Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAccepted-Finance | ₹9.7 L | L1 | Accepted-Finance ACCEPT |
| 2 | L2₹10.9 L+₹1.2 L (12.4%)Accepted-Finance | ₹10.9 L+₹1.2 L (12.4%) | L2 | Accepted-Finance ACCEPT |
| 3 | L3₹16.6 L+₹7.0 L (72.3%)Accepted-Finance | ₹16.6 L+₹7.0 L (72.3%) | L3 | Accepted-Finance ACCEPT |
| 4 | L4₹16.9 L+₹7.3 L (75.1%)Accepted-Finance | ₹16.9 L+₹7.3 L (75.1%) | L4 | Accepted-Finance ACCEPT |
| 5 | L5₹17.1 L+₹7.4 L (77.1%)Accepted-Finance | ₹17.1 L+₹7.4 L (77.1%) | L5 | Accepted-Finance ACCEPT |
Tender Value
₹17.3 L
EMD Value
₹34,540
Closing Date
20 Jul 2026, 4:00 pmClosed
Executive Engineer I and FC Divsion Nowshera
Executive Engineer I and FC Divsion Nowshera
Upgradation of Rajal Way ofConstruction R/Wall and Breast Wallat RD 3600 m RD 3710 m RCC iningfrom RD 4800 to 5100 m Construction of Damaged Channel WallsProtection Walls at RD 5800 m RD 7000 m Rd 8900 m RD 9800m RD 11950 m RD 12300 m And
2026_IFC_315861_2
e-NIT NO. 10 OF 2026-27
Open Tender
Civil Works
Percentage
75 days
Rajal
As per e-NIT
4 documents required · 4 mandatory
₹1,200
Executive Engineer I and FC Divsion Nowshera
₹34,540
22 Jul 2026
14 Jul 2026
21 Jul 2026
14 Jul 2026
20 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engaging labour for site clearance,silt/slip clearance etc. | 96 | days | 553 | ₹53,088 |
| 2 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:
In cement mortar | 28.54 | cum | 1,740.45 | ₹49,672.44 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 89.65 | cum | 5,733.6 | ₹5,14,017.24 |
| 4 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge:
1:3:6 or richer mix (i/c equivalent design mix) | 1.14 | cum | 1,725.2 | ₹1,966.73 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 5.25 | cum | 6,591.25 | ₹34,604.06 |
| 6 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in
depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth
lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil : | 30.87 | cum | 592.9 | ₹18,302.82 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:(1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 15.24 | cum | 5,202.9 | ₹79,292.2 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level
1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 33.81 | cum | 7,788.4 | ₹2,63,325.8 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Foundations, footings, bases for columns | 452.5 | sqm | 286.35 | ₹1,29,573.38 |
| 10 | Providing and laying in position specified grade of reinforced cement concrete includingcuring but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 4.84 | cum | 7,104.35 | ₹34,385.05 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_1026579.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .