Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
6 Nov 2025, 3:00 pmClosed
NITHIN C S
SM (P and P)-CD
Dismantling and fixing-back of pipelines, fittings for choke clearing at NP Plant, FACT CD
2025_FACT_882463_1
4096/2025-2026/E32370
Limited
Miscellaneous Works
Item Rate
365 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD)
4 documents required · 4 mandatory
₹0
₹12,000
Yes
7 Nov 2025
22 Oct 2025
7 Nov 2025
22 Oct 2025
6 Nov 2025
22 Oct 2025
Dismantling and fixing-back of pipelines & fittings for choke clearing at NP Plant, FACT CD.
Dismantling and Fixing back of FUME SCRUBBER RING HEADER & VENTURI SCRUBBER RING HEADER Pipelines & Fittings to Facilitate Choke Clearing in NP Plant A & B streams and Offsite area. Work Involves: Collection of required tools and tackles from workshop / tool crib. Make arrangements for dismantling the pipelines including scaffolding arrangement. Choked pipelines and fittings, such as fume scrubber ring header lines and nozzles, suction and discharge lines of fume scrubber pumps etc., must be dismantled from their respective positions. Dismantling work should only commence after obtaining process clearance. Before dismantling the lines, ensure that each line is properly marked for easy reassembling the lines. After dismantling the lines, take them to the ground level for cleaning. [Cleaning of the pipes shall be NOT in the scope of contractor]. After choke clearing is completed inspect the pipelines for any leaks and after getting process clearance, fix the pipelines back in position with proper/new gaskets and bolts properly tightned. Damaged pipelines shall be replaced with spare pipelines. Service the pipelines without any leak. Dismantling and refixing of valves / control valves in the lines to cleared of chocking is under the scope of this contract.
Dismantling and Fixing back of DRYER SCRUBBER AND COOLER SCRUBBER RING HEADER Pipelines & Fittings to Facilitate Choke Clearing in NP Plant A & B streams and Offsite area. Work Involves: Collection of required tools and tackles from workshop / tool crib. Make arrangements for dismantling the pipelines including scaffolding arrangement. Choked pipelines and fittings, such as the suction and discharge lines of cooler and dryer scrubber pumps, inner and outer ring header lines, and nozzles for cooler and dryer scrubbers etc., must be dismantled from their respective positions. Dismantling work should only commence after obtaining process clearance. Before dismantling the lines, ensure that each line is properly marked for easy reassembling the lines. After dismantling the lines, take them to the ground level for cleaning. [Cleaning of the pipes shall be NOT in the scope of contractor]. After choke clearing is completed inspect the pipelines for any leaks and after getting process clearance, fix the pipelines back in position with proper/new gaskets and bolts properly tightned. Damaged pipelines shall be replaced with spare pipelines. Service the pipelines without any leak. Dismantling and refixing of valves / control valves in the lines to cleared of chocking is under the scope of this contract.
Dismantling and Fixing back of OLD PAP AND NEW PAP ACID Pipelines & Fittings to Facilitate Choke Clearing in NP Plant A & B streams and Offsite area. Work Involves: Collection of required tools and tackles from workshop / tool crib. Make arrangements for dismantling the pipelines including scaffolding arrangement. Choked pipelines and fittings, such old and new phosphoric acid lines from PAP (NP area only) to day tanks, PAT lines, etc., must be dismantled from their respective positions. Dismantling work should only commence after obtaining process clearance. Before dismantling the lines, ensure that each line is properly marked for easy reassembling the lines. After dismantling the lines, take them to the ground level for cleaning. [Cleaning of the pipes shall be NOT in the scope of contractor]. After choke clearing is completed inspect the pipelines for any leaks and after getting process clearance, fix the pipelines back in position with proper/new gaskets and bolts properly tightned. Damaged pipelines shall be replaced with spare pipelines. Service the pipelines without any leak. Dismantling and refixing of valves / control valves in the lines to cleared of chocking is under the scope of this contract.
Dismantling and Fixing back of Pipelines & Fittings to Facilitate Choke Clearing in NP Plant A & B streams and Offsite area. Work Involves: Collection of required tools and tackles from workshop / tool crib. Make arrangements for dismantling the pipelines including scaffolding arrangement. Choked pipelines and fittings, such as both KO chambers ring header line and nozzles ,split box to reactor line,etc must be dismantled from their respective positions. Dismantling work should only commence after obtaining process clearance. Before dismantling the lines, ensure that each line is properly marked for easy reassembling the lines. After dismantling the lines, take them to the ground level for cleaning. [Cleaning of the pipes shall be NOT in the scope of contractor]. After choke clearing is completed inspect the pipelines for any leaks and after getting process clearance, fix the pipelines back in position with proper/new gaskets and bolts properly tightned. Damaged pipelines shall be replaced with spare pipelines. Service the pipelines without any leak. Dismantling and refixing of valves / control valves in the lines to cleared of chocking is under the scope of this contract.
PAREETH V V (BID ID -3312767)
AYYAPPANKUTTY M M (BID ID -3311528)
finance_927519.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BOQ_927519.xls
BOQ • 0.24 MB
Compliance.pdf
Tender Documents • 0.09 MB
SpecialConditions.pdf
Tender Documents • 0.09 MB
Tenderdocuments.pdf
Tender Documents • 1.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .