Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance ROOMPUR | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-Hard Copy Not Submitted |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-Hard Copy Not Submitted |
Tender Value
Refer Docs
EMD Value
₹2.6 L
Closing Date
14 Sept 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE 3rd Circle PWD Pithoragarh
SE 3rd Circle PWD Pithoragarh
Renewal work by SDBC in Lohaghat Barakot Simalkhet Kaflikhan Bhanauli motor road in km. 5 to 12 under Annual Maintenance 2022-23.
2022_pwd_48649_1
5387/208C-03/2022 Dated 17-08-2022
Open Tender
Civil Works - Roads
Item Rate
90 days
Lohaghat
As per Bid Documents
3 documents required · 3 mandatory
₹4,720
EE CD PWD Lohaghat
₹2.6 L
14 Sept 2022
30 Aug 2022
14 Sept 2022
31 Aug 2022
14 Sept 2022
31 Aug 2022
Amount
Civil work
WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes towater bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
Bituminous Macadam Providing and laying bituminous macadam with hot mix plant using crushedaggregates of grading as per Table 500.4 premixed with bituminous binder,transported to site upto a lead of 1000 m laid over a previously prepared surfacewith paver finisher to the required grade, level and alignment and rolled to achievethe desired compaction as per Technical Specification Clause 504.(Bitumen VG-10 @ 3.3% of the weight of mix has been used for analysis purpose.The choice of bitumen will depend upon the prevailing site conditions and shall bein accordance with Clause 504 of (MORD)with Bitumen VG-10)
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsiondistributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungrybituminous surface cleaned with Hydraulic broom as perTechnical SpecificationClause 503.
Providing and laying Semi Dense Bituminous Concrete with 100-120 TPHbatch type HMP producing an average output of 75 tonnes per hour usingcrushed aggregates of specified grading, premixed with bituminous binder @ 4.5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, leveland alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No.508 complete in all respects(Grading II - 10mm using VG - 10 bitumen)
Maintenance of Earthen Shoulder (strip soil) (Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.)
Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping,regrading, deepening of side drains as well as catch water drains as per technicalspecification Clause 1907.
Providing and laying of hot applied thermoplastic compound of ISI MarkApproved Quality of 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, as per IRC:35 .The finished surface to belevel,uniform and free from streaks and holes.and technical specificationsClause 802, 803, 1202 & 1203 of MORD Specifiction
Excavation in foundation for retaining & brest walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer - in - charge
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhand specifications)
Random rubble stone masonary laid in dry by locally available approved stone in retaining walls ,breast walls etc including supply of all material, labour, T&P etc required for proper completion of the work as per detailed P.W.D specifications and as directed by Engineer in Charge and as per prescribed drawings .
Hand packed stone filling in the back of retaining walls by locally available approved stone including supply of all material ,labour T&P etc.
Providing concrete for plain/ reinforced concrete in open foundations clause 802, 803, 1202 & 1203 PCC 1:2:4
stage.html
html • 0.02 MB
finance_57975.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .