| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.9 LAccepted-AOC OLIYAPPURAM GANDHI ROAD THIRUMARADY GP ERNAKULAM DISTRICT KERALA INDIA | THRISSUR | KERALA | 680667 | L1 | Accepted-AOC l1 | |
| 2 | L2₹21.9 L+₹1.1 L (5.15%)Rejected-Finance ASSISTANT ENGINEER LSGD POOR GRAMA PANCHAYAT KIZHKKOMBEL KOORACHUNDU P O 686634 | KOTTAYAM | KERALA | 686634 | L2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical L3 |
Tender Value
₹23.7 L
EMD Value
₹50,000
Closing Date
12 Jan 2024, 1:00 pmClosed
ASSISTANT ENGINEER
ASSISTANT ENGINEER Office of the Assistant Executive Engineer, LSGD Sub division, Pampakuda Block Panchayat
Strengthening of Compound Wall of SCDO, CDPO and DEO office and other allied works - Pampakkuda BP-2023-24 Pampakuda BP
2024_LSGD_639843_1
01/ET/PKDA/2024
Open Tender
Civil Works - Buildings
Item Rate
180 days
SCDO, CDPO and DEO office
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,500
Yes
₹50,000
Yes
16 Mar 2024
5 Jan 2024
16 Jan 2024
5 Jan 2024
12 Jan 2024
5 Jan 2024
5 Jan 2024 - 12 Jan 2024
Amount
Construction of staircase
OD260909/2023-2024:Engaging Man Coolies
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete
13.1.2:12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand).
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.44.1:Finishing walls with water proofing cement paint of required shade:New work (Two or more coats applied @ 3.84 kg/10 sqm)
OD260900/2023-2024:(Modified 10.25.2) Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
OD265875/2023-2024:Applying SBR latex of approved brand over the prepared surface of roof/open terrace 2 coats after cleaning the surface with wire brush and water jet including all material, labour charges etc complete as per direction of departmental officers at site.
13.9.2:Cement plaster 1:3 ( 1 cement : 3 coarse sand) finished with a floating coat of neat cement.20 mm cement plaster
16.83:Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.
50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
OD265877/2023-2024:Laying old cement concrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of 6mm aggregates, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (Old CC paver blocks shall be supplied by the department free of cost.)
OD265876/2023-2024:Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M - 30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of 6mm aggregates, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge.
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
OD267943/2023-2024:Designing, fabricating,testing and installing Curtain Wall with Aluminium Composite Panel Cladding, with open grooves for linear as well as curvilinear portions of the building , for all heights and all levels etc. including: Providing, fabricating and supplying and fixing panels of aluminium composite panel cladding INCLUDING aluminium base frame work in pan shape in metalic colour of approved shades made out of 3mm thick aluminium composite panel material. The aluminium composite panel cladding sheet shall be coil coated, with Kynar 500based PVDF / Lumiflon based fluoropolymer resin coating of approved colour and shade on face # 1 and polymer (Service) coating on face # 2 as specified using stainless steel screws, nuts, bolts, washers, cleats, weather silicone sealant, backer rods etc.with aluminium composite panel cladding till the handing over of the building for occupation. The Contractor shall provide curtain wall with aluminium composite panel cladding, having all the performance characteristics all complete, as per the Architectural drawings, as per item description, as specified, as per theapproved shop drawings and as directed by the Engineer-in-Charge.However, for the purpose of payment, only the actual area on the external face of the curtain wall with Aluminum Composite Panel Cladding (including width of groove) shall be measured in sqm. up to two decimal places. OD86/21-22 - Modified data 25.7
Information Board
10.3.A.2:Direction and Place Identification signs upto 0.9 sqm size board A. Retro-reflectorised Traffic Signs Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on 2 inch dia GI Pipe firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and Tehnical Specification Clause 1701.
ELDHOSE PHILIP
Mc.Rajan
Bidder Name
SUBI PAUL
Mc.Rajan
ELDHOSE PHILIP
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_975586.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .