Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹1.9 L
Closing Date
24 Dec 2025, 3:00 pmClosed
Vadodara Division:- Pre and Post tamping track measurement survey using Gedo vorsys trolley system under the jurisdiction of Sr.DEN South BRC.
DRM-BRC-155-OF-2025-26~WR
DRM-BRC-155-OF-2025-26
Open
Works - General
12 Months
Vadodara, Gujarat
₹0
₹1.9 L
24 Dec 2025
6 Dec 2025
10 Dec 2025
A-NS Items for Pre & Post Tamping Track Measurement Survey using Gedo Vorsys Above/
Item Breakup - A-NS Items for Pre & Post Tamping Track Measurement Survey using Gedo Vorsys Trolley system
Pre Tamping Measurements (a)EstabIishments of main GNSS ( DGPS Kilometre Base) Point & refrence point establishment at 150 Pleter maximum interval along the track."
"(b)Pre measurement for tamping with total station & prism Gedo Kilometre trolley measure and store Gauge. Cross elevation, Chainage , shift and lift value at every 3m i.e Every 5th sleeper interval along the track centre line and coordinates of track centre line at every 3m to be submitted with track geometry (per/km/Round)"
"(c )Construct Target/ Designs alignment with the good points of Kilometre existing pre measurment profile in desing software. To export data in ALC format with design alignment of measured reading in M/C and to provide track adjustment file with Ver. extension and also to provide Geo Geometry file to provide text file with slew, uplift and gauge at every 3m i.e every 5th sleeper interval for tamping machine operator during reference."
"Post Tamping Measurements (a)Post Tamping Measurements with Kilometre total station & prism Gedo trolley measure and store Gauge. Cross elevation, Chainage , shift and lift value at every 3m i.e Every 5th sleeper interval along the track centre line and coordinates of track centre line at every 3m to be submitted with track geometry (per/km/Round)"""
Reporting (a)Report & plotting soft and hard copies of slew & uplift Kilometre report at every 3m/ 5m i.e every 5th sleeper interval compared with design Vs pre profile report of offset distance from track entre to OHE, neighbouring track centre & platfrom point." Total 8207725.54
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
DRMBRC155of2025-26C.pdf
ATTACHMENT
Annexure-F.pdf
ATTACHMENT
JPOSTDepartment.pdf
ATTACHMENT
PCECircular88forQualityofWorks.pdf
ATTACHMENT
IRSGCCApril-2022.pdf
ATTACHMENT
AdvancecorrectionslipNo01to10GCCApril2022.pdf
ATTACHMENT
ImplementationofContractore-MB.pdf
ATTACHMENT
Annexure-VIB.pdf
ATTACHMENT
155SpecialCondition.pdf
ATTACHMENT
Dainikkaaryanishpaadananumatipatra.pdf
ATTACHMENT
JPOonJointSurveyandCableRouteMarkingduringexecutionofanydiggingexcavationworkVadodaraDivisionE-6905560.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .