| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.5 LAccepted-AOC | 1 | Accepted-AOC First lowest accepted | |
| 2 | 2₹5.9 L+₹39,380.35 (7.13%)Accepted-AOC | 2 | Accepted-AOC Second lowest rejected |
Tender Value
₹5.7 L
EMD Value
₹8,600
Closing Date
4 Nov 2022, 4:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer W W Sub Division Kochi 17
Deposit Work Kochi Corporation Supplying and laying 110mm PVC pipe 6KgCm-2 in Padam road 75mm in Padam 2nd Cross road and 63mm PVC in 1st Cross road in division 50 Old of Kochi Corporation.
2022_KWA_517674_1
E-15/2022-23/AEE/WWSDN/CHN/17
Open Tender
Civil Works - Water Works
Percentage
30 days
Padam Road
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,400
₹8,600
23 May 2023
19 Oct 2022
7 Nov 2022
19 Oct 2022
4 Nov 2022
19 Oct 2022
19 Oct 2022 - 4 Nov 2022
Amount
Working Charge
15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete.
100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals.
2.16.1:Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5m
100.9.9:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 110 mm nominal outside diameter pipes.
100.9.6:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 63 mm nominal outside diameter pipes.
100.9.7:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 75 mm nominal outside diameter pipes.
OD86755/2022-2023:Taking connection from 250 mm CI pipe line to newly laid 110 mm PVC Pipe using the specials including cost of materials and labour charges etc complete
OD86819/2022-2023:Shifting existing 63mm pvc pipe tappings of by lane to the newly laid main 110 MM PVC pipe including the cost of all materials, conveyance and labour as per the direction of the departmental officers.
OD86973/2022-2023:Taking connection from the newly laid 110 mm PVC pipe to the newly laid 75 mm PVC pipe including the cost of all materials, conveyance and labour as per the direction of the departmental officers.
OD87103/2022-2023:Shifting the public hydrants/ house connections with 20/25mm PVC pipe from the existing line to the newly laid pipes at different places
100.98.1008:Engaging Coolie.
100.98.1009:Engaging Fitter ( grade 1).
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
Cost of Materials
OD87188/2022-2023:Solvent Cement
100.98.211:Supply of PVC Pipe, 6kg/cm2, 63mm Dia.
100.98.212:Supply of PVC Pipe, 6kg/cm2, 75mm Dia.
100.98.214:Supply of PVC Pipe, 6kg/cm2, 110mm Dia.
INUDAYAN
Bidder Name
INUDAYAN
KUNJUMON P P
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_742767.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .