addressed to the
addressee given in the NIT duly super scribed “Name of Work, Bid due date and time, Name and address of the bidder”
13.0 Bid Prices
• The contract shall be for the whole works as described in Bill of Quantity based on the percentage rate in the Bill of
Quantities submitted by the bidder..
• All duties, taxes, and other levies payable by the contractor under the contract, or for any other cause shall be
included in the rates, prices and total Bid Price submitted by the Bidder, except otherwise stated in the Bid
document. Employer will not compensate the bidder (contractor) for any change in duties, taxes and other levies
payable by the contractor under the contract and any other reasons.
• The percentage rate and bid price quoted by the bidder shall be fixed up to the completion of Work and shall not be
subject to adjustment on any account, except where expressly specified, otherwise, in the contract.
14.0 Currencies of Bid and Payment
The currency of bid and payment shall be in Indian Rupees. All payments shall be made in Indian Rupees.
15.0 Bid Validity
15.1 Bids shall remain valid for 120 days from last date of submission of tender. A bid valid for a shorter period shall be
rejected by the Employer as non-responsive.
15.2 In exceptional circumstances, prior to expiry of the bid validity (120 days), the Employer may request that the bidders
may extend the period of validity for a specified additional period. The request and the bidders' responses shall be
made in writing or by cable. A bidder may refuse the request without forfeiting his bid security. A bidder agreeing to
the request will not be required or permitted to modify his bid, but will be required to extend the validity of his bid
security for a period of the extension.
Signature of Bidder Page 9 of
16.0 Earnest Money / Bid Security
16.1 The Bidder shall furnish, a Bid Security of the amount as shown in the Table of IFB as part of his bid, in the form of
Demand Draft / pay order / Bank Guarantee in favour of Municipal Commissioner, Ahmedabad valid for 120 days.
16.2 The issuing branch of the bank guarantee shall be of Ahmedabad City only
Signature of Bidder Page 10 of
Signature of Bidder Page 11 of
Signature of Bidder Page 12 of
16.3 Any bid not accompanied by an acceptable Bid Security shall be rejected by the Employer as non-responsive.
16.4 Any bid having bid security for lesser value and shorter validity period shall be treated as non-responsive.
16.5 (a) The bid security of the unsuccessful bidders, except for L1, L2 and L3 bidders will be returned as promptly as
(b) The bid security of the successful bidder, along with second and third lowest tenders, will be returned when the
successful bidder has furnished the required security deposit and signed the agreement.
16.6 The Bid Security of the Successful Bidder will be discharged when the bidder has signed the Agreement and furnished
the required security deposit.
16.7 The Bid Security shall be forfeited,
a) if the Bidder withdraws the Bid after Bid opening during the period of Bid validity;
b) in the case of a successful Bidder, if the Bidder fails within the specified time limit to
(i) sign the Agreement; or
(ii) Furnish the required security deposit.
(iii) commence the work after signing the agreement within 15 days
16.8 No interest shall be paid by the owner on any tender guarantee. The issuing branch of the bank guarantee shall be of
Ahmedabad City only.
16.9 Bank Guarantee for Earnest Money Deposit should be executed on non-judicial Stamp papers of requisite value in
accordance with the stamp Act applicable to that particular state of Indian Union, where executed.
16.10 The executing officers of the bank Guarantee for Earnest Money Bid Security shall clearly indicate in (block letters) his
name, designation, Power of Attorney No. / Signing Power No. etc.
16.11 Each page of the bank guarantee for Earnest Money Deposit shall be duly signed/initialed by the executing officers and
the last page shall be signed in full, indicating the particulars as aforesaid under the seal of the Bank.
D. SUBMISSION OF BIDS
17.0 Sealing and Marking of Bids
17.1 The bidder shall submit the Technical Bid only. The Bid shall be sealed in separate envelopes and the three sealed
envelopes shall be sealed in an outer envelope. The Bid envelopes shall be marked as follows:-
• Complete Tender Document with all necessary qualification related documents (in two copy)
Above two envelopes shall be kept in one envelope and it should be marked as “Technical Bid” and sealed. This Outer
envelope should mention the name of firm of bidder, his address, contact details & name of the work.
17.2 The inner and outer envelopes
a) Shall be addressed to the Employer at the following address:
Assistant Manager- Central Zone,
3rd Floor, B – Wing, Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
c) Bear the following identification:
Indicate the name and address of the bidder.
Signature of Bidder Page 13 of
• If the outer envelope is not sealed and marked as above, the Employer will assume no responsibility for the
misplacement or premature opening of the bid.
18.0 DEADLINE FOR SUBMISSION OF THE BID
18.1 Complete Bids (including Technical bid and necessary documents) must be received by the Employer at the address
specified in bid information not later than the date indicated on the face sheet of the document. In the event of the
specified date for the submission of bids declared a holiday for the Employer, the Bids will be received up to the
appointed time on the next working day. The Bidder is further required to submit Documents in Physical Form on or
before the Bid Due Date and before the time of submission as specified in NIT, at the following address:
Assistant Manager- Central Zone,
3rd Floor, B – Wing, Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
18.2 AMC assumes no responsibility for inability of a bidder to submit bids through (n) procure e-tendering portal on
account of delay in submission at bidder's end. Bidder shall ensure that they submit the bid well before the "Due Date
& Time of Bid- Submission". AMC shall not be responsible if bidder is not able to submit the bid on account of failure in
network/internet connection or any other technical reason.
18.3 The Employer may extend the deadline for submission of bids by issuing an amendment in accordance with respective
Clause, in which case all rights and obligations of the Employer and the bidders previously subject to the original
deadline will then be subject to the new deadline.
18.4 All bidders are requested to see the website of (n) procure for amendment / corrigendum if any.
18.5 Any Bid received by the Employer after the deadline prescribed in NIT will be rejected and returned unopened to the
Any Bid received by the Employer after the deadline prescribed in NIT will be returned unopened to the bidder.
20.0 NOTIFICATION OF AWARD & SIGNING OF AGREEMENT
The Bidder whose Bid has been accepted will be notified of the award by the Employer prior to expiration of the Bid
validity period by writing, facsimile or e-mail confirmed by registered letter. This letter (hereinafter and in the
Conditions of Contract called the “Letter of Acceptance” will state the sum that the Employer will pay the Contractor
in consideration of the execution, completion, and maintenance of the Works by the Contractor as prescribed by the
Contract (hereinafter and in the Contract called the “Contract Price”).
The notification of award will constitute the formation of the Contract, subject only to the furnishing of a Security
Deposit in accordance with the provisions of Clause.
The agreement will incorporate all correspondences between the Employer and the Successful Bidder. It will be signed
by the Employer and the Successful Bidder.
21.0 SIGNING OF CONTRACT AGREEMENT
21.1 The Employer and the successful bidder shall enter into a Contract Agreement within 28 days after the successful
bidder (hereinafter called the Contractor) receives the Letter of Acceptance, unless they agree otherwise, subject to
furnishing the security deposit before signing the Agreement with the Employer.
21.2 Upon issue of ‘Letter of Acceptance’ to the successful Bidder, the Employer will promptly notify the other Bidders that
their Bids have been unsuccessful and release their Earnest Money Deposit / Bid Security.
22.0 SECURITY DEPOSIT
22.1 Within 15 days of receipt of the Letter of Acceptance, the Successful Bidder shall deliver to the Employer a security
deposit in the form of Bank Guarantee for an amount equivalent to 3% of the Contract Price valid for the period of
valid till 90 days beyond Date of completion of work. The Security Deposit shall be payable in 10 days (for tenders upto
Signature of Bidder Page 14 of
Rs.10.0 Lacs) or 15 days (for tenders of Rs.10.0 Lacs and above)from date of receipt of LOA failing which interest @ 4%
per annum will be charged by AMC.
22.2 The security deposit shall be in the form of a Bank Guarantee in the name of the Employer, from Ahmedabad branch of
any Banks mentioned in the clause no. 16.2 of these tender documents.
22.3 This security deposit shall be released only after the clearance of final bill including pre & post Audit.
22.3 Interest @ 4 % per annum shall be deducted from contractor in case of late submission of security deposit or late
renewal of bank guarantee for the number of days delayed for submission or discontinuity of the bank guarantee.
22.4 Bank Guarantee to be submitted in the prescribed format enclosed and shall be same verbatim as per the format. Bank
Guarantee shall be submitted on right value of stamp paper and for correct value of contract.
22.5 Failure of the Successful Bidder to comply with the requirements of Sub-Clause 22.1 shall constitute sufficient grounds
for cancellation of the award and forfeiture of the Bid Security.
22.6 In case of any contract amendment during execution of the contract enhancing value of the contract the BG value shall
be enhanced accordingly. Validity of BG shall be commercial terms and conditions of the tender.
22.7 All compensation or other sums of money payable by the Contractor to the Employer under the terms of this Contract
or any other contract or on any other account whatsoever may be deducted from Security Deposit. Also in the event of
the Contractor's Security Deposit being reduced by reasons of such deductions, as aforesaid, the Contractor shall,
within 14 days of receipt of notice of demand from the Engineer-in-Charge, make good the deficit in Security Deposit.
22.8 Should there arise any occasion under the Contract due to which the periods of validities of Bank Guarantees as may
have been furnished by the Contractor from time to time, are required to be extended/renewed, the Contractor shall
get the validity periods of such guarantees extended/renewed, and furnish these to the Engineer-in- Charge one
month before the expiry date of the aforesaid Guarantees originally furnished failing which the existing Bank
Guarantees shall be invoked by the Engineer – in – charge. Also in case of any deficit in securities on any account as
might occur or is noticed, the Contractor shall forthwith recoup/replace the same with acceptable Security Deposit.
22.9 The Bank Guarantee shall be extended within the expiry dates wherever activities as per contract are not completed in
22.10 The Security Deposit less any amount due shall, on demand, be returned to the contractor after 45 days of completion
date / Final Bill paid date which ever is later. No interest on the amount of Security Deposit shall be paid to the
Contractor at the time of release of Security Deposit as stated above.
22.11 The successful bidder to whom ‘LOA’ has been issued shall enter into an agreement at Employer’s office within 15 days
23.0 Advance Payment and Security
The Employer will not provide any advance payment.
24.0 Dispute Review Expert
In case of all the disputes, decision of the Municipal Commissioner, Ahmedabad shall be final and binding to the
25.0 LITIGATION HISTORY
The applicant should provide accurate information on litigation and/or arbitration resulting from Contractors
completed or under execution by him over last five years. If the details of Litigation History are hidden by the Bidder
and later on it comes to the knowledge of the Employer, the Bidder shall be disqualified for the proposed work and
other appropriate actions shall be taken against the bidder.
DETAILS OF COMPLETED / ONGOING LITIGATION / ARBITRATION
Signature of Bidder Page 15 of
Employer Value of the Reasons/Details for Remarks showing
Year Name of Project (Rs.) litigation/arbitration Present Status
The bidder shall furnish separate table for individual project.
The above information shall be supported with necessary documents otherwise the same shall be treat as null and
A consistent history of arbitration awards? Judgments against the applicants or any partner of a joint venture may
result in disqualification for proposed work.
If the details of litigation History is hidden by the applicant and later on it comes to knowledge of the employer the
bidder shall be disqualified for the proposed work and other appropriate actions shall be taken against the bidder.
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 16 of
GENERAL CONDITIONS OF CONTRACT
1.0 Liquidated Damages
1.1 If the Contractor fails to complete the works within the original or extended time limit, the Contractor shall pay
penalty of 10% of amount of actual remaining work. The amount of work for which the scope of contractor is reduced
shall not be considered for the calculation of Liquidated Damages.
1.2 Conditions mentioned in the AMC Finance Department Circular AMC no. 18 Date: 23/05/2017 and all latest Circulars
shall be applicable.
2.0 Retention Money
2 % amount of each Running Bill shall be deducted as a Retention Money. Such retention money shall be released in
the final bill of the said work. AMC reserves right to deduct any amount to compensate the poor performance of the
contractor i.e. poor quality or abandoned / incomplete work.
3.0 Subcontracting
3.1 Except where expressly specified in the Contract, the Contractor shall not subcontract any portion of Work without the
approval of the Employer’s Representative. Any subcontracting shall not relieve the Contractor from any contractual
obligations or responsibility under the Contract.
3.2 The Contractor shall not be required to obtain consent for a subcontract for which the name of the subcontractor and
scope of works activities to be performed by him is already stated in the contract or supply of material or engagement
4.1 The Contractor shall employ the key personnel named in the Schedule of Key Personnel as referred to in the Bid
document to carry out the functions stated in the Schedule or other personnel approved by the Engineer. The Engineer
will approve any proposed replacement of key personnel only if their qualifications, abilities, and relevant experience
are substantially equal to or better than those of the personnel listed in the Schedule.
4.2 If the Engineer asks the Contractor to remove a person, without assigning reasons thereof, for his misconduct or
inadequacy of technical skills and experience, who is a member of the Contractor’s staff or his work force, the
Contractor shall ensure that the person leaves the Site within seven days and has no further connection with the work
in the Contract.
4.3 No residential accommodation is allowed at the site of work. The labour huts shall not be erected on the site of work and
contractor shall make his own arrangements to provide such accommodations as per the rules of the local bodies. He
shall make his own arrangements for housing, stores, field office etc. He shall submit a site layout plan indicating the
location of various site facilities to be created by him at his cost for the execution of work. The Owner shall in no way
be responsible for any delay on this account and no claim on this account whatsoever shall be entertained. All Basic
amenities shall be provided by the Contractor to Labours as per the prevailing labour Laws.
5.1 The Contractor shall have full regard throughout execution, completion and defects liability period to following safety
aspects and shall take all necessary steps to ensure that danger to safety is avoided all the time in respect of,
Safety of the works
• Safety of the Contractor’s employees and all the persons directly or indirectly engaged by him for the works
• Safety of all the employees including persons working on other contracts of Employer at the same site of the
Employer and Engineers employees engaged at work site.
• Any authorized third party persons on the site.
• Contractor’s plant and equipment
Signature of Bidder Page 17 of
5.2 The Contractor shall provide and maintain at his costs all lights, guards, fencing, warning signs, barricading, and cones;
when and where necessary, or required by Engineer in Charge or by any duly constituted authority for the protection
of the works or for the safety and convenience of the public or other.
5.3 The Contractor shall take all reasonable steps to protect the environment on and off the site and avoid damage or
nuisance to persons or property of the public and others arising as a consequence of his method of operation.
5.4 The Contractor shall maintain in good condition all work throughout execution, completion, and defects liability
period. The contractor shall be responsible for and to make good all injuries, damages and repairs, rendered necessary
by fire, rain, traffic, floods or other causes.
5.5 All the scaffolding work, wherever required for the execution of work, shall be provided by the contractor. Nothing
extra shall be payable on this account. It shall be provided strictly with double scaffolding system with all the
accessories etc. with adjustable suitable working platforms to access the areas, with ease for working and inspection.
It shall be designed to take all incidental loads. It should cater to the safety features for workmen. It shall be ensured
that no damage is caused to any structure due to scaffolding.
5.6 All temporary warning/ caution boards display shall be provided and displayed during day as well as night time by the
contractor, wherever required and as directed by the Engineer.
5.7 Arrangement of temporary water and electricity and telephone connection required, by him, shall be made by the
Contractor at his own cost and also necessary permissions directly from relevant Owners shall be obtained by him
under intimation to the Owner. Also all initial and running charges and security deposit, if any in this regard shall be
borne by him. The Contractor shall abide by all the rules/ bye laws applicable in this regard and he shall be solely
responsible for any penalty on account of violation of any of the rules and byelaws in this regard.
5.8 In any case if any fatal accident (major or minor) occurs due to poor safety precautions, the same shall be completely
contractor’s responsibility. All the losses due to such accidents and expenses of legal matters shall be borne by
5.9 The Contractor shall be responsible for maintenance and watch and ward of the complete installation and shall also be
responsible for any pilferage, theft, damage, penalty etc. in this regard. The Contractor shall indemnify the Owner
against any claim arising out of pilferage / theft, damage, penalty etc. whatsoever on this account.
5.10 The Contractor shall depute Site Engineer & skilled workers as required for the work. Necessary protective and safety
equipments shall be provided to them by the Contractor at his own cost and used at site.
6.0 Contractor to keep site clean:
During the execution of the work, the Contractor shall keep the site clean. All wreckage rubbish, excess materials,
temporary works no longer required will be removed from site immediately.
7.0 Clearance of site on completion:
The Contractor shall clear away and remove all Contractors equipment, surplus materials, rubbish, temporary works of
A. COST CONTROL
8.0 Bill of Quantities
a. The schedule-B shall contain Memorandum showing items for the construction, installation, testing, and
commissioning work to be done by the Contractor.
b. The quantities stated in the schedule B are estimated quantities. The Contractor shall be paid only quantities
calculated after taking measurements of executed work. The rate stated in the schedule B for each item of work
shall apply. The works shall be measured by the Contractor jointly with the authorized representative of the
Engineer and all particulars required by the representative of the Engineer shall be supplied by the contractor.
c. The work shall be measured net. No allowance for general or local custom, working space etc. is to be made.
Signature of Bidder Page 18 of
9.1 The Engineer in Charge shall have power to make any variation of form, quality or quantity of the works or any part
thereof that may, in his opinion, be necessary and for that purpose, or if for any other reason it shall, in his opinion, be
appropriate, he shall have the authority to instruct the Contractor to do and the Contractor shall do any of the
Increase or decrease the quantity of any work up to any extent included in the contract,
Omit any such work,
Change the character or quality or kind of any such work,
Execute additional work of any kind necessary for the completion of the Works or
Change any specified sequence or timing of construction of any part of work.
9.2 No such variation shall in any way vitiate or invalidate the contract, but the effects, if any, of all such variations shall be
valued in accordance with the following sub clauses. Provided that where the issue of an instruction to vary the Works
is necessitated by some default or breach of contract by contractor or for which he is responsible, any additional cost
attributable to such default shall be borne by the Contractor.
9.3 The Contractor shall not make any such variation without an instruction of the Engineer. No instruction is required for
quantities varying from those provided for the items in the contract schedule B.
10.1 The basis for the valuation of variations for addition to the Contract Price shall be as follows in the same order of
a) Variations in the quantities of work in schedule of quantities shall not vitiate the contract.
b) The contractor shall be bound to execute extra items of work as directed by the Engineer-in-charge.
c) Contract unit rates for individual items shall apply to varied quantities where there is a quantity variation.
d) The price variations on extra item will not be given.
e) In case of other non tender items following procedure shall apply.
10.2 If any extra item crops up during the progress of work the same shall be carried out by the Contractor and he shall be
paid at the rate fixed by Employer which shall be fixed as lowest of the rates derived by rate analysis based on the
following three methods. , the priority of the documents forming the Contract shall be as follows:
(i) If the extra item is included in the S.O.R. of Road & Building Department, Year 2013-14, the rate of extra item
shall be that rate and premium (above or below) quoted by contractor.
(ii) Rate analysis based on prevailing Govt. of Gujarat’s SOR rates.
(iii) Rate analysis based on current market rates. This shall be based on
The material costs, the labour costs, the cost of use of all plant, machinery and equipment, the cost of all
temporary and incidental works, the overheads and the Contractors profit.
The overheads shall be taken at 5 % of the sum of material costs, the labour costs, the cost of use of all plant,
machinery, and equipment, the cost of all temporary and incidental works.
10.3 In case of the rate is to be derived from prevailing market rate, the Contractors profit shall be taken at 10 % of the final
10.4 In the event of disagreement, the Engineer in Charge shall fix such rates and prices as are, in his opinion appropriate
and shall notify the Contractor accordingly with a copy to the Employer.
10.5 The Engineer shall determine provisional rates and prices to enable on account payments to be included in the Interim
Payment Certificates, until rates and prices are agreed as final by the Employer, the Contractor, and the Engineer.
10.6 The Contractor shall not be entitled to additional payment for costs, which could have been avoided by giving early
Signature of Bidder Page 19 of
11.1 Payments shall be adjusted for deductions for advance payments, retention, other recoveries in terms of the contract
and taxes at source, as applicable under the law. The Employer shall pay the Contractor the amounts certified by the
11.2 If an amount certified is increased in a later date certificate due to corrections in previous certificates or as a result of
an award from disputes review experts, Contractor shall be paid such amount only. The Contractor shall not be paid
any interest upon such delayed payment.
11.3 Items of the work for which no rate or price has been entered in will not be paid for by the Employer and shall be
deemed covered by other rates and prices in the Contract.
11.4 All payments shall be made in Ahmedabad.
12 Taxes and duties
12.1 The rates are inclusive of all the prevailing taxes and duties of the Central, State and Local Governing bodies prevailing
on the date of award of the contract. The Contractor will have to pay all such taxes and duties for the performance of
this Contract. The Employer will deduct from the Contractor’s monthly and other payments all taxes and duties, which
he is bound to recover in accordance with the applicable law.
12.2 The Contractor shall keep himself fully informed of all acts and laws of the Central & State and local Governing bodies,
all orders, decrees of bodies, tribunals having any jurisdiction or authority which in any manner affect those engaged
or employed, and anything related to carrying out the work. All the bye-laws lay down by AMC/AUDA and any other
local bodies while executing the work shall be adhered to. All taxes of local bodies shall be borne by the contractor.
The Contractor shall arrange to give all notices required by any authority and to pay to such authority all the fees that
may have to be paid for the material, plants, equipments etc. The Contractor shall also adhere to all traffic restrictions
notified by the local authorities. He shall protect and indemnify the Owner and its officials & employees against any
claim or liability arising out of violations of any such laws, ordinances, orders, decree, whether by himself or by his
employees or his authorized representatives. Nothing extra shall be payable on these accounts.
13.0 Labour Welfare Cess
As per circular No. GHR/2005/04/CWA/2004/841/M-3 dt. 3/1/05 and G.R. No. CWA/2004-1831-M(3) dt. 9/12/05
issued by G.O.G. (non-refundable) shall be deducted from every bills which shall be deposited to Govt. Labour
Department for Labour welfare fund.
14.0 Currencies
All payments shall be made in Indian Rupees.
15.0 Advance Payment
No Advance Payment shall be made.
16.0 Cost of Repairs
Loss or damage to the Works or Materials to be incorporated in the Works between the Start Date and the end of the
Defects Correction periods shall be remedied by the Contractor at the Contractor's cost if the loss or damage arises
from the Contractor's acts or omissions.
B. FINISHING THE CONTRACT
17.0 Completion
The Contractor shall request the Engineer to issue a Certificate of Completion of the Works and the Engineer will do so
upon deciding that the Work is completed.
18.0 Termination
Signature of Bidder Page 20 of
18.1 The Employer shall be entitled to terminate the contract if the contractor:
(a) Fails to carry out any obligation under the contract.
(b) Without reasonable excuse fails –
1. To commence the works on site within the period stated in the Appendix to Bid after receipt by him of a
Notice to this effect from the Engineer/Employer after signing the agreement or
2. To proceed with the works, or any section thereof, within 28 days after received notice
3. Has failed to comply with a notice issued or an instruction issued within 28 days after having received.
4. Abandons the works or otherwise plainly demonstrates the intention not to continue performance of his
obligation under the contract.
5. Sub-contracts the works or assigns the contract without the specific prior written permission of the engineer.
6. Has failed to furnish the required securities or extension thereof in terms of the contract.
7. Becomes bankrupt or insolvent, goes into liquidation, has a receiving or administration order made against
him, compounds with his creditors, or carries on business under receive, trustee or manager for the benefit of
his creditors, or if any act is done or event occurs which (under applicable Laws) has a similar effect to any of
these acts of event.
18.2 In any of these events or circumstances, the Employer may, upon giving 14 days notice to the contractor, terminate
the contract and expel the contractor from the site. However, in the case of sub-paragraphs (h), the Employer may be
notice terminate the contract immediately.
18.3 The Employer’s decision to terminate the contract shall not prejudice any other rights of the Employer, under the
contract or otherwise.
18.4 After termination, the Employer may complete the works and/or arrange for any other entities to do so. The Employer
and these entities may then use any goods, contractor’s documents and other design documents made by or on behalf
of the contractor.
18.5 The Employer or the Contractor may terminate the Contract if the other party causes a fundamental breach of the
18.6 Fundamental breaches of Contract include, but shall not be limited to the following:
(a) the Contractor stops work for 14 days when no stoppage of work is shown on the current Program and the
stoppage has not been authorized by the Engineer;
(b) the Employer or the Contractor is made bankrupt or goes into liquidation other than for a reconstruction or
(c) The contractor fails to fulfill requirements;
(d) the Engineer gives Notice that failure to correct a particular Defect is a fundamental breach of Contract and the
Contractor fails to correct it within a reasonable period of time determined by the Engineer;
(e) the Contractor does not maintain a security which is required;
(f) the Contractor has delayed the completion of works by the number of days for which the maximum amount of
liquidated damages becomes payable as defined in the Contract data;
(g) if the Contractor, in the judgment of the Employer has engaged in corrupt or fraudulent practices in competing for
or in the executing the Contract.
(h) For the purpose of this paragraph: “corrupt practice” means the offering, giving, receiving or soliciting of anything
of value to influence the action of a public official in the procurement process or in contract execution.
“Fraudulent practice” means a misrepresentation of facts in order to influence a procurement process or the
execution of a contract to the detriment of the Borrower, and includes collusive practice among Bidders (prior to
or after bid submission) designed to establish bid prices at artificial non-competitive levels and to deprive the
Borrower of the benefits of free and open competition.”
18.7 When either party to the Contract gives notice of a breach of contract to the Engineer for a cause other than those
listed above, the Engineer shall decide whether the breach is fundamental or not.
18.8 Notwithstanding the above, the Employer may terminate the Contract for convenience.
18.9 If the Contract is terminated the Contractor shall stop work immediately, make the Site safe and secure and leave the
Site as soon as reasonably possible and handover the site to the Employer including all materials and plant and
equipment existing there upon.
Signature of Bidder Page 21 of
19.0 Contractor's own responsibility
The contractor is to set out and level the works and will be responsible for the accuracy of the same. He shall also be
responsible for the correctness of the positions, levels, dimensions, and alignment of all parts of the structures as per
instructions given to him. If at any time any error shall appear during the progress of any part of the work, the
contractor shall at his own expense rectify such error if called upon to the satisfaction of the Engineer in charge.
20.0 Overpayment & Underpayment
20.1 Whenever any claim Fifths payment of a sum to the Municipal Corporation arises out of or under this Contract against
the contractor the same may be deducted by the Municipal Corporation from any sum then due or which at any time
thereafter may become due to the contractor under this contract and failing that under any other contract with the
Municipal Corporation or from any sum due to the contractor with the Municipal Corporation (which may be available
with Municipal Corporation), or from his retention money, or he shall pay the claim on demand. The Municipal
Corporation reserves the right to carry out post payment audit and technical examination of the final bill including all
supporting vouchers, abstracts, etc.
20.2 The Municipal Corporation further reserves the right to enforce recovery of any over payment when detected
notwithstanding the fact that the amount of the final bill may be included by the Contractor.
20.3 If as a result of such audit and technical examination any over payment is discovered in respect of any work done by
the Contractor or alleged to have been done by him under the contract, it shall be recovered by the Municipal
Corporation from the contractor by way of all the means prescribed above or if any under payment is discovered by
the Municipal Corporation, any amount due to the contractor under this contract or under payment may be adjusted
against any amount then due or which may at any time thereafter become due before payment is made to the
contractor from him to the Municipal Corporation on any other contract account whatsoever.
21.0 Materials obtain from dismantling
If the contractor, in the course of execution of work is called upon to dismantle any part for reasons other than on
account of bad or imperfect work, the materials obtained from dismantling will be the property of the A.M.C. and will
be disposed of as per instruction of Engineer-in-charge in the best interest of the A.M.C.
22.0 Dispute to be referred to Arbitrator
The disputes relating to this contract, so far as they relate to any of the following matters, whether such disputes arise
during the progress of the work or after the completion or abandonment thereof, shall be referred an independent
Arbitrator appointed by AMC as far possible in consultation with the agency if it is necessary and such disputes shall be
settled in accordance with the arbitration and conciliation Act.
(i) The rates of payment under clause 5 for any tools, materials and stores, in or upon the works of the site
thereof or belonging to the contractor or procured by him and intended to be used for execution of the work
or any part thereof possession of which may have been taken by the Engineer-in-charge under the said clause
(ii) The reduction in rates made by the Engineer-in-charge under clause 9 from the items of works not accepted as
completed fully in accordance with the sanctioned specifications.
(iii) The rate of part of payment for any class of work which is included in the additional or altered work carried
out by the contractor in accordance with the instructions of the Engineer-in-charge under clause 14 and the
rates for which is to be determined under the said clause
(iv) The rates of payment for materials already purchased or agreed to be purchased by the contractor before
receipt of notice given by the Engineer-in-charge under clause 15 and/or amount of compensation payable to
the contractor under the said clause for loss in respect of such materials.
(v) The amount of compensation which the contractor shall be liable to pay under clause 17 in the event of this
failure to rectify, remove or reconstruct the work within the period specified in the written intimation or the
Signature of Bidder Page 22 of
amount of expenses incurred by the Engineer-in-charge under the said clause17 in rectifying, removing or re-
executing the work or in removing and replacing the materials or articles complained of.
(vi) The reduction of rates as may be fixed by the Engineer-in-charge under clause 17 for the inferior work or
materials as accepted or made use of.
(vii) The amount of compensation payable by the contractor for damages as estimates and assessed under clause
(viii) The amount payable to the contractor for the work carried out under clause 33 in accordance with the
instructions and the requirement of the Engineer-in-charge in case where there are no specifications.
(ix) The awards declared by the arbitrator shall be speaking award giving reasons and calculations to every item of
claims. The decision will have to be implemented by all the concerned.
(x) In case of dispute leading to the contractor or Ahmedabad Municipal Corporation approaching on Court of
Law. It shall be within the jurisdiction where the site of work is situated.
The reference to arbitration proceeding under this clause shall not:
i) Entitle the contractor to stop the Affect the right of the Engineer-in-charge under clause 5 to take possession of all or
any tools, plants, materials and stores in or upon the works of site thereof belonging to the contractor or procured
by him and intended to be used for the execution of the work or any part thereof.
ii) Preclude the Engineer-in-charge from utilizing the materials purchased by the contractor in any work or from
removing such materials to other places, during the period the work is stopped or suspended in pursuance, of notice
given to the contractor under clause
iii) Progress of the work or the carrying out the additional or altered work in accordance with the provisions of clause
or as the case may be, of clause
23.0 Drawings and Photographs of the Works
23.1 The contractor shall do photography/ videography of the site as and when asked by AMC. No separate payment will be
made to the contractor for this. . The contractor shall have to submit the same in hard copy as well as soft copy as and
when demanded by the AMC.
23.2 No photograph of the works or any part thereof or plant employed thereon, except those permitted under clause 59.1,
shall be taken, or permitted to be taken by the Contractor or by any of his employees or any employees of his sub-
Contractors without the prior approval of the Engineer in writing. No photographs/ videography shall be published or
otherwise circulated without the approval of the Engineer in writing.
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 23 of
ybœtJtœ BGþrlrmvj ftuvtuohuNl
ftb btxuLþk xftJthe œhJt¤wk xuLzh ylu ftuLx[tfx
xuLzh btxule Nh<tu
(1) y:- yt xuLzh su <u Jdolt ybœtJtœ BGþrl.ftuvtuohuNl y&Jt fuLî{ y&Jt htsg mhfthle btLg gtœelt ftuLx[fxhtu Che
NfNu. dJobuLxlt btLg ftuLx[tfxhu ybœtJtœ BGþrl.ftuvtuohuNlbtk btLg ftuLx[tfxhtule gtœebtk hSMxuNl fhtJJtlwk hnuNu.
c:- btLg ©uKelt ftuLx[tfxh <hefu ltuk^Kelwk «btKvºtle MJ «btKe< fhuj lfj xuLzh mt&u stuzJtle hnuNu.
f:- xuLzhhle jtgft<
ftb sJtc>th xuLzhh <ubs su xuLzhh mwaJuj ftuLx[tfxhle ©uKe ytJ<t ntug <ubs ftb fhJt mûtb ntug <ublu s
ytvJtbtk ytJNu. ftb ytv<t vnujt ftuLx[tfxhu ftb mk<tu»tfthf <ubs xtRb jebexbtk ÃþY fhJt sYhe
mJj<,ylwCJ, ûtb<t ylu VtgltLmegj hemtumo hsw fhJtlt hnuNu.
z:- ybœtJtœ Bgwrlrmvj ctuzo XhtJ lk - 3836,<t.25/11/2011 &e b¤uj bkswhe ylwmth <&t mexe.Rsluh
mh¾gwjh,lk -17,<t.09/12/2012 bwsc ybœtJtœ Bgwrlrmvj ftuvtuohuNlbtk ftuLx[t¾xh hSMxuNl Ve, heLgwyj Ve
<&t yvd{uzuNl Ve ylu btvœkztu ægtlbtk htFe <u bwsc ybj fhJtltu hnuNu.
E. xuLzh Ch<t vnujt xuLzhhu mtRx rlheûtK fhe juJwk. xuLzhh ftblt «fth, ngt< hM<t, vtKe btdo, mkath ylu
JvhtNlt ceò hM<tytu&e mk<wÐ ntuJtlwk btle juJtbtk ytJNu. xuLzhhu ftblu mtRx ylu rcÕzekd(fu su ftb fhJt, ftb
ÃþY fhJt <&t ftblt buRxulLm btxu cltJuj ntug).<ubs xuLzhhu yt mtRxlt ftb btxu, rcÕzekd btxu, gtzo, zevtu btxule
søgt vtu<tle he<u bu¤Je juJtle hnuNu. (xuLzhlwk ftb fhJt, ftb vwhwk fhJt <&t ftblt buRxulLm btxule søgt)
(h) yt ftble mbg bgtoœt bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk sKtJuj «btKu le hnuNu.
(3) xuLzh Jujezexe rvhegz bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk sKtJuj «btKu le hnuNu.
(4) xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
(5) xuLzh Vtubo
xuLzh Vtubo ylu ylwmwrabtkle œhufu œhuf Ftje søgt xuLzh Chlthu Chuje yt mt&u btufjujt œM<tJus vh< fhJtlt hnuNu.
(6) ftuLx[tfxhtuyu leaule ctc<tu ft¤SÃËJof JtkaJt rJlk<e Au.
(1) ftuR fkvlelu ltbu xuLzh juJtbkt ytÔgwk ntug <tu fkvle J<e xuLzh vh mne fhlth Ôgrf<lu yr^f]< fh<wk bwFðgthltbwk
xuLzh mt&u hsw fhJtlwk hnuNu.
(2) Bgwrl.ftuvtuohuNllt «Joðbtl rlgbtu ylwmth yluMxble ChJtle hnuNu.ylu xuLzh mt&u cezJtle hnuNu.
(3) ftuLx[tfxhu RLfbxuût mkckr^< vtl lkch <&t cukf zexuRj ytvJtle hnuNu.
(4) ftuLx[tfxh vtmu ydtWlt ylwCJt ykdult «btKvºttule lfj xuLzh mt&u hsw fhe NfNu.
(5) xuLzh Nh<tu ylu MvuNeVefuNl <&t CtJ vºtflt œhuf vtlt ylu rJd<tu vh ftuLx[tfxhu mne fhJe.
(6) <btb mw^tht, AufAtf ylu Dwkxujt jFtK vh ftuLx[tfxhu xwkfe mne fhJe.
Signature of Bidder Page 24 of
xuLzh Chlthlu sKtJJtbtk ytJu Au fu xuLzh œM<tJustult jFtKbtk ftuR AufAtf fu VhuVth fhJtbtk ytJtNu lrn ylu
ytJe ftuR AufAtf fu VuhVth juJtNu lrn, <ultk jFtKbtk ftuR Cwj ntug <tu <ult vh l Dwkx<t Ftuxt jFtK fu ytkfzt vh
Auftu bthelu <ult mtawk jFtK fu ytkfzt MvÐ Wfju <u he<u jFJt. «ðguf mw^tht vh xwkfe mne fhJe.
(8) y:- xuLzh hsw fh<tk vnujt Ftm fhelu xuLzhbtk œNtoJuj mwaltytulwk vtjl fhJtbtk ytÔgw lrn ntug <tu xuLzh ybtLg
dKJtbkt ytJNu <ule ltuk^ juJt rJlk<e Au. J¤e yt Vtubolwk bwFv]ƒ ylu ftuLx[tfxhtult btdoœNol btxu mtbtLg rlgbtu
ylu mwaltytu vK ft¤SvwJof JtkaJt rJlk<e Au.
(1) ftuEvK fthK œNtoÔgt rmJtg ftuEvK fu c^t xuLzhtu yMJefthJtltu n¬ yctr^< hnu Au.
(h) xuLzhhu ctujvtuELx vullt c>ju NtneJt¤e vul&e Chujt xuLzhtu ðþkh< s ybtLg dKJtbtk ytJNu.
c:- Wvhle ctc<tu Wvhtk< xuLzh leault mkstudtubtk <h< ybtLg XhJtlu vtºt &Nu.
(1) xuLzh Chlth, rlg< ftb y&Jt ftb btxu bkswh fhuj y&Jt CtJ vºtflt ftuR ftuz y&Jt vîr< y&Jt rJd<tubtk
bwfuj Nh< y&Jt mw^thtbtk ftuR VuhVth mwaJ<t ntug.
(h) xuLzhlwk ftuR vtlwk fu vtlt ftZe ltkÏgwk/ltkÏgt ntug fu cœÕGþ / cœÕgt ntug.
(3) c^t mw^tht J^tht y&Jt atukxtzuje ftvjeytu Wvh xuLzh Chlthu xwkfe mne l fhe ntug.
(4) xuLzhbtk <ubKu ftuR AufAtf fhe ntug, ylu
(5) xuLzh Chlth y&Jt vuZele ctc<btk œhuf Ctdeœth y&Jt <u ykdulwk bwFðgthltbwk ^htJlth Ôgrf< mne l fhu y&Jt
xuLzhbt <u btxu htFJtbtk ytJuje søgtbtk mne/mneytu Wvh ftuR mtûteyu mtF fhe l ntug.
f:- Nh<e xuLzh MJefthJtbtk ytJNu lne.
z:- xuLzh MJefthJw, hœ fhJw, ftulu ytvJw ylu fgt CtJ&e ytvJw <u ykdu Bgwrl. frb§h©eltu rlKog ytFhe hnuNu. ftuR
fthKmh stu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykdu ftuLx[tfxh ftuRvK «fthltu lwfNtle fu J¤<hltu nff œtJtuu fhe
NfNu lrn fu ftgœtfeg ftgoJtne yt ykdu &R NfNu lrn. xuLzh bkswh >ltu y&o ftb ytve œuJtLþk Au <uJtu &R NfNu
lrn.Nh<e xuLzh MJefthJtbtk ytJNu lne.
(9) rJmkdr< ylu rnmtc stud:
nt& ^hJtlt ftbtule ctc< œNtoJ<t CtJ vºtfbtklt sÚ&t ylu hfble ftuRvK Cwjawf leault rlgbtu
ylwmth mhCh fhJtbtk ytJNu.
(1) xuLzh Chlthu œhuf Ftltbtk sKtJuj Nçœtu ylu ytkfzt Jåau ftuR ymkdr<lt fumbtk Nçœtuubtk sKtJuj hfb btLg
htFJtbtk ytJNu.
(2) yufb œh ylu sÚ&tlt Ftuxt dwKtfthlt fthKu ftble ctc<tu œNtoJ<e CtJ vºtflt Ftltbtk&e hfbbtk Cwj sKtg <tu
yufb œh btLg htFJtbkt ytJNu ylu œhlt yt^thu dwKtfth mw^thJtbkt ytJNu.
(3) yufblt Ftltbtk&e <ubs ytd¤ Fuka<t mhJt¤tle <btb Cwjtu mw^thJtbkt ytJNu.
(4) ctc<tu y&Jt mhJt¤t mtbu vwhu ytkfzu fhuj ftuR vK ctc< ægtlbtk juJtbtk ytJNu lrn.
Signature of Bidder Page 25 of
(10) y:- ftbltu «tud{um mbgbgtoœt bwsc fhJtltu hnuNu. yt mbgbgotœt 10 jtF mw^elt ftb btxu yuj.ytu.ytR. ytÃgt
<theF&e 10 rœJm <&t 10 jtF &e Wvhltk ftb btxu yuj.ytu.ytR. ytÃg <theF&e 15 rœJm&e NY &guj dKJtbt
ytJNu. <&t <u œhBgtl ftble 3% juFu zevtuÍex Che fhthvºt fhJtltu hnuNu.
xuLzhbtk ftuLx[t¾xh îtht Chujt CtJ <btb «fthlt su <u «J<o<t mhfthe xuût mrn<lt CtJ dKJtbtk ytJNu.
ylu <ubtk atjw ftb œhBgtl su ftuR VuhVth &Nu <ultu J^thtu awfJJtbtk ytJNu lrnk.
c:- mûtb m•tt îtht xuLzhle bkswheltu XhtJ vtzgt ctœ (LOI) ytvJtbtk ytJNu ðgth ctœ rœl - 10 btk rm¾gtuhexe
zevtuÍex sbt fhtJJtle hnuNu. rm¾gtuhexe zevtuÍex btuze ChJtlt rfMmtbtk Bgwrl.ftuvtuohuNlbtk «Joðbtl rlgb
ylwmth ftgoJtne fhJtbtk ytJNu.
f:- bkswh &guj xuLzhle mbgbgtoœtbtk ftbdehe vqKo l &tg <tu bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk sKtJuj «btKu
bkswh &guj mbgbgtoœt ctœlt FhuFh ctfe ftble hfblt bn•tb 10% juFu (jefJezexe zubuSm) vulÕxe Jmwj
z:- yu.yth.me. xuLzhbtk bkswh &guj sw>t sw>t yk>ts vifelt ftbtu Jfo ytuzoh b¤u&e NY fhJtlt hnuNu.
E:- yu.yth.me. xuLzhbtk yjd yjd ykkœtsle bkkswhe bégu&e btºt rmJej ftbdehelt ftb «btKu yk>ts hfb Bþsc
mbgbgto>t dKtNu.
(1) Yt.1,00,000.00 Mþ^elt ftbtu btxu 02 btm
(h) Yt.3,00,000.00 Mþ^elt ftbtu btxu 03 btm
(3) Yt.5,00,000.00 Mþ^elt ftbtu btxu 04 btm
(4) Yt.5,00,000.00 &e Wvhlt ftbtu btxu 06 btm
(11) y:- awfJKe:-
xuLzh Chlthu yu Jt< mbS juJtle hnuNu fu <uKu xtkfujt œh vwhtk &gujt ftb btxult Au ylu <ubtk bswhe, vtjF, ÃjtLx,
œuFhuF, mhJem-ftbdehe, Jes¤e, htugÕxe ylu ytufx[tug Jduhu ykNu <btb Faoltu <&t sYh sKtg <tu ylu ðgthu
ht<vt¤elt ftblu juJt c^t J^thtlt Faoltu mbtJuN &Nu ylu xtkfujt CtJ fu œh fh<t J^thtle ftuR awfJKe ykdult
<ublt ftuR œtJt ægtlbtk juJtNu lnek ylu xuLzh Chlth Ftuxe hswyt<lu fthKu y&Jt ftuR Ôgrf<yu (vAe<u ctk^ftb
rJCtdltu fboathe ntug fu l ntug) <ublu ytvuje btne<elu yt^thu vtA¤&e ftuR œtJt hsw fhJt nfœth hnuNu lnek.
<ublw xuLzh ChJt <&t <ubtk swœt swœt CtJ ylu œh ChJt btxu sYhe yuJe <btb btne<e vtu<tlt vûtu l bu¤Je
NfJtlu fthKu vtu<u xuLzh hsw fhJtlu je^u y&Jt <ubtk&e WCt &<t ftuR stuFb fu sJtcœthebtk&e Axfe NfNu lnek.
mœh ftbbtk ftuR vK ò<lt ctk^ftblt bxehegj Wvh CtJ J^thtu ytvJtbtk ytJNu lrnk.
c:- ftuLx[tfxhtulu vubuLx / hlekd cej Bgwrl. frb§h©elt su <u «J<obtl rlgb bwsc fhJtbt ytJNu. <&t Bgwrl.
frb§h©e/mexe Rsluh©e lt su <u JF<ltk mh¾gwjh «btKu ftbdehe/ybj fhJt rcl Nh<e ckDlf<ot hnuNu.
f:- ftuLx[t¾xhlt œhuf hlekd cejbtk&e ftuLx[t¾xhlu awfJJtle &<e fwj hfb Wvh (xuLzh bwsclwk vubuLx + yu¾x[t ytRxb)
2 % juFu hexulNl ble ftvJtbtk ytJNu su VtRlj cejbtk vh< ytvJtbtk ytJNu.
z:- htsg / fuL÷ mhfth©elt JF<tuJF<lt ftgœt bwsc su ftuR hfble fvt< fhJtle &Nu <u bwsc ftuLx[tfxhlt
cejbtk&e fvt< fhJtbt ytJNu.
Signature of Bidder Page 26 of
(12) yu:- fhth mkc^e œM<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{ ftblu jtdw vzNu.
ce:- xuLzhbtk œNtoJuj ftb mkck^e œM<tJusbtk œNtoJuj rJd<btk rJmkd<<tlt rfMmtbtk leau œNotJuj ¢btlwmth œM<tJusbtk
œNtoJuj rJd< d{tng htFJtbkt ytJNu.fhth mkc^e œM<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt
fhth mbd{ ftblu jtdw vzNu.
(yu) yufb ylu fœ:-
(2) xuLzh VtuboLþk CtJvºtf
(3) MvuNeVefuNl
z[tu#dbtk fœ, ytfth, ytkfzt fœta Ftuxt ntug <tu btvujt fœ, ytfthlu yLþmhÔþk
(2) xuLzh Vtubole yLþMþra-ce
(3) MvuNeVefuNl
Cwj Chujt fu Ftuxt JKollt rfMmtbtk yt mkck^e Wvhefûttyu rJmkd<<t ykdule ltuk^ bwfe yuze.mexe
yuLSlegh / zu.BGþrl.frbNlh©ele bkswhe bu¤JJtbtk ytJNu ylu <u bwsc fhJtbkt ytJuj rlKog ykr<b dKJtbkt
(13) xuLzhhu z[tuRkd fu MvuNeVefuNlbtk hnuje ftuR ûtr< fu Ftbeltu duhjtC juJtle fturNN l fhJe ylu Rsluh Rlatsuo Ãjtl
<&t MvuNeVefuNlle ûtr<ytu mw^thJe <&t <ulwk mtawk y&oDxl fhtJJwk.
(14) yt Wvhtk< y.Bgw. ftuvtuo. lt slhj ftuLx[tfx fLzeNl vK btLg htFJle hnuNu.
(15) yufe JF<u yuf fh<t J^w søgtytuyu ftb NY fhJtltu Jfo ytuzoh b¤u <tu ftb yuf mt&u s c^u NY fhJw vzNu.
(16) atjw ftbu mrJom jtRllu lwfNtl l &tg <u he<u ftb fhJtlw hnuNu. stu ftuR mrJom jtRllu lwfNtl &Nu <tu <ule mkvwKo
sJtcœthe (òlbtj) ftuLx[tfxhle vtu<tle hnuNu. mtRx Wvh ftb œhBgtl bswhtu fu sl<tlt ftuR btKmlt òlbtj
lu lwfNtl &tg <ule sJtcœthe ftuLx[tfxhle hnuNu. vtujem Vrhgtœ &tg <tu <ule sJtc>the vK ftuLxtfxhle hnuNu.
CuFz Dme l vzu <ule sJtc>the vK vtujem Vrhgtœbt ftuLx[tfxhle hnuNu. CuFz Dme l vzu <u btxu mjtb<elt
vdjt (suJt fu œtuhzwk ctk^e bswh Ftztbtk W<thJt, mtuhekd ylu Mx[xekd fhJt rJduhu) je^t Jdh bsqhlu Ftztbtk W<thNu
<tu ftuLx[tfxh s vtujem Vrhgtœbt sJtcœth hnuNu ylu Bgwrl.ftuvtuohuNlltu ftuRvK MxtV ytlt btxu sJtcœth hnuNu
lrn. ytxjwk mbSlu s xuLzh ChJwk. œhuf ftb fh<t bswhtultu rJbtu vK W<thujtu ntuJtu stuRyu.
(17) bxehegÕm fu ceò xuMxed hevtuxo ftuLx[tfxhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu fhtJJtlt hnuNu. bxehegÕm
jtJJt fu jR sJtltu mkvwKo Fao ftuLx[tfxhu CtudJJtltu hnuNu.<&t atjw ftb œhBgtl yuLSlegh Rlatso îtht
ybœtJtœ Bgwrlmevj ftuvtuohuNlle buxjzuvtu jucbtk xuMxekd fhtJJt sKtJJtbtk ytJu <tu ftuLx[t¾xh îtht <ulw vtjl
(18) M&¤ vrhrM&r< / sYhegt< bwsc ftb fhtJ<t xuLzhlt ytRxblt sÚ&tbtk J^ ^x &tg <tu rlgb ylwmth <u ykdu ftb
fhJt ftuLx[tfxh ck^tgujt Au.
Signature of Bidder Page 27 of
(19) mtRx vh jtJJtbtk ytJuj btj mtbtl hesufx fhJtbt ytJu <tu <whk< rœl 1btk vh< jR sJtltu hnuNu. yLg&t <ule
lwfNtlle sJtc>the ftuLx[tfxhle hnuNu.
(20) ftuLx[tfxhlu su ftuLx[tfx ytvJtbtk ytJu Au. <ubt mhfth©elt «Joðbtl rlgb bwsc ve.yuV/juch yufx <&t bswhtu
<&t MxtVle Jebt vtujeme jElu <ult ftgœtlw vtjl fhJtlwk hnuNu <&t yt ykdu Bgwrl.ftuvtuohuNl îtht su btne<e
btkdJtbtk ytJu <u ytvJtle hnuNu. bu.BGþrl.frbNlh©elt mh¾âwjh Bþsc sYhe ctknu^he vºtf ytvJtLþk hnuNu.
(21) ftuRvK ftgœtfeg jexeduNl ybœJtœ Nnuhle ftuxobt hnuNu.
(22) btj su <u Mxtumo Wvh y&Jt mtRx Wvh jtuftulu lz<h l &tg <u he<u mwalt bwsc W<thJtltu <ubs dtuXJJtltu hnuNu.
(23) ftuR vK mhfthe fhJuht ChJtle <btb sJtcœthe ftuLx[tfxhle hnuNu.
(24) ftuLx[tfxh îtht xuLzhbt œNtoJuj MveNeVefuNl bwsc MxtLzzo bxehegÕm MvuNeVefuNl bwsc jtJJtlt hnuNu.<&t
xuMxekd fhtJJtlwk hnuNu.<&t y ykdu «Joðbtl Bgwrl.ftuvtuohuNlt rlgbtulw vtjl fhJtlw hnuNu.
(25) yt xuLzhbtk stu ftuR ytRxb hne dR ntug <tu <u y&Jt M&¤ M&e<e bwsc xuLzhbtk mbtJuN l ntug <uJe J^thtle
ftbdehe fhJtle &tg <uJt rfMmbtk Bgwrl.ftuvtuohuNlt «Joðbtl rlgb ylwmth J^thtle ytRxblt CtJ lffe
fhJtbtk ytJNu ylu <u bwsc awkfJKe fhJtbtk ytJNu.
(26) atjw ftb œhBgtl «tuxufNlle mkvwKo sJtcœthe ftuLx[tfxhle hnuNu. subtk vevzt, œtuhzt Cgmwaf ctuzo, ÃjtMxef vèe,
rJ. ftuLx[tfxhu jtJJtlwk ylu mtaJJtlwk hnuNu. ylu ftuRvK yfMbt< &Nu <tu <ule mkvwKo sJtc>the ftuLx[tfxhle
(27) M&¤ Wvh atjw ftbdehe œhBgtl ftb fhlth ftuLx[tfxhlt bswh / fboathe y&Jt yLg Ôgrf<lt yfMbt<lt rfMmbtk
juch yufx bwsc fhJtle &<e ftgoJtne <&t vtujem ftgoJtnele sJtc>the ftuLx[tfxhle hnuNu.
(28) stu MxtV mqalt ytvu <u bwsc mwalt vtu&e ftuLx[tfxhu htFJtle hnuNu. <ubtk œhhtus fhuj ftbdehe <&t yr^ftheytuyu
ftb mw^thJt fu «tud{um J^thJtlt ltuk^ fhuj ntug <tu <ulwk ftuBÃjtgLm ytvJtlwk hnuNu ytJe ltu^lt sJtc l &gu fu <u
«btKu M&¤ Wvh ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle m•tt yuze.mexe yuLSlehgh©elu hnuNu.
(29) œhuf ytRxblt MvuNeVefuNl ybœtJtœ Bgwrlrmvj ftuvtuohuNlltk bkswh &guj <&t btLg htFuj MvuNeVefuNl Nh<tu
bwsc hnuNu su ytRxbbtk MvuNeVefuNl l ntug <uJt mkstudtubtk yuze.mexe.yuLSlegh©eltu rlKog ytFhe
hnuNu.Jtuxhekd fhJtbtk lrn ytJu fu œhhtus J^thtltu zucheÍ WvtzJtbtk lrn ytJu <tu ftuLx[tfxhlt Fauo ylu sutFbu
Jdh ltuxemu Jtuxhekd fhtJJtbtk <&t zucheÍ WvtzJtbtk ytJNu ylu cejbtk&e hfb ftve juJtbtk ytJNu.
(30) juch JuÕVuh Vkz btxu ntjbtk htsg mhfth©eyu fhuj nwfb bwscle hfb cejbtk&e ftve juJtbtk ytJNu.
(31) atubtmtltu vehegz <t.15 swl &e 14 ytufxtuch Mþ^eltu dKJtbtk ytJNu. yt mbg œhBgtl ftuLx[tfxh îtht ftbdehe
fhe Nftg <ub l ntug <tu <u Bþscle xtEb jebex J^the ytvJtbtk ytJNu.
(32) muÕm xuût / Jux lkch / ve.yuV. ftuz lkch / vtl lkch / S.yum.xe. lkch rJduhu ftuLx[t¾xhu VhSgt< ytvJtlt hnuNu.
(33) ltbœth ftuxo îtht fhuj nwfb <ubs rlœuo»ttulwk awM<vKu vtjl fhJtlwk hnuNu. subtk z[ulus lu jd<tk ftb btk ftuRvK
mkkstudtubtk bNel ntuj / dxh btk btKmlu W<thJtu lnek <ubs buLgwyj M¾{uJSkd ykdule btdoœrNoft lwk vtjl fhJwk.
Signature of Bidder Page 28 of
(34) mœh xuLzhle ytRxbtult CtJtu ltKt Ft<t lt mhfgwjh lk.38, <t.21/11/22 <&t mûtb m•ttle b¤uj bkswhe bwsc
GST rmJtg dKºtebtk juJtbt ytJuj <&t «Jo<btl rlgb bwsc GST awfJJt vtºt &Nu su&e <btb cezomu <u bwsc
dK<he fhe xuLzhtu ChJtlt hnuNu.
(35) mœh xuLzh yk<od<lt ftb mkjøl y.Bgw.ftu.btk vJo<btl <btb rlgbtu/mhfgwjhtu jtdw vzNu <ubs JF<tu JF< <h
mw^thtytu vK jtdw vzNu. sule ltuk^ jR xuLzhtu ChJtlt hnuNu.
(36) mœh xuLzh yu.yth.me. «fthlw Au ytvlu mtukvJtbtkk yuxju fu ytv îtht ChJtbtkk ytJuj ftbdehelt sÚ&t bwsc mbg
bgtoœt lffe fhe su <u mûtbm<tle yjd yjd ykkœtsle bkkswhe bégu&e Jfo ytuzoh ytvJtbtkk ytJNu ylu mbg
bgtoœtbtkk ftbdehe vqKo fhJtlw awM< vKu vtjl fhJtlw hunNu .
(37) mœhnw ftbbtkk Jtuzobtkk sYhegt< bwsc ytuAtbtkk ytuAe xuLzhle Nh< bwsc bkkswh <h xuLzh vife yjd yjd
ykkœtsle bkkswhe bu¤JJtbtkk ytJ<e ntuR, ytuAtbtkk ytuAe yuf mt&u œN søgtyu sYhegt< bwsc ftbdehe NY
fhJtle Nh<u ylu <u «btKu bulvtJh, bNelhe, bxehegÕm <ubs ltkkKtfeg studJtRle vwh<t «btKbtkk ÔgJM&t fhe
su <u xuLzhhu xuLzh Cgto vqJuo ytdtu<Y ytgtuslle <igthe mt&u ftbdehe fhJtle &tg Au.
yufhthlwk Vtubo
(1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tk vnujtk buk/ybu M&¤le bwjtft< je^e Au ylu
ftblu jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le ò<-btne<e bu¤Je Au.
(2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu jd<t œM<tJustu
ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkb< Awk/Aeyu.
ftuLx[tfxhle mne ylu rmfft
Signature of Bidder Page 29 of
TECHNICAL SPECIFICATIONS:
Name of work:- bægÍtullt zu.mexe.Rsluh -2 btk ytJ<t Ftzegt <&t yLg Jtuzobtk atjeytu,vtu¤tu,<&t djeytubtk lJe meMxubuxef z[ulus
jtRl ltFJtlt,auBch/bNelntuj hevuhekd fhJtlt,<&t lJt bNelntuj cltJJtlt ftb.(yu.yth.me.)
Item No : 01 Excavation for pipe line trenches for water supply, sewerage line, manhole etc. all with
shoring and struting if required as per required gradient and line including safety provisions
using site rails and stacking excavated stuff including up to all required lead cleaning the site
etc. complete for all lifts and strata as specified. In all sorts of soil and soft murrum.
0 to 1.5 meter depth.
1.5 to 3 meter depth.
3 to 4.50 meter depth.
Any soil which generally yields to the application of ackaxes and shoves, phawaras rakes or
any such ordinary excavating implement or organic soil, gravel silt, sand turfloam, clay, peat etc., fall
under this category.
Clearing the site :
The site on which the structure is to be built shall be cleared and all obstructions, loose
stone, materials and rubbish of all kind, bush, wood and trees shall be removed as directed. The
materials so obtained shall be property of the Government and be conveyed and stacked as directed.
within 50 M. lead. The roots of the trees coming in the sides shall be cut and coated with a hot
The rate of site clearance is deemed to be included in the rate of earth work for which no
extra will be paid.
After clearing the site, the center lines will be given by the Engineer-in-charge. The
contractor shall assume full responsibility for alignment, elevation and dimension of each and all
parts of the work. Contractor shall supply laborers, materials, etc. required for setting out the
reference marks and bench marks and shall maintain them as long as required and directed.
The excavation in foundation shall be carried out in true line and level and shall have the
width and depth as shown in the drawings or as directed. The contractor shall do the necessary
shoring and shutting or providing necessary slopes to a safe angle, at his own-cost. The payment for
such precautionary measures shall be paid separately if not specified. The bottom of the excavated
area shall be 1 evened both longitudinally and transversely. as directed by removing and watering as
required. No earth filling will be allowed for bringing it to level, if mistake or any other reason
excavation is made. deeper or wider that shown on the plan or directed. The extra depth or width
shall be made up with concrete of same proportion as specified for the foundation concrete at the
cost of the contractor. The excavation up to 1.5 m. depth shall be measured under this item.
Disposal of the excavated stud :
The excavated stuff of the selected type shall be used in filling the trenches and plinth or
leveling the ground in layer including ramming and watering etc.
Signature of Bidder Page 30 of
The balance of the excavated quantity shall be removed by the contractor from the site of
work to a place as directed with lead upped 50 M. and all lift.
Mode of measurement and payment :
The measurement of excavation in trenches for foundation shall be made according to the
sections of trenches shown on the drawing or as per sections given by the Engineer-in-charge. No
payment shall be made for surplus excavation made in excess of above requirements or due to
slopping and sloping back as found necessary on account of conditions of soil , and requirements of
The rate shall be for a unit of one cubic meter.
Item No. 02 : Extra rate over item of excavation of earth if excavation is to be done in wet condition
without resorting to pumping but incl. of bailing out of water.
Extra rate over item of excavation of earth if excavation is to be done in wet condition without
resorting to pumping but incl. of bailing out of water.
Measurement shall be on per Cmt.
Item No : 03 Extra rate over item of excavation of earth for excavation of asphalt pavement / RCC of
thickness up to 0.20 meter including demolishing the asphalt carpet, metal, soiling/cutting
Reinforcement etc.comp. with stacking the material as directed.
up to 0.20 meter thickness (By Manual)
Up to 0.30 meter (By any type of Breaker Machine or R.C.C.Cutter machine including cost of
operator, fuel, & transportation etc complete.
0.30 meter & above (By any type of Breaker Machine or R.C.C.Cutter machine including cost of
operator, fuel, & transportation etc complete.
Under this item contractor shall demolish existing asphalt or WBM pavement met with
during laying of RCC pipe.
Only area of pavement intercepted in pipe laying shall be demolished. If excess area is
demolished same shall be reinstated by the contractor.
Demolished material like asphalt pavement lump and metal shall be stacked separately as
directed by the Engineer, so that it can be reused in doing the pavement on completion of
laying the pipe.
Work done to the extent of requirement for laying of pipeline and as per specifications shall
be measured in sq.m. and paid at the tender rate.
Item No : 04 Refilling in pipe line trenches ramming and watering, Consolidating, disposal of surplus stuff
as directed within 3 KM Area
As per GWSSB SOR 2022-23; Item No.14.1.
All fill material will be subject to Engineer’s approval. If any material is rejected by Engineer,
contractor shall remove the same forthwith from the site at no extra cost to the owner. Surplus fill
material shall be deposited / disposed off as directed by Engineer after the fill work is completed
upto a distance of 5 Km for which separate payment will be paid under the corresponding item.
Signature of Bidder Page 31 of
No earth fill shall commence until surface water discharges and streams have been properly
intercepted or otherwise dealt with as directed by Engineer.
To the extent available, selected surplus soils from excavated materials shall be used as backfill. Fill
material shall be free from clods, salts, sulphates, organic or other foreign material. All clods of earth
shall be broken or removed. Where excavated material is mostly rock, the bounders shall be broken
into pieces not larger than 150 mm size, mixed with properly graded fine material consisting of
murrum or earth fill up the voids and the mixture used for filling.
If any selected fill material is required to be borrowed, Contractor shall make arrangements for
bringing such material from outside borrow pits. The material and source shall be subject to prior
approval of Engineer. The approved borrow pit area shall be cleared of all bushed, roots of trees,
plants, rubbish etc, top soil containing salts / sulphate and other foreign material shall be removed.
The materials so removed shall be burnt or disposed off as directed by Engineer. Contractor shall
make necessary access to borrow areas and maintain the same, if such access road does not exist, at
FILLING IN PITS AND TRENCHES AROUND FOUNDATIONS OF STRUCTURES, WALLS ETC.
As soon as the work in foundations has been accepted and measured, the spaces around the
foundations, structures, pits, trenches etc. shall be cleaned of all debris, and filled with earth in layers
not exceeding 20 cm, each layer being watered, rammed and properly consolidated, before the
succeeding one is laid. Each layer shall be consolidated to the satisfaction of Engineer. Earth shall be
rammed with approved mechanical compaction machines if instructed. Usually no manual
compaction shall be allowed unless Engineer is satisfied that in some cases manual compaction by
tampers cannot be avoided. The final backfill surface shall be trimmed and leveled to proper profile
as directed by Engineer or indicated on the drawing.
FILLING IN TRENCHES
Filling in trenches for pipes and drains shall be commenced as soon as the joints of pipes and drains
have been tested and passed. The backfilling material shall be properly consolidated by watering and
ramming, taking due care that no damage is caused to the pipes.
Where the trenches are excavated in soil, the filling from the bottom of the trench to the level of the
centreline of the pipe shall be done by hand compaction with selected approved earth in layers not
exceeding 8 cm; backfilling above the level of the centreline of the pipe shall also be done with
selected earth by hand compaction or other approved means in layers not exceeding 20 cm.
In case of excavation of trenches in rock, the filling upto a level 30 cm above the top of the pipe shall
be done with fine materials, such as earth, moorum etc. The filling up of the level of the centreline of
the pipe shall be done by hand compaction in layers not exceeding 20 cm. Also the filling above the
centreline of the pipe shall be done by hand compaction or approved means in layers not exceeding
20 cm. The filling from a level 30 cm. Above the top of the trench shall be done by hand or other
approved mechanical methods with broken rock filling of size not exceeding 20 cm mixed with fine
material as available to fill up the voids.
Signature of Bidder Page 32 of
Filling of the trenches shall be carried simultaneously on both sides of the pipe to avoid unequal
pressure on the pipe.
GENERAL SITE GRADING
Site grading shall be carried out as indicated in the drawings and as directed by Engineer. Excavation
shall be carried out as specified in the specification. Filling and compaction shall be carried out as
specified elsewhere unless otherwise indicated below.
If no compaction is called for, the fill may be deposited to the full height in one operation and
levelled. If the fill has to be compacted, it shall be placed in layers not exceeding 200 mm and
leveled uniformly and compacted as indicated in before the next layer is deposited.
To ensure that the fill has been compacted as specified, field and laboratory tests shall be carried out
by Contractor at his cost.
Field compaction test shall be carried out at different stages of filling and also after the entire height
has been completed. This shall hold good for embankments as well.
Contractor shall protect the earth fill from being washed away by rain or damaged in any other way.
Should any slip occur, Contractor shall remove the affected material and make good the slip at his
The fill shall be carried out to such dimensions and levels as indicated on the drawings after the
stipulated compaction. The fill will be considered as incomplete if the desired compaction has not
If specifically permitted by Engineer, compaction can be obtained by allowing loaded trucks
conveying fill or other material to ply over the fill area. Even if such a method is permitted, it will be
for contractor of demonstrate that the desired / specified compaction has been obtained. In order
that the fill may be reasonably uniform throughout, the material should be dumped in place in
approximately uniform layers. Traffic over the fill shall then be so routed to compact the area
uniformly throughout.
If so specified, the rock as obtained from excavation may be used for filling and leveling to indicate
grades without further breaking. In such an event, filling layers not exceeding 50 cms approximately.
After rock filling the void in the rocks shall be filled with finer materials such as earth, broken stone
etc. and the area flooded so that the finer materials fill up the voids. Care shall be taken to ensure
that the finer fill material does not get washed out. Over the layer so filled, a 100 mm thick mixed
layer of broken materials and earth shall be laid and consolidation carried out by a 12 tonne roller.
No less than twelve passes of the roller shall be accepted before subsequent similar operations are
The compaction, only where so called for, in the schedule of quantities / items shall comply with the
specified (Standard Proctor / modified Proctor) density at moisture content differing not more than
percent from the optimum moisture content. Contractor shall demonstrate adequately at his cost, by
field and laboratory tests that the specified density has been obtained.
Signature of Bidder Page 33 of
Lead for deposition / disposal of excavated material, shall be as specified in the respective
item of work. For the purpose of measurement of lead, the area to be excavated or filled or
area on which excavated material is to be deposited / disposed off shall be divided into
suitable blocks and for each of the blocks, the distance between centerlines shall be taken as
the lead which shall be measured by the shortest straight line route taken by Contractor. No
extra compensation is admissible on the grounds that the lead including that for borrowed
material had to be transported over marshy or ‘katcha’ land / route.
Measurement and Payment
Backfilling as per specifications on the sides of foundations of columns, footings, structures, walls,
tanks, rafts, trenches etc. with excavated material shall be done. As a rule, material to be backfilled
shall stacked temporarily within the basic lead of 90 meters unless otherwise directed by the
Engineer. If Engineer directs / permits a lead of over 90 meters for such material, the conveyance of
the material for the extra distance over the basic lead of 90 meters for backfilling will be paid for.
Actual quantities of consolidated back filing shall be measured and paid in cubic meters.
Penalty for improper watering and compaction will be Rs. 350/Tanker required and rent for roller @
Rs. 20 per sq.m.
In case the watering and compaction of the backfilled material is not as per the specifications, AMC
will carry out the same through own resources. A rate of Rs. 350 per water tanker and Rs. 20 per
sq.m. for rolling and compacting will be recovered from the contractor.
The M/s shall be on CMT basis.
Item No : 05 Conveyance of lime murrum building rubbish earth manure or sludge & execavated rockand
rubbish [Lime murrum building rubbish]. Up to 5.0 Km. lead
(Building SOR 2023-24 Statement No.5 Item No. 030201A1 ; Page no.6)
Disposal of earth, lime, murrum, building rubbish, manure, garbage, sludge, excavated rock, fly ash,
aggregates of any kind is subject to the following :
Unsuitable materials obtained from clearing site and excavation shall be
disposed off within a lead of 50 meters as directed. useful materials obtained from clearing site and
excavation shall be stacked within a lead of 50 mt. beyond the work area as directed. Materials
suitable for back filling shall be stacked at convenient places within a lead of 50 mt. from the
structure for reuse. Useful stones from rock excavation shall be stacked neatly within a lead of 50 M.
and will be allowed to be used by the contractor on payment at rates laid down in the contract or if
not so aid down, at schedule of rates of the Division or at a mutually agreed rates if there are no such
rates in the Schedule of rates.
If surplus materials are required to be conveyed beyond 50 M. conveyance will be paid for
under a separate item.
The M/s shall be on CMT basis.
Item No : 06 & 07 Providing and supplying ISI marked only Standard length Stoneware pipes in standard
lengths of following class and diameter including all taxes, insurance, transportation, freight
charges, octroi, inspection charges, loading, unloading, conveyance to departmental stores,
Signature of Bidder Page 34 of
(IS - 651 / 1989) (Based on GWSSB SOR 2022-23, Item No. 11.0 P-17)
100mm, 150mm,230mm AA Class
The pipes shall be of best quality stone ware pipes. The pipes shall be of approved quality and make
and shall be brought on site after approval. (The pipes shall be laid in grade as per instruction)
contractor shall have introduce bills for standard pipes.The joints shall be done in cement prop. (1 :
1) (1 part cement : 1 part sand) using spun yarn dispend in hot asphalt and caulking tools. The
hydraulic pressured test shall be given be the contractor for testing pipes and jointing. No. trenches
shall be filed without the approval of the Engineer in charge. The rate of the pipes work are inclusive
of excavation and refilling. The excavation etc. shall be done as follows :
The sewet trench shall be excavated to the alignment and gradient shown on the plan and section. In
all storts soil including oil masonary asphalt roads and wet. excavation . The sewer excavation shall
be commenced at the down stream end of the sewer and be continued upto thegradient as directed.
The trench shall not open more than 60 meters in advace of the completed sewer only when directed
by the Engineer in charge looking to the progress of the work in obtaining the formation of the
bottom of the trenches the usual methods of suing sight rails and bonning roads shall be adopted
during the whole of the process. The center line of uniform height shall be carried clearly on each
rail. The depth of the excavation and invert of the sewer shall be checked by means of bonning road
of appropriate length and also straight edge. The bed of the trench be shall well remmed before
starting laying of sewer lines and cement concrete and masonary work. Where trenches are deep in
bad grounds the sides shall be supported by suitable timbering of shorting work looking to the nature
of soil near big or important structures, the sides of the trenches shall be closely and securely
timbered. If any settlement of the building is anticipated the timbering shall be left in the ground.
The various materials excavated shall be separately stacked so that in refilling the may be relaid on
the same order as before and least possible damage shall be done carpet on the public roads and
private properties. Surface covering consisting of asphalt carpet shall be kept on one side and
preserved for reinstatement. The excavated earth shall not heaped near the renchers so as to
caused unnecessary obstruction along the pulling inspection, trenches etc. shall be tunneled under
only as necessary. The side of the trenches shall be nearly vertical and plumb & red light shall be
placed at each end at intervals as instructed and further protested by rope fence. Necessary caution
boards shall also be erected and diaced as directed by the Engineer in charge. Wherever possible
material excavated from the trenches of whatever kind shall not placed nearer than 3 meters from
the outer edge of the excavated trench. The utmost shall have to be taken in refilling the trenches so
that no damage may be done no sewer no lump shall be allowed to be put around the sewer. The
remming of the filling shall be done and well watered. The surplus earth shall be removed directed
within 30 meters lead. The measurement of the work shall be exact length and width of the trench as
specified or as per City Engineer instruction and depth shall be measured vertical as per section upto
invert or the pipe lind The City Engineer reserves the right of extra excavation on either side if
considers necessary for the safely of the work. The bottom and sides of the trench shall be dressed
in level and plumb in all directions before any concrete in India. In case the excavation is done
deeper than required no filling shall be allowed to bring the formation to proper level but contractor
shall have to lay cement or lime be concrete of filling or other acceptable materials as directed by
Signature of Bidder Page 35 of
C.E. at contractor won cost so as to come to proper information, in case bas formation are met with
the work shall have be done as per instruction of C.E. necessary arrangements for watering trenches
must be provided be contractor and without proper watering trenches will not be allowed to be tilled
to further. Contractor shall have to make arrangement for acees to invert of the sewer and for
inspection of the ware as ordered by the Engineer. If is required to shired or after the alignment
section of diameter of the pip the contractor shall carry or altered the alignment section or diameter
of the pipe the contractor shall carry out the altered work at the rates quoted by him for the original
work for items and contractor shall not claim any expenses due to the changes made. In case no
work shall be done at night or on Sundays & other holidays and during the recess time except in and
other holiday the case of bad grounds such as running sand where the work must be executed
various day night without intruption when so ordered by the Engineer. All existing water pipe storm
drains sewer line railway tract, electric cables etc. which do not in the opinion of Engineer required
to be charged in location shall be supported and protected from injury by the contractor. The
contractor shall be liable to pay all damages to water pipe, drains electric and telephone cables and
to private property during the execution of this contract and the same will be recovered from the
running bills or the deposit of work whenever it becomes necessary in the opinion of the Engineer in
charge location of any existing sewers drains etc. not otherwise from in these specification the
contractor shall do the work of making such change and the work shall be paid for as extra work. All
places of public utility etc. shall be kept accessible for use. No extra payment shall be made for land
sides and side slopes done without prior approval of the Engineer in charge. Wherever natural soil
commends winder excavation the mentioned above the same shall be given after approved C.E. The
rate for excavation for easy jointing and caulking nothing extra shall be paid for this.
Refilling of trenches shall be done only after the grade of line and hydraulic test practicable of the
lines are checked and approved of and order given by the Engineer in charge. The refilling shall be
accompanied by through watering the layers of 0.50 metrs. Further refilling shall be done there after
and process should be repeated till trenches are completely refilled. Temping and ramming with
rammers shall have to be done at all place of important work where ordered by Engineer in charge.
After the trench is give the trenches shall have to be refilled within 4 days with complete watering. If
the contractor fails to do watering satisfactory corporation shall get it done at the risk and cost of the
contractor with or without giving any notice and the expenses incurred in doing so recovered from
the contactor either in cost or from his payment through bills.
The rate shall be for a unit of one Rmt basis.
Item No : 07 R. C. C. PIPE (Horizontal Cast) Providing and supplying ISI Standard R.C.C. pipes(of Sulphate
Resisting Cement) in standard lengths of following class and diameter suitable for either collar
joints or rubber ring joints instuction given as per Engineer incharge including all taxes, insurance,
transportation, freight charges, octroi, inspection charges, loading, unloading, conveyance to
departmental stores, stacking etc Note : One collar should be supplied with each full length plain
ended RCC pipe, cost included in rates below. One rubber ring should be supplied with each full
length socketed pipe, cost included in rates below.(Class NP3 Test Pressure 0.7 Kg/sq.cm). Rate
also Include RCC Collars for RCC pipes including all taxes, carting, loading,unloading, etc complete.
(GWSSB SOR 2022-23 Item No. 10, Page No. 13) R. C. C. PIPE (Horizontal Cast) Providing and
supplying ISI Standard R.C.C. pipes(of Sulphate Resisting Cement) in standard lengths of following
Signature of Bidder Page 36 of
class and diameter suitable for either collar joints or rubber ring joints instuction given as per
Engineer incharge including all taxes, insurance, transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to departmental stores, stacking etc Note : One collar
should be supplied with each full length plain ended RCC pipe, cost included in rates below. One
rubber ring should be supplied with each full length socketed pipe, cost included in rates
below.(Class NP3 Test Pressure 0.7 Kg/sq.cm). Rate also Include RCC Collars for RCC pipes including
all taxes, carting, loading,unloading, etc complete.
(GWSSB SOR 2022-23 Item No. 10, Page No. 13)
300 mm internal diameter (GWSSB SOR 2022-23 Item No. 10.1.D,
450 mm internal diameter (GWSSB SOR 2022-23 Item No. 10.1.D,
750 mm internal diameter (GWSSB SOR 2022-23 Item No. 10.1.D,
Class NP4 Test Pressure 0.7 Kg/Sq.Cm.
600 mm internal diameter (GWSSB SOR 2022-23 Item No. 10.1.E,
900 mm internal diameter (GWSSB SOR 2022-23 Item No. 10.1.E,
1200 mm internal diameter (GWSSB SOR 2022-23 Item No. 10.1.E,
This specification covers requirements for manufacturing, testing, supplying, jointing and testing at
work sites of Reinforced Cement Concrete (RCC) pipes, of both pressure and not pressure varieties
used for pumping mains and sewers. Laying of pipes and fittings/specials is covered in Part: 2. The
two parts are complementary and are to be read together for a correct interpretation of the
provisions of this specification.
APPLICABLE CODES
The manufacturing, testing, supplying. Jointing and testing at work sites of RCC pipes shall comply
with all currently applicable statutes, regulations, standards and codes. In particular, the following
standards, unless otherwise specified herein, shall be referred. In all cases, the latest revision of the
codes shall be referred to. If the requirements of this specification conflict with the requirements of
thecodes and standards, this specification shall govern.
a.) IS : 458 - Specification for pre-cast concrete pipes (with and without reinforcement) b.) IS : 3597 -
Method of tests for concrete pipes.
c.) IS : 5382 - Specification for rubber sealing rings for gas mains, water mains and sewers.
CODE OF PRACTICE
a.) IS : 456 - Code of practice for plain and reinforced concrete.b.) IS : 783 - Code of practice for laying
of concrete pipes.
Signature of Bidder Page 37 of
Design of RCC pipes shall be in accordance with the relevant clauses of IS :
The details of reinforcement shall be as per IS :
D7.5.3 The ends of pipes shall be in accordance with relevant clauses of IS :
The method of manufacture shall be such that the form and the dimensions of the finished
pipes are accurate within the limits specified in relevant clause of IS: 458.The surfaces and edges of the
shall be well defined and true, and their ends shall be square with the longitudinal axis. The ends ofthe
pipes shall be further reinforced by an extra ring of reinforcement to avoid breakage duringtransportation.
The R.C.C. pipes and collars/ rubber rings shall be systematically checked for any
manufacturing defects by experienced supervisors so as to maintain a high standard of quality.
Owner/Engineer/its representative or consultants also shall at all reasonable times have
free access to the place where the pipes and collars/ rubber rings are manufactured for the purpose of
examining and testing the pipes and collars/ rubber rings and of witnessing the test and manufacturing.
All tests specified either in this specification or in the relevant Indian Standards shall be
performed by the supplier/contractor at his own cost and in presence of Owner /Engineer if desired. For
this, sufficient notice before testing of the pipes and fittings shall be given to Owner/Engineer in writing.
1.5.1.5 If test is found unsatisfactory, Owner/Engineer may reject any or all pipes of that lot. The decision
ofOwner/Engineer in this matter shall be final and binding on Contractor and not subjected to any
arbitration or appeal.
Cement used for the manufacture of RCC pipes and collars shall conform to relevant IS codes. ThePipes shall
be manufactured from Ordinary Portland Cement.
Aggregates used for the manufacture of RCC pipes and collars shall confirm to IS : 383. The
size of aggregate should not exceed one-third the thickness of the pipe or 20 mm, whichever issmaller.
MIXING AND CURING WATER
Water shall be clean, colorless and free form objectionable quantities of organic matter, alkali, acid, salts or
other impurities that might reduce the strength, durability or other desirable qualities of concrete and
Reinforcement used for the manufacture of the RCC pipes and collars shall be mild steel Grade I or medium
tensile steel bars conforming to IS : 432 (Part-1) or hard-drawn steel wire conforming to IS : 432 (Part-2).
Reinforcement cages for pipes and collars shall be as per relevant requirements of IS :458.
Signature of Bidder Page 38 of
Ahmedabad Municipal Corporation
Concrete used for the manufacture of RCC pipes and collars shall conform to IS : 456. The minimum
cement content and minimum compressive strength of concrete shall be as per relevant requirements of IS:
458. Compressive strength tests shall be conducted on 15 cm cubes or standard size cylinders in
accordance with the relevant requirements of IS: 456 and IS:
Pipes manufactured in compliance with IS : 458 shall be either water cured or steam curedin
accordance with the relevant requirements of IS :
The internal diameter, wall thickness and length of barrel and collar of pipes, reinforcement
(longitudinal and spiral), type of ends and minimum clear cover to reinforcement and strength test
requirements shall be as per the relevant clauses/ tables of IS: 458for different classes of pipes.
The tolerances regarding overall length, internal diameter of pipes or sockets and barrel
wall thickness shall be as per relevant clause of IS:
WORKMANSHIP AND FINISH
Pipes shall be straight and free from cracks except that craze cracks may be permitted. The
ends of the pipes shall be square with their longitudinal axis so that when placed in a straight line in the
trench no opening between ends in contact shall exceed 3mm in pipes up to 600 mm diameter (inclusive),
and 6 mm in pipes larger than 600 mm diameter. D.7.6.8.2 The outside and inside surfaces of the pipes shall
be smooth, dense and hard and shall not be coated
with cement wash or other preparation unless otherwise agreed to between Owner/ Engineer and the
manufacturer or supplier.
D.7.6.8..3 The pipes shall be free from defects resulting from imperfect grading of the aggregate, mixing or
D.7.6.8..4 The pipes shall be free from local dents or bulges greater than 3 mm in depth and extending over a
length in any direction greater than twice the thickness of barrel.
D.7.6.8.5 The deviation from straight in any pipe throughout its effective length, tested by means of a rigid
straight edge parallel to the longitudinal axis of the pipe shall not exceed, for all diameters 3mm for every
All Pipes for testing purposes shall be selected at random from the offered stock of the manufacturer
and shall be such as would not otherwise be rejected under the criteria of tolerances asmentioned in
During manufacture, tests on concrete shall be carried out as per IS:
456. The manufacturershall
supply, when required to do so by Owner/Engineer the results of compressive test of concrete cylinders or
cubes made from the concrete used for the pipes. Every pressure pipe shall be tested bythe manufacturer for
the hydrostatic test pressure.
D.7.7..3 The specimen of Pipes for the following tests shall be selected in accordance with Clause 9.1of IS:
and tests in accordance with the methods described in IS :
i.) Hydrostatic test
ii.) Three edge bearing test( Including ultimate strength test )
iii.) Absorption test
Note : Three edge bearing load to produce 0.25 mm crack on bottom of pipes shall be as specified in
SAMPLING AND INSPECTION
any consignment, all the pipes of same class and size and
Signature of Bidder Page 1 of
Ahmedabad Municipal Corporation
manufactured under similar conditions of production shall be
grouped together to constitute a lot .The conformity of a lot to the
requirements of this specification shall be ascertained on the basis of
tests on pipes selected from it.
he number of pipes to be selected from the lot for testing shall be in
accordance with Table 15 of IS:
pes shall be selected at random from lot size. In order to ensure
randomness, all the pipes in the lot may be arranged in a serial order
and starting from any pipe.
l pipes selected as per clause 9.2 shall be inspected for dimensional
requirements, finish and
deviation from straight.
he number of pipes to be tested for tests under clause 9.2 shall be in
accordance with column 4 of Table 15 of IS: 458. These pipes shall be
selected from pipes that have satisfied the requirements
mentioned in Clause 9.1.1.of IS:458.
lot shall be considered as conforming to the requirements of IS: 458 if
the following conditions are satisfied. (a) The number of defective
pipes (those not satisfying one or more of the requirements for
dimensions. finish and deviation from straight) shall not be more
than the permissible number given in column 3 of Table 15 of IS:
(b) All the pipes tested for various tests as per Clause 7,8 & 9.1.1 shall satisfy corresponding requirements of
the tests. (c) In case the number of pipes not satisfying requirements of any one or more tests, two further
samples of same size shall be selected and tested for the test or tests in which failure has occurred, all these
pipes shall satisfy the corresponding requirements of the test.
The following information shall be clearly marked on each pipe :
(a) Internal diameter of pipe
(b) Class of pipe
(c) Date of manufacturer
(d) Pipe numbers and
(e) Name of manufacturer or his registered trade-mark or both.
(f) Any other information suggested by Engineer-in-charge.
Signature of Bidder Page 2 of
Ahmedabad Municipal Corporation
Jointing of RCC pipes shall be done as per the requirements of following specifications and as per the relevant
IS. The type of joints shall be collar joint. After jointing, extraneous material, if any, shall be removed from the
inside of the pipe and the newly made joints shall be thoroughly cured.
D.7.10.1.2 COLLAR JOINT (RIGID)
After laying the RCC pipes at proper alignment and gradient their abutting faces shall be coated with hot
bitumen in liquid condition by means of a brush. The wedge-shaped groove in the end of the pipe shall then
be filled with a tarred gasket in one length for each joint. The collar shall then be slippedover
the end of the pipe and the next piped butted well against the tarred gasket by suitable appliances approved
by Owner/Engineer so as to thoroughly compress the tarred gasket into the grooves, carebeing taken that the
concentricity of the pipes and level are not disturbed during this operation. The collar shall then be placed
symmetrically over the end of the two pipes and the space between the inside of the collar and the outside of
the pipe filled with a mixture of cement and sand in proportion 1:1, tempered with just sufficient water to
have a consistency of the semi-dry conditions, well packed and thoroughly rammed with caulking tools. The
joints shall be finished off with a fillet sloping at 45oto
the side of the pipe. The finished joints shall be protected and cured thoroughly as directed by
owner/engineer. Any plastic solution or cement mortar that may have been squeezed into the inside of the
pipe shall be removed so as to leave the inside of the pipe perfectly clean.
The pipes having diameter 900mm and above shall be provided internal joint also with CM 1:1 for thispurpose
directly the edges of the pipes shall be chipped off and then CM shall have to provided. The surface shall be
finished smoothly to allow smooth flow.
LEANING OF PIPES
s soon as a stretch of RCC pipes has been laid complete from
manhole, for a stretch asdirected by
owner/Engineer contractor shall run through the pipes both backwards and forwards a double disc or solid or
closed cylinder 75mm less in diameter than the internal diameter of pipes. The open end ofan
incomplete stretch of pipeline shall be securely closed as may be directed by owner/Engineer toprevent entry
of mud or silt etc.
as a result of the removal of any obstructions Owner/Engineer
considers that damages may have been caused to the pipelines, he
shall be entitled to order the stretch to be tested immediately.
Should such test prove unsatisfactory, contractor shall amend the
work and carry out such further tests as are required by
owner/Engineer.
shall also be ascertained by contractor that each stretch from
manhole to manhole or the stretch as directed by Engineer is
absolutely clear and without any obstruction by means of visual
examination of the interior of the pipe line suitable enlightened by
projected sunlight or otherwise.
l RCC pipes shall be measured according to the work actually done
and no allowance will be made for any waste in cutting to the exact
length required. The measurement for pipes shall be in running
meters nearest to a cm. of length along the centre line of pipe as
actually laid at work sites.
Signature of Bidder Page 3 of
Ahmedabad Municipal Corporation
he rate for providing, laying and jointing of RCC pipes shall be
deemed to include the cost of collars/rubber rings, jointing material,
testing and extra excavation required for ordinary bedding of pipes
and also for collars and pipe sockets, if any.
any damage is caused to the pipeline during the execution of work
or while cleaning the pipeline as specified, Contractor shall be held
responsible for the same and shall replace the damaged pipeline and
the same at his own cost to the full satisfaction of Engineer.
Item No. : 08 Lowering, laying and jointing R. C. C. pipes in C. M. 1.1 1/2 of following diameters in
proper position, grade and alignment at all level as directed by Engineer-in-charge
including conveyance from stores to site of work, labour, giving hydraulic testing as
(Based on GWSSB SOR 2022-23, Item No. 11; Page-39)
300 mm internal diameter (Based on GWSSB SOR 2022-23, Item No. 11.b.6 ; Page-39)
450 mm internal diameter (Based on GWSSB SOR 2022-23, Item No. 11.b.10; Page-39)
600 mm internal diameter (Based on GWSSB SOR 2022-23, Item No. 11.b.10; Page-39)
750 mm internal diameter (Based on GWSSB SOR 2022-23, Item No. 11.b.10; Page-39)
900 mm internal diameter (Based on GWSSB SOR 2022-23, Item No. 11.b.10; Page-39)
1200 mm internal diameter (Based on GWSSB SOR 2022-23, Item No. 11.b.10; Page-39)
LAYING OF PIPES AND FITTINGS/SPECIALS
This specification covers the requirements for laying of pipes and fittings/specials below ground.
APPLICABLE CODES
The laying of pipes and fittings/ specials shall comply with all currently applicable statutes,
standards and codes. In particular, the following standards, unless otherwise specified herein, shallbe
referred to. In all cases, the latest revision of the standards/ codes shall be referred to. If
of this specification conflict with the requirements of the standards/codes, this specification shallgovern.
CODES OF PRACTICE
(a) IS : 783 - Code of practice for laying of concrete pipes.
(b) IS : 3114 - Code of practice for laying of cast iron pipes.
(c) IS : 3764 - Safety codes for excavation work
(d) IS : 4127 - Code of practice for laying of glazed stoneware pipes
(e) IS : 5822 - Code of practice for laying of welded steel pipes for water supply
(f) IS : 6530 - Code of practice for laying of asbestos cement pressure pipes
CARTING & HANDLING
Pipes and fittings/ specials shall be transported from the factory to the work sites at places along the
alignment of pipeline as directed by Owner/ Engineer. Contractor shall be responsible for the safety of
pipes and fittings/ specials in transit, loading/ unloading. Every care shall be exercised in handling pipes
and fittings/ specials to avoid damage. While unloading, the pipes and fittings/ specials shall not be
thrown down from the truck on to hard surfaces. They should be unloaded on timber skids with
steadying ropes or by any other approved means. Padding shall be provided between coated pipes,
Signature of Bidder Page 4 of
Ahmedabad Municipal Corporation
fittings/ specials and timber skids to avoid damage to the coating. Suitable gaps between pipes
be left at intervals in order to permit access from one side to the other. In case of spigot socket pipes,
care should be taken regarding orientation of pipes while unloading. As far as possible pipes shall be
unloaded on one side of the trench only. The pipes shall be checked for any visible damage (such as
broken edges, cracking or spilling of pipe etc.) while unloading and shall be sorted out for
Any pipe, which shows sufficient damage to prelude it from being used, shall be discarded. Draggingof
pipes and fittings/ specials along concrete and similar pavement with hard surfaces shall be
Each stack of pipes shall contain only pipes of same class and size, with consignment or
batch number marked on it with particulars of suppliers/manufacturer wherever possible. Storage shall
be done on firm level and clean ground and wedges shall be provided at the bottom layer to keep
the stackstable.
The stack shall be in pyramid shape or the pipes laid length wise and crosswise in alternate layers.
The pyramid stack shall be made for smaller diameter pipes for conserving space in storing them. The
height of the stack shall not exceed 1.5 m.
Fittings/specials shall be stacked under cover and separated from pipes.
Rubber rings shall be stored in a clean, cool store away from windows, boiler, electrical
equipment and petrol, oils or other chemicals. Particularity in the field where the rubber rings are
being used it is desirable that they are not left out on the ground in the sun or overnight under
heavy frost or snow conditions.
BONING STAVES AND SIGHT RAILS
laying the pipes and fittings/ specials the centre for
each manhole/ chamber or pipeline shall be marked
by a peg. Contractor shall dig holes for and set up
two post (about 100mm x100mm x1900
mm) at each manhole/ chamber or junction of pipelines at nearly equal distance from the peg and at
sufficient distances therefrom to be well clear of all intended excavation, so arranged that a sight rail
when fixed at a certain level against the post shall cross the centre line of the manhole/ chamber or
pipes lines. The sight rail shall not in any case be more than 30m apart, intermediate rails shall be putup
if directed by Owner/Engineer.
oning staves of 75mm x 50mm size shall be prepared
by Contractor in various lengths, each length being of
a certain whole number of meters and a fixed tee-
head and fixed intermediate cross pieces,
each about 300 mm long. The top-edge of the cross piece must be fixed below the top-edge of this
at a distance equal to the outside diameter of the pipe or the thickness of the concrete bed to be
laid as the case may be. The top of cross pieces shall indicate different levels such as excavation for pipe
line, top of concrete bed, top of pipe etc. as the case may be.
he sight rail of size 250 mm x 40 mm shall be
screwed with the top edge resting against the level
Signature of Bidder Page 5 of
Ahmedabad Municipal Corporation
marks. The center line of the pipe shall be marked on
the rail and this mark shall denote also the meeting
point of the centre lines of any converging pipes. A
line drawn from the top edge of one rail to the top
edge of the next rail shall be vertically parallel with
the bed of the pipe, and the depth of the bed
of pipe at any intermediate point may be determined by letting down the selected boning staff until the
tee head comes on the line of sight from rail to rail.
he post and rails shall be perfectly square and planed
smooth on all sides and edges. The rails shall be
painted white on both sides, and tee-heads and
cross-piece of the boning staves shall be painted
black. For the pipes converging to manhole/ chamber
at various levels, there shall be a rail fixed for every
different level. When a rail comes within 0.60 M of
the surface of the ground, a higher sight- rail shall be
fixed for use with the rail over the next point. The
posts and rails shall in no case be removed until the
trench is excavated, the pipes are laid and
Owner/Engineer gives permission to proceed with
the back filling.
The type of bedding for pipes shall be granular bedding as specified and directed by Engineer- incharge.
Laying of pipes and fittings/specials
All precautions shall be taken during excavation and laying operations to guard against possible damage
to any existing structure/ pipeline of water, gas, sewage etc. After excavation of trenches, pipes shall
not be lowered unless the dimensions of trenches and bedding work for pipes at thebottom
of the trenches are approved and measured by Owner/Engineer. Pipes and fittings/specials shall be
carefully lowered in the trenches. Special arrangements such as cranes, tripods with chain pulley
for lowering the pipes and fittings/ specials shall be made by Contractor. In no case pipes and fittings/
specials shall be dropped. Slings of canvas or equally non-abrasive material of suitable width or special
attachment to fit the ends of pipes and fittings/ specials shall be used to lift and lower the coated pipes
and fittings/specials. The pipes and fittings/specials shall be inspected for defects and be rung with a
light hammer preferably while suspended to detect cracks. If doubt persists, further confirmation shallbe
done by pouring a little kerosene/dye on the inside of the pipe at the suspected spot. No sign of
kerosene/dye should appear on the outside surface. Pipes and fittings/specials damaged during
lowering or aligning shall be rejected by Owner/ Engineer.
l the pipes are to be laid perfectly true both in alignment
and to gradient specified. In case of spigot and socket pipe
the socket end of the pipe shall face upstream, except
when the pipelines runs uphill in which case the socket
ends should face the upgrade. The lying of pipes shall
always proceed upgrade of a slope. After placing a pipe in
the trench, the spigot end shall be entered in the
socket and the pipe forced home and aligned to required gradients. The pipes shall be secured in place
with approved backfill material tamped under it except at the socket. Pipes and fittings/ specials which
Signature of Bidder Page 6 of
Ahmedabad Municipal Corporation
sufficient and uniform space for joints shall be removed and replaced with pipes and fittings/ specials of
proper dimensions to ensure such uniform space. Precautions shall be taken to prevent dirt from
entering the jointing space. At times when pipe laying is not in progress, the open ends of pipe shallbe
closed by a watertight plug or other means approved by Owner/ Engineer. During the period that the
plug is on, the Contractor shall take proper precautions against floating of the pipe owing to entry of
water into the trench. Wherever it is necessary to deflect pipe form a straight line, either in the vertical
of horizontal plane, to avoid obstruction or where long radius curve are permitted the deflection
at joints shall not exceed 2 1/2o. In case of pipes, with joint to be made with loose collars, the collars
shall be slipped on before the next pipe is laid. The pipes shall be laid such that the marking on pipes
appears at the top of the pipes.
he cutting of pipe for inserting valves, fittings or specials
shall be done in a neat and workman like manner without
damage to the pipe so as to leave a smooth end at right
angles to the axis of the pipe. For this purpose, pipe-
cutting machine shall be used.
Thrust blocks shall be provided, to counteract hydraulic thrust, at places wherever directed by
owner/engineer and as per relevant drawing
Jointing for pipes and fittings/specials shall be done in accordance with the relevant specifications
depending upon the type of pipes being used.
TESTING AND COMMISSION
Testing and commissioning of pipes shall be done in accordance with the relevant specifications.
Trenches shall be back filled with approved selected excavated material only after the successful testing
of the pipeline. The tamping around the pipe shall be done by hand or other hand-operated mechanical
means. The water content of the soil shall be as near the optimum moisture content as possible. Filling
of the trench shall be carried out simultaneously on both sides of the pipe in such a manner that
unequal pressure does not occur. Back filling shall be done in layers not exceeding 45cm.
Each layer shall be consolidated by watering, ramming, care being taken to avoid damage to the
pipeline. In case of mild steel Pipes/specials, the spiders provided during assembly and welding shall be
retained until the trench is refilled and consolidated. Where timbers are placed under the pipelineto
aid alignment, these timbers shall be removed before back filling.
REINSTATEMENT OF ROAD/FOOTPATH
Reinstatement of road/footpath shall be done as per the requirements of local authorities and the
relevant specification after completion of work.
CLEARING OF SITES
All surplus materials, and all tools and temporary structures shall be removed from the site as
by Owner/Engineer and the construction site left clean to the satisfaction of Owner/Engineer.
• The measurement for excavation in trenches shall be done in following manner and will be paid
i. Length :As per the actual length of pipes and fittings/special laid at work site.
ii. Width & Cross sections : As per instructions of Engineer-in-charge.
iii. Depth : Average depth of trench from ground level to the bottom level of bedding.
Signature of Bidder Page 7 of
Ahmedabad Municipal Corporation
D.8.6.6 Measurement for pipes and fittings/ specials shall be in accordance with the relevant clause(s)
specification for particular type of pipes.
encing provided along the sides of trenches and pits shall not
be paid for separately andContractor shall take into account the
costs of such works and quote accordingly.
case of the metal packing or dressed stones not being deposited
as specified or being mixed up with excavated materials and not
available for the reinstatement of road/pavement, the cost of
the metal packing or dressed stones required shall be charged to
Contractor by Owner/Engineer.
Service lines if damaged during excavation shall be made good
either by contractor or by other agency as Owner/Engineer may
decide and wholly in either case at the expense of Contractor.
For the service lines of water and drainage above 150mm dia.,
the cost of the diversion, supporting etc. will be paid extra as per
Contractor shall not be paid any additional compensation for
excess excavation over what is specified as well as for any
remedial measures that are specified.
The excess excavated material shall be carried away from site of
works as specified, failing which in view of public safety and
traffic conveniences Owner/Engineer may carry out the work
byany other agency at Contractor’s risk and cost.
Item No : 09 Constructing Chamber of following size including excavation, refilling, BBCC (1:5:10) for
foundation, C.C.Channel (1:2:4), finished 15 mm thick cement plaster inside in CM 1:3,
finishing with cement slurry, Brick masonary in CM 1:5 & excluding the cost of chamber
seat cover etc.completed.
0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to 0.90 meter
0.60 X 0.75 mt. size Inside Clear, Depth from 0.0 to 0.90 meter.
0.75 X 0.75 mt. size (Inside Clear) Depth from 0.0 to 1.20 meter.
The sewet trench shall be excavated to the alignment and gradient shown on the plan and section. In
all storts soil including oil masonary asphalt roads and wet. excavation . The sewer excavation shall be
commenced at the down stream end of the sewer and be continued upto the gradient as directed. The
trench shall not open more than 60 meters in advace of the completed sewer only when directed by
the Engineer in charge looking to the progress of the work in obtaining the formation of the bottom of
the trenches the usual methods of suing sight rails and bonning roads shall be adopted during the
whole of the process. The center line of uniform height shall be carried clearly on each rail. The depth
of the excavation and invert of the sewer shall be checked by means of bonning road of appropriate
length and also straight edge.
Signature of Bidder Page 8 of
Ahmedabad Municipal Corporation
The bed of the trench be shall well remmed before starting laying of sewer ines and cement concrete
and masonary work.
Where trenches are deep in bad grounds the sides shall be supported by suitable imbering of shorting
work looking to the nature of soil near big or important structures, the sides of the trenches shall be
closely and securely timbered. If any settlement of the building is anticipated the timbering shall be left
in the ground. The various materials excavated shall be separately stacked so that in refilling the may
be relaid on the same order as before and least possible damage shall be done carpet on the public
roads and private properties. Surface covering consisting of asphalt carpet shall be kept on one side
and preserved for reinstatement. The excavated earth shall not heaped near the trenchers so as to
caused unnecessary obstruction along the pulling inspection, trenches etc. shall be tunneled under
only as necessary. The side of the trenches shall be nearly vertical and plumb & red light shall be
placed at each end at intervals as instructed and further protested by rope fence. Necessary caution
boards shall also be erected and diaced as directed by the Engineer in charge.
Wherever possible material excavated from the trenches of whatever kind shall not placed nearer than
3 meters from the outer edge of the excavated trench. The utmost shall have to be taken in refilling
the trenches so that no damage may be done no sewer no lump shall be allowed to be put around the
sewer. The remming of the filling shall be done and well watered. The surplus earth shall be removed
directed within 30 meters lead. The measurement of the work shall be exact length and width of the
trench as specified or as per City Engineer instruction and depth shall be measured vertical as per
section upto invert or the pipe lind The City Engineer reserves the right of extra excavation on either
side if considers necessary for the safely of the work.
The bottom and sides of the trench shall be dressed in level and plumb in all directions before any
concrete in India. In case the excavation is done deeper than required no filling shall be allowed to
bring the formation to proper level but contractor shall have to lay cement or lime be concrete of
filling or other acceptable materials as directed by C.E. at contractor won cost so as to come to proper
information, in case bas formation are met with the work shall have be done as per instruction of C.E.
necessary arrangements for watering trenches must be provided be contractor and without proper
watering trenches will not be allowed to be tilled to further. Contractor shall have to make
arrangement for acees to invert of the sewer and for inspection of the ware as ordered by the
Engineer. If is required to shired or after the alignment section of diameter of the pip the contractor
shall carry or altered the alignment section or diameter of the pipe the contractor shall carry out the
altered work at the rates quoted by him for the original work for items and contractor shall not claim
any expenses due to the changes made.
In case no work shall be done at night or on Sundays & other holidays and during the recess time
except in and other holiday the case of bad grounds such as running sand where the work must be
executed various day night without intruption when so ordered by the Engineer.
All existing water pipe storm drains sewer line railway tract, electric cables etc. which do not in the
opinion of Engineer required to be charged in location shall be supported and protected from injury by
the contractor. The contractor shall be liable to pay all damages to water pipe, drains electric and
telephone cables and to private property during the execution of this contract and the same will be
recovered from the running bills or thedeposit of work whenever it becomes necessary in the opinion
of the Engineer in charge location of any existing sewers drains etc. not otherwise from in these
specification the contractor shall do the work of making such change and the work shall be paid for as
extra work. All places of public utility etc. shall be kept accessible for use.
Signature of Bidder Page 9 of
Ahmedabad Municipal Corporation
No extra payment shall be made for land sides and side slopes done without prior approval of the
Engineer in charge.
Wherever natural soil commends winder excavation the mentioned above the same shall be given
after approved C.E. The rate for excavation for easy jointing and caulking nothing extra shall be paid for
Refilling of trenches shall be done only after the grade of line and hydraulic test practicable of the lines
are checked and approved of and order given by the Engineer in charge. The refilling shall be
accompanied by through watering the layers of 0.50 metrs. Further refilling shall be done there after
and process should be repeated till trenches are completely refilled. Temping and ramming with
rammers shall have to be done at all place of important work where ordered by Engineer in charge.
After the trench is give the trenches shall have to be refilled within 4 days with complete watering. If
the contractor fails to do watering satisfactory corporation shall get it done at the risk and cost of the
contractor with or without giving any notice and the expenses incurred in doing so recovered from the
contactor either in cost or from his payment through bills.
The brickbats shall be of new bricks, hared well burnt and broken to 40 mm nominal size. These shall
be free from earth and shall be got app. use. Sand shall be clear coarse, sharp and free from earth and
other impurities. Mixing shall be done on brick or stone platform or of brickbats to mortar shall be
measured in heaps by brick height irregular measure. If ordered by C.E.
Concrete shall be laid in layers of 15 cms. and well consolidated maintained by the contractor for
before commencing the brick work. over boxes, concrete shall be well watered. The mix shall be done
in prop. of 1 : 5 :
Cement shall confirm to M-3, sand shall confirm to M-6, coarse agg. shall confirm to M-13, water shall
The prop. of the cement of sand coarse agg. shall be 1 : 5 : 10 i.e. 1 part of cement, 5 part of sand and
10 parts of coarse agg. by volume. and the work shall be carried out as per inst. of Engineer in charge
and as per C.3.
Brick work cement mortar :
Bricks shall be table brick confirming of approved kiln specifications as laid sown n PWD Hand book
NO. 2. These shall be well burnt and free from all defects and shall be got approved by the Engineer in
charge before the work is started. Cement to be used for mortar shall comply with PWD Hand book
specifications, cement mortar in the brick work shall be 1 part of cement, 5 parts of sand. Every brick
well sacked in water is required to be laid I full & closed joints of cement mortar the thickness of which
shall not exceed 1.25 cms. If on removal of centering any open joint shall be found, these shall be
pointed immediately. Special care shall taken to make the face of brick work smooth brick work shall
be toothed or shall racked back in coarse.
All intrades of curves shall be worked from temple strictly made to dimensions as per 1974-75 latest
plan and section approved by C.E.
Signature of Bidder Page 10 of
Ahmedabad Municipal Corporation
Brick work in general shall be of first class workmanship & shall be executed according to the plan
working proper dimention & as directed by the Office in charge from time to time. Brick should be
thoroughly wetted in water before use. All brick work to be cleaned & wetted before laying cement
mortar shall be prepared in special iron pals. And mixed bag of 1.25 cft. or 1 cft. as measured as the
case may be. All materials shall be stacked in one side so as not to obstruct traffic in any way. The
masonry should be constructed in proper workmanship like manner with jointing plumb etc. to confirm
with the general specification No. 45 PWD Hand Book. The face work should be nearly finished. The
shall be kept watered for a week at least three days after the date of completion.
Providing and laying cement concrete 1:2:4
(1 cement :2 coarse sand :4 graded stone aggregate 20 mm nominal size)
RCC Work :- In general, plain and reinforced concrete work for manholes shall be carried out in
accordance with latest version of IS 456 unless otherwise specified in this specification. The slab of
manhole shall be cast with shutters lined with plywood and shall be
smooth finished. For avoiding surface cracks due to variation in atmospheric temperature and
exposure to direct sunlight, RCC slab of manholes after casting shall be kept wet. M 15 grade of
concrete used for construction of RCC manholes shall have minimum cement content of 360 kg/cum of
concrete. Bar bending schedule for reinforcement shall be prepared by contractor and got approved
from owner/ engineer before proceeding with the work. Minimum cover to the reinforcement shall be
The rate includes cost of all labour, materials, tools and plant etc. required for satisfactory completion
of this item as described above.& the drawing as per A.M.C Dr. S.O.R shall be final. The rate shall be for
a unit of one number basis.
Providing TMT bar.
TMT bars shall conform to M-18. Mild steel binding wires shall conform to M-21
The work shall consist of furnishing and placing reinforcement to the shape and dimensions shows as
on the drawings or as directed.
Steel shall be clean and free from rust and loose mill scale at the time of fixing in position and
subsequent concreting.
Reinforcing steel shall conform accurately to the dimensions given in the bar bending schedules shown
on relevant drawings. Bars shall be bent cold to specified shape and dimensions or as directed using a
proper bar bender, operated by hand or power to attain proper radius of bends. Bars shall not be bent
or straightened in a manner that will injure the material. Bars bent during transport or handling shall
be straightened before being used on the work. They shall not be heated to facilitate bending. Unless
otherwise specified, a ‘U’ type hook at the end of each bar shall invariably be provided to main
reinforcement. The radius of the bend shall not be less than twice the diameter of the round bar and
the length of straight part of the bar beyond the end of the curve shall be at least four times the
diameter of the round bar. In case of bars which are not round and in case of deformed bars, the
Signature of Bidder Page 11 of
Ahmedabad Municipal Corporation
diameter shall be taken as the diameter of circle having an equivalent effective area. The hooks shall
be suitably encased to prevent any splitting of the concrete.
All the reinforcement bars shall be accurately placed in exact position shown on the drawing and shall
be securely held in position during, metal hangers, supporting wires or other approved devices at
sufficiently close intervals,. Bars shall not be allowed to sag between supports nor displaced during
concreting or any other operations of the work. All devices used for positioning shall be of
noncorrodible material. Wooden and metal supports shall no extend to the surface of concrete, except
where shown on drawings. Placing of broken stone or brick and wooden blocks shall not be allowed.
Pieces of broken stone or brick and wooden blocks shall not be used. Layers of bars shall be separated
by spacer bars, precast mortar blocks or other approved devices. reinforcement after being placed in
position shall be maintained in a clean condition until completely embedded in concrete. Special care
shall be exercised to prevent any displacement of reinforcement in concrete already placed. To
prevent reinforcement from corrosion, concrete cover shall be provided as indicated on drawings. All
the bars producing from concrete and to which other bars are to be spliced and which are likely to be
exposed for a period exceeding 10 days shall be protected by a thick coast of neat cement grout.
Bars crossing each other where required shall be secured by binding wires (annealed) of size not less
than 1 mm in such manner that they do not slip over each other at the time of fixing and concreting.
As far as possible, bars of full length shall be used. In case this is not possible, overlapping of bars shall
be done directed. When practicable, overlapping bars shall not touch each other, but be kept apart by
25 mm or 1.25 mm times the maximum size of the coarse aggregate whichever is greater by concrete
between them. Where not feasible, overlapping bars shall be bound with annealed wires not less than
1 mm thick twisted tight. The overlaps shall be staggered for different bears and located at points
along the span where neither shear nor bending movement is maximum.
Whenever indicated on the drawings or desired by the Engineer- in-charge, bars shall be joined by
coup lings which shall have a cross-section sufficient to transpit the full stresses of bars. The ends of
the bars that are joined by coupling shall be upset for sufficient length so that the effective cross
section at the base of threads is not less than norma l cross-section of the bar. Threads shall be
standard threads. Steel for coupling shall conform to I.S.
When permitted or specified on the drawings, joints of reinforcement bars shall be butt-welded so as
to transmit their full stresses. Welded joints shall preferably be located at points when steel will not be
subject to more than 75 percent of the maximum permissible stresses and welds so staggered that at
any one section not more than 20 percent of the rods are welded. Only electric are welding using a
process which excludes air from the molten metal and conforms to any or all other special provisions
for the work shall be accepted. Suitable means shall be provided for holding bars securely in position
during welding. It shall be ensured that no voids are left in welding and when welding is done in two or
three stages, previous surface shall be cleaned properly. Ends of the bars shall be cleaned of all loose
scale, rust, grease, paint and other foreign matter before welding. Only competent welders shall be
employed on the work. the M.S. electrodes used for welding shall conform to I.S. 814. Welded pieces
of reinforcement shall be tested. Specimen shall be taken from the actual site and their number and
frequency of test shall be as directed.
R.C.C. Bedding :
Signature of Bidder Page 12 of
Ahmedabad Municipal Corporation
Cement concrete for the bottom portion of manhole shall consist of one part of cement two parts of
sand four parts of black trap metal of other approved material of 0.6 to 2.5 cms size from well graded
as per instruction. The rate includes all necessary materials mixing lifting placing ramming watering etc.
the exposed faces to be neatly finished smooth with cement as per instructions. The concrete work to
kept constantly watered for at least fortnight.
Cement Plaster :
Cement plaster 15 mm thick shall be done using cement mortar of 1 part of cement & 3 parts of sand
in uniform thickness with surfaces trely in plums. The work in general shall comply with general
specifications for plaster No. 64 in PWD hand book. The plaster surfaces to be kept damp at least for a
fortnight. All internal sides of the manholes including soffit of the arch shall be provided with cement
FRC manhole cover with seat to be set in cement mortar with cement concrete of 1 : 2 : 4 prop.
alround. FRC cover shall be marked with year mar AMC. etc. & arrow showing the direction of flow.
Foot steps shall be of the best quality PVC as specified above true to dimensions. The rate includes
mixing the same in position as directed PVC foot steps of approved design and quality shall have to be
fixed if so ordered by C.E. without extra charges. PVC steps shall be fixed at interval of 37 cm. vertically
& 22 cm. horizontally starting from the invert of the line.
Mode Measurment
The mode of measurement shall be on Nos.
Item No : 10 & 11 Constructing Slab Type M.H. Chamber Of The Following Size Including Excavation,
Refilling, Brick Bats Cement Concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of
thickness 10 C.M., finished 15 mm thick cement plaster inside & outside (Only for shaft) In
Cm 1:3, Finishing With Cement Slurry, P/F 4 Mm Dia M.S.Steel Hdpe Coated Steps 35 Cm C/C
At 35 Cm Staggered Masonary In Cm 1:5, Rcc Slab In Cc1:1.5:3 of thickness 15 C.M.,Including
Cantering & Reinforcement (Single jalli at 15 C.M. c/c bothway 10 mm dia.)But Excluding The
Cost Of Manhole Seat Cover Etc..Completed Of Size 0.75 X 1.00 Meter (Inside Clear, M.H.
length should be parallel to the flow)
(Based on Drainage SOR 2015-16; Item No.14)
1.00 to 2.00 meter depth, (Slab at Ground level)
2.00 to 3.00 meter depth, (Slab at below 0.60 mt. From G.L.)
Manhole shall be provided at every change of alignment, gradient or diameter of
sewer/storm water drains, Bends and junctions in the sewer/drain shall be grouped together
in manhole as far as possoble. The maximum distance between inspection chambers shall be
about 25 meters. Where the diameter of sewer/drain is increased, the soffit of the pipe shall
be fixed at the same level and necessary slope given to the channel of manhole/inspection
chamber. The minimum internal sizes of manhole/inspection chamber shall be as per the
respective item of work. The manhole/inspection chamber shall be constructed as per the
detailed drawings and as directed by Engineer. The bed concrete and the brick masonry shall
be constructed of such thickness as shown on drawing. The brick masonry shall be constructed
Signature of Bidder Page 13 of
Ahmedabad Municipal Corporation
in C.M. (1:5), plastered on both faces with 15 mm cement plaster in C.M. (1:3). The channel
shall be semicircular in the bottom half and of diameter equal to the sewer/drain. Above the
horizontal diameter, the sides shall be extended vertically to the same level as the crown of
the outgoing pipe and the top edge shall be suitable rounded off. The branch channels shall
also be similarly constructed with respect to the benching out at their junction with the main
channel as appropriate fall suitable rounded off in the direction of flow in the main channel
shall be given. The channel at the bottom of manhole / inspection chamber shall be
plastered with C.M. (1:3) and finished smooth. Rungs shall be provided in all
manholes/inspection chambers over 0.6 mtr in depth and shall be of cast iron conforming to
IS:5455. These rungs shall be fixed staggered in two vertical runs, 300 mm apart horizontally
and 300 mm c/c vertically. The top rung shall be 450 mm below the manhole/ inspection
chamber cover and the lowest not more than 300 mm above the benching. The
manhole/inspection chamber frame and cover shall be of cast iron of specified weight and
shall conform to the requirements given in IS:1726. The covers and frames shall be cleanly cast
and they shall be free from air and sand holes and from clod shuts. They shall be neatly
dressed and carefully trimmed. All castings shall be free from voids whether due to shrinkage,
gas inclusion or other causes.Covers shall have a raised chequered design on the top surface to
provide an adequered nonslip grip. Cover shall be capable of easy opening and closing and it
shall be fitted in the frame in workmanship like manner. The cover shall be gastight and water
tight. The size of covers specified shall be considered as the clear internal dimensions of
the frame. Covers and frames shall be coated with a black bituminous composition. The
coating shall be smooth and tenaceous. The frame of manhole/inspection chamber cover shall
be firmly embeded to correct alignment and level in cement concrete on the top of the
masonry. The item shall be executed as per the detailed drawing and as directed by Engineer.
Precast R.C.C. cover of required size and thickness shall be provided if specified in the item of
FRC SEAT COVER:
The frame shall be fixed in cement concrete of M15 grade all around and finished with neat
cement. The cover shall have a minimum thickness of 100 mm and weighing 78 kg. The fibers
shall constitute 1% of the weight of the concrete in the form of 50 mm to 100 mm long high
tensile steel wires. For the cover, MS sheet lapping of 3 gauge shall be provided to avoid
damage to the edges. Similarly for frame, MS angle/flat shall be provided along the edge.
Both MS sheet and angle shall be painted with black bituminous paint. The cover should have
suitable lifting arrangement. The fiber reinforced frame and cover shall be manufactured as
per the drawing approved by Owner/Engineer. The size, type, weight, and locking
arrangement for frame and cover shall be as specified
RCC Work :- In general, plain and reinforced concrete work for manholes shall be carried out
in accordance with latest version of IS 456 unless otherwise specified in this specification.
The slab of manhole shall be cast with shutters lined with plywood and shall be smooth
finished. For avoiding surface cracks due to variation in atmospheric temperature and
exposure to direct sunlight, RCC slab of manholes after casting shall be kept wet. M 20 grade
of concrete used for construction of RCC manholes shall have minimum cement content of
360 kg/cum of concrete. Bar bending schedule for reinforcement shall be prepared by
Signature of Bidder Page 14 of
Ahmedabad Municipal Corporation
contractor and got approved from owner/ engineer before proceeding with the work.
Minimum cover to the reinforcement shall be 40 mm.
The rate includes cost of all labour, materials, tools and plant etc. required for satisfactory
completion of this item as described above. The rate shall be for a unit of one number basis.
Rate reduction over item of Constructing Slab Type M.H. Chamber of size 1.00 x 0.75 mt for constructing
slab @ depth more than 0.60 mt below Ground Level (Max. 3 unit of DM should be reduced in this
Item No : 12 & 13 Constructing Slab type M.H. Chamber of the following size including excavation, refilling,
brick bats cement concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of thickness 10 C.M.,
finished 15 mm thick cement plaster inside & outside (Only for shaft) in CM 1:3, finishing with
cement slurry, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c at 35 cm staggered in masonary
CM 1:5, RCC Slab in CC 1:1.5:3 of thickness 23 C.M., including Cantering & reinforcement (double
jalli at 15 C.M. c/c bothway 12 mm dia.) but excluding the cost of Manhole seat cover
etc..completed. of Size 1.00 X 1.40 meter (Inside Clear, M.H. length should be parallel to the
1.00 to 2.00 meter depth, (Slab at Ground level)
2.00 to 3.00 meter depth, (Slab at below 0.6 mt. From G.L.)
3.00 to 4.00 meter depth, (Slab at below 1.00 mt. From G.L.)
5.00 to 6.00 meter depth, (Slab at below 1.00 mt. From G.L.)
6.00 to 7.00 meter depth, (Slab at below 1.00 mt. From G.L.)
Rate reduction over item of Constructing Slab Type M.H. Chamber of size 1.00 x 1.40 mt for
constructing slab @ depth more than 0.60 mt for ( MH 2 to 3 mt depth) and 1.0 mt for (MH above
3.0 mt depth) below Ground Level (Max. 5 unit of DM should be reduced in this item)
Specification is same as specification of Item No 08, only the MH Chamber size is mentione in this
item is follows.
Mode Measurment
The mode of measurement shall be on Nos.
Item No : 14 Dismantling of existing Arch type manhole up to Arch and then Const. Slab type manhole of
following size incl. excavation, refilling and & finished 15 mm thick cement plaster inside in CM 1:3,
P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c at 35 cm staggered in masonry CM 1:5, incl.
cost of RCC Slab in CC 1:1.5:3, including Cantering & reinforcement as directed by engineer in
charge. Rate includes carting of debris and excavated soil
1.0 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M& reinforcement (Single jalli at 15 C.M.
c/c bothway 10 mm dia.) From 0 to 2 mt depth (Slab at Ground level)
Signature of Bidder Page 15 of
Ahmedabad Municipal Corporation
1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M& reinforcement (Single jalli at 15 C.M. c/c
bothway 10 mm dia.) From 2 to 3 mt depth (Slab at below 1.00 mt. From G.L.)
1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM & reinforcement (double jalli at 15 C.M.
c/c bothway 10 mm dia.) From 0 to 2 mt depth (Slab at Ground level)
1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM& reinforcement (double jalli at 15 C.M. c/c
bothway 10 mm dia.) From 2 to 3 mt depth (Slab at below 1.00 mt. From G.L.)
1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM & reinforcement (double jalli at 15 C.M.
c/c bothway 10 mm dia.) From 3 to 4 mt depth (Slab at below 1.00 mt. From G.L.)
The manholes shall be Dismantling of existing Arch type manhole up to Arch and then Const. Slab type
manhole as per plan and section approved by the Addl. C.E. The specifications for different items of
manholes are as under :
Excavation: This shall be done as per specification mentioned in item No.1 Excavation.
Brickbats cement concrete in proportion (1:5:10) For detailed specification refer R & B Dept. booklet
for General Technical Specification for building works , Page no. 31 , Section.No. 5.3.8(a)
Brickwork(1:5):
For detailed specification refer R & B Dept. booklet for General Technical Specification for building
works ,Page no. 43 , Section. No. 6.12(B).
C.C. Channels :
Cement concrete for the inverts and channels of manholes shall consist of one parts of cement 2 parts
of sand and 4 parts of aggregates of black trap metal of approved materials of sizes from 0.6 to
cm. well graded as per instructions.
The rate includes all necessary materials mixing, laying and ramming and watering. The exposed faces
to be finished with neat cement as per instructions. The channel shall be half round in lies with the dia
of pipe as per drawing and instruction of the engineer in charge. Proper benching shall be provided at
both sides of the channel.
Cement Plaster(1:3) :
For detailed specification refer R & B Dept. booklet for General Technical Specification for building
works , Page no. 104 , Section. No. 17.58(I) Except that the thickness of the plaster shall be 15 mm
instead of 10 mm.
4 mm dia M.S Steel HDPE coated steps 35 cm c/c at 35 cm staggered
For detailed specification refer R & B Dept. booklet for General Technical Specification for building
works , Page no. 159 , Section. No. 24.13 and fixation or any change at the site according to the
direction of Engineer-in-charge in charge
Carting of Surplus Earth :
The surplus earth which is left an site after refilling and proper watering of the trenches shall have to
be carted away upto a distance within 30 mts. & shall be spread at the site according to the direction
of Engineer-in-charge in charge.
RCC Work :- In general, plain and reinforced concrete work for manholes shall be carried out in
accordance with latest version of IS 456 unless otherwise specified in this specification. The slab of
manhole shall be cast with shutters lined with plywood and shall be smooth finished. For avoiding
surface cracks due to variation in atmospheric temperature and exposure to direct sunlight, RCC slab
of manholes after casting shall be kept wet. M 20 grade of concrete used for construction of RCC
manholes shall have minimum cement content of 360 kg/cum of concrete. Bar bending schedule for
Signature of Bidder Page 16 of
Ahmedabad Municipal Corporation
reinforcement shall be prepared by contractor and got approved from owner/ engineer before
proceeding with the work. Minimum cover to the reinforcement shall be 40 mm.
The rate includes cost of all labour, materials, tools and plant and size etc. required for satisfactory
completion of this item as described above.& the drawing as per A.M.C Dr. S.O.R shall be final.
The rate shall be for a unit of one number basis.
Item No : 15 Providing and fixing S.W. gully trap with C.I. grating\ brick masonry chamber and water tight
C.I. cover with frame of 300mm x 300mm size (inside) with standard weight.(i) Square mouth traps.
(A) 100mm x 100mm size P type (Based on Building SOR 2023-24, Item No. 24006AA, NBO Item
(1) Water shall conform to M-1. (2) Cement mortar of proportion 1 : 5 shall conform to to M-11. (3)
Burnt brick shall conform to M-15. (4) The S.W. Gulley trap of 100 mm. x 10-0 mm. size shall conform
Excavation for gulley trap shall be done true to dimensions and levels as indicated on plans or as
directed. The excavation work shall generally be done as per relevant specification of earth work.
The gulley trap shall be fixed over cement concrete 1 : 5 : 10 (1 cement : 5 sand : 10 graded brick bats
aggregate 40 mm. nominal size) foundation, 650 mm. square and 100 mm. thick. The depth of top of
concrete below the ground level shall be 675 mm. The jointing of gulley outlet to the branch drain
shall be done similar to jointing of S. W. pipe as described in item No. 24.1 (A).
Brick masonry chamber : After fixing and testing gulley and branch drain, a brick masonry 300 x
mm. inside with bricks in C. M. 1 : 5 (1 cement : 5 sand) shall be built be built with a 100 mm. brick
work round the gully trap from the top of bed concrete upto ground level. The space between the
chamber walls and the trap shall be filled with cement concrete 1 : 5 : 10. The upper portion of the
chamber i.e. above the top level of the trap shall be plastered inside with cement mortar 1 : 3 (1
cement : 3 sand) finished with floating coat of neat cement. The corners and bottom of the chamber
shall be rounded of so as to slope towards the grating.
Fixing FRC G.T. round cover with frame incl. fixing the same.
Mode of measurements & payment :
The rate includes cost of all labour, materials, tools and plant etc. required for satisfactory completion
of this item as described above.The rate shall be for a unit of one number basis.
Item No : 16 Making connection to the ex.M.H.in running sewer incl. Dewatering and other required
machinery etc. of following dia pipes at any convenient time. All damaged work shall be well
repaired as per instructions. etc..complete.
Making connections to the Ex. MH in running sewer of any dia pipes at any convenient time when MH
is found empty. All damage work shall be well repair instructions etc. comp.The pipes of any dia and
any material shall be cut as per requirement to make connection in existing manhole. Reinforcement
bars shall also have to be cut in existing manhole as per requirement and making good the same. The
dis-mental materials shall be carried to places at all lead as directed by Engineer-in-charge. If directed
the work shall have to be done at night.
The measurement, shall be as per No.
Signature of Bidder Page 17 of
Ahmedabad Municipal Corporation
Item No : 17 Cutting the pipes of following dia coming in the new M.H.in running sewer including cutting
bars, including removing debris /silt from the M.H. and carting at a suitable distance etc..complete
as directed. No payment for M.H. work will be made until pipe is not cut completely in all respect.
150 mm to 300 mm dia.
400 mm to 600 mm dia.
Cutting the pipe of dia 150 to 300 mm incl. cutting the bars, in new mm at any depth it read. And
finishing smooth. Removing any type debris form the MH and courting away at a suitable dist. The
cutting edge shall be finished smooth with CM 1:3 and CC 1:2:4.The M/s shall be on No. basis.
Item No : 18 Repairing damaged M.H. and rasing M.H. up to road level incl. removing damaged brick work
and repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing
MH sheet cover, removing the debris from MH and carting the same as directed.
(A) up to 0.15 mt. (@ Two Coarse)
(B) up to 0.35mt. (@ Four Coarse)
(C) up to 0.65 mt. (@ Seven Coarse)
(D) up to 0.90 mt. (@ Ten Coarse )
Repairing damaged M.H. and rasing M.H. up to road level incl. removing damaged brick work and
repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing MH
sheet cover, removing the debris from MH and carting the same as directed. Also
The M/s shall be on No. basis.
Item No : 19 Repairing damaged I.C./ Raising removing damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing chamber sheet cover,
removing the debris from chamber and carting the same as directed.
Repairing damaged I.C./ Raising removing damaged brick work and repairing by brick masonry in
C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing chamber sheet cover, removing the
debris from chamber and carting the same as directed.
The M/s shall be on No. basis.
Item No : 20 Providing F.R.C. MH seat cover incl. carting to the work site etc. comp. Directed.
F.R.C. Extra Heavy Duty (EHD-35) Manhole Covers & Frames Cover : 728mm ø & 100 mm thick
circular cover, 35.00 MT load design, 100x2mm MS flat allround, 16mm ø plain round bar for lifting
the cover & should be fitted with plastic cups. Frame : 560 mm ø clear opening, outer size-
888x888x175 mm. On the upper periphery of frame 25 x 3 mm wide MS flat should be well embed
in concrete to protect the edges of frame. FRC E.H.D.-35 manhole cover & frame described as
F.R.C. Heavy Duty [HD-20] Machinehole Covers - 560 mm ø clear opening, The dimension of frame
and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
F.R.C. Medium Duty [MD-10] Machinehole Covers - 560mm ø clear opening, The dimension of
frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table 1..
F.R.C. Medium Duty [MD-10] Chamber Covers & Frame- 600 x 450 mm clear opening, The
dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
F.R.C. Light Duty [LD-2.5] Machinehole Covers & Frames-560mm ø clear opening, The dimension of
frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
Providing and Supplying Fiber reinforced concrete circular cover of following dia,thickness and Load
design, with minimum concrete grade M30 and minimum cement content shall be 360 kg / m3, with
maximum water cement ratio of 0.45, minimum reinforcement shall be 70 kg/cmt of bars or with
welded wire mesh, The minimum volume of fibers shall be 0.5 % of the volume of the concrete.
equivalent dia of fiber shall not be greater than 0.75 mm, the length to eq.dia ratio of fiber shall be in
Signature of Bidder Page 18 of
Ahmedabad Municipal Corporation
range of 50 to 80, 2mm th M.S. flat of full thickness around periphery of cover shall be provided, for
lifting arrangement 16 or 12 mm dia plain bar should be fitted with G.I. or plastic cup as per load
design incl. loading carting unloading stacking etc. complete as per IS 12592 & as directed. Other
specification is same as per AMC central store latest circuler.
The design load is as per mentione in the items.
The M/s shall be on NO basis.
Item No : 21 Carting and Fixing M.H., Chamber or Catchpite Seat and Cover in line and level to match
exisisting road level in C.C. 1:2:4 and finishing smooth, watering and protecting for 7 days etc.
complete as directed. M.H. seat cover will be supplied byA.M.C.
Carting and Fixing M.H., Chamber or Catchpite Seat and Cover in line and level to match exisisting
road level in C.C. 1:2:4 and finishing smooth, watering and protecting for 7 days etc. complete as
directed. M.H. seat cover will be supplied byA.M.C.(from any store).
The M/s shall be on No. basis.
Item No : 22 Providing Kachha of Pakka Dummy in the following dia pipes and removing the same after
completion of the connection work as directed. (GWSSB SOR 2022-23)
300 MM dia. And below sewer line
400 to 500 mm dia. Sewer line
600 to 700 mm dia. Sewer line
Temporary/ permanent plugging and blocking of sewer line, branch connections and diversion of
flows anremoval of all plugs, etc. The plugging in the line is temporary or permenent is desided by the
engineer incharge. And that plugging will be removed by agency as and when ask by the engineer
incharge. No extra cost for removing of plugging will given.
Item No : 23 Providing Dead Cantering using good quality Country Wood Planks, wall Plate of required
thickness and size including placing the nece. supports of reqd. size, nailing, fixing with mortar,
levelling. All specification for dead centring as per standard engg. practice etc. comp. as directed.
Providing Dead Cantering using good quality Country Wood Planks,
wall Plate of required thickness and size including placing the nece. supports of reqd. size, nailing,
fixing with mortar, levelling. All specification for dead centring as per standard engg. practice etc.
comp. as directed.
The M/s shall be on Smt. basis.
Item No : 24 Supplying, labour for break down repairing work for activities like excavation, disliting,
removing debris from trench back filling etc. comp. as directed by Eng.in charge.(Building SOR
2023-24,(Basic rates for Labour work))
Labour charges - Mazdoor (Male) (Sr. No. 1051 Code L-22, Page No.39)
Labour charges - Mazdoor (Fe-Male) (Sr. No. 1050 Code L-21, Page No.39)
Labour charges - Supervision for Machinery (Sr. No. 1058 Code L-29, Page No.39)
Providing Labour for Mice. Work for Breakdown work releted job including required tools
etc.comp.Work with available equipment for breakdown type of work. No extra cost will be given for
the equpement used by the labour for the work.
The M/s shall be on No basis.
Item No : 25 Barricading the entire break down or excavated area on rental basis using wooden ballies /
M.S.angles at max. 2.00 meter centre to centre, C.G.I. Sheet, reflective paint / Board out side to
avoid accident & for smooth traffic diversion & movement including cautionary board etc. Item also
Signature of Bidder Page 19 of
Ahmedabad Municipal Corporation
includes for making temporary sufficient nos of lighting arrangement through out the work with
necessary required arrangement. The same shall be removed after completion of work. (Only for
break down work from start to complete) (Based on Drainage SOR 2015-16)
For detailed specification refer5th revision of MORTH (2013) & also amendment shall be applicable to
the latest versions.
The M/s shall be on SMT basis.
Item No : 26 Providing TMT Bar FE415 reinforcement for R.C.C. work including bending, binding and
placing in position complete upto floor two level (upto 10 ton)
For detailed specification refer R & B Department booklet for General Technical Specification for
building works.
M/s. shall be on Kgs basis.
Item No : 27 Brick work using common burnt clay building bricks having crushing strength not less than
35kg./Sq.Cm. In foundation and plinth in Cement Mortar 1:5.(1-Cement: 5 -fine sand)(B)
Foundation Masonary: Providing and laying Brick work using common burnt clay building
bricks having crushing strength not less than 35 kg/Sq. cm. in foundations and plinth in
cement mortar 1: 6 (1 cement : 6 fine sand). This includes pointing, curing, scaffolding, etc.
complete Materials: Water shall conform to M-1 Cement shall conform to M-3 Sand shall
conform to M-6. Brick shall conform to M-15 Cement mortar shall conform to M-11.
Workmanship: Proportion: The proportion of the cement mortar shall be 1:6 (1 cement :
fine sand) by volume. Wetting of bricks: The bricks required for masonry shall be thoroughly
wetted with clean water for about two hours before use or as directed. The cessation of
bubbles, when the bricks are wetted with water is an indication of through wetting of bricks.
Laying: Bricks shall be laid in English bond unless directed otherwise. Half or cut bricks shall
not be used except when necessary to complete to bond; closer in such case shall be cut to
required size and used near the ends of walls. A layer of mortar shall be spread on full width
for suitable length of the lower course. Each brick shall first be properly bedded and set
home by gently tapping with handle of trowel or wooden mallet. It side face shall be flushed
with mortar before the next brick is laid and pressed against it. On copletion of course, the
vertical joints shall be fully filled form the top with mortar. The walls shall be taken up truly in
plumb. All courses shall be laid truly horizontal and all vertical joint shall be truly vertical.
Vertical joints in alternate course shall generally be directly one over the other. The thickness
of brick course shall be kept uniform. The brick shall be laid with frog upwards. A set of tools
comprising of wooden straight edges, mason’s sprit level, square half meter rub, and pins,
string and plumb shall be kept on the site of work for frequent checking during the progress
of work. Both the faces of walls of thickness greater than 23 cms shall be kept in proper
place. All the connected brick work shall be kept not more than one meter over the rest of
the work. Where this is not possible, the work shall be raked back according to bond (and not
left toothed) at an angle not steeper than 45 degrees. All fixtures, pipes, outlets of water,
hold fasts of doors and windows etc. which are required to be built in wall shall be embedded
in cement mortar. Joints: Bricks shall be so laid that all joints are quite flush with mortar.
Thickness of joins shall not exceed 12 mm. The face joints shall be raked out as directed by
taking tools daily during the progress of work, when the mortar is still green so as to provide
key for plaster or pointing to done. The face of brick shall be cleaned the very day on which
the brick work is laid and all mortar dropping removed. Curing Green work shall be protected
from rain suitably. Masonry work shall be kept moist on all the faces for a period seven days.
The top of masonry work shall be kept well wetted at the closeof the day Preparation of
foundation bed: If the foundation is to be laid directly on the excavated bed, the bed shall be
leveled, cleared of all loose materials, cleaned and wetted before starting masonry. If
Signature of Bidder Page 20 of
Ahmedabad Municipal Corporation
masonry is to be laid on concrete footing, the top of concrete shall be cleaned and
moistened. The contractor shall obtain the engineer'’ approval for the foundation bed, before
foundation masonry is started. When puccas flooring is to be provided flush with the top to
plinth, the inside plinth offset hall be kept lower than the outside plinth top by the thickness
of the flooring. Mode of measurements and payment: 70 | P a g e The measurements of this
item shall be taken for the brick masonry fully completed in foundation up to plinth. The
limiting dimensions not exceeding those shown on the plans or as directed shall be final.
Battered, tapered and curved portions shall be measured net. No deduction shall be made
from the quantity of brick work nor any extra payment made for embedding in masonry or
making holes in respect of following items: (1) Ends of joints, beams, posts, girders, rafters,
purlins, trusses, corbel steps etc. where cross sectional area does not exceed 500 Sq. cm. (2)
Opening not exceeding 1000 Sq. cm. (3) Wall plates and bed plates, bearing of slabs, chhajas
an the like whose thickness does not exceed 10 Cms. and the bearing does not extend to the
full thickness of wall. (4) Drainage holes, and recesses for cement concrete blocks to embed
hold fasts for doors, windows etc. (5) Iron fixtures, pipes up to 300 mm dia hold fasts and
doors and windows built into masonry and pipes etc. for concealed wiring. (6) Forming
chases of section not exceeding 350 Sq. Cm. in masonry. Apertures for fire places shall not be
deducted nor shall extra labour required to make splaying of jambs, throating and making
Arches over the aperture be paid for separately. The rate shall be for a unit of one cubic
meter. Above Plinth Masonary: Providing and laying Brick work using common burnt clay
building bricks having crushing strength not less than 35 kg/Sq. cm. in cement mortar 1: 6 (1
cement : 6 fine sand) for superstructure upto floor three level height. This includes pointing,
curing, necessary scaffolding, tools, etc. complete. Materials: Bricks shall conform to M-15.
Cement mortar shall conform M-11. Workmanship: The relevant specifications of item No.
shall be followed except that the masonry work shall be carried out above plinth level to floor
two level i.e. for ground floor. The frames of doors, windows, cupboards, etc. shall be housed
into the brick work at the correct location and level as directed. The heavy steel doors,
window frames etc. shall be built in with brick work but for ordinary steel doors and windows
required opening for frames, hold fasts etc. shall be left in the wall and frames embedded
later on in order to avoid damage to the frames. Necessary scaffolding shall be provided. The
supports of the scaffolding shall be sound and strong tied together with horizontal pieces
over which the scaffolding planks shall be fixed. Simple scaffolding shall be allowed normally.
In this case scaffolding hole shall rest in hold header horizontal coarse only. Minimum
number of holes shall be left in brick work for supporting horizontal scaffolding holes. The
contractor is responsible for providing and maintaining sufficiently strong scaffolding so as to
withstand all loads likely to come upon it. For the face of brick work where plastering is to be
done joints shall be racked out to a depth not less than thickness of joints. The face of brick
work shall be cleaned and mortar dropping removed on very same day that brick work is laid.
Mode of measurement: The masonry work of G. F. i.e. above plinth level to floor two level
shall be measured and paid under this item. 71 | P a g e Brick work in parapet shall be
included in the corresponding masonry item of store immediately below the floor above
which the parapet is built. No deduction shall be made from quantity of brick work. No extra
payment shall be made for embedding in masonry or making holes in respect of following
items: The rate shall be for a unit of one cubic meter Half Brick Masonary: Providing and
laying brick partition wall of 11.50 cms thick with good quality bricks of the strength not less
than 35 Kg / Sq. c.m. kiln burnt bricks laid in C.M. 1:4 ( 1 Cement and 4 Coarse sand) including
providing 5 cms thick cement concrete bed 1:3:6 ( 1 Cement : 3 Sand : 6 Grit size 6 mm to
mm) after every 8 layers of bricks including racking out the joints , scaffolding, staging curing,
etc. complete as per the standard specifications in true line, level and plumb for super
Signature of Bidder Page 21 of
Ahmedabad Municipal Corporation
structure at any height and level. This includes pointing, curing, necessary scaffolding, tools
etc. complete. Materials: Brick shall conform to M-15. Water shall conform to M-1. Cement
shall conform to M 3. Sand shall conform to M-6. Cement mortar shall conform to M-11.
Workmanship: Relevant specifications of bricks, wetting and laying of bricks, joints, curing
etc. shall conform to item No 13 except the brick work of half bricks shall be carried out.
Cement mortar used in masonry work shall be in proportion of 1 part of cement and 4 part of
sand by volume. All bricks shall be laid strecher wise, breaking joints with those in the upper
and lower courses. The wall shall be taken truly plumb. All courses shall be laid truly
horizontal and all vertical joints shall be truly vertical. The bricks shall be laid with frogs
upwards. A set of masons tools shall be maintained on work as required for frequent
checking. Mode of measurement and payment: The half brick masonry work in foundation
and plinth shall be measured under this item, the limiting dimensions shall not exceed those
shown in the plan or as directed. Any work done extra over the specified dimensions shall be
ignored. The relevant specifications of item No. 6.12 shall be followed. The length shall be
measured nearest to one Cm. The rate shall be for a unit of Sq. Mt.
M/s. shall be on CMT basis.
Item No : 28 Providing15mm thick cement plaster in single coat on Rough (Similar) side of single or half
brickwalls for interior plastering upto floor two level and finished even and smooth in (i) Cement
mortar 1:3 (1-cement:3-sand)
For detailed specification refer R & B Department booklet for General Technical Specification
for building works. Plaster thickness is 15mm.
M/s. shall be on SMT basis.
Item No : 29 Constructing Bombay Pattern Type Catch Pit of size 0.60 x 0.60 depth up to 1 mt including
excavation, B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the prop. of CM (1:6) with 40 mm
thick IPS flooring in the prop M15 at bottom and 15 mm thick cement plaster inside the catch pit in
the proportion of CM (1:3) with out jali etc. comp. as directed.
Constructing Bombay Pattern Type Catch Pit of size 0.60 x 0.60 depth up to 1 mt including excavation,
B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the prop. of CM (1:6) with 40 mm thick IPS flooring
in the prop M15 at bottom and 15 mm thick cement plaster inside the catch pit in the proportion of
CM (1:3) with out jali etc. comp. as directed.
M/s. shall be on No basis.
Item No : 30 CatchPit Jali (Heavy duty) Fixing P/F FRC catch pit jali with frame 600mm x 600mm clear
opening etc. comp.. As directed by engineer in charge.
CatchPit Jali (Heavy duty) Fixing P/F FRC catch pit jali with frame 600mm x 600mm clear opening etc.
comp.. The cover and frame both are in heavy duty. No extra cost for the fitting of frame and cover
and carting and lifting will given.
M/s. shall be on No basis.
Item No : 31 Providing, laying and jointing in true line and level UPVC pipe (SCH-40) of following dia.
Including fittings of standard make as approved by Engineer-in-charge. (Building SOR 2023-24, Item
Providing, laying and jointing in true line and level UPVC pipe (SCH-40) of following dia.
Including fittings of standard make as approved by Engineer-in-charge. The pipe is strong and this is
for the small connection work during drainage work. All bend and other solution for the connection of
pipe is include in the cost.
M/s. shall be on Rmt basis.
Signature of Bidder Page 22 of
Ahmedabad Municipal Corporation
Item No : 32 Dismentaling tiled of stone floors laid in mortar including stacking of serviceable materilas
and disposal of unserviceable materials with all lead and lift.
(Based on Building SOR 2023-24, Item No 20005,Page No:- 140)
Dismentaling tiled of stone floors laid in mortar including stacking of serviceable materilas
and disposal of unserviceable materials with all lead and lift.
Rate included with labour and excess disposal machinary used for the same.
M/s. shall be on Smt basis.
Item No : 33 Providing & Supplying Hitachi Machine -110 capacity on rental basis in case of emergency
situation and break down type work & also during unavoidable condition as per instruction of
engg.incharge , rate includes all nece. shifting, fuel and operating charges . (No payment should be
allowed for non working condition of machinery ) (Based on central work shop rate)
Unit shall be in Hour basis.
Item No : 34 Providing & Supplying Hitachi Machine -200 capacity on rental basis in case of emergency
situation and break down type work & also during unavoidable condition as per instruction of
engg.incharge , rate includes all nece. shifting, fuel and operating charges. (No payment should be
allowed for non working condition of machinery ) (Based on central work shop rate)
Unit shall be in Hour basis.
Item No : 35 Providing & Supplying hydra carne Machine of 12 tone capacity on rental basis in case of
emergency situation and break down type work & also during unavoidable condition as per
instruction of engg.incharge , rate includes all nece. shifting, fuel and operating charges . (No
payment should be allowed for non working condition of machinery) (Based on central work shop
Unit shall be in Hour basis.
Item No : 36 Supplying electric breaker machine for RCC slab or asphalt demolishing work on site by using
operator, fuel, power supply etc.complete as directed. (no payment should be allowed for
non working condition of machinery and for pipe line excavation and M.H. work. Allowed
only for break down work)
(Based on Previously approved rate by CE sir )
Unit shall be in Shift basis.
Item No : 37 Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing Work on site by
using Operator, fuel, power Supply etc. Complete as Directed. (No payment should be
allowed for non working condition of machinery and for pipe line excavation and M.H. work.
Allowed only for break down work) (Based on Previously approved rate by C E sir )
Unit shall be in Shift basis.
Item No : 38 Hiring of tractor with trolley considering 8 Hrs. as working day hours incl.Driver (GWSSB SOR
Hiring of tractor with trolley considering 8 Hrs. as working day hours incl.Driver
Item No : 39 Hiring of Three wheeler carrier (Chakado/Rixa) considering 10 Hrs. as working day hours
incl.Driver (GWSSB SOR 2021-22)
Hiring of Three wheeler carrier (Chakado/Rixa) considering 10 Hrs. as working day hours
incl.Driver (GWSSB SOR 2021-22)
Item No. 40 Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm thick, M-35 Grade of any
size ; shape (Usually Uni-Paver Blocks) using black trap good quality aggragate of 20 mm nominal size
Signature of Bidder Page 23 of
Ahmedabad Municipal Corporation
for footpath, parking areas, service lanes and other areas as mentioned in the
drawing/instruction of engineer in charge. Cost includes formworks using rubber mould, Rate
providing and laying paver blocks as per required grading and specification. The paver block shall be
mechanically compacted. The work of paving blocks shall be executed in line and level by skill
mason of flooring work only. It should be laid in such a way that the no cutting of the paver block to be
necessary. if cutting of paver block necessary then it should be cut by machine only and carting. The
finished surface of the paver block shall have resonably good, plain finished. Paver blocks shall be
compacted and shall be relaid if necessary. Gravel or such type of materials shall not be allowed for
production. Laying on 5cms thick sand beddding.
The scope of work includes manufacturing, supplying and laying of precast paver blocks at various Retail
outlets. The work includes :Verification of the existing site condition and advising our project in charge to
lay suitable base course if required.
Contractors are required to satisfy themselves with quality of sub grade, sub -base course before the
paver blocks are laid and suggest strengthening if required.
Clearing the site by removing all obstacles such as stones, debris etc. for laying of paver
blocks.Manufacturing of paver blocks in your plant as per requirements in technical specification
enclosed.Supplying of paver blocks at site, including handling at both ends.
Laying of paver blocks at site as per requirement in technical specification, within shortest possible time
the site is public place hence care should be taken to ensure that the routine activities shall not be
disturbed. The job of laying may required to be carried out during night also.
Testing of paver blocks through reputed Govt./Non Govt. Test house and submission of test results as per
requirements in Technical Specifications. AMC reserves the right to carryout test at random. Cost for
such tests to be borne by party.The contractor shall guarantee that all material and components
designed, fabricated, supplied and laid by him shall be free from any type of defect due to faulty material
and/or workmanship/erection for a period of One year from the date of completion of work. However,
the contractor One years shall render free mintenance.
I) Paver Block Manufacturing Facilities :
The Paver Block shall be made in factory with following minimum facilities :
1.1 Concrete Block making Machines :
The machine should be capable of producing high quality Paver Blocks by obtaining high level of
compaction by application of hydraulic compaction and also by high intensity vibration to the moulds.
The machine should have automatic control panel for uniformity in strength.
1.2 Concrete Batching & Mixing Plant : (Not essential)
The concrete Mix Design should be followed for each batch of materials. The concrete ingredient should
be mixed in concrete Batching & Mixing plant with minimum capacity of 30 cum/hour. The plant should
equipped with automatic control panel for maintaining water cement ratio from batch to batch to obtain
concrete of uniform quality and strength.
The plant should be equipped with adequate mechanism for mechanized loading of raw materials into
mixer and conveyor belt for transportation of concrete from mixer to concrete block making machine to
maintain quality of wet cement.
The factory should have well designed curing area to ensure adequate curing of paver blocks.
1.4 Laboratory (Desirable but not essential) :
The factory should have the following:
Compression testing machine of adequate capacity.
Other tools and equipment for testing raw materials and paver blocks.
Signature of Bidder Page 24 of
Ahmedabad Municipal Corporation
(1). Systematic record of test results of various paver blocks manufactured in the factory.
(2). Concrete Mix Design for various grade of concrete used for making of paver blocks.
II) SPECIFICATIONS FOR COLOURED PAVER BLOCKS :
Coloured concrete paver blocks shall be manufactured as per attached specifications using approved
colour Pigment of “BAYER” Make “BAYFERROX IRONOXIDE PIGMENTS” with minimum colour pigment of
3% by weight of cement. The colour shade shall be “RED” as selected by AMC before commencement of
the work. White cement shall be used for colored pavers to obtain the desired colour shade. The job also
includes providing 50 mm thick sand bedding to match the shade of the paver block.
The colour of the paver block shall be guaranteed against fading of colour for period of 12 months from
the date of laying of the same at site.
All other technical specifications & Procedure for testing, laying & sampling of coloured pavers will be as
per attachment.
III) PAVERS BLOCK CHARACTERISTICS :
The concrete pavers should have perpendicularities after release from the mould and the same should be
retained until the laying.
The surface should be reasonably smooth and of anti skid and anti glare type.
The paver should have uniform chamfers to facilitate easy drainage surface run off.
The pavers should have uniform interlocking space of 2mm to 3mm to ensure compacted sand filling
after vibration on the paver S urface.
The concrete mix design should be followed for each batch of materials separately and automatic
batching plant is to be used to achieve uniformity in strength and quality.
The pavers shall be manufactured in single layer only.
Skilled labour should be employed for laying blocks to ensure line and level of laying, desired shape of
the surface and adequate compaction of the sand in the joints.
The pavers shall be of cement gray colour without any pigment & for coloured pavers refer
“specifications for coloured pavers.”
The pavers are to be skirted all round with kerbing using solid concrete blocks of size 150mm X 250mm X
380mm. The kerbing should be embedded for 100mm depth. The concrete used for kerbing shall be
cured properly for 7 days minimum.
IV) Paver Block Dimensions :
Thickness 60mm Shape Unirregular (Uniform Shape with no Hollow Or Cracks) Uni, I shape, tri hex or
directed by Addl .C.E.
Chamfer 4mm to 6mm along top edges Colour Natural cement grey colour without use of any pigment.
For coloured pavers refer “specifications for coloured pavers”
(+/-) 2mm for length & width,
(+/-) 3mm for Height (Thickness)
V) Testing of Paver Blocks :
(Average of Minimum
Five Samples/Site)
1. Compressive Strength Min. 35 N/Sqmm for 60mm
2. Flexural Strength Minimum 4.5 N/Sqmm
3. Abrasion Resistance Maximum
4. Water Absorption Maximum 5.80%
Signature of Bidder Page 25 of
Ahmedabad Municipal Corporation
5. Minimum Cement Content 380 Kg/Cum (Not Essential)
* Sampling and Testing procedure as per enclosed specifications
SAMPLING AND TESTING PROCEDURES FOR PAVER BLOCKS.
INTERNAL – Average of minimum 3 samples per 5000 Blocks.
Essential – Minimum 2 Blocks per 10000 bocks..
1. Sampling For Testing
Sampling for testing of paver blocks shall be done in accordance with Appendix-A.
Compressive Strength
Testing for compressive strength shall be undertaken in accordance with Appendix-B.
The average compressive strength of the bocks tested shall be Min. 35 N/Sqmm.
Abrasion Resistance
Testing for abrasion shall be in accordance with IS 1237 (Specifications for Cement
Concrete Floor Tiles) – Appendix C.
Flexural Strength
Testing for flexural shall be n accordance with IS 1237 (Specifications for Cement
Concrete Floor Tiles) – Appendix D.
Water Absorption
Testing for water absorption shall be in accordance with IS 2185:1979 : Part I
(Specifications for Concrete Masonry Units) – Appendix E.
Sampling of Paver blocks.
Method of sampling :
Before laying paver blocks, each designated section comprising not more than
blocks, shall be divided into ten approximately equal groups. Three blocks shall be drawn
from each group.
Marking and identification :
All samples shall be clearly marked at the time of sampling in such a way that the
designated section of part thereof, and the consignment represented by the sample, are
clearly defined.
The sample shall be dispatched to the approved test laboratory taking precaution to avoid
damage to the paving in transit. Protect the paving from damage and contamination until
they have been tested. The testing shall be carried as soon as possible, after the sample
has been taken. As soon as practicable after sampling. The samples shall be stored in
water at 20 degree C ± 5 degree C for 24 hours prior to testing.
The mode of measurement shall be on Smt. basis.
Item No : 41 Providing and laying cement concrete 1:5:10 (1- Cement : 5- fine sand : 10- graded brick bat
aggregates 40mm nominal size) and curing complete excluding cost of formwork in (A)
Foundation and Plinth
(Building SOR 2023-24 Item Code No. 05009A , as per NBO Item No. 5.8.3; Page no. 56)
1.0 Materials: Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6, Grit
shall conform to M-8 Graded stone aggregate 20 mm nominal size shall conform to M-12.
2.1 The concrete mix is not required to be designed by preliminary tests. The proportion of the concrete
mix shall be 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 10 mm nominal size) by
volume. Concrete work shall have exposed concrete surface or as specified in the item.
2.2 The designation ordinary M-100, M-150, M-200, M-250 specified as per I.S Correspond
approximately to 1:3:6, 1:2:4, 1 1/2 :3 and 1:1:2 nominal mix of ordinary concrete by volume
Signature of Bidder Page 26 of
Ahmedabad Municipal Corporation
2.3 The ingredients required for ordinary concrete containing one beg of cement of 50 Kg. by weight
(0.0342 Cu. M) for different proportions of mix shall be as under:-
Grade of Total quantity of dry Proportion of fine Quantity of
concrete aggregate by volume per 50 aggregate to coarse water per
Kgs, of cement to be taken as aggregate 50 Kgs. of
the sum of individual volume cement
of fine and coarse maximum.
aggregates, maximum
M-100 (1:3:6) 300 Liters Generally 1:2 for fine 34 Liters
aggregate by volume
M-150 (1:2:4) 220 ” but subject to and upper 32 “
limit of 1:1/2 and lower
2.5 The water cement ratios shall not more than those specified in the above table. The cement content
of the mix specified in the Table shall be increased if the quantity of water in a mix has to be
increased to overcome the difficulties of placement and compaction so that the water cement ratio
specified in the Table is not exceeded.
2.6 Work ability of the concrete shall be controlled by maintaining a water cement ratio that is bound to
give a concrete mix which is just sufficiently wet to be placed and compacted without difficulty with
the means available.
2.7 the maximum size of coarse aggregate shall be as large as possible within the limits specified but in no
case greater than surround all reinforcement thoroughly and to fill the corners of the form.
2.8 For reinforced concrete work, coarse aggregates having a nominal size of 20mm are generally
considered satisfactory.
2.9 For heavily reinforced concrete members as in the case of ribs of main beams the nominal maximum
size of coarse aggregate should usually be restricted to 5 mm less than the minimum clear distance
between the main bars, or 5 mm less than the minimum cover to the reinforcement whichever is
2.10 Where the reinforcement is widely spaced as in solid slabs, limitations of size of the aggregate may
not be important and the nominal maximum size may sometimes be as greater than the minimum
2.11 Admixture may used in concrete only with approval of Engineer-in-charge based upon the evidence
that with the passage of time, neither the compressive strength of concrete is reduced nor are other
requisite qualities of concrete and steel impaired by the use of such admixtures.
3.0 Workmanship:
3.1 Proportioning: Proportioning shall be done by volume, except cement which shall be measured in
terms of bags of 50 Kg. weight. The volume of one such bag being taken as 0.0342 Cu. Meter. Boxes of
suitable sizes shall be used for measuring sand aggregate. The size of the boxes (internal) shall be
cms x 25 cms. and 40 cms deep. White measuring the aggregate and sand, the box shall be filled
without shaking ramming or hammering. The proportioning of sand shall be on the basis of its dry
volume and in case of damp sand, allowances for bulkage shall be made.
3.2.1 For all work, concrete shall be mixed in a mechanical mixer which along with other accessories shall
be kept in first class working condition and so maintained throughout the construction. Measured
quantity of aggregate, sand, cement required for each batch shall be poured into the drum of the
mechanical mixer while it is continuously running. After about half a minute of dry mixing, measured
Signature of Bidder Page 27 of
Ahmedabad Municipal Corporation
quantity of water required for each batch of concrete mix shall be added gradually and mixing
continued for another one and half a minute. Mixing shall be continued till materials are uniformly
distributed and uniform color of the entire mass is obtained and each individual particle of the coarse
aggregate shows complete coating of mortar containing its proportionate amount of cement. In no
case shall the mixing be done for less than 2 minutes after all ingredients have been put into the
3.2.2 When hand mixing is permitted by the Engineer-in-charge for small jobs or for certain other reasons,
it shall be done on the smooth watertight platform large enough to allow efficient turning over the
ingredients of concrete before and after adding water. Mixing platform shall be so arranged that no
foreign material gets mixed with concrete nor does the mixing water flow out. Cement in required
number of bags shall be placed in a uniform layer on top of the measured quantity of fine and coarse
aggregate, which shall also be spread in a layer of uniform thickness on the mixing platform. Dry
coarse and fine aggregate and cement shall then be mixed thoroughly by turning over to get a
mixture to uniform color. Specified quantity of water shall then be added gradually through a rose-
can and the mass turned over till a mix of required consistency is obtained. In hand mixing quantity of
cement shall be increased by 10 percent above that specified.
3.2.3 Mixers which have been out of use for more than 30 minutes shall be thoroughly cleaned before
putting in a new batch. Unless otherwise agreed to by the Engineer-in-charge the first batch of
concrete from the mixture shall contain only two thirds of normal quantity of coarse aggregate.
Mixing plant shall be thoroughly cleaned before changing from one type of cement to another.
3.3 Consistency :
3.3.1 The degree of consistency which shall depend upon the nature of the work and methods of vibration
of concrete, shall be determined by regular slump tests in accordance with I.S. 1199-1959. The slump
of 10mm to 25mm. shall be adopted when vibrators are used and 80mm when vibrators are not used.
3.4 Inspection:
3.4.1 Contractor shall give the Engineer-in-charge due notice before placing any concrete in the forms to
permit him to inspect and accept the false work and forms as to their strength, alignment, and
general fitness but such inspection shall not relieve the contractor of his responsibility for the safety
of men, machinery, materials and for results obtained. Immediately before concreting, all forms shall
be thoroughly cleaned.
3.4.2 Centering design and its erection shall be got approved from the Engineer-in-charge. One carpenter
with helper shall invariably be kept present throughout the period of concreting. Movement of labour
and other persons shall be totally prohibited for reinforcement laid in position. for access to different
parts, suitable mobile platforms shall be provided so that steel reinforcement in position is not
disturbed. For ensuring proper cover, mortar blocks of suitable size shall be provided so that steel
reinforcement in position is not disturbed. For ensuring proper cover, mortar blocks of suitable size
shall be cast and tied to the reinforcement. Timber kapachi or metal pieces shall not be used for this
3.5 Transporting and laying:
3.5.1 The method of transporting and placing concrete shall be as approved. Concrete shall be so
transported and placed that no contemination, segregation or loss of its constituent material takes
All form wok shall be cleaned and made free from standing water, dust, show or ice immediately
before placing of concrete.
No concrete shall be placed in any part of the structure until the approval of the Engineer-in-charge
has been obtained.
3.5.2 Concreting shall proceed continuously over the area between construction joints. Fresh concrete shall
not be placed against concrete which has been in position for more than 30 minutes unless a proper
construction joint is formed. Concrete shall compacted in its final position within 30 minutes of its
discharge from the mixer. Except where otherwise agreed to by the Engineer-in-charge concrete shall
Signature of Bidder Page 28 of
Ahmedabad Municipal Corporation
be deposited n horizontal layers to a compacted depth of not more than 0.45 meter when internal
vibrators are used and not exceeding 0.30 meter in all other cases.
3.5.3 Unless otherwise agreed to by the Engineer-in-charge, concrete shall not be dropped into place from
a height exceeding 2 meters. When trunking or chutes are used they shall be kept close and used in
such a way as to avoid segregation. When concreting has to be resumed on a surface which has
hardened, it shall be roughened, swept clean, thoroughly wetted and covered with a 13 mm thick
layer of mortar composed of cement and sand in the same ratio as in the concrete mix itself. This
mm layer of mortar shall be freshly mixed and placed immediately before placing of new concrete.
Where concrete has not fully hardened, all laitance shall be removed by scrubbing the wet surface
with wire or bristle brushes, care being taken to avoid dislodgment of any particles of coarse
aggregate. The surface shall then be thoroughly wetted, all free water removed and then coated with
neat cement grout. The first layer of concrete to be placed on this surface shall not exceed 150 mm in
thickness and shall be well rammed against old work particular attention being given to corners and
3.5.4 All concrete shall be compacted to produce a dense homogeneous mass with the assistance of
vibrators, unless, otherwise permitted by the Engineer-in-charge for exceptional cases, such as
concreting under water, where vibrators cannot be used. Sufficient vibrators in serviceable condition
shall be kept at site so that spare equipment is always available in the event of breakdowns.
Concrete shall be judged to be compacted when the mortar fills the spaces between the coarse
aggregate and begins to cream up to form an even surface. Compaction shall be completed before
the initial setting starts i.e. within 30 minutes of addition of water to dry mixture. During compaction,
it shall be observed that needle vibrators are not applied on reinforcement which is likely to destroy
the bond between concrete and reinforcement.
3.6 Curing: Immediately after compaction, concrete shall be protected from weather including rain,
running water, shocks, vibration, traffic, rapid temperature changes, frost and drying out process. It
shall be covered with wet sacking, hassain or other similar absorbant material approved, soon after
the initial set and shall be kept continuously wet for a period of not less than 14 days from the date of
placement. Masonary work over foundation concrete may be started after 48 hours of its laying but
curing of concrete shall be continued for a minimum period of 14 days.
3.7 Sampling and Testing of concrete:
3.7.1 Samples from fresh concrete shall be taken as per I.S. 1199-1959 and cubes shall be made, cured and
tested at 7 days or 28 days as per requirements in accordance with I.S. 516-1959. A random sampling
procedure shall be adopted to ensure that each concrete batch shall have a reasonable chance of
being tested i.e. the sampling should be spread over the entire period of concreting and cover all
mixing units. The minimum frequency of sampling of concrete of each grade shall be in accordance
with following:
Quantity of concrete No. of Quantity of concrete in the No. of samples
in the work samples works
51 and above 4+ one additional for each additional 50 M. or part thereof.
NOTE : At least one sample shall be taken from each shift. Ten test specimens shall be made from each
sample, five for testing at 7 days and the remaining five at 28 days. The samples of concrete shall be
taken on each day of the concreting as per above frequency. The number of specimens may be
suitably increased as deemed necessary by the Engineer-in-charge when procedure of tests given
above reveals a poor quality of concrete and in other special cases.
3.7.2 The average strength of the group of cubes cast for each day shall not be less than the specified cube
strength of 150 Kg/Cm2 at 28 days. 20% of the cubes cast for each day may have value less than the
specified strength provided the lowest value is not less than 85% of the specified strength. If the
concrete made in accordance with the proportions given for a particular grade, does not yield the
Signature of Bidder Page 29 of
Ahmedabad Municipal Corporation
specified strength; such concrete shall be classified as belonging to the appropriate lower grade.
Concrete made in accordance with the proportions given for a particular grade shall not, however, be
placed in a higher grade on the ground that the test strength are higher than the minimum specified.
3.8.1 The Engineer-in-charge shall be informed in advance by the contractor of his intention to strike the
form work. While fixing the time for removal of form work, due consideration shall be given to local
conditions, character for the structure, the weather and other condition that influence the setting of
concrete and of the materials used in the mix. In normal circumstances (generally where
temperatures are above 200 C) and where ordinary concrete is used, forms may be struck after expiry
of periods specified in item No 9.1(A) for respective item of form work.
3.8.2 All form work shall be removed without causing any shock or vibration as would damage the
concrete. Before the soffit and struts are removed, the concrete surface shall be exposed, where
necessary in order to ascertain that the concrete has sufficiently hardened. Centering shall be
gradually and uniformly lowered in such manner as to permit the concrete to take stresses due to its
own weight uniformly and gradually. Where internal metal ties are permitted, the or their removable
parts shall be extracted without causing any damage to the concrete and remaining holes filled with
mortar. No permanently embedded metal part shall have less than 25 mm cover to the finished
concrete surface. Where it is intended to re-use the form work, it shall be cleaned and made good to
the satisfaction of the Engineer-in-charge. After removal of form work and shuttering, the Executive
Engineer shall inspect the work and satisfy by random checks that concrete produced is of good
3.8.3 Immediately after the removal of forms, all exposed bolts etc., passing through the cement concrete
member and used for shuttering or any other purpose shall be cut inside the cement concrete
member to a depth of at least 25 mm below the surface of the concrete and the resulting holes be
filled by cement mortar. All fine caused by form joints, all cavities produced by the removal of form
ties and all other holes and depressions honeycomb spots, broken edges or corners and other defects
shall be thoroughly cleaned, saturated with water and carefully pointed and rendered true with
mortar of cement and fine aggregate mixed in the proportions used in the grade of concrete that is
being finished and of as dry consistency as is possible to use. Considerable pressure shall be applied in
filling and pointing to ensure thorough filling in all voids. Surfaces which are pointed shall be kept
most for a period of 25 hours.
If rock pockets/honeycombs in the opinion of the Engineer-in-charge are of such an extent or
character as to effect the strength of the structure materially or to endanger the life of the steel
reinforcement, he may declare the concrete defective and require the removal and replacement of
the portion of the structure affected.
4.0 Mode of measurement and payment:
4.1 The consolidated cubical contents of concrete work as specified in item shall be measured. The
concrete laid in excess of section shown on drawings or as directed shall not be measured. No
deduction shall be made for –
(a) Ends of dis-similar materials such as joints, beams, posts, girders, rafters, purline trusses, corbels and
steps etc. up to 500 Sq. Cm. in section.
(b) Opening up to 0.1 Sq. M.
4.2 The rate includes cost of all materials, labour, tools and plant required for mixing, placing in position,
vibrating and compacting, finishing, as directed, curing and all other incidental expenses for
producing concrete of specified strength. The rate excludes the cost of form work.
4.3 The rate shall be for a unit of one cubic meter.
5.4.1 Providing and laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate
mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced
concrete work in :
(A) Foundation footing, base of columns and mass (B) Slabs, landings, shelves, balconies, internals beams
girders and cantilever up to floor two level (C) Columns, pillars, posts and struts up to floor two level
(D) Staircase up to floor two level (E) Vertical and horizontal fins up to floor two level.
Signature of Bidder Page 30 of
Ahmedabad Municipal Corporation
1.0 Materials & Workmanship
1.1 The relevant specification of item No. 5.3.13 shall be followed except that the work shall be carried
out for reinforced concrete work for work as specified in item 1.2. In addition, the following
stipulations shall be followed for :
(a) The bars shall be kept in position by the following methods:
(i) In case of beam and slab construction, sufficient number of precast cover blocks in cement mortar
1:2 (1 cement : 2 coarse sand) about 4 cms x 4 cms section and of thickness equal to the specified
cover shall be placed between the bars and shuttering as to secure and maintain the requisite cover
of concrete over the reinforcement.
In case of cantilevered or doubly reinforce beams of slabs, the main reinforcing bars shall be held in
position by introducing chain spacers or supports bars at 1.0 to 1.2 meters centers.
(ii) In case of columns walls, the vertical bars shall be kept in position by means of timber temphtes with
slotes accurately out in them. The temphtes shall be removed after concreting has been done below
it. The bars may also be suitably tied by means of annealed steel wires to the shuttering to maintain
their position during concreting.
1.2 All bars projecting from pillars, columns beams, slabs etc., to which other bars and concrete are to be
attached or bounced to later on, shall be protected with a coat of thin neat cement grout, if the bars
are not likely to be incorporated with succeeding mass of concrete within the following 10 days. This
coat of thin neat cement shall be removed before concreting.
2.0 Mode of measurement and payment:
2.1 Relevant specifications of item No. 5.3.13 shall be followed.
2.2 The volume occupied by reinforcement shall not be deducted from R.C.C. work.
2.3 The rate shall be for a unit of one cubic meter.
Providing and laying controlled cement concrete M.200 and curing complete excluding the cost of formwork
and reinforcement for reinforced concrete work in (A) Foundations, footings, Base of columns and Mass
concrete (Building SOR 2023-24 Item Code No. 05009A , as per NBO Item No. 5.8.2; Page no. 56)
Materials & Workmanship :
Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6. Grit shall conform to M-8. Coarse
aggregate shall conform M-12 B.
The proportioning of cement and aggregates shall be done by weight and necessary precautions shall be taken in the
production to ensure that the required work cube strength is attained and maintained. The controlled concrete shall be
in grades of M-100, M-150, M-200, M-250, M-300, M-350, M-400, with prefix controlled added to it. The letter ‘M’ refers
to mix and numbers specify 28 days works cube compressive strength of 150 mm cubes of the mix expressed in Kg. /
The proportion of cement, sand and coarse aggregates shall be determined by weight. the weight batch machine shall be
used for maintaining proper control over the proportion of aggregates as per mix design.
The strength requirements of different grades of concrete shall be as under:
Grade of Concrete Compressive strength of 15 cms 28 days cubes in Kg./Cmt. at with I.S. 516-
conducted in accordance Preliminary test Work
Signature of Bidder Page 31 of
Ahmedabad Municipal Corporation
In all cases, the 28 days compressive strength specified in above table above be the criteria for acceptance or rejection of
Where the strength of a concrete mix as indicated by tests, lies in between the strength of any two grades specified in
the above table such concrete shall be classified in for all purposes as concrete belonging to the lower of the two grades
between which its strength lies.
The proportions for ingredients chosen shall be such that concrete has adequate workability for conditions prevailing on
the work in question and can be properly compacted with means available except where it can be shown to the
satisfaction of the Engineer-in-charge, that the supply of properly graded aggregate of uniform quality can be maintained
till the completion of work. Grading of aggregate shall be controlled by obtaining the coarse aggregates, in different sizes
and being in them in the right proportions as required. Aggregate of different sizes shall be stocked in separate stock
piles. The required quantity of material shall be stock piled several hours, preferably a day before use. The grading of
coarse and fine aggregate shall be checked as frequently as possible, the frequency for a given job being determined by
the Engineer-in-charge to ensure that the suppliers are maintaining the uniform grading as approved for samples used in
the preliminary tests.
In proportioning concrete, the quantity of both cement and aggregate shall be determined by weight. Where the weight
of cement is determined by accepting the maker’s weight per bag a reasonable number of bags shall be weighted
separately to check the net weight. Water shall either be measured by volume in calibrated tanks or weighed. All
measuring equipments shall be maintained in clean and serviceable condition. Their accuracy shall be periodically
In is most important to keep the specified water cement ratio constant and at its correct value. To this end, moisture
content in both fine and coarse aggregates shall be determined by the Engineer-in-charge, according to the weather
conditions. The amount of mixing water shall then be adjusted to compensate for variations in the moisture content. For
the determination of moisture content in the aggregates, I.S. 2389(Part III) shall be referred to. Suitable adjustments
shall also be made in the weights of aggregates due to variation in their moisture content. Minimum quantity of cement
to be used in concrete shall not be less than 220 Kgs./M 3 in plain concrete and not less than 250 Kg/M3 in reinforced
Mode of measurement and payment:
The consolidated cubical contents of concrete work as specified in item shall be measured. The concrete laid in excess of
section shown on drawings or as directed shall not be measured. No deduction shall be made for –
Ends of dis-similar materials such as joints, beams, posts, girders, rafters, purline trusses, corbels and steps etc. up to
Sq. Cm. in section.
Opening up to 0.1 Sq. M.
The rate includes cost of all materials, labour, tools and plant required for mixing, placing in position, vibrating and
compacting, finishing, as directed, curing and all other incidental expenses for producing concrete of
specified strength. The rate excludes the cost of form work.
Item No : 43 Providing and operation dewatering Pump including fuelcharges & operator Charges etc. as
directed etc. comp.(Shift for Eight Hour) (For Each Pump Set, No paymentshould be allowed
Signature of Bidder Page 32 of
Ahmedabad Municipal Corporation
for non working condition ofmachinery ) ( Based on Previously approved rate by C Esir )
(Based on Drainage SOR 2015-16) Machinery
Providing and operation dewatering Pump including fuel charges & operator Charges etc.
as directed etc. comp. (Shift for Eight Hour) (For Each Pump Set, No payment should be
allowed for non working condition of machinery )
M/s. shall be on Shift. basis.
Item No : 44 Dewatering by pumping set of required capacity including temporary carting pumping at site
and fixing the same in position including all accessories and fuel and laboures etc.complete.
(GWSSB SOR-2022-23,Section -2 E,Miscelleneous,Item No.1,Page No.104)
Dewatering by pumping set of required capacity including temporary carting pumping at site
and fixing the same in position including all accessories and fuel and laboures etc.complete.
Item No : 45 Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam
specification including premixing the Material with water at OMC in mechanical mix plant
carriage of mixed Material by tipper to site, laying in uniform layers in sub-base/base course
on well prepared surface and compacting with vibratory roller to achieve the desired density
as per Codal Provision.
(RA Approved St.Com.Res. No.189,Dt.19/05/2022)
This work shall consist of laying and compacting clean, crushed, graded aggregate and
granular material, premixed with water, to a dense mass on a prepared
subgrade/subbase/ base or existing pavement as the case may be in accordance with
the requirements in these Specifications. The Material shall be laid in one or more layers
as necessary to lines, grades and cross-sections shown on the approved drawings or as
directed by the Engineer.
The thickness of a single compacted Wet Mix Macadam layer shall not be less than
mm.When vibrating or other approved types of compacting equipment are used,the
compacted depth of a single layer of the sub-base course may be increased to 200 mm
upon approval of the Engineer.
17.2.1. Aggregates
17.2.1.1. Physical requirements: Coarse aggregates shall be crushed stone.If crushed
travel/shingle is used, not less than 90 per cent by weight of the gravel/shingle pieces
retained on 4.7mm sieve shall have at least two fractured faces.The aggregates shall
conform to the physical requirements set forth in Table 400-10 below.
TABLE 400-10. PHYSICAL REQUIREMENTS OF AGGREGATES FOR WE
MIX MACADAM FOR SUB-BASE/BASE COURSES
Test Requirements
* Los Angeles IS:2386 (Part-4) 40 per cent (Max.)
Abrasion value IS:2386 (Part-4) 30 per cent (Max.)
Signature of Bidder Page 33 of
Ahmedabad Municipal Corporation
Combined Flakiness
2 and Elongation IS:2386 (Part-1) 30 per cent (Max)**
indices (Total)
* Aggregate may satisfy requirements of either of the two tests.
** To determine this combined proportion, the flaky stone from a representative sample
should first be separated out. Flakiness index is weight of flaky stone metal divided by
weight of stone sample.Only the elongated particles be separated out from the
remaining (non-flaky) stone metal. Elongation index is weight of elongated particles
divided by total non-flaky particles. The value of flakiness index and elongation index
so found are added up.
If the water absorption value of the coarse aggregate is greater than 2 per cent, the
soundess test shall be carried out on the material delivered to site as per IS:2386 (Part-
17.2.1.2. Grading requirements: The aggregates shall conform to the grading
given in Table 400-11.
TABLE 400-11. GRADING REQUIREMENTS OF AGGREGATES FOR WET MIX MACADAM
IS Sieve Per cent by
Designation weight
600.00 micron 8-22
75.00 micron 0-8
Materials finer than 425 micron shall have Plasticity Index (PI) not exceeding
The final gradation approved within these limits shall be well graded from coarse to fine
and shall not vary from the low limit on one sieve to the high limit on the adjacent or
17.3. Construction Operations
17.3.1. Preparation of base: Clause 404.3.1. shall apply.
17.3.2. Provision of lateral confinement of aggregates:While constructing wet mix
macadam, arrangement shall be made for the lateral confinement of wet mix.This shall
be done by laying materials in adjoining shoulders along with that of wet mix macadam
layer and following the sequence of operations described in Clause 407.4.1.
17.3.3. Preparation of Mix: Wet Mix Macadam shall be prepared in an approved
mixing plant of suitable capacity having provision for controlled addition of water and
forced/positive mixing arrangement like pugmill or pan type mixer of concrete batching
plant. For small quantity of wet mix work, the Engineer may permit the mixing to be
done in concrete mixers.Optimum moisture for mixing shall be determined in
accordance with IS: 2720 (Part-8) after replacing the aggregate fraction retained on
Signature of Bidder Page 34 of
Ahmedabad Municipal Corporation
mm sieve with material of 4.75 mm to 22.4 mm size. While adding water, due allowance
should be made for evaporation losses. However, at the time of compaction, water in
the wet mix should not vary from the optimum value by more than agreed limits.The
mixed material should be uniformly wet and no segregation should be permitted.
17.3.4. Spreading of mix: Immediately after mixing, the aggregates shall be spread
uniformly and evenly upon the prepared subgrade-sub-base/base in required quantities.
In no case should these be dumped in heaps directly on the area where these are to be
laid nor shall their hauling over a partly completed stretch be permitted.The mix may be
spread either by a paver finisher or motor grader. For portions where mechanical means
cannot be used, manual means as approved by the Engineer shall be used. The motor
grader shall be capable of spreading the material uniformly all over the surface. Its blade
shall have hydraulic control suitable for initial adjustments and maintaining the same so
as to achieve the specified slope and grade.
The paver finisher shall be self-propelled, having the following features:
(i) Loading hopper and suitable distribution mechanism.
(ii) The screed shall have tamping and vibrating arrangement for initial compaction to the
layer as it is spread without rutting or otherwise marring the surface profile.
(iii) The paver shall be equipped with necessary control mechanism so as to ensure that the
finished surface is free from surface blemishes.
The surface of the aggregate shall be carefully checked with templates and all high or low
spots remedied by removing or adding aggregate as may be required.The layer may be
tested by depth blocks during construction.No segregation of large and fine particles
should be allowed.The aggregates as spread should be of uniform gradation with no
pockets of line materials.
17.3.5. Compaction: After the mix has been laid to the required thickness, grade and
crossfall/camber the same shall be uniformly compacted, to the full depth with suitable
roller. If the thickness of single compacted layer does not exceed 100 mm, a smooth
wheel roller of 80 to 100 kN weight may be used. For a compacted single layer upto
mm, the compaction shall be done with the help of vibratory roller of mi8nimum static
weight of 80 to 100 kN or equivalent capacity roller. The speed of the roller shall not
exceed 5 km/h.In portions having unidirectional cross fall/super-elevation, rolling shall
commence from the lower edge and progress gradually towards the upper
edge.Thereafter, roller should progress parallel to the centre line of the road, uniformly
overlapping each preceding track by at least one third width until the entire surface has
been rolled. Alternate trips of the roller shall be terminated in stops at least 1 m away
from any preceding stop.In portions in camber, rolling should begin at the edge with the
roller running forward and backward until the edges have been firmly compacted. The
roller shall then progress gradually towards the centre parallel to the centre line of the
road uniformly overlapping each of the preceding track by at least one-third width until
the entire surface has been rolled.Any displacement occurring as a result of reversing of
the direction of a roller or from any other cause shall be corrected at once as specified
and/or removed and made good.Along forms, kerbs, walls or other places not accessible
to the roller, the mixture shall be thoroughly compacted with mechanical tampers or a
plate compactor.Skin patching of an area without scarifying the surface to permit proper
bonding of the added material shall not be permitted.Rolling should not be done when
the subgrade is soft or yielding or when it causes a wave-like motion in the sub-
base/base course or subgrade.If irregularities develop during rolling which exceed
mm when tested with a 3 metre straight edge,the surface should be loosened and
premixed material added or removed as required before rolling again so as to achieve a
Signature of Bidder Page 35 of
Ahmedabad Municipal Corporation
uniform surface conforming to the desired grade and cross fall.In no case should the use
of unmixed material be permitted to make up the depressions.Rolling shall be continued
till the density achieved is at least 98 per cent of the maximum dry density for the
material as determined by the method outlined in IS: 2720 (Part-8).
After completion, the surface of any finished layer shall be well-closed, free from
movement under compaction equipment or any compaction planes, ridges, cracks and
loose material.All loose, segregated or otherwise defective areas shall be made good to
the full thickness of the layer and re-compacted.
17.3.6. Setting and drying: After final compaction of wet mix macadam course,the
road shall be allowed to dry for 24 hours.
17.4. Opening to Traffic
Preferably no vehicular traffic of any kind should be allowed on the finished wet mix
macadam surface till it has dried and the wearing course laid.
17.5. Surface Finish and Quality Control of Work
17.5.1. Surface evenness: The Surface finish of construction shall conform to the
requirements of Clause
17.5.2. Quality Control: Control on the quality of materials and works shall be
exercised by the Engineer in accordance with Section
17.6. Rectification of Surface Irregularity
Where the surface irregularity of the wet mix macadam course exceeds the permissible
tolerance or where the course is otherwise defective due to subgrade soil getting mixed
with the aggregates, the full thickness of the layer shall be scarified over the affected
area, reshaped with added premixed material or removed and replaced with fresh
premixed material as applicable and recompacted in accordance with Clause 406.3.
The area treated in the aforesaid manner shall not be less than 5 m long and 2 m wide.In no
case shall depressions be filled up with unmixed and ungraded material or fines.
17.7. Arrangement for Traffic
During the period of construction, arrangement of traffic shall be done as per the
17.8. Measurements for Payment
Wet mix macadam shall be measured as finished work in position in cubic metres.
The Contract unit rate for wet mix macadam shall be payment in full for carrying out the
required operations including full compensation for all components listed in Clause
Item No : 46 M.S. Channel (Building Sor 2023-24, Material Basic Rate Item No. 663 Code M681)
Shape and Design of the Channels as per instruction of site incharge.
Unit shall be in Quintal.
Item No : 47 Labour work for fixing Interlocking Blocks / any kind of pavement on up to 50 mm th sand
bedding, levelling, watering and fixing in line & level as well cleaning the site etc.comp. as
directed. (AMC Approved Rate)
The reinstatement of W.T. & kerb or water table or C.C. Block or ladi on av. 3 cm. Thick sand
bedding in cement in pointing 1:2 incl. Nece. Watering consolidation etc.comp. Necessary
excv’n shall be made to the depth level & grade as shown to the contractor. foundation shall be
watered & consolidated before the sand conc. Is laid. The W.T. kerb & C.C. Block & ladi shall
be leveled with & filling av. 3 cm.th sand bedding so as bring w.t. kerb in line & level as dire.
The sand shall be clean & coarse The surplus earth shall be laid on top of this conc. Surface
Signature of Bidder Page 36 of
Ahmedabad Municipal Corporation
with cement mortar 1:2 prop. The slab shall be laid in such a way that surface shall be line &
gradient joint should be 3/8” to ¾” thickness staggering of the joints shall be req. No. part of
the slab/ladi should be projected above the sanction. For pointing all the joints shall be recede
out to be req. depth while the mortar has set during the laying of
slab/ladi. The jointing shall be finished with the neat cement so that the surface may be smooth
& flush with slab watering shall be done for 7 days. For pointing prop. One cement Two sand to
full depth as and where
Item No : 48 Providing & Supplying JCB Machine on rental basis in case of emergency situation and break
down type work & also during unavoidable condition as per instruction of
engg.incharge , rate includes all nece. shifting, fuel and operating charges and stacking
of useful & non-useful materials separately up to store. (No payment should be
allowed for non working condition of machinery and for pipe line excavation and laying
M/s. shall be on Hr. basis.
Item No.49: Supplying and fixing Nimbhada ladi 37 to 50 mm thick for walk-way, covering the activity of
excavation, ramming, Laying on sand bedding as per requirement to fix the Nibhada Stone in Line &
Level with cement pointing in cement mortar 1:2 etc complete as directed.
1.Nimbhada stone : The material shall conform to M-48 Page No.-16 except that the stone shall be of
ordinary nimbhada stone instead of rough kota stone .
2. Sand : As per buiding booklet M-6 Page No.4.
3.Cement : As per buiding booklet M-3 Page No.3.
The work man ship shall conform to buiding booklet section no. 14,-14.46 (A), 2.0 page no.- 87 except
that the base shall be sand bedding of 5 cm thickness and cement pointing shall be in proportion 1:3
Mode of measurment shall be on smt basis
Item No.50: Providing and supplying of Class SN8 Structured Wall polyethelenePiping systems (Pipe with
online/offline coupler and elastomeric sealing ring) with non-smooth External Annular
CorrugatedandSmoothInternalSurfaces(DoubleWall) fornonpressure underground
Sewerage&Drainage application as per EN:13476-3 (manufacture with Anti-roadent Chem ical)
including all local andcentral taxes, transportation, freight charges,octroi, inspection charges,
loading, unloading,conveyance to the departmental stores etc. complete. (ID Dia)DWC Pipe Dia
Providing and supplying of Class SN8 Structured Wall
polyethelenePipingsystems(Pipewithonline/offlinecouplerand elastomeric sealing ring) with non-
smooth External Annular CorrugatedandSmoothInternalSurfaces(DoubleWall) fornonpressure
underground Sewerage&Drainage application as per EN:13476-3 (manufacturewithAnti-
roadentChemical) including all local andcentral taxes, transportation, freight charges,octroi,
Signature of Bidder Page 37 of
Ahmedabad Municipal Corporation
inspection charges, loading, unloading,conveyance to the departmental stores etc. complete. (ID
Mode of measurment shall be on Rmt basis
Item No.51: Lowering, laying and jointing of class SN8 structuredwall ( External Annular Corrugated &
Smooth Internal surface) PolyethylenePipingandfittingswiththehelpofcoupler(online/ off line )
attached with one end of pipes, sliding over the
elastomericsealingrubberringplacedonthespecifiedvalleyofthe corrugationat thespigot end,
loweringthesameinto the trench, layingonthelowerbedding(constructedatbottomof trenches)at
prescribedgradient,depth&alignment, testingthewatertightness of the joints, ensuring the
continuity tests of specified pipe segmentsetc. completeasper drawing, specifications&detailed
engineering,includingcarriageofpipes&fittingsfromsitestacks to the place of laying etc. as per
direction of Engineer-in-charge. Dia 100 mm to 250 mm
Lowering, laying and jointing of class SN8 structuredwall ( External Annular Corrugated & Smooth
Internal surface) PolyethylenePipingandfittingswiththehelpofcoupler(online/ off line ) attached with
one end of pipes, sliding over the elastomericsealingrubberringplacedonthespecifiedvalleyofthe
corrugationat thespigot end, loweringthesameinto the trench,
layingonthelowerbedding(constructedatbottomof trenches)at prescribedgradient,depth&alignment,
testingthewatertightness of the joints, ensuring the continuity tests of specified pipe segmentsetc.
completeasper drawing, specifications&detailed
engineering,includingcarriageofpipes&fittingsfromsitestacks to the place of laying etc. as per direction
of Engineer-in-charge. Mode of measurment shall be on Rmt basis
Item No.52: Providing&Constructing Precast RCC Machinehole in RCC M-40 grade Controlled
concrete as per drawing, in OPC including excavation ,80mm thick P.C.C. in M-15,Reinforcementin
TMT500 ,PVC Foot steps, Providing &fixing FRC Manhole frame& cover including inside epoxy paint
Providing&Constructing Precast RCC Machinehole in RCC M-40 grade Controlled concrete as per
drawing, in OPC including excavation ,80mm thick P.C.C. in M-15,Reinforcementin TMT500 ,PVC Foot
steps, Providing &fixing FRC Manhole frame& cover including inside epoxy paint complete etc.
Mode of measurment shall be on No. And more than specific depth Rmt basis
Seal and Signature of the Bidder Addl. City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 38 of
Ahmedabad Municipal Corporation
yb>tJt> BGþrlrmrvj ftuvtuohuNl
bægÍtul- Esluh Ftðþ
vtKe, z[ulus, vuJ´d, heEMxuxbuLxlt ftuLx[tfxhu Ftm JtkaJt ylu ægtlbtk htFJtle ctc< leau Bþsc Au.
"yt ftblt >huf ytExblt sÚ&tbtk ~ËLg &e cMmtu xftle JD^x &Jt mkCJ Au. ftuE ytExbltu
CtJ J^thtu ytvJtbtk ytJNu lrn. yuf s ftuLx[tfxhu yuf søgtyu <btb ftbdehe vtKe, z[ulus, vuJ´d,
heEMxuxbuLx rJ. <btb ftbdehe fhJtle Au. yBþf JF<u btºt vtKelt Ôgrf<d< flufNltu s c>jJtlt
«mkdtu WCt &Nu ylu yBþf JF< btºt bulntuj/ auBchlu Vh<u fta ltkFuÕþk ÃjtMxh fhJtLþk &tg <uÔþk vK
clNu. yBþf søgtyu swlt vÚ&h s VheJth heEMxux fhJtlt &Nu fu btºt ytMVtÕx htuz d{tWxed - heEMxux
fhJtltu &Nu. <uJe >huf ytExbbtk J^^x &tg fu ytExb yufÍefGþx l &tg <uÔþk vK clNu. ytlt btxu
ftuEvK «fthle J¤<hle btkdKe fhJtle hnuNu lrn fu CtJ J^thtu, vK ytvJtltu &Nu lrn. <ult btxu
Ãþh<tk mt^ltu ylu bsqhtu ntug, yuf mt&u yluf søgtytuyu ftb fhJtle ûtb<t ntug <ubKu s rJathelu xuLzh
ChÔþk. bsqhtu l&e fu dtbzu s<t hÌtt Au fu ntu¤e, lJhtºte, r>Jt¤e, jøl meÍl fu yLg <nuJthtubkt fu
«mkdtubtk bsqhtu ytJ<t l&e <uJt fu ceò ftuEvK cntlt nuX¤ ftb ck^ htFe NftNu lrn yLg&t htuslt
Yt. 250.00le J^thtle vulÕxe ftb ck^ hnu fu MËalt fh<t ytuAt bsqhtu ytJu <ulu je^u fhJtbtk ytJNu."
Seal and Signature of the Bidder AdditionalCity Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 39 of
Ahmedabad Municipal Corporation
(A) Penalty For Maintenance and SLA Purpose: Penalties will be applied for work done after the SLA period
based on the following schedule:
Department Category Problem SLA 10% 20% 30% Penalty
Penalty Penalty (Hours)
(Hours) (Hours)
Engineering Water Water-low pressure 240 Hours 240 480
Engineering Water Water-No Supply 240 Hours 240 480
Engineering Water Water-Other 72 Hours 72 144
Engineering Water Water-Leakage In Main 48 Hours 48 96
Engineering Water Water-Pollution In Supply 240 Hours 24 48
Engineering Drainage Drainage- Manhole Cover 24 Hours 24 48
Engineering Drainage Drainage-Other 48 Hours 48 96
Engineering Drainage Drainage- Choking Of Line 48 Hours 48 96
Engineering Drainage Drainage-Public 72 Hours 72 144
Toilets/Urinals Blockage
Engineering Road Road-Other 48 Hours 48 96
Engineering Road Road-Bhuva On Road 48 Hours 48 96
Engineering Road Road-Repair Require 72 Hours 72 144
Engineering Storm Road-Waterlogged Due To 24 Hours 24 48
Engineering Storm Road-Catch Pit Repairing 96 Hours 96 192
Engineering Public Public Building-Repairing 360 Hours 360 720
of Doors, Windows, Tiles
Signature of Bidder Page 40 of
Ahmedabad Municipal Corporation
Building or Sheets
Engineering Footpath Road-Footpath Repairing 168 Hours 168 336
Engineering Building Building-Municipal Schools 168 Hours 168 336
Note: If work is not completed after the penalty time limit, a penalty equal to the full amount of the work will
(B) Penalty 10% for New Allocated Works.
Signature of Bidder Page 41 of
Ahmedabad Municipal Corporation
AHMEDABAD MUNCIPAL CORPORATION
Central Zone - Engineering Dept.
ftblwk ltb:-bægÍtullt zu.mexe.Rsluh -2 btk ytJ<t Ftzegt <&t yLg Jtuzobtk atjeytu,vtu¤tu,<&t djeytubtk lJe meMxubuxef z[ulus jtRl
ltFJtlt,auBch/bNelntuj hevuhekd fhJtlt,<&t lJt bNelntuj cltJJtlt ftb.(yu.yth.me.)
Description Of Item Net Rate
Qty. Unit Amount
Excavation for pipe line trenches for water supply, sewerage
line, manhole etc. all with shoring and struting if required as
per required gradient and line including safety provisions
using site rails and stacking excavated stuff including up to all
1 required lead cleaning the site etc. complete for all lifts and
strata as specified. In all sorts of soil and soft murrum.
(GWSSB SOR 2022-23;Item No. 1.A.1; Page No. 32)
a 0 to 1.5 meter depth. 1000 Cu.M 89.00
b 1.5 to 3 meter depth. 500 Cu.M 98.00
c 3 to 4.50 meter depth. 1 Cu.M 103.00
d 4.50 to 6.00 meter depth. 1 Cu.M 109.00
Extra rate over item of excavation of earth if excavation is to
be done in wet condition without resorting to pumping but
2 incl. of bailing out of water. 500 Cu.M 18.04
Extra rate over item of excavation of earth for excavation of
asphalt pavement / RCC of thickness upto 0.20 meter
including demolishing the asphalt carpet,metal,soiling/cutting
3 Reinforcement etc.comp. with stacking the material as
directed.AMC Drainage / SWD pipe line S.O.R.Jan/2016
a) upto 0.20 meter thickness (By Manual) AMC Drainage /
SWD pipe line S.O.R.Jan/2016 Sr.4(a)
b) 0.20 meter to 0.30 meter (By Breaker Machine including
cost of operator, fuel, & transportaion etc complete. AMC
Drainage / SWD pipe line S.O.R.Jan/2016 Sr.4(b)
c) 0.30 meter & above (By Breaker Machine including cost of
operator, fuel, & transportaion etc complete. AMC Drainage /
SWD pipe line S.O.R.Jan/2016 Sr.4©
Refilling in pipe line trenches ramming and watering,
Consolidating, disposal of surplus stuff as directed within
4 KM Area (GWSSB SOR 2022-23; Item No.14.1,Page No. 40) 1000 Cu.M 22.00
Signature of Bidder Page 42 of
Ahmedabad Municipal Corporation
Conveyance of lime murrum building rubbish earth manure
or sludge & execavated rockand rubbish [Lime murrum
5 building rubbish]. Up to 5.0 Km. lead (Building SOR 2023-24
Statement No.5 Item No. 030201A1 ; Page no.6)
e Up to 5.0 Km. lead 300 Cmt 326.73
Providing and supplying ISI marked only Standard length
Stoneware pipes in standard lengths of following class and
diameter including all taxes, insurance, transportation, freight
charges, octroi, inspection charges, loading, unloading,
6 conveyance to departmental stores, stacking etc. (IS - 651 /
1989) (Based on GWSSB SOR 2022-23, Item No. 11.2 Class
a 100 mm dia 800 Rmt 124.00
b 150 mm dia 500 Rmt 179.00
c 200 mm dia 300 Rmt 277.00
d 230 mm dia 500 Rmt 329.00
Lowering, laying and jointing Stone Ware pipes of following
diameters with cement joints in C. M. 1:1 proportion in
proper position, grade and alignment at all level as directed
7 by Engineer-in-charge including conveyance from stores to
site of work, Jointing material etc. comp.(Based on GWSSB
SOR 2022-23, Item No. 12; Page-40)
a 100 mm dia 800 Rmt 58.00
b 150 mm dia 500 Rmt 88.00
c 150 mm dia 300 Rmt 113.00
d 230 mm dia 500 Rmt 128.00
R. C. C. PIPE (Horizontal Cast) Providing and supplying ISI
Standard R.C.C. pipes(of Sulphate Resisting Cement) in
standard lengths of following class and diameter suitable for
either collar joints or rubber ring joints instuction given as per
Engineer incharge including all taxes, insurance,
transportation, freight charges, octroi, inspection charges,
loading, unloading, conveyance to departmental stores,
stacking etc Note : One collar should be supplied with each
7 full length plain ended RCC pipe, cost included in rates below.
One rubber ring should be supplied with each full length
socketed pipe, cost included in rates below.(Class NP3 Test
Pressure 0.7 Kg/sq.cm). Rate also Include RCC Collars for RCC
pipes including all taxes, carting, loading,unloading, etc
complete. (GWSSB SOR 2022-23 Item No. 10, Page No. 13)
Class NP3 Test Pressure 0.7 Kg/Sq.Cm.
300 mm internal diameter (GWSSB SOR 2022-23 Item No.
10.1.D, Page No. 15)
450 mm internal diameter (GWSSB SOR 2022-23 Item No.
10.1.D, Page No. 15)
Signature of Bidder Page 43 of
Ahmedabad Municipal Corporation
750 mm internal diameter (GWSSB SOR 2022-23 Item No.
10.1.D, Page No. 15)
Class NP4 Test Pressure 0.7 Kg/Sq.Cm.
600 mm internal diameter (GWSSB SOR 2022-23 Item No.
10.1.E, Page No. 15)
900 mm internal diameter (GWSSB SOR 2022-23 Item No.
10.1.E, Page No. 15)
1200 mm internal diameter (GWSSB SOR 2022-23 Item No.
10.1.E, Page No. 15)
Lowering, laying and jointing R. C. C. pipes in C. M. 1.1 1/2 of
following diameters in proper position, grade and alignment
at all level as directed by Engineer-in-charge including
8 conveyance from stores to site of work, labour, giving
hydraulic testing as per ISI code. (Based on GWSSB SOR
2022-23, Item No. 11; Page-39)
300 mm internal diameter (Based on GWSSB SOR 2022-23,
Item No. 11.b.6 ; Page-39)
450 mm internal diameter (Based on GWSSB SOR 2022-23,
Item No. 11.b.10; Page-39)
600 mm internal diameter (Based on GWSSB SOR 2022-23,
Item No. 11.b.13; Page-39)
750 mm internal diameter (Based on GWSSB SOR 2022-23,
Item No. 11.b.16; Page-39)
900 mm internal diameter (Based on GWSSB SOR 2022-23,
Item No. 11.b.18; Page-39)
1200 mm internal diameter (Based on GWSSB SOR 2022-23,
Item No. 11.b.21; Page-39)
Constructing Chamber of following size including excavation,
refilling, BBCC (1:5:10) for foundation, C.C.Channel (1:2:4),
finished 15 mm thick cement plaster inside in CM 1:3,
9 finishing with cement slurry, Brick masonary in CM 1:5 &
excluding the cost of chamber seat cover etc.completed.
(Based on Drainage SOR 2015-16; Item No.11)
0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to
0.60 X 0.75 mt. size Inside Clear, Depth from 0.0 to
0.75 X 0.75 mt. size (Inside Clear) Depth from 0.0 to
meter for pipe dia <=20 mm
Signature of Bidder Page 44 of
Ahmedabad Municipal Corporation
Constructing Slab Type M.H. Chamber Of The Following Size
Including Excavation, Refilling, Brick Bats Cement Concrete
(1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of thickness
10 C.M., finished 15 mm thick cement plaster inside &
outside (Only for shaft) In Cm 1:3, Finishing With Cement
Slurry, P/F 4 Mm Dia M.S.Steel Hdpe Coated Steps 35 Cm C/C
At 35 Cm Staggered Masonary In Cm 1:5, Rcc Slab In Cc1:1.5:3
of thickness 15 C.M.,Including Cantering & Reinforcement
10 (Single jalli at 15 C.M. c/c bothway 10 mm dia.)But Excluding
The Cost Of Manhole Seat Cover Etc..Completed Of Size
X 1.00 Meter (Inside Clear, M.H. length should be parallel to
the flow) (Based on Drainage SOR 2015-16; Item No.12)
1.00 to 2.00 meter depth (Slab at Ground level) Sr. No.12(a)
2.00 to 3.00 meter depth, (Slab at below 0.60 mt. From
G.L.)Sr. No.12(b) page No.3
Constructing Slab type M.H. Chamber of the following size
including excavation, refilling, brick bats cement concrete
(1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of thickness
10 C.M., finished 15 mm thick cement plaster inside &
outside (Only for shaft) in CM 1:3, finishing with cement
slurry, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c
at 35 cm staggered in masonary CM 1:5, RCC Slab in CC
12 1:1.5:3 of thickness 23 C.M., including Cantering &
reinforcement (double jalli at 15 C.M. c/c bothway 12 mm
dia.) but excluding the cost of Manhole seat cover
etc..completed. of Size 1.00 X 1.40 meter (Inside Clear,
M.H. length should be parallel to the flow. (Based on
Drainage SOR 2015-16; Item No.14)
1.00 to 2.00 meter depth, (Slab at Ground level)Sr. No.14(a)
2.00 to 3.00 meter depth, (Slab at below 0.6 mt. From G.L.)Sr.
No.14(b) page No.3
3.00 to 4.00 meter depth, (Slab at below 1.00 mt. From
G.L.)Sr. No.14(C) page No.3
5.00 to 6.00 meter depth, (Slab at below 1.00 mt. From
G.L.)Sr. No.14(d) page No.3
7.00 to 8.00 meter depth, (Slab at below 1.00 mt. From
G.L.)Sr. No.14(e) page No.3
Dismantling of existing Arch type manhole up to Arch and
then Const. Slab type manhole of following size incl.
excavation, refilling and & finished 15 mm thick cement
plaster inside in CM 1:3, P/F 4 mm dia M.S.Steel HDPE coated
steps 35 cm c/c at 35 cm staggered in masonry CM 1:5, incl.
14 cost of RCC Slab in CC 1:1.5:3, including Cantering &
reinforcement as directed by engineer in charge. Rate
includes carting of debris and excavated soil (Based on
Drainage SOR 2015-16; Item No.17)
Signature of Bidder Page 45 of
Ahmedabad Municipal Corporation
1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M&
reinforcement (Single jalli at 15 C.M. c/c bothway 10 mm dia.)
From 0 to 2 mt depth (Slab at Ground level)Sr. No.17(a) page
1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M&
reinforcement (Single jalli at 15 C.M. c/c bothway 10 mm dia.)
b From 2 to 3 mt depth (Slab at below 1.00 mt. From G.L.)Sr. 25 No 8883.93
No.17(b) page No.4
1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM &
reinforcement (double jalli at 15 C.M. c/c bothway 10 mm
c dia.) From 0 to 2 mt depth (Slab at Ground level)Sr. No.17(c) 10 No 8080.36
1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM &
reinforcement (double jalli at 15 C.M. c/c bothway 10 mm
d dia.) From 2 to 3 mt depth (Slab at below 1.00 mt. From 5 No 17008.93
G.L.)Sr. No.17(d) page No.4
1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM &
reinforcement (double jalli at 15 C.M. c/c bothway 10 mm
e dia.) From 3 to 4 mt depth (Slab at below 1.00 mt. From 5 No 24776.79
G.L.)Sr. No.17(e) page No.4
Providing and fixing S.W. gully trap with C.I. grating\ brick
masonry chamber and water tight C.I. cover with frame of
300mm x 300mm size (inside) with standard weight.(i) Square
15 mouth traps. (A) 100mm x 100mm size P type (Based on 200 Each 1279.40
Building SOR 2023-24, Item No. 24006AA, NBO Item 24.19)
Making connection to the ex.M.H.in running sewer incl.
Dewatering and other required machinery etc. of following
dia pipes at any convenient time. All damaged work shall be
16 well repaired as per instructions. etc..complete.(Based on
Drainage SOR 2015-16; Item No.19)
a a. 150 mm to 300 mm dia.Sr. No.19(a) page No.4 10 No. 1339.29
b b. 400 mm to 600 mm dia.Sr. No.19(b) page No.4 10 No. 2232.14
Cutting the pipes of following dia coming in the new M.H.in
running sewer including cutting bars, including removing
debris /silt from the M.H. and carting at a suitable distance
17 etc..complete as directed. No payment for M.H. work will be
made until pipe is not cut completely in all respect. (Based on
Drainage SOR 2015-16) Item No.20
a 150 mm to 300 mm dia.Sr. No.20(a) page No.4 10 No. 1133.93
b 400 mm to 600 mm dia.Sr. No.20(b) page No.4 10 No. 1687.50
Repairing damaged M.H. and rasing M.H. up to road level
incl. removing damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I.
18 steps and existing MH sheet cover, removing the debris
from MH and carting the same as directed.
(A) up to 0.15 mt. (@ Two Coarse)Sr. No.21(a) page No.4
Signature of Bidder Page 46 of
Ahmedabad Municipal Corporation
(B) up to 0.35mt. (@ Four Coarse)Sr. No.21(b) page No.4
(C) up to 0.65 mt. (@ Seven Coarse)Sr. No.21(c) page No.4
(D) up to 0.90 mt. (@ Ten Coarse )Sr. No.21(d) page No.4
Repairing damaged I.C./ Raising removing damaged brick
work and repairing by brick masonry in C.M. 1:5 and plaster
in C.M. 1:3 and fixing C.I. steps and existing chamber sheet
19 cover, removing the debris from chamber and carting the 20 No. 401.79
same as directed. (Based on Drainage SOR 2015-16 Item
No.22)page No.4
As per Central Store Circular No.01/2025-26 Dt.
21.04.2025(SET cover and frame) F.R.C. Extra Heavy Duty
[EHD-35] Machinehole Covers & Frame- 560mm ø clear
20 opening, The dimension of frame and cover as per mentioned 20.00 No. 6165.25
in Amend No. to IS 12592 : 2002 table 1 Sr.No.1
(SET cover and frame) F.R.C. Heavy Duty [HD-20]
Machinehole Covers & Frames- 560mm ø clear opening, The
a dimension of frame and cover as per mentioned in Amend 40.00 No. 5889.83
No.1 to IS 12592 :2002 table 1 Sr.No.2
(SET cover and frame) F.R.C. Medium Duty [MD-10]
Machinehole Covers & Frames- 560mm ø clear opening, The
b dimension of frame and cover as per mentioned in Amend 30.00 No. 4025.42
No.1 to IS 12592 :2002 table 1 (SET cover and frame)Sr.No.3
(SET cover and frame) F.R.C. Light Duty [LD-2.5] Machinehole
Covers & Frames- 560mm ø clear opening, The dimension of
c frame and cover as per mentioned in Amend No.1 to IS 12592 10.00 No. 3050.85
: 2002 table 1 Sr.No.4
(SET cover and frame) F.R.C. Medium Duty [MD-10] Chamber
Covers & Frame- 600 x 450 mm clear opening, The dimension
d of frame and cover as per mentioned in Amend No.1 to IS 10.00 No. 4025.42
12592 : 2002 table 1 Sr.No.5
(SET cover and frame) F.R.C. Light Duty [LD-2.5] Chamber
Cover & Frame - 600 x 450mm clear opening,The dimension
e of frame and cover as per mentioned in Amend No.1 to IS 20.00 No. 3262.71
12592 : 2002 table 1 Sr.No.6
(SET cover and frame) F.R.C. Light Duty [LD-2.5] Chamber
Cover & Frame:-450 x 450mm clear opening,The dimension
f of frame and cover as per mentioned in Amend No.1 to IS 10.00 No. 2288.14
12592 : 2002 table 1 Sr.No.7
Signature of Bidder Page 47 of
Ahmedabad Municipal Corporation
As per Central Store Circular No.02/2024-25 Dt. 14.10.2024
Sr.No.1 (F.R.C. Strom Water Grating Grating(Jali): 740 x 740 x
90mm square jali, 20:00 MT load design, 90x2mm MS flat
allround,Frame: 600 x 600mm clear opening, outer size- 900 x
g 900 x 165 mm. On the upper periphery of frame 25 x 3mm 30.00 No. 5173.73
wide MS flat should be well embded in concrete to protect
the edges of frame
As per Central Store Circular No.02/2024-25 Dt. 14.10.2024
Sr.No.2 F.R.C. Strom Water Grating Grating(Jali): 690 x 690 x
70mm square jali, 20:00 MT load design, 70x2mm MS flat
allround,Frame: 600 x 600mm clear opening, outer size- 800 x
h 800 x 120 mm. On the upper periphery of frame 25 x 3mm 20.00 No. 4741.53
wide MS flat should be well embded in concrete to protect
the edges of frame
As per Central Store Circular No.02/2024-25 Dt. 14.10.2024
Sr.No.3 F.R.C. Strom Water Grating Grating(Jali): 620 x 620 x
75mm square jali, 20:00 MT load design, 75x1.2mm MS flat
allround,Frame: 500 x 500mm clear opening, outer size- 770 x
i 770 x 135 mm. On the upper periphery of frame 25 x 1.5 mm 20.00 No. 4734.75
wide MS flat should be well embded in concrete to protect
the edges of frame
As per Central Store Circular No.02/2024-25 Dt. 14.10.2024
Sr.No.7 R.C.C. Gully Trap Covers & Frames Cover: 205mm 0 &
30mm thick circular cover Frame: 165mm 0 clear opening,
j outer size - 300 x 300 x 60 mm. Set : R.C.C. Gully Trap Covers 200.00 No. 382.20
& Frames described as above
Carting and Fixing M.H., Chamber or Catchpite Seat and
Cover in line and level to match exisisting road level in C.C.
1:2:4 and finishing smooth, watering and protecting for
21 days etc. complete as directed. M.H. seat cover will be 10 No. 750.00
supplied by A.M.C.(from any store) (Based on Drainage SOR
2015-16 Item No.24)page No.5
Providing Kachha of Pakka Dummy in the following dia pipes
and removing the same after completion of the connection
work as directed. (GWSSB SOR 2022-23)Item No.6 Page
300 MM dia. And below sewer line Item No.6(a) Page no.102
400 to 500 mm dia. Sewer line Item No.6(b) Page no.102
600 to 700 mm dia. Sewer line Item No.6 © Page no.102
d 900 mm Item No.6 (e) Page no.102 1 No. 3484.00
e 1200 mm Item No.6 (g0 Page no.102 1 No. 4839.00
Signature of Bidder Page 48 of
Ahmedabad Municipal Corporation
Providing Dead Cantering using good quality Country Wood
Planks, wall Plate of required thickness and size including
placing the nece. supports of reqd. size, nailing, fixing with
mortar, levelling. All specification for dead centring as per
23 standard engg. practice etc. comp. as directed. (Based on 5 Smt 312.50
Drainage SOR 2015-16 Item No.27)page No.5
Supplying, labour for break down repairing work for activities
like excavation, disliting, removing debris from trench back
24 filling etc. comp. as directed by Eng.in charge.(Building
SOR 2023-24,(Basic rates for Labour work))
Labour charges - Mazdoor (Male) (Sr. No. 1051 Code L-22,
Labour charges - Mazdoor (Fe-Male) (Sr. No. 1050 Code L-
21, Page No.39)
Labour charges - Supervision for Machinery (Sr. No.
Code L-29, Page No.39)
Barricading the entire break down or excavated area on
rental basis using wooden ballies / M.S.angles at max.
meter centre to centre, C.G.I. Sheet, reflective paint / Board
out side to avoid accident & for smooth traffic diversion &
movement including cautionary board etc. Item also includes
for making temporary sufficient nos of lighting arrangement
25 through out the work with necessary required arrangement. 300 Rmt. 80.36
The same shall be removed after completion of work. (Only
for break down work from start to complete) (Based on
Drainage SOR 2015-16) Item No.29
Providing TMT Bar FE 500D reinforcement for R.C.C. work
including bending, binding and placing in position complete
upto floor two level (Building SOR 2023-24 Item Code
05014C, Page no. 54)
Brick work using common burnt clay building bricks having
crushing strength not less than 35kg./Sq.Cm. In foundation
and plinth in Cement Mortar 1:5.(1-Cement: 5 -fine sand)(B)
27 Conventional. (Building SOR 2023-24 Item Code 1 Cmt 4011.66
No.06001BA , as per NBO Item No. 6.12; Page no.70)
Providing15mm thick cement plaster in single coat on Rough
(Similar) side of single or half brickwalls for interior plastering
upto floor two level and finished even and smooth in (i)
28 Cement mortar 1:3 (1-cement:3-sand). (Building SOR 2023-24 5 Smt 174.83
Item Code 17002A,Item No.as per NBO-17.60 page no.129)
Signature of Bidder Page 49 of
Ahmedabad Municipal Corporation
Constructing Bombay Pattern Type Catch Pit of size 0.60 x
0.60 depth up to 1 mt including excavation, B.B.C.C. (1:5:10),
23 cms thick brick maso. wall in the prop. of CM (1:6) with
mm thick IPS flooring in the prop M15 at bottom and 15 mm
29 thick cement plaster inside the catch pit in the proportion of 30 No 3125.00
CM (1:3) with out jali etc. comp. as directed. (Based on
Drainage SOR 2015-16 Item No.1)page No.7
CatchPit Jali (Heavy duty) Fixing P/F FRC catch pit jali with
frame 600mm x 600mm clear opening etc. comp.. As directed
by engineer in charge. (Based on Drainage SOR 2015-16 Item
Providing, laying and jointing in true line and level UPVC pipe
(SCH-40) of following dia. Including fittings of standard make
31 as approved by Engineer-in-charge. (R & B Ah city Building
SOR 2023-24, Item code 23061) page no.170
a 15 mm (Item code 23061) page no.170 20 Rmt 71.93
b 25 mm (Item code 23062) page no.170 10 Rmt 90.93
c 32 mm (Item code 23063) page no.170 50 Rmt 117.97
Dismentaling tiled of stone floors laid in mortar including
stacking of serviceable materilas and disposal of
32 unserviceable materials with all lead and lift. (Based on 100 Smt 47.25
Building SOR 2023-24, Item No 20005,Page No:- 140)
Providing & Supplying Hitachi Machine -110 capacity on
rental basis in case of emergency situation and break down
type work & also during unavoidable condition as per
instruction of engg.incharge , rate includes all nece. shifting,
33 fuel and operating charges . (No payment should be allowed 8 hr 1785.71
for non working condition of machinery ) (Based on Drainage
SOR 2015-16) Item No.5 Page No.7
Providing & Supplying Hitachi Machine -200 capacity on
rental basis in case of emergency situation and break down
type work & also during unavoidable condition as per
instruction of engg.incharge , rate includes all nece. shifting,
34 fuel and operating charges. (No payment should be allowed 8 hr 2410.71
for non working condition of machinery ) (Based on Drainage
SOR 2015-16) item No.6 Page No.7
Providing & Supplying hydra carne Machine of 12 tone
capacity on rental basis in case of emergency situation and
break down type work & also during unavoidable condition as
per instruction of engg.incharge , rate includes all nece.
shifting, fuel and operating charges . (No payment should be Per
allowed for non working condition of machinery) (Based on hr Shift
Drainage SOR 2015-16) item No.7 Page No.7
Signature of Bidder Page 50 of
Ahmedabad Municipal Corporation
Supplying Electric Breaker Machine for RCC Slab or Asphalt
Demolishing Work on site by using Operator, fuel, power
Supply etc. Complete as Directed. (No payment should be
allowed for non working condition of machinery and for pipe
36 line excavation and M.H. work. Allowed only for break down 150 Shift 1071.43
work) ( Based on Previously approved rate by C E sir ) SOR -
(Jan. 2016) Rates for work of Drainage / SWD pipe line
Supplying Pneumatic Breaker Machine for RCC Slab or
Asphalt Demolishing Work on site by using Operator, fuel,
power Supply etc. Complete as Directed. (No payment should
be allowed for non working condition of machinery and for
37 pipe line excavation and M.H. work. Allowed only for break 40 Hr 535.71
down work) SOR - (Jan. 2016) Rates for work of Drainage /
SWD pipe line Machinery Sr.10
To provide Tractor with Hydraulic Trolley, driver with fuel, to
carryout different works during day/night for 8 Hrs. Shift.
Work shall be carried out as per the instructions of Engineer
38 In-Charge. No extra charged shall be paid for night shift. 20 Day 2104.09
GWSSB S.O.R 22-23 Machinery Sr.7 page no.105
Providing and supplying Chhakdo Rickshaw/chhota hathi type
vehicle during day and night shift at road store incl. fuel and
39 driver charges etc.comp. as dire.( shift for 10 hrs.)GWSSB SOR 50 Day 1153.24
22-23 Item No.7 Page NO.105
Providing and fixing pre-cast Rubber Dye / steel Dye inter
locking concrete block 60mm thick with grade of concrete
M300 pnumatic compressed / vibrated mechanically and as
per approved design Confirming to IS 15658 : 2006 including
40 35 mm Sand layer for levelling and filling the joint with sand 20 Smt 680.10
in proper line and level as per guidlines of IRC : SP 63-2018
etc. Complete.(P.123 I.No14033 Building S.O.R.2023-2024)
Providing and laying cement concrete 1:5:10 (1- Cement : 5-
fine sand : 10- graded brick bat aggregates 40mm nominal
size) and curing complete excluding cost of formwork in (A)
41 Foundation and Plinth (Building SOR 2023-24 Item Code No.
05009A , as per NBO Item No. 5.8.3; Page no. 56)
(A) Foundation and plinth 1 Cmt 2457.01
Providing and laying controlled cement concrete M.200 and
curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A)
42 Foundations, footings, Base of columns and Mass concrete 1 Cmt 3977.88
(Building SOR 2023-24 Item Code No. 05009A , as per NBO
Item No. 5.8.2; Page no. 56)
Signature of Bidder Page 51 of
Ahmedabad Municipal Corporation
Providing and operation dewatering Pump including fuel
charges & operator Charges etc. as directed etc. comp. (Shift
for Eight Hour) (For Each Pump Set, No payment should be
43 allowed for non working condition of machinery ) SOR - (Jan. 50 Shift 535.71
2016) Rates for work of Drainage / SWD pipe line Machinery
Dewatering by pumping set of required capacity including
temporary carting pumping at site and fixing the same in
position including all accessories and fuel and laboures
44 etc.complete. (GWSSB SOR-2022-23,Section -2 1500 HP/Hr 18.32
E,Miscelleneous,Item No.1,Page No.104)
Providing, laying, spreading and compacting graded stone
aggregate to wet mix macadam specification including
premixing the Material with water at OMC in mechanical mix
plant carriage of mixed Material by tipper to site, laying in
uniform layers in sub-base/base course on well prepared
45 surface and compacting with vibratory roller to achieve the
desired density as per Codal Provision. (RA Approved
St.Com.Res. No.189,Dt.19/05/2022)
a Production & Supply of WMM 75 Cmt. 1975.00
b Laying of WMM 75 Cmt. 35.00
M.S. Channel (Building Sor 2023-24, Material Basic Rate Item
46 10 Quintal 3811.02
No. 663 Code M681)
Labour work for fixing Interlocking Blocks / any kind of
pavement on up to 50 mm th sand bedding, levelling,
watering and fixing in line & level as well cleaning the site
47 etc.comp. as directed. AMC Central Verge / Footpath / 4 Smt. 69.64
Stone Paving S.O.R.Jan/2016 Sr.4 I Code
Providing & Supplying JCB Machine on rental basis in case of
emergency situation and break down type work & also during
unavoidable condition as per instruction of engg.incharge
rate includes all nece. shifting, fuel and operating charges and
stacking of useful & non-useful materials separately up to
48 store. (No payment should be allowed for non working 15 Hr. 535.71
condition of machinery and for pipe line excavation and
laying work) SOR - (Jan. 2016) Rates for work of Drainage /
SWD pipe line Machinery Sr.4
Supplying And Fixing Nimbhada Ladi 37 To 50 Mm Thick For
Walk-Way, Covering The Activity Of Excavation, Ramming,
Laying On Sand Bedding As Per Requirement To Fix The
49 Nibhada Stone In Line & Level With Cement Pointing In 13 Smt. 236.61
Cement Mortar 1:2 Etc Complete As Directed.AMC Central
Verge / Footpath / Stone Paving S.O.R.Jan/2016 Sr.8
Signature of Bidder Page 52 of
Ahmedabad Municipal Corporation
Providing and supplying of Class SN8 Structured Wall
polyethelenePipingsystems(Pipewithonline/offlinecouplerand
elastomeric sealing ring) with non-smooth External Annular
CorrugatedandSmoothInternalSurfaces(DoubleWall)
fornonpressure underground Sewerage&Drainage application
as per EN:13476-3 (manufacturewithAnti-roadentChemical)
including all local andcentral taxes, transportation, freight
50 charges,octroi, inspection charges, loading,
unloading,conveyance to the departmental stores etc.
complete. (ID Dia)DWC Pipe
(a) 100 mm dia 470 Rmt. 208.00
(b) 200 mm dia 300 Rmt. 738.00
Lowering, laying and jointing of class SN8 structuredwall (
External Annular Corrugated & Smooth Internal surface)
PolyethylenePipingandfittingswiththehelpofcoupler(online/
off line ) attached with one end of pipes, sliding over the
elastomericsealingrubberringplacedonthespecifiedvalleyofthe
corrugationat thespigot end, loweringthesameinto the
trench, layingonthelowerbedding(constructedatbottomof
trenches)at prescribedgradient,depth&alignment,
51 testingthewatertightness of the joints, ensuring the
continuity tests of specified pipe segmentsetc. completeasper
drawing, specifications&detailed
engineering,includingcarriageofpipes&fittingsfromsitestacks
to the place of laying etc. as per direction of Engineer-in-
(a) 100 mm dia 470 Rmt. 21.00
(b) 200 mm dia 300 Rmt. 33.00
(c) 250 mm dia 300 Rmt. 42.00
Providing&ConstructingPrecastRCCMachineholeinRCCM-40
grade Controlled concrete as per drawing, in OPC including
excavation,80mmthickP.C.C. inM-
52 15,ReinforcementinTMT500,PVCFoot
steps,Providing&fixingFRCManholeframe& cover including
inside epoxy paint complete etc.
For 200 & 250 dia. Pipe (upto 3 m. depth)
(i) 0.5 dia x 1.25m Depth after rate reduction approved rate
MC (CZ) Reso.No.25 Date 29.06.2026
(i) 0.6 dia x 1.25m Depth after rate reduction approved rate
MC (CZ) Reso.No.25 Date 29.06.2026 20 No. 15625
(ii) 0.6 dia - 1.26 to 1.99 m after rate reduction approved rate
MC (CZ) Reso.No.25 Date 29.06.2026 20 Rmt. 3385
(i) 0.9 dia x 1.25m Depth 15 No. 30105.00
(ii) 0.9 dia - 1.26 to 1.99 m Depth 15 Rmt. 8375.00
(i) 0.9 dia x 2.0m Depth 10 No. 36170.00
Signature of Bidder Page 53 of
Ahmedabad Municipal Corporation
(ii) 0.9 dia - 2.01 to 2.99 m Depth 10 Rmt. 8208.00
For 300 & 450 dia. Pipe (upto 4 m. depth)
(i) 1.2 dia x 2.0m Depth 3 No. 39704.00
(ii) 1.2 dia - 2.01 to 2.99 m Depth 3 Rmt. 9034.00
Providing and fixing M.S. grills of required pattern
to wooden frames of windows etc. with M.S. flats at
53 required spacings and frame alround, square or 500 Kg 143.63
round bars with round headed bolts and nuts or by
screws. (B) ORNAMENTAL GRILL
Seal and Signature of the Bidder Addl. City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 54 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
TENDER NO.52.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .