Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹31.0 L+₹17,369.46 (0.56%)Rejected-AOC MALAMAKKAVU PO KUBALLUR VIA PALAKKADOT | PALAKKAD | KERALA | 672122 | L2 | Rejected-AOC L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | TK. Rajan L2 | VENUGOPALAN P L1 |
|---|---|---|---|---|---|
| 1.00ROAD concreting | |||||
| 1.00 | 3.2:Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 1,659 | sqm | 16.01 ₹26,560.59 | 14.5 ₹24,055.5 Lowest |
| 1.00 | 4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (i) For Grading I Material | 60.53 | cum | 3,003 ₹1,81,786.61 Lowest | 3,037.4 ₹1,83,869.01 |
| 1.00 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 277.44 | cum | 8,607 ₹23,87,926.08 Lowest | 8,703 ₹24,14,560.32 |
| 1.00 | 3.14:Construction of Subgrade and Earthen Shoulders<br> Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 99.73 | cum | 650.34 ₹64,858.41 | 591.8 ₹59,020.21 Lowest |
| 1.00 | OD329365/2025-2026:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in
position and applying a priming coat of approved steel primer using structural steel etc. as
required.
In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Details of cost for 1 mx1 m framed guard bar grating of 0.218 quintal | 668 | sqm | 187.66 ₹1,25,356.88 | 170 ₹1,13,560 Lowest |
| 1.01 | 10.6:Painting on Steel Surfaces Providing and applying two coats of ready mix paint including primer coat of approved brand on steel surface after through cleaning of surface to give an even shade as per drawing and Technical Specification Clause 1701 | 65.6 | sqm | 202.52 ₹13,285.31 | 184 ₹12,070.4 Lowest |
| 1.01 | OD324777/2025-2026:Providing and fixing of direction and place identification retro-reflectorised sign with 7 years
warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting fixed
over aluminium sheeting, 2 mm thick/ aluminium composite material sheeting 4 mm thick with
area not exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and
supported on GI pipe pole 50mm NB-2 nos confirming to IS 1239 firmly fixed to the ground by
means of properly designed foundation with M 15 grade cement concrete min size 40 cm x 40
cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of
epoxy painting over epoxy primer and as per approved drawing and clause 801 including
lettering symbols etc. (Derived from MoRD spec 10.3.A.2) | 0.9 | sqm | 13,611 ₹12,249.9 | 12,386 ₹11,147.4 Lowest |
| 2.00Retarring | |||||
| 2.00 | OD329478/2025-2026:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials
removed) after supplying a prime coat of hot bitumen using 36mm broken stone and
compacting with power roller to get a compact surface. | 8.44 | cum | 8,036 ₹67,823.84 | 7,558 ₹63,789.52 Lowest |
Tender Value
₹33.9 L
EMD Value
₹50,000
Closing Date
10 Nov 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUBITHA CS
Office of the Assistant Engineer LIDEW Section
LRRP-CMLRRP 2 0 Sl No 4087 Thrithala LAC RADAMMA MEMMORIAL ANAKKARA SIVAKSHETHRAM ROAD IN Anakkara GP Palakkad District
2025_LSGD_815808_18
ET 08/25-26/AE/LSGD/ANK
Open Tender
Civil Works - Roads
Item Rate
180 days
ANAKKARA
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
6 Jan 2026
29 Oct 2025
11 Nov 2025
29 Oct 2025
10 Nov 2025
29 Oct 2025
Amount
ROAD concreting
3.2:Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (i) For Grading I Material
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
3.14:Construction of Subgrade and Earthen Shoulders<br> Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
OD329365/2025-2026:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works Details of cost for 1 mx1 m framed guard bar grating of 0.218 quintal
10.6:Painting on Steel Surfaces Providing and applying two coats of ready mix paint including primer coat of approved brand on steel surface after through cleaning of surface to give an even shade as per drawing and Technical Specification Clause 1701
OD324777/2025-2026:Providing and fixing of direction and place identification retro-reflectorised sign with 7 years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composite material sheeting 4 mm thick with area not exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 50mm NB-2 nos confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 40 cm x 40 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. (Derived from MoRD spec 10.3.A.2)
Retarring
OD329478/2025-2026:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm broken stone and compacting with power roller to get a compact surface.
75.5.2.2pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65)
TK. Rajan (BID ID -2426739)
Bidder Name
TK. Rajan
VENUGOPALAN P
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1367866.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
BOQ_1367866.xls
BOQ • 0.31 MB
nitradhamma.pdf
Tender Documents • 0.03 MB
sbdradhamma.pdf
Tender Documents • 1.76 MB
tenderdocuments.pdf
Tender Documents • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .