Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.7 LAccepted-AOC | ₹4.7 L | 1 | Accepted-AOC accepted |
| 2 | 2₹4.7 L+₹8,780 (1.89%)Rejected-Finance | ₹4.7 L+₹8,780 (1.89%) | 2 | Rejected-Finance Not lowest |
| 3 | 3₹5.0 L+₹30,700 (6.60%)Rejected-Finance | ₹5.0 L+₹30,700 (6.60%) | 3 | Rejected-Finance Not lowest |
| 4 | 4₹5.2 L+₹57,800 (12.4%)Rejected-Finance 6 KHOTTAPARA LANE KRISHNAGAR NADIA 741101 | KRISHNAGAR | NADIA | WEST BENGAL | 741101 | ₹5.2 L+₹57,800 (12.4%) | 4 | Rejected-Finance Not lowest |
| 5 | 5₹5.9 L+₹1.2 L (26.8%)Rejected-Finance | ₹5.9 L+₹1.2 L (26.8%) | 5 | Rejected-Finance Not lowest |
| Sl No | Description | Qty | Unit | M/S. AJIT KUMAR GHOSH AND SONS L3 | M/s ANJALI CONSTRUCTION L6 | MRINMOY CHATTERJEE L4 | M/s. Karunamoyee Enterprise L1 | ANUJ KUMAR MOULIK L5 | MANAS TARAFDAR L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply of unskilled labour equipped with shovel, hammer, cutter, pickaxe, basket etc necessary for encoarchment removal operation / cutting trees or branches, removal from carriageway, loading of wooden logs into tractor-trailer and unloading at the destination etc.
(Rate for 8 working hours including 1% L.W. Cess & Contractors profit) | 180 | Nos | 950 ₹1,71,000 | 620 ₹1,11,600 | 1,000 ₹1,80,000 | 900 ₹1,62,000 | 600 ₹1,08,000 | 500 ₹90,000 Lowest |
| 2.00 | Supply of JCB or equivalent excavator (0.40 to 0.60 cum bucket capacity with front loader) including wages of operators & helper, cost of fuel & lubricant and all other incidental charges. | 144 | Hours | 1,350 ₹1,94,400 | 1,310 ₹1,88,640 | 1,400 ₹2,01,600 | 1,300 ₹1,87,200 | 1,300 ₹1,87,200 | 1,050 ₹1,51,200 Lowest |
| 3.00 | Hire charges of Tractor - Trailer (90cft / 3.0 Ton capacity) including wages of operator & helper, cost of fuel & lubricant and all other incidental charges etc. | 144 | Hours | 275 ₹39,600 | 1,580 ₹2,27,520 | 300 ₹43,200 | 225 ₹32,400 Lowest | 1,550 ₹2,23,200 | 1,200 ₹1,72,800 |
| 4.00 | Hire & labour charges of Fuel / Electrically operated Chain Shaw machine including cost of fuel & wages of operator and all other incidental charges. | 64 | Hours | 600 ₹38,400 | 280 ₹17,920 | 650 ₹41,600 | 550 ₹35,200 | 250 ₹16,000 | 180 ₹11,520 Lowest |
| 5.00 | Hire & labour charges of Manual Shaw Cutter including wages of operator and all other incidental charges. | 64 | Hours | 400 ₹25,600 | 160 ₹10,240 | 450 ₹28,800 | 350 ₹22,400 | 150 ₹9,600 | 140 ₹8,960 Lowest |
| 6.00 | Mobilization charges to arrange men, machinaries and all incidental factors etc. necessaryfor encoarchment removal operation / cutting of trees or branches, lifting and shifting of wooden logs or any meterial recovered from encoarchment removal operation as and when required. | 18 | Each Operation | 1,500 ₹27,000 | 2,600 ₹46,800 | 1,550 ₹27,900 | 1,450 ₹26,100 Lowest | 2,550 ₹45,900 | 2,200 ₹39,600 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
23 Jun 2026, 2:00 pmClosed
Sanjoy Das, EE
Ashabari House, Krishnagar, Nadia
Mobilization and Supply of men and machineries as and when required including operation of the same in connection with removal of unauthorized encroachments and cutting or trimming and removal of uprooted or broken trees or branches under KHSD I
2026_WBPWD_5015393_1
WBPWD(R)/EE/NHD-I/NIeQ-5/26-27
Open Tender
CIVIL WORKS
Item Rate
365 days
Nadia
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
5 Aug 2026
11 Jun 2026
25 Jun 2026
12 Jun 2026
23 Jun 2026
12 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply of unskilled labour equipped with shovel, hammer, cutter, pickaxe, basket etc necessary for encoarchment removal operation / cutting trees or branches, removal from carriageway, loading of wooden logs into tractor-trailer and unloading at the destination etc.
(Rate for 8 working hours including 1% L.W. Cess & Contractors profit) | 180 | Nos | 100 | ₹18,000 |
| 2 | Supply of JCB or equivalent excavator (0.40 to 0.60 cum bucket capacity with front loader) including wages of operators & helper, cost of fuel & lubricant and all other incidental charges. | 144 | Hours | 100 | ₹14,400 |
| 3 | Hire charges of Tractor - Trailer (90cft / 3.0 Ton capacity) including wages of operator & helper, cost of fuel & lubricant and all other incidental charges etc. | 144 | Hours | 100 | ₹14,400 |
| 4 | Hire & labour charges of Fuel / Electrically operated Chain Shaw machine including cost of fuel & wages of operator and all other incidental charges. | 64 | Hours | 100 | ₹6,400 |
| 5 | Hire & labour charges of Manual Shaw Cutter including wages of operator and all other incidental charges. | 64 | Hours | 100 | ₹6,400 |
| 6 | Mobilization charges to arrange men, machinaries and all incidental factors etc. necessaryfor encoarchment removal operation / cutting of trees or branches, lifting and shifting of wooden logs or any meterial recovered from encoarchment removal operation as and when required. | 18 | Each Operation | 100 | ₹1,800 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
Tendernotice_2.pdf
PDF • 1.21 MB
BOQ_5084165.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .