Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2022.0 CrAccepted-AOC AFCONS HOUSE 16 SHAH INDUSTRIAL ESTATE VEERA DESAI ROAD AZADNAGAR ANDHERI WEST MUMBAI 400 053 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400053 | L1 | Accepted-AOC L1 | |
| 2 | L2₹2232.9 Cr+₹210.9 Cr (10.4%)Rejected-AOC 48 9 17 DWARKANAGAR VISAKHAPATNAM 530016 | VISAKHAPATANAM | ANDHRA PRADESH | 530016 | L2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | - | Rejected-Technical Non Compliant as per Qualification Crieteria |
Tender Value
₹2024.6 Cr
EMD Value
₹20.5 Cr
Closing Date
25 Apr 2024, 5:00 pmClosed
General Manager, PIU Jamrani, UPDCC
Office of General Manager, PIU Jamrani, UPDCC, Jamrani Irrigation Colony, Damuwadhunga, Kathgodam, Haldwani, Distt Nainital, Uttarakhand
Civil and Hydromechanical works of dam and appurtenant works
2024_UPDC5_70430_1
01/GM/PIUJ/Dam/2023-24
Open Tender
Civil Works - Others
Item Rate
1825 days
Jamrani, Haldwani
Please refer Tender documents.
4 documents required · 4 mandatory
₹1.2 L
GM PIU Jamrani UPDCC
₹20.5 Cr
PIU Jamrani office, Damuwadhunga,Haldwani
23 Nov 2024
27 Feb 2024
26 Apr 2024
27 Feb 2024
25 Apr 2024
20 Mar 2024
28 Feb 2024 - 8 Mar 2024
12 Mar 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dewatering of surface construction sites /As per Technical Specification SECTION B.1 (1.3.2/1.4.1) | 32,50,000 | KWH | 48.28 | ₹15,69,10,000 |
| 2 | Dewatering of Diversion Tunnels /As per Technical Specification SECTION B.1 (1.3.3/1.4.2) | 7,50,000 | KWH | 61.43 | ₹4,60,72,500 |
| 3 | Ordinary Excavation for Dam all other open structure /As per Technical Specification SECTION B.2 (2.3.1/2.10.3) | 7,06,647.39 | m3 | 435 | ₹30,73,91,614.65 |
| 4 | Rock Excavation for Dam all other open structure /As per Technical Specification SECTION B.2 (2.3.2/2.10.4) | 4,27,294.32 | m3 | 886 | ₹37,85,82,767.52 |
| 5 | Dental Excavation /As per Technical Specification SECTION B.2 (2.3.3/2.10.7) | 27,274.11 | m3 | 1,252 | ₹3,41,47,185.72 |
| 6 | Rock excavation in Diversion Tunnel As per Technical Specification SECTION B.3 (3.8.1/3.8.2/./3.15.1/3.15.2) | 87,203.2 | m3 | 2,048 | ₹17,85,92,153.6 |
| 7 | Wire-Mesh (100 * 120 mm opening) SECTION B.3 , 3mm mesh wire dia | 8,598.74 | Sqm | 152 | ₹13,07,008.48 |
| 8 | Common Excavation for Diversion Tunnel /As per Technical Specification SECTION B.3 (3.8.1/3.8.2/./3.15.1/3.15.2) | 10,259.2 | m3 | 2,718 | ₹2,78,84,505.6 |
| 9 | Open Excavation In Inlet Portals for DT as per Technical SECTION B.3(2.3.1/2.10.3) | 5,129.6 | m3 | 435 | ₹22,31,376 |
| 10 | Rock anchors (25 mm dia.)-Length up to 3 m /As per Technical Specification (4.5.2/4.10.1/4.10.2) | 100.8 | m | 746.23 | ₹75,219.98 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_84583.xls
BOQ Document • 0.49 MB
140570535.pdf
Tender Document • 0.81 MB
BidDocumentJamraniDamVol5to6.pdf
Tender Document • 33.78 MB
BiddocumentJamraniVol0to4.pdf
Tender Document • 38.60 MB
140570540.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .