| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹9.5 L+₹3.7 L (63.8%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹10 L+₹4.2 L (72.4%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
Closing Date
19 Aug 2021, 2:00 pmClosed
Varghese P O
SM P AND P FACT LTD
Replacement of Damaged Conveyor Belt in NP Plant and Offsite Area, FACT CD.
2021_FACT_641759_1
04096/2021-2022/E23769
Limited
Miscellaneous Works
Item Rate
365 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD) (list CDM106A)
4 documents required · 4 mandatory
₹0
Exempted
21 Sept 2021
4 Aug 2021
20 Aug 2021
4 Aug 2021
19 Aug 2021
4 Aug 2021
Replacement of Damaged Conveyor Belt in NP Plant and Offsite Area, FACT CD.
Replacement of Conveyor Belt of width 750 mm in NP / OS Area. [More than 25 meters] Work involves: The new conveyor belt from CD - store / old usable belt from site shall be transported and unloaded at required site. Damaged old belt shall be removed after arresting the gravity take up. The new belt shall be pulled in, full length or part [ more than 25 meters] and placed properly to suit with site condition. The arrangements like idler / frame dismantling, wooden planks fixing, belt supporting etc. shall be done for splicing / mechanical jointing of conveyor belt. Splicing / jointing of conveyor belt is not in the scope of contractor. The conveyor belt shall be released after the curing of joint / getting clearance. Removed idlers / frames shall be fixed back properly. Trail run of the conveyor belt shall be taken on load, with out any sway. Balance belt roll shall be transported to storage area near offsite. Scrap conveyor belts shall be transported to scrap yard after cutting and rolling the same into smaller bundles as per instructions.
Arrangements for repair / new splice Joint of Conveyor belt 750 mm width in NP / OS Area. [ Up to 25 meters] Work involves: The new conveyor belt from CD - store / old usable belt from site shall be transported and unloaded at required site. Damaged old belt shall be removed after arresting the gravity take up. The new belt shall be pulled in, full length or part [ up to 25 meters] and placed properly to suit with site condition. The arrangements like idler / frame dismantling, wooden planks fixing, belt supporting etc. shall be done for splicing / mechanical jointing of conveyor belt.Splicing / jointing of conveyor belt is not in the scope of contractor. The conveyor belt shall be released after the curing of joint / getting clearance. Removed idlers / frames shall be fixed back properly. Trail run of the conveyor belt shall be taken on load, with out any sway. Scrap conveyor belts shall be transported to scrap yard after cutting and rolling the same into smaller bundles as per instructions.
Replacement of damaged skirt of product conveyors. Work involves: Damaged skirt of product conveyors chute at two sides shall be removed and replaced with new one. Maximum length of skit shall be 15 mtrs. Scrap conveyor belts shall be transported to scrap yard. [ One set means two skirts of one chute.]
BASHEER V P
PAREETH V V
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_675452.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .