Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC | L1 | Accepted-AOC Please see the AOC uploaded | |
| 2 | L2₹3.2 L+₹17,678.90 (5.82%)Rejected-AOC | L2 | Rejected-AOC Please see the AOC uploaded | |
| 3 | L3₹3.4 L+₹32,813.69 (10.8%)Rejected-AOC | L3 | Rejected-AOC Please see the AOC uploaded | |
| 4 | L4₹3.6 L+₹55,293.80 (18.2%)Rejected-AOC D NO 50 117 17 9 7 ASR NAGAR SEETHAMMADHARA VISAKHAPATNAM 530 013 | VISAKHAPATANAM | ANDHRA PRADESH | 530013 | L4 | Rejected-AOC Please see the AOC uploaded | |
| 5 | Rejected-Technical | - | Rejected-Technical Please see Summary of technical evaluation |
Tender Value
₹3.4 L
EMD Value
₹6,900
Closing Date
26 Sept 2020, 3:00 pmClosed
Director of Lighthouses and Lightships, Visakhapat
DEEP BHAVAN, PORT RESIDENTIAL AREA, SALIGRAMPURAM, Visakhapatnam - 530 024
Construction of outdoor Badminton Court with Synthetic Rubber flooring at Deep Bhavan, Visakhapatnam.
2020_DGLL_579331_1
VSP/V(25)/2017/D and W-IX (Deep Bhavan Badminton)
Open Tender
Civil Works
Works
30 days
DEEP BHAVAN, PORT RESIDENTIAL AREA, SALIGRAMPURAM
Tender Fee, EMD etc.
8 documents required · 8 mandatory
₹500
Director of Lighthouses and Lightships
₹6,900
DEEP BHAVAN, PORT RESIDENTIAL AREA, SALIGRAMPURAM,
28 Nov 2020
25 Aug 2020
28 Sept 2020
25 Aug 2020
26 Sept 2020
25 Aug 2020
25 Aug 2020 - 10 Sept 2020
10 Sept 2020
Amount
Supply and installation of Synthetic rubber flooring (SBR/EPDM) for 0utdoor badminton court : Providing and supply of Synthetic Rubber Flooring (SBR/EPDM) of 15mm thick, 100% natural Rubber Flooring, 100% Hygienic & safer for children, Should be long life, Resistance to abrasion, slipping, indentation & ignition and no hidden hazards, no joints for vandals to crack for Badminton Court of size 7.0m x 15.0m and size of SBR green tiles 480mmx480mmx15mm of approved brand, pattern,colour and weight not less than 3.2 Kgs/tile including the cost of all materials, labour, transportation, loading & unloading etc. complete.
Installation of Synthetic Rubber Flooring (SBR/EPDM) of 15mm thick, 100% natural Rubber Flooring for Badminton Court all as per standard specifications and as directed at site including the cost of all labour, materials, tools & plants and all other charges etc. complete.
Line Marking Charges (As per specifications) including the cost of all labours, materials, tools & plants and all other charges etc. complete.
Civil work for preparation of basement etc to Badmintion Court of size 7.20m x 15.20m : - Providing and laying 125mm thick stone boulders layer by excavating the area of existing G.L. upto 75mm depth in all kinds of soil, as directed and dressing the sides, ramming the bottom surface including the levels of ups & downs, compaction, curing before placing the stone boulders including the cost of all materials, labours, tools & plants, and also fill the interstices with gravel, compaction, curing and all other charges etc. complete as per specifications, drawing and directed at site.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m for All kinds of soil all as directed and as standard specifications including cost of all labour, tools & plants, safety and other charges etc. complete.
Providing and laying in position 50mm thick cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) all as directed and as standard specifications including cost of all labour,material,machine mixture, vibrator, curing, tools & plants, safety and other charges etc. complete.
Providing Half brick masonry of height 15cm above ground level with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations and plinth in Cement mortar 1:3 (1 cement : 3 coarse sand) all as directed and as standard specifications including cost of all labour, materials, curing, tools & plants, safety and other charges etc. complete.
Providing 12 mm cement plaster finished with a floating coat of neat cement of CM : 1:3 (1 cement: 3 fine sand) all as directed and as standard specifications including cost of all labour,materials, curing, tools & plants and other charges etc. complete.
Providing & laying 75mm thick plain cement concrete 1:2:4 (1cement , 2coarse sand and 4graded stone aggregate 20mm nominal site) as directed and as per standard specifications including the cost of materials, labour charges, mechanical mixing, compaction, centering & shuttering, curing and all other charges etc complete
Removal of 4no GI poles & 1no children balancing swivel including base concrete. Carrying & re-fixing the same with base concrete 1:2:4 of size 0.50x0.50x0.60 as directed in the premises of Deep Bhavan including earth work excavation in all types of soil including rock and cost of all material, labour charges, mechanical, vibration, centering & shuttering, tools & plants, and all other charges etc. complete.
PUSHPA MECHANICAL & CIVIL WORKS
NIKESH ENTERPRISES
ASR CONSTRUCTIONS
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .