Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-AOC | ₹5.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹6.0 LRejected-AOC | ₹6.0 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MUHAMMED SHAFEEQ L1 | Muhammed Shafi vemmully L2 |
|---|---|---|---|---|---|
| 1.00road retarring | |||||
| 1.00 | 5.5.A.1a:Modified Penetration Macadam 50 mm thick using Bitumen S-65 <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 73.04 | sqm | 295.49 ₹21,582.59 | 295.49 ₹21,582.59 |
| 1.00 | 5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. (B) 75 mm thick :- (II) Bitumen (S-65) | 234.55 | sqm | 382.21 ₹89,647.36 | 382.21 ₹89,647.36 |
| 1.00 | 5.2.1a:Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 1,666.5 | sqm | 13.73 ₹22,881.05 | 13.73 ₹22,881.05 |
| 1.00 | 5.11.1.A.2a:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means :- Type A (II) Bitumen (S-65) | 1,666.5 | sqm | 275.36 ₹4.6 L | 280.5 ₹4.7 L |
Tender Value
₹5.9 L
EMD Value
₹14,825
Closing Date
3 Sept 2025, 6:00 pmClosed
SINIMON CH
Office of the Assistant Engineer, LID EW Section, Edappatta Grama Panchayat
Pro No 59/26 Cheriparamb Yatheemkhana Road Maintenance Ward 10
2025_LSGD_791313_1
TN/AE/LSGD/EDP/2/2025-26
Open Tender
Civil Works - Roads
180 days
EDAPPATTA GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,310
Yes
₹14,825
Yes
18 Jun 2026
26 Aug 2025
5 Sept 2025
26 Aug 2025
3 Sept 2025
26 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1304799.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid