Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹17.3 Cr
EMD Value
₹27.3 L
Closing Date
30 Nov 2026, 4:00 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE ENGINEER, AURANGABAD
EE
PHED COLONY , AURANGABAD
MANOJ KUMAR
CHIEF ENGINEER
GR NO-04 Design, Construction, Supply of materials including Testing and Commissioning of 112 Nos. Piped Water Supply Schemes (ward level schemes) for left out habitations under ?Har Ghar nal Ka Jal? nischay yojna in panchayats where ?Har Ghar nal Ka Jal? was executed by the ?Panchayati Raj Department? with Electric Driven Pumps in different habitations of Obra Block on turn-key basis with 3 months Trial Run Period.
143958
RE-TENDER NIT No ?07/2026-27/(LoT/PRD)
Open Tender
CIVIL
Aurangabad
• Bid Validity
Bids shall remain valid for a period not less than 180 days after the deadline date. A Bid valid for a shorter period shall be rejected by the Employer as non-responsive
180 Days
Bid validity periods In days
• (i) Legal Status of Bidder.
(ii) Place of Registration.
(iii) Principal place of Business
(iv) Power of attorney of signatory Bid
Attached or Not.
• Achieved in any one year a minimum annual financial turnover (in all classes of civil engineering construction works only) volume of construction work of at least the amount equal to the 50% (fifty percent) estimated cost of works for which bid has been invited. The turnover will be indexed at the rate of 8% for a year. The certificates attached in support of turnover attached shall have valid Unique Document Identification Number (UDIN).
2019-20
Escalation Factor= 1.47
2020-21
Escalation Factor= 1.36
2021-22
Escalation Factor= 1.26
2022-23
Escalation Factor= 1.17
2023-24
Escalation Factor= 1.08
Amount To be entered (Rs in Lakhs)
• Work Experience (Refer SBD Section 1 ITB Clause 4.5A (b) and 4.5A (c))
• Bidding Capacity:------
Should be more than Available Bid capacity = (A x N x 3 - B)= Rs. _____, Where A= Maximum Value of work executed in any one year during last 5 yrs. , N = Number of years prescribed for completion of the works (Design Build Period) for which bids are invited, B= Value (updated to the price level of the year indicated in Appendix) of existing commitments and on-going works to be completed during the next 12 months
• Existing commitments and ongoing works.
• Work for which Bid already submitted.
• Availability of key items of Contractor's Equipment
Type of Equipment/Maximum
age No. Required Nos. Max. Age (01.04.25)
Concrete Mixer 2 5
Vibrator 4 5
Rotary Drilling / Reverse Rotary
/ DTH Rig Machine 1 10
Compressor 1 5
Truck/Tractor with trailer 1 5
Hydraulic Excavator 1 5
• Key Personnel-------------------------
Project Manager B.E. Civil + 10Years Exp. (5 years as Manager in PHED works) or retired E.E. & above of PHED 1
Site Engineer B.E. Civil + 07Years Exp. (3 years as Manager in PHED works) or retired A.E. & above of PHED 3
Site Supervisor B.E. Mech./Civil + 05 Years Exp. Or Dip. Mech./Civil + 07 years Exp. Or or retired J.E. & above of PHED 8
Surveyor .B E. Civil + 03 Years Exp. orDip. Civil + 05 years Exp. 2
• Evidence of accesses to Financial Resources
Evidence of access to or availability of credit facilities (10% of estimated cost), certified by bankers ( Not more than 3 month old) (Rs. in Lakh)
• Proposed methodology and programme of construction.
Justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion as per milestones. (Attached or not).
• Litigation History
Information regarding any litigation, current or during the last five years, in which the Bidder is involved, the parties concerned, and disputed amount. (Attached or not)
• Affidavit Regarding statements made in the required attachments are true and correct.
(Attached or not)
• Undertaking Able to invest a minimum of cost up to 25% of contract value of work. During implementation of contract.
25 % of B.O.Q. Amount
(Attached or not)
• PAN No.
• GST No.
• Valide Character Certificate
• Time of Completion
06 Months.
CIVIL
ITEM RATE
L1
1
24 documents required · 24 mandatory
₹10,000
Processing Fee: 11800
₹27.3 L
Office of Executive Engineer, P. H. Division, Aurangabad
21 Nov 2026
21 Nov 2026
30 Nov 2026
23 Nov 2026
30 Nov 2026
23 Nov 2026
24 Nov 2026
180 days
RE-TENDER NIT No –07/2026-27/(LoT/PRD)
TECHNICAL BID SHEET OF GROUP 04
Name of Work Design, Construction, Supply of materials including Testing and Commissioning of 112 Nos. Piped Water Supply Schemes (ward level schemes) for left out habitations under “Har Ghar nal Ka Jal” nischay yojna in panchayats where “Har Ghar nal Ka Jal” was executed by the “Panchayati Raj Department” with Electric Driven Pumps in different habitations of Obra Block in the District of Aurangabad, Bihar on turn-key basis with 3 months Trial Run Period. Cost of Work as per BOQ(Rs in Lakhs) 1733.70 Time of Completion in months 6 ALL COLOURED CELL TO BE FILLED ACCORDINGLY
Sanctioned Amount 1741.50 As per Technical Approval Date of Tender 30.11.2026
Sl No. Items Requirement Requirement Cl. No.
Name of the Contractor
Address of the Contractor
1 Bid Validity Bids shall remain valid for a period not less than 180 days after the deadline date. A Bid valid for a shorter period shall be rejected by the Employer as non-responsive 180 Days 15.1 Page/17 Bid validity periods In days
2 Bid Security Unconditional bank guarantee from any scheduled Indian bank issued within the state in the format given (If issued from any bank outside state will be converted to any bank within the state before executing the agreement, duly pledged in favour of the Executive Engineer, P.H. Division, Aurangabad. 16.1 Page-17 Amount To be entered (Rs in Lakhs)
Bid Security Amount - (Rs. In Lakhs) 27.32 Bid Security Amount - Rs. 0.00
3 (i) Legal Status of Bidder. 4.3(a) Page-12
(ii) Place of Registration.
(iii) Principal place of Business
(iv) Power of attorney of signatory Bid Attached or Not 4.2(iv) Page-11
4 Total value of civil engineering construction work performed in last five years. Achieved in any one year during the last five years, a minimum annual financial turnover (in all classes of civil engineering construction works only) volume of construction work of at least the amount equal to the 50% (fifty percent) of the estimated cost of the works for which bid has been invited. The turnover will be indexed at the rate of 8% for a year. The certificates attached in support of turnover attached shall have valid Unique Document Identification Number (UDIN). 866.85 4.5A (a) Page-12
2019-20 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.47 0.00000
2020-21 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.36 0.00000
2021-22 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.26 0.00000
2022-23 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.17 0.00000
2023-24 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.08 0.00000 0.00000
5 Work Experience of Similar nature Satisfactorily completed as a prime contractor (or as a nominated sub contractor, where the sub contract involved execution of all main items of work described in the bid document, provided further that all other qualification criterion are satisfied) at least one similar work of value not less than the amount indicated in the appendix (Not less than 10% (Ten percent) estimated value of contract 173.37 4.5A (b) Page -12-13 Amount To be entered (Rs in Lakhs)
6 Minimum Quantities of work done of similar nature during last five years. Executed the minimum quantities of the following item of work as indicated in the appendix:
Items Unit Quantity 4.5A(c) Page-12-13
High Yielding Tube well Nos. 22 Value to be entered in unit Nos
Pump/ Motor Nos. 22 Value to be entered in unit Nos
Distribution Main meter 14306 Value to be entered in unit Meter
House Connection Nos. 1552 Value to be entered in unit Nos
RCC/Steel Staging Nos. 14
Supply & installation of water treatment units Nos. #VALUE! Value to be entered in unit nos
7 Bidding Capacity: More than the total Bid value of present work = A*N*3-B=Rs. ____.Where A = Maxm. Value of work executed in any one yr during last 5 yrs. N= Nos of years for completion of works. B=Value of existing commitments & ongoing works to be completed in period. Necessity of bid capacity for bidders who meet the minimum qualifying criteria is not mandatory for ward wise schemes up to Rs. 2.00 crore in Har Ghar Nal Ka Jal Nishchay Yojna. Clause- 4.7(a) above is not applicable for this category of schemes 1733.700 4.7 Page- 13 0.00000
7 Bidding Capacity: Should be more than Available Bid capacity = (A x N x 3 - B)= Rs. _____, Where A= Maximum Value of work executed in any one year during last 5 yrs. , N = Number of years prescribed for completion of the works (Design Build Period) for which bids are invited, B= Value (updated to the price level of the year indicated in Appendix) of existing commitments and on-going works to be completed during the next 12 months 1733.70 4.7 Page-20 Amount To be entered (Rs in Lakhs)
8 (a) Existing commitments and ongoing works Page - 20 Amount To be entered (Rs in Lakhs)
(b) Work for which Bid already submitted Page - 20 Amount To be entered (Rs in Lakhs)
9 Availability of key items of Contractor's Equipment Type of Equipment/Maximum age No. Required Nos. Max. Age 4.5(B) (b) Page-26 Annexure-I Nos./ Max. Age
Concrete Mixer 2 5
Rotary Drilling / Reverse Rotary / DTH Rig Machine 1 10
Truck/Tractor with trailer 1 5
Hydraulic Excavator 1 5
10 Key Personnel 10-30 Crores 4.5(B) (b) Page-34 Annexure-II Name of the Personnel and Experience in years
Project Manager B.E. Civil + 10Years Exp. (5 years as Manager in PHED works) or retired E.E. & above of PHED 1
Site Engineer B.E. Civil + 07Years Exp. (3 years as Manager in PHED works) or retired A.E. & above of PHED 3
Site Supervisor B.E. Mech./Civil + 05 Years Exp. Or Dip. Mech./Civil + 07 years Exp. Or or retired J.E. & above of PHED 8
Surveyor .B E. Civil + 03 Years Exp. orDip. Civil + 05 years Exp. 2
11 Evidence of accesses to Financial Resources Evidence of access to or availability of credit facilities (10% of estimated cost), certified by bankers (Not more than 3 months old). (Rs in Lakhs). 173.37 Page 15 4.3 (g) Amount To be entered (Rs in Lakhs)
12 Proposed methodology and programme of construction. Justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion as per milestones. (Attached or not) Page 15 4.3 (l)
13 Litigation History Information regarding any litigation, current or during the last five years, in which the Bidder is involved, the parties concerned, and disputed amount. (Attached or not) Page 15 4.3 (j)
14 Affidavit Regarding statements made in the required attachments are true and correct. Page 23 12.1 (iv)
Affidavit as per Clause 4.8 Page 17 4.8
15 Undertaking Able to invest a minimum of cost upto 25% of contract value of work. During implementation of contract. 25 % of B.O.Q.Amount 433.43 Page 12 4.3 (h)
18 Character Certificate
19 Time of Completion 6 Months To be entered in months
Executive Engineer,
P.H. Division, Aurangabad.
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used for purposes of post qualification as provided for in Clause 4 of the Instructions to Bidders. This information will not be incorporated in the Contract.
NAME OF THE CONTRACTOR
1 For Individual Bidders
1.1 Constitution or legal status of Bidder (Attach copy)
Place of registration :
Principal place of business :
Power of attorney of signatory of Bid (Attach)
1.2 Total value of Civil Engineering construction work performed in the last five years** (in Rs. Million)
1.3.1 Work performed as prime contractor, work performed in the past as a nominated sub- contractor will also be considered provided the sub-contract involved execution of all main items of work described in the bid document, provided further that all oth
NAME OF THE CONTRACTOR
Project Name Name of the Employer* Description of work Contract No. Value of Contract (Rs. In Crore) Date of issue of work order Stipulated period of completion Actual date of completion* Remarks explaining reasons for delay & work completed)
* Attach certificate(s) from the Engineer(s)-in-Charge
** Immediately preceding the financial year in which bids are received.
Attach certificate from Chartered Accountant.
1.3.2 Quantities of work executed as prime contractor, work performed in the past as a nominated sub-contractor will also be considered provided the sub-contract involved execution of all main items of work described in the bid document, provided further that all other qualification criteria are satisfied (in the same name and style) in the last five years.
NAME OF THE CONTRACTOR
Year Name of the work Name of the Employer* Quantity of work performed
Remarks* (indicate contract Ref)
1.4 Information on Bid Capacity (works for which bids have been submitted and works which are yet to be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
NAME OF THE CONTRACTOR
Description of works Place & State Contract No. Name & Address of Employer Value of Contract (Rs Cr) Stipulated Period of Completion Value of works* remaining to be completed (Rs Cr) Anticipated date of completion
* Attach certificate(s) from the Engineer(s)-in-Charge
The item of work for which data is requested should tally with that specified in ITB clause 4.5A ©
** Immediately preceding the financial year in which bids are received.
# Delete, if prequalification has been carried out.
(B) Works for which bids already submitted :
Description of works Place & State Name & Address of Employer Estimated value of works (Rs Cr) Stipulated period of completion Date when decision is expected Remarks, if any
1.5 Availability of key items of Contractor’s Equipment essential for carrying out the Works [Ref. Clause 4.5(B)(a)]. The Bidder should list all the information requested below. Refer also to Sub Clause 4.3 (d) of the Instruction to Bidders.
NAME OF THE CONTRACTOR
Description of works Requirement Availability proposals Remarks (from whom to be purchased)
No. Capacity Owned/Leased to be procured Nos./Capacity Age/ Condition
1.6 Qualifications and experience of key personnel required for administration and execution of the Contract [Ref. Clause 4.5(B)(b)]. Attach biographical data. Refer also to Sub Clause 4.3 (e) of instructions to Bidders and Sub Clause 9.1 of the Condition
NAME OF THE CONTRACTOR
Position Name Qualification Year of Experience (General) Years of experience in the proposed position
1.7 Proposed sub-contracts and firms involved. [Refer ITB Clause 4.3(k)]
NAME OF THE CONTRACTOR
Sanction of the works Value of Sub-contract Sub-contractor (Name & Address) Experience in similar work
Attach copies of certificates on possession of valid license for executing water supply/ sanitary work/ building electrification works [Reference Clause 4.5(d) & Clause 4.5(e)]
*1.8 Financial reports for the last five years: balance sheets, profit and loss statements, auditors' reports (in case of companies/corporation), etc. List them below and attach copies.
1.9 Evidence of access to financial resources to meet the qualification requirements: cash in hand, lines of credit, etc. List them below and attach copies of support documents.
1.10 Name, address and telephone, telex and fax numbers of the Bidders' bankers who may provide references if contacted by the Employer.
1.11Information on litigation history in which the Bidder is involved.
NAME OF THE CONTRACTOR
Other Party(ies) Employer Cause of Dispute Amount involved Remarks showing Present Status
1.12 Statement of compliance under the requirements of Sub Clause 3.2 of the instructions to Bidders. (Name of Consultant engaged for project preparation is ** ........................ …………….............................)
Proposed work method and schedule. The Bidder should attach descriptions, drawings and charts as necessary to comply with the requirements of the Bidding documents. [Refer ITB Clause 4.1 & 4.3(1)]
1.15 Quality Assurance Programme
2 Additional Requirements
2.1 Bidders should provide any additional information required to fulfill the requirements of Clause 4 of the Instructions to the Bidders, if applicable.
(ii) Undertaking
*** (iii) Update of original prequalification application
*** (iv) Copy of original prequalification application
*** (v) Copy of prequalification letter
* Delete, if prequalification has been carried out.
** Fill the Name of Consultant.
*** Delete, if prequalification has not been carried out.
Check List for Submission Of Tender
Evaluation will be done as per the information provided in the document attached with tender. Bidder may disqualified, if documents are not attached properly.
Name of the Bidder
Sl. No. Checklist Items (Attach Documents in Edit Attachment Folder) Document attached
1 BIDSECURITY PHOTO COPY
2 LAST 5 YEARS ANNUAL TURN OVER
3 EXPERIENCE Of SIMILAR NATURE Of W0RKS
4 QUANTITY OF WORK OF SIMILAR NATURE EXECUTED DURING LAST 5 YEARS)
5 BALANCE VALUE OF ON GOING WORKS
6 EXISTING COMMITMENTS
7 BANKER'S CERTIFICATE FOR ACCESS OF FINACIAL RESOURCES
10 LITIGATION HISTORY
11 PLANT and MACHINARIES
12 KEY PERSONNEL
13 Registration
14 Power of Attoney
15 Legal Status Of Bidder
16 PROGRAMME Of CONSTRUCTION
17 NOC FOR DEBAR
18 LABOUR LICENCE
20 GST CERTIFICATE
21 Character Certificate
22 Any other Documens required as per NIT/ Standard Bidding Documents Required
IF YOU HAVE NOT BEEN DEBARED WRITE "NOT APPLICABLE" IN YOUR LETTER HEAD SCAN AND UPLOAD IN THE IN NOC FOR DEBAR LINK
Note:-Attachment should be self attested and should be attached as per above instruction, otherwise it may be rejected.
I, the undersigned, do hereby certify that all the statements made in the required attachments are true and correct.
Signature & Seal of the Bidder
RE-TENDER NIT No –07/2026-27/(LoT/PRD)
Financial Bid Sheet Group 04
Name of The Work: Design, Construction, Supply of materials including Testing and Commissioning of 112 Nos. Piped Water Supply Schemes (ward level schemes) for left out habitations under “Har Ghar nal Ka Jal” nischay yojna in panchayats where “Har Ghar nal Ka Jal” was executed by the “Panchayati Raj Department” with Electric Driven Pumps in different habitations of Obra Block in the District of Aurangabad, Bihar on turn-key basis with 3 months Trial Run Period.
Date of Tender :- 30.11.2026
Estimated Cost:- 173370000
Earnest Money :- 2732000
Time of Completion :- 6 MONTHS
Cost of BSEDC Bid processing fee:- Rs 11800.00 (to be paid online)
Cost of BOQ :- Rs 10,000.00 (to be paid online)
Name and Address of the Bidder
Sl. No. Particulars Rate in Rs. Qty. Unit Amount in Rs
ITEM WISE COST BREAKUP FOR
SECTION – A : EXECUTION PART
1A Construction of 150mm X91m deep Gravel packed T/W etc. all complete and as per direction of E/I. 112 Each 1A Construction of 150mm dia & 91 M Gravel packed T/W etc. all complete and as per direction of E/I.
1B Construction of 150MM DIA & 90 M deep drilled T/W etc. all complete and as per direction of E/I. 0 Each 1B Estimate of Construction of 200/165mm dia 125Mtr Deep Drilled High Yield Tube Well by DTH Rig Machine With Blue Casingh UPVC Pipe all complete and as per direction of E/I.
2 Constructing masonry Chamber 100x100x75 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for Tube Well, and RCC top slab 1:1.5:3 mix (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size ) , necessary excavation, foundation concrete 1:2:4(1 cement : 2 fine sand : 4 graded stone aggregate 20 mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3coarse sand) 12 mm thick with 5% cico fnished with a floating coat of neat cement, out side plastering with cement mortar 1:4 (1 cement : 4coarse sand) 12 mm thick complete as per standard specifications & direction of E/I. 112 Each 2 Constructing masonry Chamber 100x100x75 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for Tube Well, and RCC top slab 1:1.5:3 mix (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size ) , necessary excavation, foundation concrete 1:2:4(1 cement : 2 fine sand : 4 graded stone aggregate 20 mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3coarse sand) 12 mm thick with 5% cico fnished with a floating coat of neat cement, out side plastering with cement mortar 1:4 (1 cement : 4coarse sand) 12 mm thick complete as per standard specifications & direction of E/I.
3A Supplying and installation, commissioning and testing of 3 HP Single phase SubSupplying and installation, commissioning and testing of 3 HP Single phase Submersible pump and motor of KSB/Kirloskar or or equivalent make having discharge of 2.5 to 3 lps against a total head of 45 m including doing power and light wiring SUPPLYING & FITTING service wire extension of L T line (0.3Km) & 65 mm dia G I medium class column pipe, 65 / 50mm dia Riser pipe (L), 65 / 50 mm dia N/R Valve, 65/50mm dia flange and Supplying and installation of 7.5 KVA Stablizer, taking single phase connection, Meter Board, Starter including power wiring all complete job etc all complete as per direction of E/I. 69 Each 3A Supplying and installation, commissioning and testing of 3 HP Single phase Submersible pump and motor of KSB/Kirloskar or or equivalent make having discharge of 2.5 to 3.35 lps against a total head of 35 m including doing power and light wiring SUPPLYING & FITTING service wire extension of L T line (0.3Km) & 50 mm dia G I medium class column pipe, 50 mm dia Riser pipe (30 Mtr.), 50 mm dia N/R Valve, 50 mm dia flange and Supplying and installation of 7.5 KVA Stablizer, taking single phase connection, Meter Board, Starter including power wiring all complete job etc all complete as per direction of E/I.
3B Supplying and installation, commissioning and testing of 2 HP Single phase SubSupplying and installation, commissioning and testing of 2 HP Single phase Submersible pump and motor of KSB/Kirloskar or or equivalent make having discharge of 2 to 2.35 lps against a total head of 35 m including doing power and light wiring SUPPLYING & FITTING service wire extension of L T line (0.3Km) & 65 mm dia G I medium class column pipe, 65 / 50mm dia Riser pipe (L), 65 / 50 mm dia N/R Valve, 65/50mm dia flange and Supplying and installation of 7.5 KVA Stablizer, taking single phase connection, Meter Board, Starter including power wiring all complete job etc all complete as per direction of E/I. 43 Each 3B Supply, installation & commissioning of single phase 2 H.P submersible motor pump set with all accessories including extension of L.T. line from nearest source up-to pumping station.
4 Supplying all materials and Laying of distribution network as per the directions of Engineer in Charge including Earthwork in 30m wide and 1.1m deep trenches, Including crossing of ditches Road cutting and restoration and backfilling the trenches after layig of line, providing and laying HDPE pipe of 90 mm dia, 75 mm dia and 63 mm dia of (PE-PN10 rating) as per IS 4984/1995 and 50 mm dia pipe (PE100-PN8 rating) as required including supplying all jointing materials etc. including all taxes, duties etc.-and incidental charges providing necessary thrust block where as required, construction of brick masonary chamber (60cm x 60cm x 75cm) for valves with cost of certification mark and fixing in trenches including the cost of fullway valves, earth work in back filling the trenches after laying of different types and sizes of pipe, fittings and valves with earth removed during excavation within initial lead and lift etc. including providing night guard, barrier and red light to safe guard against accident, testing of laid pipes etc. all complete job as per specification and direction of E/I. 3C Supplying, testing and commissioning of Solar photovoltaic water pumping system consising of 02 H.P. Submersible pump (900/1800/2700 water pump) (300 watt or above/PV Module) suitable for 100mm dia & above dia bore well with sufficient length of cable for inter connection from PV Array to motor pump on off switch for motor, PV array mounted on sutiable fixed structure with daily yield per day 20000 LPD minimun. The SPV water pumping system should be operated with a PV array in the range of 200 watts to 3000 watts. This power output of individual PV modules used in the PV array under STC should be minimum of 75 watts. The PV module shall be as per IES 61215 (revised) specification or equivalent National or International standards.
HDPE PIPE AND FITTING 4 Supplying all materials and Laying of distribution network as per the directions of Engineer in Charge including Earthwork in 30m wide and 1.1m deep trenches, Including crossing of ditches Road cutting and restoration and backfilling the trenches after layig of line, providing and laying HDPE pipe of 90 mm dia, 75 mm dia and 63 mm dia of (PE-PN10 rating) as per IS 4984/1995 and 50 mm dia pipe (PE100-PN8 rating) as required including supplying all jointing materials etc. including all taxes, duties etc.-and incidental charges providing necessary thrust block where as required, construction of brick masonary chamber (60cm x 60cm x 75cm) for valves with cost of certification mark and fixing in trenches including the cost of fullway valves, earth work in back filling the trenches after laying of different types and sizes of pipe, fittings and valves with earth removed during excavation within initial lead and lift etc. including providing night guard, barrier and red light to safe guard against accident, testing of laid pipes etc. all complete job as per specification and direction of E/I.
90mm PE 100-PN10 3576 PM HDPE PIPE AND FITTING
75mm PE 100-PN10 17882 PM 90mm PE 100-PN10
63mm PE 100-PN10 21458 PM 75mm PE 100-PN10
50mm PE 100-PN8 28612 PM 63mm PE 100-PN10
40mm PE 100-PN8 0 PM
5 Providing and placing on terrace (at all floor levels)/8 M staging polyethylene water storage tank, (10000 liter capacity =2x5000 liter each) ISI : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. 69 Each 50mm PE 100-PN8
6 Providing house connection for each house hold including supplying all materials, labours, tools and making ferrule connection with 20 mm dia MDPE and 15mm G.I Pipes with all fittings etc all complete. 7761 Each 40mm PE 100-PN8
7A Providing and erecting 8M high staging with ladder of ISA65x65x6 and 16mm dia MS bar as trade @ 400mm c/c and GI enclosure to house electric switch panel & treatment unit (where required) of suitably designed MS section of angle, channel, etc. as per drawing attached. . 69 Each 5 Providing and placing on terrace (at all floor levels)/8 M staging polyethylene water storage tank, (10000 liter capacity =2x5000 liter each) ISI : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank.
7B Construction of 2.10x2.40mx2.40 m high of Attendanent Cum Chlorinator room. 43 Each
8 Installation of Electronically Regulated Doser type chlorinator using Sodium Hypo Chlorite (Hypo NaOCl) 112 Each 6 Providing house connection for each house hold including supplying all materials, labours, tools and making ferrule connection with 20 mm dia MDPE and 15mm G.I Pipes with all fittings etc all complete.
9 Surveying and levelling using Total Station/DGPS or auto level instruments of the project area including transfer of relevant bench mark to establish the levels of strategic points at the selected position of the T/Well, pumping station & attach the surveying data sheet with drawing of pipe line, map of location of HYDT & Steel structure etc. all complete work. 71.53 P/Km 7A Providing and erecting 8M high staging with ladder of ISA65x65x6 and 16mm dia MS bar as trade @ 400mm c/c and GI enclosure to house electric switch panel & treatment unit (where required) of suitably designed MS section of angle, channel, etc. as per drawing attached. .
10 Cost of Applying for Taking Electricity connection including installation of Electric Meter on the scheme. 112 Each
11 Cost for Electricity charges for a period of 3 months ( Trial Run Period ) ( @ Rs.4860 / 3 month ) [ FOR 3HP ] 69 Each
12 Cost for Electricity charges for a period of 3 months ( Trial Run Period ) ( @ Rs.3290 / 3 month ) [ FOR 2HP ] 43 Each
13 For 2 PPM & 30% Chlorine solution of { Total population served ( say = 400 nos. (avg.) / scheme )} *81*2/1000000)*(100/30)*3months*30* No.of schemes 112 Each
Total-A 7B Construction of 2.10x2.40mx2.40 m high of Attendanent Cum Chlorinator room.
Bidders are required make the entries in the coloured cells only. 12 Cost for Electricity charges for a period of 3 months (Trial Run Period) @ Rs.2.45/unit [FOR 3 HP]
13 Cost for Electricity charges for a period of 3 months (Trial Run Period) @ Rs.2.45/unit [FOR 2 HP]
Executive Engineer,
P.H. Division, Aurangabad.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Standard Bidding Doc_leftover tolas_PRD GR-04.doc
NIT • 0.98 MB
TECHNICALBID GR-04.xlsx
NIT • 0.08 MB
NIT No-07(2026-27) (LoTPRD).pdf
NIT • 0.82 MB
NIT-07 PAPERCUTTING DT-20.11.2026.pdf
NIT • 4.50 MB
FINANCIALBID GR-04.xls
NIT • 0.05 MB
C1 Corrigendum (4).pdf
Corrigendum • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .