Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹20.2 LAccepted-AOC | 1 | Accepted-AOC Agreement executed by him | |
| 2 | 2₹21.4 L+₹1.2 L (5.81%)Rejected-AOC | 2 | Rejected-AOC second lowest |
Tender Value
₹23.1 L
EMD Value
₹50,000
Closing Date
5 Aug 2019, 5:00 pmClosed
Executive Engineer
Office of the Executive Engineer, Sabarimala Development Project, TDB Building, Kumbazha Road, Pathanamthitta
SDP-Pamba-M and M festival in 1195 ME-Disposal of garbages at Pamba-Overhauling and operation of INCINERATOR UNIT-I including supply of spares and labour (Old Incinerator)
2019_TDB_288695_1
SDP/EE/ET-10/2019-20
Open Tender
Civil Works - Others
Item Rate
90 days
Pamba
Refer NIT
6 documents required · 6 mandatory
₹2,800
online
₹50,000
25 Nov 2020
27 Jul 2019
7 Aug 2019
27 Jul 2019
5 Aug 2019
27 Jul 2019
Amount
APPENDIX A Maintenance to the droplet separator by dismantling the unit from the incinerator assembly, and de ashing the same using suitable chemical solution, provide necessary patch work to the rubber lining inside the surface. Re assembling the unit using new high quality gasket, nuts, bolts and painting using heat resistant hammer tone painting .The work includes repairing and cleaning of ‘U’ bend connecting the droplet separator with ID fan consumables.
Maintenance to the ventury scrubber unit by dismantling all the water inlet connections from the unit, cleaning the spray nozzles, inside surface, butter fly control mechanism, thermo well and re assembling the unit using new gaskets, nuts bolts etc. the defective gaskets, nuts bots , . The rate inclusive all taxes cost of consumables etc
Overhauling and Replacing the defective casing- (completely corroded) of the ID fan assembly by new one using MS sheet, ‘C’ Channel, MS flat, angle, etc . The work includes dismantling the impeller, shaft etc from the defective old casing , re conditioning and balancing of impeller, assembling to the newly fabricated casing , labour charges for replacing the bearing , sleeve and servicing of ID fan motor etc. The work also includes providing 2 coats of epoxy painting to the casing and connected parts. assembling , and necessary patch work to the casing and painting . The rate inclusive of all taxes transportation and cost of consumables.
Complete overhauling and repairing of FD fan assembly connected to second incinerator ( right side) by replacing the defective impeller, motor bearings, patch work to the fan casing , re painting etc. The rate is inclusive of transportation charges of fan assembly from nilakkal to ernakulam workshop and back to Nilakkal
Maintenance, repairing and complete overhauling of primary and secondary chamber. The work includes complete dismantling of primary chamber top refractory casting from top plate and providing of 'Y' type anchors inside the surface for strengthening of refractory lining and recasting of top refractory by using insulate castable and firecrete cement, replacing of damaged bricks, recasting of damaged wall casting of both the chambers, The rate is inclusive of painting of secondary and primary chamber with 2 coats of heat resistant aluminium paint.
Dismantling of horizontal refractory lined duct connecting the secondary chamber with ventury scrubber , removing the defective refractory layer form the duct, cleaning and re casting the duct using refractory cement (grade whytete/K). the work also includes providing necessary ‘Y’ type jagers inside the surface for strengthening the refractory lining. The rate inclusive of all taxes cost of consumables , all tools , tackles , like tri-pole for lifting the duct.
Complete dismantling of monobloc burner assembly in primary and secondary chamber, cleaning of electrodes, solenoid valves, blower fans, transformer, burner rod, nozzle, photocell, sight glass, diffuser plate, cone etc., and complete painting of burner assembly. Reassembling and tuning of burner assembly for proper combustion of system. The rate inclusive of all taxes .
Labour charges for checking and necessary repairs of control panel board and related parts of Incinerator ensuring perfect and trouble free operation of all switches, contactors, OLR, MCBs, fuses, sequence controller, temperature controller, RTD, thermocouple, motors, photocell, visual and alarm monitors, limit switches, indication lamps, etc. and cleaning of all terminals using Carbon tetra chloride, painting of panel board
Labour charges for cleaning of fuel day tank, fuel lines, strainers, valves, fuel filter, rectification of leakages to the fuel line valves, fuel pump. Replacement of gland packing, gaskets, oil seal etc; and painting of fuel tank, structural support for fuel tank and venture scrubber using suitable grade enamel paint.
Repairing and maintenance to the damaged grate bar and grates support using 25 mm for steel and ISMB-150x75.The work includes dismantling and removing the entire grate bar assembly, Cleaning the grate bars, re-assembling the same inside the furnace after repairing .The rates inclusive all taxes and transportation charges.
Design , supply, fabrication of MS duct for replacing the defective duct portion between ID fan and chimney and emergency stack from ventury scrubber - duct having 400 mm dia , 4mm thick , with mitter bend flanges, drain point , etc coated with 2 coats of aluminum paint . The rate is inclusive of dismantling of existing duct , transportation charges etc
APPENDIX B- Spare partsThermocouple K Type (For primary chamber)
Thermocouple KER 710 (For secondary chamber)
Nozzle
Roller bearing 2311 K
Sleeve H2312
RTD assembly for ventury outlet
V -Belt B- 97
Hose metallic braided
Fuel Filter 0.5Ltr
Diffuser Plate
Electrode Assembly
Transformer 14.5 KVA
Electrode holder
Contactor 32 A,230 V coil
Contactor 12 A.230 V coil
Contactor 9A.230 Vcoil.
Overload Relay 14-23A
Overload Relay 4.5-6.5A
Overload Relay 1.4-2.3A
1 sqmm, 8 core cable for burner assembly
APPENDIX C Engaging overall Supervisor for 72 days.(1 No./shift for 2 shifts/day ) (1*2*72=144)
Engaging SCAVENGERfor loading of garbages into the incinerator for 72 days (3 Nos/shift for 2 shifts/day) (3*2*72=432)
Engaging SCAVENGER to segregate plastic materials from the garbages for 72 days (5 Nos/shift for 2 shifts/day) (5*2*72=720)
Engaging ELECTRICIAN for 72 days. (1 No./shift for 2 shift/day) (1*2*72=144)
Engaging PUMP OPERATOR for 72 days. (1 No./shift for 2 shift/day) (1*2*72=144)
Engaging MAN MAZDOOR for conveying bio-degradable waste to the compost pit in the forest for 72 days. (2 Nos/shift for 2 shifts/day) (2*2*72=288
Yellow mask
MattyMask
Rubber Gloves 14"
Rubber Gloves 18"
CINZAC ENGINEERS (INDIA) PVT LTD
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_393011.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .