| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹13.2 L+₹1,087 (0.08%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹13.2 L+₹9,105 (0.69%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹14.0 L+₹82,070 (6.24%)Admitted-Finance KOUSTHUBAM 31 76A 1 MAYANAD KOZHIKODE 673008 | KOZHIKODE | KERALA | 673008 | L4 | Admitted-Finance | |
| 5 | L5₹14.0 L+₹82,700 (6.29%)Admitted-Finance SIVAJYOTHI ENGOLIPARAMBU KARANTHUR 673571 | KOZHIKODE | KERALA | 673571 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | HARISH KUMAR CP L6 | HRL ENTERPRISES L1 | RAJENDRA PRASAD B L3 | Celmech Engineering Pvt.Ltd L4 | SIVADASAN N L5 | JAIN P MATHEW L7 | EK MOIDEEN L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00EARTH WORK | ||||||||||
| 1.10Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead anywhere in campus and for all lift, as directed by Engineer-in-charge. | ||||||||||
| 1.11 | All kinds of soil | 51 | cum | 350 ₹17,850 | 220 ₹11,220 | 250 ₹12,750 | 450 ₹22,950 | 150 ₹7,650 | 1,500 ₹76,500 | 90 ₹4,590 Lowest |
| 1.20Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. | ||||||||||
| 1.21 | Beyond 30 cm girth upto and including 60 cm girth | 5 | each | 1,000 ₹5,000 | 450 ₹2,250 Lowest | 1,000 ₹5,000 | 5,000 ₹25,000 | 450 ₹2,250 Lowest | 500 ₹2,500 | 1,400 ₹7,000 |
| 1.22 | Beyond 60 cm girth upto and including 120 cm girth | 2 | Each | 2,500 ₹5,000 | 750 ₹1,500 Lowest | 1,000 ₹2,000 | 8,000 ₹16,000 | 1,950 ₹3,900 | 1,000 ₹2,000 | 3,000 ₹6,000 |
| 2.00CEMENT CONCRETE (CAST IN SITU) | ||||||||||
| 2.10Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | ||||||||||
| 2.11 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 9 | CUM | 7,000 ₹63,000 | 6,400 ₹57,600 | 7,000 ₹63,000 | 7,500 ₹67,500 | 6,300 ₹56,700 Lowest | 8,000 ₹72,000 | 6,874 ₹61,866 |
| 3.00REINFORCED CEMENT CONCRETE | ||||||||||
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
12 Sept 2025, 6:00 pmClosed
Director
NIT Calicut, NIT Calicut Campus PO, Kerala, 673601
Construction of compound wall from Health Centre to REC school and road side
2025_NITC_874383_1
Engg/D1/JE9/398/2024-25
Open Tender
Civil Works
Item Rate
60 days
NIT Calicut, NIT Calicut Campus PO, 673601
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹30,000
Yes
15 Oct 2025
22 Aug 2025
15 Sept 2025
22 Aug 2025
12 Sept 2025
22 Aug 2025
Amount
EARTH WORK
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead anywhere in campus and for all lift, as directed by Engineer-in-charge.
All kinds of soil
Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.
Beyond 30 cm girth upto and including 60 cm girth
Beyond 60 cm girth upto and including 120 cm girth
CEMENT CONCRETE (CAST IN SITU)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
REINFORCED CEMENT CONCRETE
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement:
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
MASONRY WORK
Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest size for superstructure above plinth level up to floor two level including all cost of materials, labour charges etc..
Cement Mortar 1:6 (1 cement : 6 coarse sand).
solid masonry with neatly dressed precastsolid block of size 40x20x15cm or nearest size for superstructure above plinth level to floor two level including all cost of materials, labour charges etc.
STONE WORK
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :
Cement mortar 1:6 (1 cement : 6 coarse sand)
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level : with available dismantled stone
STEEL WORK
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.
GI Tubular TATA or equvalent
FINISHING
12 mm cement plaster of mix :
1:4 (1 cement: 4 fine sand)
Finishing walls with Acrylic Smooth exterior paint of required shade .
New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.
On steel work
Dismantling and Demolishing
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material outside the campus by own arrangement
In cement mortar
Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material outside the campus by own arrangement
In cement mortar
ROAD WORK
Providing and fixing G.I. chain link fabric fencing of required width in mesh size 25x25 mm made of G.I. wire of dia 3 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge.
EK MOIDEEN (BID ID -3281798)
RAJENDRA PRASAD B (BID ID -3281480)
Celmech Engineering Pvt.Ltd (BID ID -3281513)
SIVADASAN N (BID ID -3281661)
HARISH KUMAR CP (BID ID -3281394)
JAIN P MATHEW (BID ID -3281636)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .