Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.0 LAccepted-AOC | L1 | Accepted-AOC l1 | |
| 2 | L2₹67.8 L+₹5.8 L (9.34%)Rejected-AOC | L2 | Rejected-AOC l2 | |
| 3 | L3₹68.1 L+₹6.1 L (9.80%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹91.1 L+₹29.0 L (46.8%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹91.5 L+₹29.5 L (47.5%)Rejected-Finance | L5 | Rejected-Finance L5 |
Tender Value
₹76.2 L
EMD Value
₹50,000
Closing Date
10 Apr 2025, 2:00 pmClosed
Executive Engineer
Minor Irrigation Division, 4th Floor,Civil Station, Kakkanad, Ernakulam
Rectification work-Urgent rectification works to Malayattoor No.1 LIS main canal of Neeleeswaram
2025_Irrig_756846_1
EE/MIDVN/EKM/28/ET/2024-25/S Tender
Open Tender
Civil Works - Others
Item Rate
270 days
Malayattoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
17 Jun 2025
29 Mar 2025
11 Apr 2025
29 Mar 2025
10 Apr 2025
29 Mar 2025
Amount
Rectification works of canal
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
C Y Jose (BID ID -2193865)
V. JOY (BID ID -2193907)
AHAMMED FANAS M A (BID ID -2194112)
ABDUL ALTHAF (BID ID -2194238)
Bidder Name
WILSON THOMAS
AHAMMED FANAS M A
ABDUL ALTHAF
C Y Jose
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1229349.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .