Loading…
Loading…
| # | Company | Amount |
|---|---|---|
| 1 | ₹8.2 Cr | ₹8.2 Cr |
| 2 | ₹9.9 Cr | ₹9.9 Cr |
| 3 | ₹10.4 Cr | ₹10.4 Cr |
| 4 | ₹11.3 Cr | ₹11.3 Cr |
| Sl No | Description | Qty | Unit | M S Constructions-MS | ANANDI BUILDERS-Prateek Kumar | mohan poddar-mohan | Raipur Construction Pvt. Ltd.-Mohammad |
|---|---|---|---|---|---|---|---|
| 1 | Detailed survey of existing road including chaining, leveling, with cross section at 25.0 m intervals and closing survey each day's work, fixing of bench marks, painting, taking trialpits and submission of road cross sections, L-sections, quantity statements and details of all cross drainage works in computerized prints in five copies in proper files and all type of compliance required by the Engineer-in-charge. | 1.7 | Kilometer | 17,110 ₹29,087 | 7,000 ₹11,900 Lowest | 18,500 ₹31,450 | 17,110 ₹29,087 |
| 2 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned including all leads and lifts removal and disposal of top organic soil not exceeding 150 mm in thickness if required and as per relevant clauses of section- 200. (A)In area of Light Jungle | 3.36 | Hectare | 72,278.54 ₹2,42,855.89 | 5,200 ₹17,472 | 72,278.54 ₹2,42,855.89 | 1 ₹3.36 Lowest |
| 3 | Excavation in Soil (by Mechanical Means.)
Excavation for roadway in soil using mechanical means including loading in tipper for carrying of cut earth to embankment site and unloading with all leads and lifts as per relevant clauses of section 300. | 27,096.3 | Meter | 121.54 ₹32,93,284.3 | 25 ₹6,77,407.5 | 121.54 ₹32,93,284.3 | 1 ₹27,096.3 Lowest |
| 4 | Construction of embankment with Material Obtained from Borrow Pits/Borrow Area (Construction of embankment with approved material/ selected soil having C.B.R.>5 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2). | 16,652.85 | Cubic meter | 280.84 ₹46,76,786.39 | 106 ₹17,65,202.1 | 380 ₹63,28,083 | 1 ₹16,652.85 Lowest |
| 5 | Construction of Sub Grade with Material Obtained from Borrow Pits/Borrow Area (Construction of sub-grade with approved material/selected soil having C.B.R.>8 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2). | 13,548.15 | Cubic meter | 316.24 ₹42,84,466.96 | 250 ₹33,87,037.5 | 360 ₹48,77,334 | 1 ₹13,548.15 Lowest |
| 6 | Granular Sub-base as per Table:- 400-1 Construction of granular sub-base by providing graded Material, , carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface watering, rolling and compacting with vibratory power roller at OMC to achieve the desired density, complete as per clause 401A) Plant mix method (with Mechanically crushed stone only) (a) for Sub-base cum dranage layer or upper sub base with
(i) Grading –III Material. | 3,984.12 | Cubic meter | 1,850.24 ₹73,71,578.19 | 1,870 ₹74,50,304.4 | 1,950 ₹77,69,034 | 1 ₹3,984.12 Lowest |
| 7 | Granular Sub-base as per Table:- 400-1
Construction of granular sub-base by providing graded Material, , carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface watering, rolling and compacting with vibratory power roller at OMC to achieve the desired density, complete as per clause 401
A)Plant mix method (with Mechanically stone only)
(a) for Sub-base cum dranage layer or upper sub base with
(ii) Grading IV Material | 3,823.47 | Cubic meter | 2,394.56 ₹91,55,528.32 | 1,870 ₹71,49,888.9 | 1,950 ₹74,55,766.5 | 1 ₹3,823.47 Lowest |
| 8 | Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, as per clause 406. | 3,480.75 | Cubic meter | 1,895.08 ₹65,96,299.71 | 1,870 ₹65,09,002.5 | 1,895.8 ₹65,98,805.85 | 1 ₹3,480.75 Lowest |
| 9 | Construction of Shoulders (Construction of shoulders with selected soil from borrow pits / borrow areas having CBR not less than 12 and shall have L.L. and P.I. not more than 25% and 6% respectively, inclusive of all leads and lifts, including clearing and scrapping of existing surface, providing required cross fall, compacting, watering rolling and royalty charges etc. complete as per clause 408
A) With vibratory roller. | 1,173.82 | Cubic meter | 385.86 ₹4,52,930.19 | 304 ₹3,56,841.28 | 385.86 ₹4,52,930.19 | 1 ₹1,173.82 Lowest |
| 10 | Prime coat (Providing and applying primer coat with Bitumine emulsion (SS-1, grade confirming to IS.8887) on prepared surface of granular Base including clearing of road surface and spraying primer using mechanical means as per clause 502.
(i) on WBM/WMM surface @ 0.85 Kg/Sqm. | 13,387.5 | Square meter | 90.86 ₹12,16,388.25 | 52 ₹6,96,150 | 90.86 ₹12,16,388.25 | 1 ₹13,387.5 Lowest |
Tender Value
₹10.2 Cr
EMD Value
₹10.2 L
Closing Date
24 Apr 2026, 5:00 pmClosed
MR HEMRAM VERMA(DFLT)
TECHNICAL SECTION - I
“Infrastructure development works i/c roads, drainage, culverts, water supply system & street light for Proposed New Industrial area/ Food Park area at Village- Bartori, Tehsil- Bilha, District- Bilaspur (C.G.)”
188625
01 /CSIDC/E.E./Division-I/2026-27, Raipur, Dated: 08/04/2026
RESTRICTED TENDER
WORKS
ITEM RATE
9 days
TECHNICAL SECTION - I
Required Past Technical Experience: AS PER NIT
Required Financial Turnover (in INR): AS PER NIT
Required Bid Capacity (in INR): AS PER NIT
7 documents required · 7 mandatory
Chhattisgarh State Industrial Development Corporation (CSIDC)
WORKS
MR HEMRAM VERMA(DFLT)
RESTRICTED TENDER
ITEM RATE
A
TECHNICAL SECTION - I
TENDER SECTION
CHHATTISGARH STATE INDUSTRIAL DEVELOPMENT CORPORATION (CSIDC)
120
09
No
212
188625
24 Apr, 2026 5:00:00 PM IST
29 Apr, 2026 12:00:00 PM IST
8 Apr, 2026 5:00:01 PM IST
01 /CSIDC/E.E./Division-I/2026-27, Raipur, Dated: 08/04/2026
“Infrastructure development works i/c roads, drainage, culverts, water supply system & street light for Proposed New Industrial area/ Food Park area at Village- Bartori, Tehsil- Bilha, District- Bilaspur (C.G.)”
1019000.00 INR
Fixed Deposit Receipt (OFFLINE)
101900000.00
2
28 Apr, 2026 5:00:00 PM IST
101900000
AS PER NIT
AS PER NIT
AS PER NIT
0.00 INR
7 documents required · 7 mandatory
₹0
₹10.2 L
24 Apr 2026
8 Apr 2026
29 Apr 2026
8 Apr 2026
28 Apr 2026
boq_comp_chart.xls
BOQ Comparative Chart • 0.21 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 1.10 MB
7833388948963061796_188625_NIT for New work.zip
NIT • 12.90 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .