| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC JOYNAGAR AGARTALA WEST TRIPURA PIN 799001 | AGARTALA | WEST TRIPURA | TRIPURA | 799001 | ₹1.0 Cr | L1 | Accepted-AOC FORMAL |
| 2 | Rejected-Technical VILL BANKUMARI SAHAPARA P O JOGENDRANAGAR AGARTALA TRIPURA PIN 799 004 | AGARTALA | WEST TRIPURA | TRIPURA | 799004 | - | - | Rejected-Technical L2 |
Tender Value
₹1.1 Cr
EMD Value
₹2.1 L
Closing Date
17 Feb 2026, 3:00 pmClosed
O/o the EE, Agt. Divn. No.V, PWD(RandB)
O/o the EE, Agt. Divn. No.V, PWD(RandB)
Improvement of road from Agragati Club to Housing board via Ambedkar High School (L-0.75 Km) in AMC Ward No. 51, 18-Surjamaninagar Assembly Constituency during the year 2025-26
2026_CEPWD_70128_1
129/SE-II/PWD(RandB)/2025-26
Open Tender
Civil Works - Roads
Percentage
180 days
Agartala
Please refer to DNIT
6 documents required · 6 mandatory
₹4,000
₹2.1 L
18 Apr 2026
7 Feb 2026
17 Feb 2026
7 Feb 2026
17 Feb 2026
7 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in Soil with Dozer with lead upto 100 m
Excavation for roadway in soil by mechnical means with Dozer including cutting and pushing the earth to site of embankment up to a distance of 100 mtr (Average lead of 50.00 mtr) ,including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per MoRD Technical Specification Clause 302.3 | - | cum | 81.1 | - |
| 2 | Excavation in Roadway cutting in soil by using manual means for carrying of cut earth to embankment site with all lifts and lead upto 50 m as per MoRD Technical Specification Clause 302.3. | 117 | cum | 214.8 | ₹25,131.6 |
| 3 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per MoRD Technical Specification Clause 301.5. | 618.75 | cum | 346.2 | ₹2,14,211.25 |
| 4 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site , spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per MoRD Technical Specification Clause 303.1. | 253.5 | cum | 233.8 | ₹59,268.3 |
| 5 | Surface Drains
Construction of unlined surface drains of average cross-sectional area 0.40 sqm in ordinary soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3 m and lead of 50 m (average lead 25 m) as per MoRD Technical Specification Clause 307.i) Surface Drains in Ordinary Soil A) Manual Means Surface Drains in Ordinary Soil Manual Means | 40 | mtr | 114.6 | ₹4,584 |
| 6 | Brick on edge soling
Providing and laying brick on edge soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with sand, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. | 60.96 | sqm | 1,034.09 | ₹63,038.13 |
| 7 | Flat brick soling
Providing and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. | 1,365 | sqm | 601.8 | ₹8,21,457 |
| 8 | Brick edging laid in full brick width
Providing and laying brick edging on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412.. | 840 | mtr | 261.01 | ₹2,19,248.4 |
| 9 | Dismentalling of Brick Soling stacking serviceable and un serveciable materials saperately with all lifts and upto a lead of 500 mtr by manual means as per MoRD technical specication cluses 202Required sizes for WBM Grading 2 (63 mm to 0.075 mm) as per MoRD Technical Specification Clause 405. | 71.4 | cum | 859.2 | ₹61,346.88 |
| 10 | Labour charge for Breaking of jhama bats/ jhama bricks/ 1st class bricks. Breaking of jhama bats/ jhama bricks /1st class bricks (including bigger lumps) into metal/chips /aggregates and stacking serviceable materials and unserviceable materials separately as per direction of the Engineer-in-charge with all lifts and upto a lead of 100 m. Required sizes for GSB//WBM Grading 3 (53 mm to 0.075 mm) as per MoRD Technical Specification Clause 405. | 1 | cum | 1,520.1 | ₹1,518.58 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.59 MB
DNIT_SE129.pdf
Tender Documents • 3.97 MB
BOQ_71366.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .