| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 CrAdmitted-Finance | ₹4.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.3 Cr+₹10.4 L (2.48%)Admitted-Finance MAIN ROAD PRAGATI VIHAR RISHIKESH DEHRADUN 249201 | DEHRADUN | UTTARAKHAND | 249201 | ₹4.3 Cr+₹10.4 L (2.48%) | L2 | Admitted-Finance |
| 3 | L3₹4.3 Cr+₹13.6 L (3.25%)Admitted-Finance | ₹4.3 Cr+₹13.6 L (3.25%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically Disqualified |
| Sl No | Description | Qty | Unit | ALPHA PACIFIC SYSTEMS PVT. LTD. L3 | M/S PURNAGIRI CONSTRUCTION CO. PVT. LTD. L1 | SS Soam Engineers Pvt. Ltd. L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)including getting out and disposal of excavated earth lead upto 50 m and for all lift , as directed by Engineer-in-charge. All kinds of soil. | 6,400 | Cum | 180 ₹11,52,000 | 177 ₹11,32,800 Lowest | 190 ₹12,16,000 |
| 2.00 | Laying of LDPE film (250micron, 5.80m wide *50m long) confirming to IC 2508 revised 1984 or its latest amendments, with the help of Bamboos on the side slopes of ring band in submerged area including cost of all materials. | 1,848 | Sqm | 60 ₹1,10,880 Lowest | 63 ₹1,16,424 | 65 ₹1,20,120 |
| 3.00 | Providing and laying of Empty Cement Bags ( Gunny Bags) filled with local sand and tightened using sutli and carriage upto site including preparing subgrade before placing in position, also including supply of all material, labour, T&P etc required for proper completion of the work. | 25,596 | Nos | 20 ₹5,11,920 | 18 ₹4,60,728 Lowest | 23 ₹5,88,708 |
| 4.00 | Dewatering by electric pumps | 1,93,363 | Kwh | 29 ₹56,07,527 | 27 ₹52,20,801 Lowest | 28 ₹54,14,164 |
| 5.00 | Providing and laying in position specified grade of cement concrete excluding the cost of centering, shuttering, finishing -All work upto plinth level 1:2:4 (1 cement : 2 coarse sand(zone-111)derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources). | 3,820.5 | Cum | 8,475 ₹3,23,78,737.5 | 8,250 ₹3,15,19,125 Lowest | 8,400 ₹3,20,92,200 |
| 6.00 | Drilling 32 mm dia holes 150 cm deep in old concrete. | 300 | Nos | 470 ₹1,41,000 | 457 ₹1,37,100 Lowest | 525 ₹1,57,500 |
| 7.00 | Steel reinforcement for R.C.C. work including straitening, cutting, bending, placing in position and binding all complete above plinth level. Thermo - mechanically treated bars of Fe 500D or more. | 2,893.5 | Kg | 120 ₹3,47,220 | 107 ₹3,09,604.5 Lowest | 125 ₹3,61,687.5 |
| 8.00 | Preparation and poring of Epoxy primer drill holes as per direction of Engineer - in - charge, including cost of all material. | 157.86 | Kg | 470 ₹74,194.2 | 463 ₹73,089.18 Lowest | 510 ₹80,508.6 |
| 9.00 | Centering and Shuttering including strutting's, propping etc. and for foundations, footings, bases for columns, removal of form work. | 368.66 | Sqm | 400 ₹1,47,464 | 390 ₹1,43,777.4 Lowest | 425 ₹1,56,680.5 |
| 10.00 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work;using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.All works upto plinth level Concrete of M50 grade with minimum cement content of 410 kg/cum. | 16.5 | Cum | 11,800 ₹1,94,700 | 10,108 ₹1,66,782 Lowest | 12,500 ₹2,06,250 |
Tender Value
Refer Docs
EMD Value
₹8.0 L
Closing Date
21 Dec 2024, 11:30 amClosed
Group Sr. Manager (Contracts)
Procurement- Contract Divison, Tanakpur Power Station, Banbassa , Champawat
Restoration of Launching Apron and right warp wall of under sluice bay no 01 to 5 of TPS Barrage
2024_NHPC_837242_1
NH/TPS/PnC/NIT/2024/E 130306 /1055/513 dt 29/11/2024
Open Tender
Civil Works
Works
120 days
NHPC Ltd. Tanakpur Power Station, Banbasa
As per tender document
5 documents required · 5 mandatory
₹1,770
NHPC Ltd. Tanakpur Power Station
₹8.0 L
Yes
14 Jan 2025
30 Nov 2024
24 Dec 2024
30 Nov 2024
21 Dec 2024
30 Nov 2024
30 Nov 2024 - 10 Dec 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)including getting out and disposal of excavated earth lead upto 50 m and for all lift , as directed by Engineer-in-charge. All kinds of soil. | 6,400 | Cum | - | - |
| 2 | Laying of LDPE film (250micron, 5.80m wide *50m long) confirming to IC 2508 revised 1984 or its latest amendments, with the help of Bamboos on the side slopes of ring band in submerged area including cost of all materials. | 1,848 | Sqm | - | - |
| 3 | Providing and laying of Empty Cement Bags ( Gunny Bags) filled with local sand and tightened using sutli and carriage upto site including preparing subgrade before placing in position, also including supply of all material, labour, T&P etc required for proper completion of the work. | 25,596 | Nos | - | - |
| 4 | Dewatering by electric pumps | 1,93,363 | Kwh | - | - |
| 5 | Providing and laying in position specified grade of cement concrete excluding the cost of centering, shuttering, finishing -All work upto plinth level 1:2:4 (1 cement : 2 coarse sand(zone-111)derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources). | 3,820.5 | Cum | - | - |
| 6 | Drilling 32 mm dia holes 150 cm deep in old concrete. | 300 | Nos | - | - |
| 7 | Steel reinforcement for R.C.C. work including straitening, cutting, bending, placing in position and binding all complete above plinth level. Thermo - mechanically treated bars of Fe 500D or more. | 2,893.5 | Kg | - | - |
| 8 | Preparation and poring of Epoxy primer drill holes as per direction of Engineer - in - charge, including cost of all material. | 157.86 | Kg | - | - |
| 9 | Centering and Shuttering including strutting's, propping etc. and for foundations, footings, bases for columns, removal of form work. | 368.66 | Sqm | - | - |
| 10 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work;using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.All works upto plinth level Concrete of M50 grade with minimum cement content of 410 kg/cum. | 16.5 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.32 MB
Tenderdocument.pdf
Tender Documents • 3.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .