| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹45.8 LAdmitted-Finance | -33.30% | ₹45.8 L | L1 | Admitted-Finance |
| 2 | L2₹50.9 L+₹5.1 L (11.1%)Admitted-Finance | -25.89% | ₹50.9 L+₹5.1 L (11.1%) | L2 | Admitted-Finance |
| 3 | L3₹54.3 L+₹8.5 L (18.5%)Admitted-Finance | -20.95% | ₹54.3 L+₹8.5 L (18.5%) | L3 | Admitted-Finance |
| 4 | L4₹60.0 L+₹14.2 L (30.9%)Admitted-Finance | -12.66% | ₹60.0 L+₹14.2 L (30.9%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹68.6 L
EMD Value
₹1.4 L
Closing Date
2 Sept 2026, 4:00 pmClosed
Executive Engineer CD-II PDC Kargil
Baroo Kargil
Balance civil work of Reconstruction/ Remodelling of Innundation channel and open lining channel at MHS Haftal covered power channel, Inundation channel, widening and strengthening of Tailrace channel at MHS Haftal
2026_PDNRE_19439_2
CDII/PDC/K/04 of 2026-27.
Open Tender
Civil Works - Others
Percentage
Sani Zanaskar
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Payable To Account Officer PDC Kargil
₹1.4 L
5 Sept 2026
1 Sept 2026
3 Sept 2026
1 Sept 2026
2 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed within a lead of 50 metres | |||||
| 1.01 | All kind of soil | 146.29 | cum | 256.85 | ₹37,574.59 |
| 1.02 | Ordinary Rock | 36.57 | cum | 493.5 | ₹18,047.3 |
| 2Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | |||||
| 2.01 | All kind of soil | 13.22 | cum | 479.3 | ₹6,336.35 |
| 2.02 | Ordinary Rock | 3.3 | cum | 924.8 | ₹3,051.84 |
| 3Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | |||||
| 3.01 | All kind of soil | 6 | cum | 187.3 | ₹1,123.8 |
| 3.02 | Ordinary Rock | 9 | cum | 392.8 | ₹3,535.2 |
| 4 | Dry stone pitching 22.5 cm thick including supply of stones and preparing surface including Grouting of stone pitching using M-10 nominal mix concrete (max. size of aggregates; 20mm nominal) @ 3.65 cum per 100 sq m on horizontal/side slopes; complete including curing. | 1,644.85 | sqm | 913 | ₹15,01,748.05 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
ReNITHaftelnew.pdf
Tender Documents • 0.90 MB
BOQ_46132.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .