Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.0 LAccepted-AOC | 1 | Accepted-AOC L1 Lowest quoted amount | |
| 2 | 2₹4.2 L+₹19,877.54 (4.93%)Rejected-Finance | 2 | Rejected-Finance e payment not submitted |
| Sl No | Description | Qty | Unit | C R VIJAYAN L2 | P K MURALIDHARAN NAIR L1 |
|---|---|---|---|---|---|
| 1.00Annual Maintenance | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 608 | sqm | 18.91 ₹11,497.28 | 18.17 ₹11,047.36 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 289.56 | cum | 267.93 ₹77,581.81 | 257.37 ₹74,524.06 Lowest |
| 1.00 | OD11146/2025-2026:Engaging coolie for removing plastic wastes, derisis etc from the thode | 13 | each | 1,136.28 ₹14,771.64 | 1,081.09 ₹14,054.17 Lowest |
| 1.00 | 60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 11 | cum | 3,115.35 ₹34,268.85 | 2,964.22 ₹32,606.42 Lowest |
| 1.00 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 50.95 | sqm | 881.58 ₹44,916.5 | 838.76 ₹42,734.82 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 10.98 | cum | 9,697.76 ₹1,06,442.61 | 9,226.73 ₹1,01,272.59 Lowest |
| 1.01 | 13.8.1:15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix:1:3 ( 1 Cement : 3 fine sand) | 138.7 | sqm | 554.4 ₹76,895.28 | 528.06 ₹73,241.92 Lowest |
| 1.01 | 13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand) | 15.75 | sqm | 478.58 ₹7,537.64 | 468.75 ₹7,382.81 Lowest |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.5 | cum | 8,998 ₹49,489 | 8,483.44 ₹46,658.92 Lowest |
Tender Value
₹4.0 L
EMD Value
₹10,109
Closing Date
20 Oct 2025, 5:00 pmClosed
Assistant Executive Engineer
Minor Irrigation Sub Division, Mini Civil Station, IInd Floor, Aranmula
GENERAL-MI PTA - Annual Maintenance of Civil Work 2025-26-Annual Maintenance of Aranmula No.2 LI Scheme-General Civil Work
2025_Irrig_808811_1
IRR/IA/TR/1985/2025_5_8_7/1
Open Tender
Civil Works - Others
Item Rate
180 days
Aranmula
Please see the tender documents
7 documents required · 7 mandatory
₹895
Yes
₹10,109
Yes
18 Nov 2025
13 Oct 2025
22 Oct 2025
13 Oct 2025
20 Oct 2025
13 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1349118.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1349118.xls
BOQ • 0.30 MB
viewsbd.pdf
Tender Documents • 1.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .