| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹55.1 LAccepted-AOC 105 K N SEN LANE KOLKATA 700 042 | KOLKATA | KOLKATA | WEST BENGAL | 700042 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹63.0 L+₹5.0 L (8.60%)Rejected-Finance MAJIRHAT MECHEDA DIST PURBA MEDINIPUR PIN 721137 | MECHEDA | PURBA MEDINIPUR | WEST BENGAL | 721137 | L2 | Rejected-Finance Higher bid value | |
| 3 | L3₹64.1 L+₹6.0 L (10.4%)Rejected-Finance 16 12A SWAMIJI ROAD NEAR SABUJ SANGHA KOLKATA WEST BENGAL 700060 | KOLKATA | WEST BENGAL | 700060 | L3 | Rejected-Finance Highest bid value |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
23 Jul 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The DGM(MandC)KTPS
GM bldg,KTPS,Mecheda,Purba Medinipur
Rate Contract for Repairing and Maintenance jobs of Coal Nozzles, Burners, Air Registers, Coal Mills, Coal Pipes, Jobs related to I.D.Fans,F.D.Fans and P.A. Fans, Air Seal System, Coal Feeder, Coal Cleaning Work of Unit No. 3 under BM, KTPS for six m
2021_WBPDC_333649_1
GM(K)/CC /BM/ 2330(Vol-8)/E1803/20-21
Open Tender
Support/Maintenance Service
Item Rate
180 days
GM bldg, KTPS, Mecheda, Purba Medinipur 721137
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.1 L
Yes
Conference Hall,GM bldg,KTPS,Mecheda,Purba Medinip
30 Jun 2022
30 Jun 2021
26 Jul 2021
30 Jun 2021
23 Jul 2021
9 Jul 2021
7 Jul 2021
180 days
Amount
COAL MILL WORK: GRINDING ZONE: Insertion of Filling Balls & if re-quired, Damaged Balls are to be removed from the Coal Mill
Insertion of Filling Balls.
Replacement of Stirrup assembly & if required Swivel Balls of Stir-rup Assembly are to be changed
Loading Block of Spider replace-ment & allied work as necessary
Total Set of Grinding Ball re-placement
Measurement of wear of Ring & Ball
Checking of Coal Mill internals
CLASSIFYING EQUIPMENT WORKS: Replacement of Throat Plate & allied work as necessary
Readjustment of Throat Gap & if required necessary repairing jobs between Mill Housing & Throat Plate are to be done
Classifier Blade adjustment
Replacement of Classifier Blade
Total set of Throat Plate replace-ment & allied work as necessary
LOADING SYSTEM WORK: Replacement of Loading Unit as-sembly
Replacement of Loading Cylinder
Repairing of Walker Seal/Loading cylinder servicing
Bolt tightening of Mill Housing
Bolt tightening of Loading Units
REJECTION SYSTEM WORK: Cleaning of Rejection passage
Cleaning of Rejection passage along with Scrapper Plate fitting
Replacement after fabrication of Brush Plough Door
Repairing / replacement of knife Gate assembly including all asso-ciated work
Repairing / replacement of pyrite Gate assembly including all asso-ciated work /SA fan anti vibration pad replacement with associated job
Thorough repairing & refitting of Gravity Damper assembly
COAL MILL WEAR PLATE WORK: Replacement of Mill Housing Lin-er
COAL PIPE WORK: Replacement of “Y” piece
Replacement of Coal Carrying Pipe (CCP) Bends
Replacement of Straight CCP
Replacement of NRV after repair-ing including Hard Facing at cor-ners
Fabrication & fitting / replacement of Coal Sampler
Dismantling & refitting of John-son’s Coupling (JC) & Sealing rings. Rockwell coupling fitting with seal rings. Eroded portion of straight CCP carrying JC is to be replaced by welding fresh part of CCP.
REPAIRING WORK OF COAL PIPE: Coal dust leakage to be stopped by inserting asbestos rope or by tightening the Johnson’s Coupling
Coal dust leakage to be stopped by application of Sodium silicate / jute packing with grease on leakage point/Burner cleaning / oil top up
COAL CLEANING WORK: Cleaning of choked Coal Carrying Pipe
Cleaning of Coal Mill inside
Cleaning of Coal Feeder box & if required Coal Bunker is to be iso-lated by operating the gates
Cleaning of choked Feeder to Mill drop pipe & chute/Loading unit servicing
Cleaning of choked Coal Burner Mouth
FOREIGN MATERIAL REMOVAL WORK: Removal of foreign material from inside the Coal Feeder box
Removal of foreign material from Coal Mill after necessary checking of Mill inside & Ring, Ball meas-urement to be carried out if re-quired
Removal of foreign material after necessary checking from rotary throt of modified Mill, if required by gas cutting.
AIR SEAL SYSTEM WORK: Replacement / readjustment of Air Seal system as a whole (upper & lower outer seal)
Air Seal pipe cleaning & meas-urement of Bottom Air Seal gap
PATCH REPAIRING WORK: Patch repair in position by re-quired portion of MS plate weld-ing
Welding of leakage joints
COAL FEEDER WORK: Through repairing of Coal feeder with all necessary work as per scope of work
Complete removal of Drag Link Chain & refitting the same after thorough repairing of the chain
Bed Height adjustment & if re-quired partial cleaning of coal feeder
Replacement of Scrapper bar & Chain link of Drag link chain of Coal Feeder in situ
Replacement of Conical Chute
Replacement of Drop pipe includ-ing fitting of man holes after fab-rication of the same
Feeder chain checking & all pin tacking
Feeder bearing greasing (4 nos.)
Feeder chain tension checking & tightening
Replacement of Duplex chain
ALIGNMENT WORK: Alignment of Coal Mill motor with Mill Gear box. Gear box holding down bolts tightness to be done.
Alignment of Motor with PA Fan. Tightening of Fan bearings are to be done./PA or FD fan bearing replacement work with associated job.
Alignment of Motor with FD Fan. Tightening of Fan bearings are to be done.
Realignment of Hydraulic Cou-pling with Motor & ID Fan includ-ing tightening of Fan bearing bolts
Alignment of Hydraulic Coupling with Motor & ID Fan & if re-quired Hydraulic Coupling is to be shifted / replaced. Tightening of Fan bearing bolts are to be done/Hydraulic coupling servicing
Removal & repositioning of Coal Mill / PA Fan motor
Alignment of Seal Air Fan with Motor
Seal Air Fan bearing replacement with Motor alignment
Mill / PA Fan Coupling replace-ment with Motor alignment
FAN & DAMPER WORK: Servicing of Gas Damper & if re-quired bearing are to be replaced
Servicing of Air Damper & if re-quired bearings are to be re-placed/Feeder radicon gear box servicing
PA / FD Fan RVC adjustment
Repairing & Hard facing of ID Fan runner as per scope of work. Only Hard facing electrodes will be supplied by WBPDCL.
Part repairing & Part hard facing of ID Fan runner. Only hard facing electrode will be supplied by WBPDCL. Scope of work is as per enclosed sheet.
PA Fan Impeller checking
Seal Air Fan / PA Fan balancing
ID Fan runner checking & balanc-ing
COAL BURNER WORK: Rotation of PF Impeller regulating rod
Replacement after repairing of Coal nozzle, Impeller, Impeller regulating rod, Guard plate, PA liner including hard facing in the following areas with ESAB 600B electrode:
Replacement after repairing of Impeller, Impeller regulating rod, Guard plate, PA liner including hard facing like serial no. E/2/b
Replacement / rotation of Coal nozzle, Impeller, Impeller regulating rod, PA liner & repairing, hard facing of Guard plate. 75% of the Guard plate is to be hard faced with 3 – 4 mm heights. (Hard facing electrode will be supplied by WBPDCL)
Hard facing of Coal nozzle - 60” X 8” X 3 - 4 mm at the flange end (Hard facing electrode will be supplied by WBPDCL and hard facing is to be done as per direction of Control Engineer)
Oil burner barrel replacement & associate work
WIND BOX WORK: Part repair of Air Register in situ
OTHER WORK: Greasing of PA Fan / Mill Coupling
Attending PA leakage from flange joint between PA Fan & Mill
Replacement of Mill Gear box oil after thorough cleaning of Gear box internals & its auxiliaries
Seal Air Fan bearing greasing & coupling checking
ID / FD / PA / Mill lub oil strainer cleaning
Replacement of Radicon Gear box
Oil replacement of Hydraulic Coupling & working oil cooler of ID Fan
For cooler leakage testing cooling water line isolation & normalisa-tion.
Replacement of Air seal & cooling water hose of PA Fan
Fabrication & repairing of Feeder Conical chute
ASSOCIATE ENGINEERS
TECHNO ENGINEERING
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .