Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | ₹2.8 L Quoted ₹3.3 L | L1 | Accepted-AOC AOC |
| 2 | L2₹3.5 LRejected-Finance | ₹3.5 L | L2 | Rejected-Finance Rejected |
| 3 | L3₹3.7 LRejected-Finance | ₹3.7 L | L3 | Rejected-Finance Rejected |
| 4 | Not Admitted-Fee/PreQual/Technical CONTRACTOR WARD NO 10 DEVINAGAR PAONTA SAHIB DISTRICT SIRMOUR H P | SIRMAUR | HIMACHAL PRADESH | 173001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Himalaya Enterprises L2 | Noor Hassan L3 | Zahid Hasan L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches etc. in earth work in all kinds of soil such as pick work, jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the excavated soil not more than 3mtr. Clear from the edge of excavation and then returning the stacked soil in consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated earth as directed with in all leads lifts and as per directions of the Engineer in charge. | 17.44 | P/Cum | 555 ₹9,679.20 | 550 ₹9,592 | 570 ₹9,940.80 |
| 2.00 | Providing and laying cement concrete 1:4:8(1cement:4 sand:8 graded stone agg.40mm nominal size) and curing complete excluding cost of form work in foundation and plinth including all leads lifts and carriage of material at site & as per direction directed of the Engineer in charge. | 5.82 | P/Cum | 7,500 ₹43,650 | 7,500 ₹43,650 | 7,000 ₹40,740 |
| 3.00Providing form work with steel sheets 3.15 mm thick welded with angle iron 30x30x5mm so as to give rough finish i.c centering, shuttering and propping etc. with wooden battens & bellies height of propping and centering below supporting floor to ceiling not exceeding 4mtrs. and removal of the same for insitu RCC work and PCC work i.c all leads, lifts complete in all respect and as per direction of the Engineer in charge. | ||||||
| 3.01 | In Foundation and Plinth | 3.78 | P/Sqm | 250 ₹945 | 250 ₹945 | 270 ₹1,020.60 |
| 3.02 | Flat surface such as soffits and suspended floors roofs landing and the like floors etc. upto 200 mm in thickness. | 15.1 | P/Sqm | 600 ₹9,060 | 600 ₹9,060 | 560 ₹8,456 |
| 3.03 | Vertical surface such as wall (any Thickness) partition and the like including attached pilaster ,buttresses, string courses and the like. | 48.72 | P/Sqm | 450 ₹21,924 | 575 ₹28,014 | 400 ₹19,488 |
| 3.04 | Edges of Slab | 53.42 | P/Sqm | 165 ₹8,814.30 | 165 ₹8,814.30 | 150 ₹8,013 |
| 4.00Providing and laying cement concrete work 1:1-1/2:3 (1cement: 1-1/2 sand:3 graded stone agg.20mm nominal size & curing complete) excluding cost of form work and reinforcement for concrete work in walls any thickness) attached pilaster, buttresses, beam, girders and cantilever upto floor two level as per direction of Engineer in charge. | ||||||
| 4.01 | Buse | 5.02 | P/Cum | 11,500 ₹57,730 | 12,500 ₹62,750 | 11,000 ₹55,220 |
| 4.02 | Walls | 7.66 | P/Cum | 12,000 ₹91,920 | 12,600 ₹96,516 | 11,500 ₹88,090 |
Tender Value
₹2.9 L
EMD Value
₹5,710
Closing Date
6 Oct 2025, 10:00 amClosed
Executive Engineer
Jal Shakti Division PaontaSahib
C/O 02 Nos RCC Storage Tank 15000 Ltrs. Cap.at Pinja Basti and Pradhan Basti in GP Palhori
2025_HPIPH_116021_1
PNT-SMR02-720 No.13140-13239 dated 25.09.2025
Open Tender
Civil Works
90 days
Khairni
Please refer to Tender documents
7 documents required · 7 mandatory
₹500
EE JSV PaontaSahib
₹5,710
7 Mar 2026
26 Sept 2025
6 Oct 2025
26 Sept 2025
6 Oct 2025
26 Sept 2025
26 Sept 2025 - 6 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid